Annual Report to shareholders
Released
Released
Announcement PDF
Contents
CORPORATE DIRECTORY
3
CHAIRMAN’S LETTER
4
REVIEW OF OPERATIONS
6
ANNUAL MINERAL RESOURCE AND ORE RESERVES STATEMENT
19
DIRECTORS’ REPORT
22
AUDITOR’S INDEPENDENCE DECLARATION
39
FINANCIAL REPORT
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
41
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
42
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
43
CONSOLIDATED STATEMENT OF CASH FLOWS
44
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
45
CONSOLIDATED ENTITY DISCLOSURE STATEMENT
77
DIRECTORS’ DECLARATION
78
INDEPENDENT AUDITOR’S REPORT
79
ASX INFORMATION
83
SCHEDULE OF MINERAL TENEMENTS
89
Corporate Directory
Tesoro Gold Ltd is an Australian listed company focused on the acquisition,
exploration and development of commercially significant resource projects in
Chile, with a focus on gold. For more details visit www.tesorogold.com.au.
DIRECTORS
Mr Mark Connelly
(Non-Executive Chairman)
Mr Zeffron Reeves
(Managing Director)
Mr Linton Putland
(Executive Director – Mining and
Development)
Mr Geoffrey McNamara
(Non-Executive Director)
Mr Alan Gibson
(Non-Executive Director)
COMPANY SECRETARY
Ms Sue Wong
REGISTERED OFFICE
c/- Source Services
Level 39 Central Park
152 – 158 St Georges Terrace
PERTH WA 6000
Telephone: (08) 6383 7883
PRINCIPAL PLACE OF
BUSINESS
Level 39 Central Park
152 – 158 St Georges Terrace
PERTH WA 6000
SHARE REGISTRY
Automic Pty Ltd
Level 5
191 St Georges Terrace
PERTH WA 6000
GPO Box 5193,
SYDNEY, NSW 2000
Telephone: 1300 288 664 (within Australia)
Email: hello@automic.com.au
SECURITIES EXCHANGE
LISTING
TESORO GOLD LIMITED
Australian Securities Exchange Limited and
OTC Markets Group
(Home Exchange: PERTH, Western Australia)
Code: ASX:
TSO, TSOO, TSOOA
OTCQB: TSORF
AUDITOR
RSM Australia Partners
Level 32 Exchange Tower
2 The Esplanade
PERTH WA 6000
WEBSITE
www.tesorogold.com.au
|3
CHAIRMAN’S LETTER
Dear Shareholders,
It is with great pleasure that I address you as the new Independent Non-Executive Chair of Tesoro Gold Ltd
(Tesoro, or the Company), having assumed this role on 3 June 2024. I am honoured to have joined the
Company at such an exciting time in its journey and am enthusiastic about the exploration and
advancement opportunities that lie ahead. The past year has been marked by significant milestones as
we continue our exploration efforts at the El Zorro Gold Project in Chile (El Zorro, the Project), setting the
stage for future growth and value creation.
I was attracted to Tesoro by its impressive geological setting, fantastic location, and experienced
leadership and in-country team. Located in the highly prospective Coastal Cordillera region of Chile, our
Project is strategically positioned 140 km from Copiapó and approximately 800 km north of Santiago,
benefiting from well-established infrastructure. The existing Ternera Mineral Resource Estimate and starter
pit scoping study, completed in April 2023, during a substantially lower gold price environment, confirm the
technical and financial robustness of a gold mining and processing operation at the Project, and this is just
the beginning.
During the financial year, our exploration activities have successfully identified multiple large new
outcropping gold anomalies, particularly at the Ternera South, Drone Hill, and Ternera East targets. The
results from these areas have been highly encouraging, with significant gold mineralisation identified across
various locations, suggesting the potential for substantial extensions and uplifts to our existing resource
base.
This year has also seen important corporate developments. The appointment of Mr Alan Gibson as NonExecutive Director brings valuable expertise to the Board, particularly in the areas of corporate
development and M&A. I would also like to welcome Mr Graeme Morissey as our new Chief Financial
Officer, whose extensive experience in the mining sector will be instrumental as we continue to grow.
Furthermore, the appointment of Ms Sue Wong as Company Secretary ensures that we maintain the
highest standards of corporate governance as we move forward.
As we look ahead, our strategic focus remains on unlocking the full potential of the El Zorro Gold Project.
We are committed to advancing our exploration activities, expanding our resource base, and progressing
towards the development of a world-class gold mining operation. The signing of a Memorandum of
Understanding with Aguas CAP for the potential supply of water to El Zorro, marks an important step in
ensuring the sustainability and viability of the Project.
At Tesoro, we are deeply committed to upholding the highest environmental, social, and governance
standards. Our exploration and development activities are conducted with a strong emphasis on
sustainability, and we continue to engage with local communities to ensure that our activities bring positive
benefits to the region.
In closing, I would like to extend my sincere thanks to our Shareholders for their continued support and
confidence in Tesoro. The progress we have made this year would not have been possible without the
dedication and hard work of our team, and I am confident that, together, we will continue to drive the
Company towards long-term success.
I look forward to sharing our continued progress with you in the year ahead.
Yours faithfully,
Mark Connelly
Independent Non-Executive Chair
Tesoro Gold Ltd
TESORO GOLD LIMITED
|4
REVIEW OF
OPERATIONS
TESORO GOLD LIMITED
|5
REVIEW OF OPERATIONS
Overview
Tesoro is focused on exploration and development of the El Zorro Gold Project (El Zorro or the Project) in
the Coastal Cordillera region of Chile. El Zorro is proximate to well established infrastructure and is 140 km
from the city of Copiapo and approximately 800 km north of the Chilean capital, Santiago (refer Figure 1).
Successful exploration at the Project has resulted in the definition of the 1.46 Moz Au Ternera Gold Deposit
(Ternera or the Deposit) Mineral Resource Estimate (MRE) (refer Table 1). The combination of highly
prospective geology and positive results from regional exploration have confirmed El Zorro as a new
Chilean gold district.
Ternera was the subject of a Phase 1 Scoping Study (refer ASX Announcement 4 April 2023) (Scoping Study)
which demonstrated the potential development of a gold mining and processing operation. The Scoping
Study considered an initial development of a Phase 1 open pit mining operation on the upper 200 m of the
Deposit to feed a 2.4 Mtpa gold processing plant. Key outcomes highlighted the ability of the Deposit to
support the estimated capital required for the development of the Project at a scale that would result in
an annual average gold production of between 90 and 100-Koz per annum (refer Table 2).
During the financial year ended 30 June 2024 (FY2024 or the Financial Year), the Company further
increased its ownership in El Zorro (refer ASX Announcement 3 July 2023) and successfully delineated
multiple new large outcropping gold anomalies.
Figure 1: Location map for the El Zorro Gold Project showing proximity to major mining projects, existing infrastructure
and population centres.
TESORO GOLD LIMITED
|6
Figure 2: Ternera long section looking west. Block Model of indicated and inferred resources only, showing extensions
to the south outside of existing MRE (Ternera South) (refer ASX Announcements: 1 May 2023, 17 January 2023 and
8 November 2022).
Figure 3: Ternera long section looking north. Block Model of indicated and inferred resources only, showing extensions
to the east outside of existing MRE (Ternera East) (refer ASX Announcement 2 July 2024).
TESORO GOLD LIMITED
|7
Table 1 - Constrained Ternera MRE.
Area
Open Pit
Resource
Underground
Resource
Total Resources
Au g/t
cut off
Mt
Indicated
Au g/t
Koz
Mt
Inferred
Au g/t Koz
0.30
22.5
1.10
1.50
0.1
22.6
Mt
Total
Au g/t
Koz
795
10.0
1.18
379
32.5
1.13
1,175
2.64
7
1.2
2.64
100
1.3
2.64
107
1.11
802
11.2
1.34
479
33.7
1.18
1,282
The updated MRE has been constrained to a US$1,800/oz optimised pit shell, with the underground resource reported
at a 1.50 g/t Au cut-off. The underground resource is reported at a cut-off where gold mineralisation is consistently
well developed below the optimised pit shell.
Table 2 - Unconstrained Ternera MRE reported at various cut offs to the 200mRL.
Indicated
Inferred
Total
Au g/t cut off
2.00
Mt
2.6
Au g/t
3.75
Koz
317
Mt
2.0
Au g/t
3.71
Koz
241
Mt
4.7
Au g/t
3.73
Koz
558
1.00
7.2
2.25
523
5.6
2.24
400
12.8
2.24
923
0.50
16.3
1.39
727
12.8
1.37
561
29.1
1.38
1,288
0.30
23.2
1.09
815
19.4
1.03
645
42.6
1.07
1,459
For full details of the Ternera Deposit Mineral Resource Estimate (802 koz Indicated, 479 koz Inferred), refer to ASX
Announcement dated 9 March 2023. .
TESORO GOLD LIMITED
|8
Table 3: Scoping Study evaluation period results and key assumptions (100% ownership basis) (April 2023)
Physicals and costs (± 35%)
Ore tonnage
Mt
17.1
Gold grade
g/t
1.25
Contained ounces
Koz
689
Plant throughput
Mtpa
2.4
Evaluation period (excluding pre-strip)
years
7.4
waste:ore
8.3:1
Process gold recovery (life of mine average)
%
94.5
Process production – total evaluation period
koz
651
Process production – average annual steady state
koz pa
93
Upfront capital – plant and process infrastructure
US$M
108.0
Upfront capital – open pit mining
US$M
13.5
Upfront capital – pre strip
US$M
10.4
Operating costs – mining
US$/oz Au
585
Operating costs – processing
US$/oz Au
368
Operating costs – general and administration
US$/oz Au
102
Strip ratio
Financials and key assumptions (± 35%)
Gold price
Discount rate (real)
US$/oz
%
Base
Spot
1,750
1,950
5
5
AISC (life of mine average)
US$/oz
1,068
1,068
NPV5% (pre-tax)
US$M
201
300
%
27.5
37.1
Net cash flow (undiscounted, pre-tax)
US$M
312
442.5
Payback period (pre-tax)
years
3.4
2.8
IRR (pre-tax)
TESORO GOLD LIMITED
|9
Ternera Gold Deposit
A detailed mapping and continuous surface channel sampling program was completed during the
Financial Year to follow up on the previously announced shallow, high-grade Ternera South drilling results
(refer to ASX Announcements on 11 May 2023 and 21 June 2023). The program was designed to better
define the southern extensions of the Ternera Deposit.
Assay results reported on 18 September 2023 from Ternera South, confirmed surface gold mineralisation up
to 380 m south of the existing MRE, suggesting the potential for a significant southern extension to Ternera.
Key results included;
•
•
•
•
4.00 m @ 13.31 g/t Au (EZTR004143);
13.00 m @ 9.67 g/t Au (EZTR004207) including;
–
6.00 m @ 20.02 g/t Au; and
–
3.00 m @ 30.80 g/t Au.
9.00 m @ 4.60 g/t Au (EZTR004208) including;
–
3.00 m @ 12.60 g/t Au.
3.00 m @ 4.70 g/t Au (EZTR004209).
Regional Exploration
El Zorro’s permitted tenure covers an area of over 570 km2 (refer to ASX announcements on 23 September
2020 and 3 March 2022) with less than 5% of the ground having been subject to drilling. During FY2024,
previously identified regional anomalies were investigated further, with additional surface sampling
delineating multiple new target areas.
Among these, four target areas have been selected for high-priority exploration drilling designed to
delineate additional shallow gold zones situated near Ternera (refer to Figures 2 and 3). These target areas
comprise:
•
•
•
•
Drone Hill;
Ternera East;
Buzzard; and
Toro Blanco
A diamond drilling program remains ongoing, with five diamond holes completed at Drone Hill, two at
Buzzard, three at Ternera and two at Ternera East for a total of 3,066 metres of drilling.
Additional areas of prospective gold mineralisation have been identified outside of the immediate Ternera
MRE zone, which are yet to be tested with drilling. These target areas include:
•
•
•
•
•
La Brea;
Sierra del Portrero;
Kitsune;
Calderillas; and
Animas Viejas
TESORO GOLD LIMITED
| 10
Figure 4: El Zorro Gold Project district map showing highly prospective gold corridor and high-priority targets along an
approximately 20 km north-south trending zone. Datum PSAD56 19S.
TESORO GOLD LIMITED
| 11
Figure 5: Ternera regional map showing highly prospective gold corridor and high-priority targets proximate to the
existing Tenera Gold Deposit. Datum PSAD56 19S.
TESORO GOLD LIMITED
| 12
Figure 6: Drill targets and drill locations included in recent drill programs at Drone Hill, Buzzard and Ternera East (refer
to ASX Announcements 13 June 2024, 23 March 2021 and 18 September 2023). Red lines are mineralised mapped faults
that link Ternera to Drone Hill and associated with mineralisation reported in hole ZDDH0338. Hole ZDDH0338 was drilled
from the same location as ZDDH0095. Datum PSAD56 19S
TESORO GOLD LIMITED
| 13
Drone Hill
Detailed, systematic mapping and sampling work was conducted at Drone Hill throughout the Financial
Year, with initial results reported on 19 October 2023. These results successfully delineated a new large
outcropping gold anomaly. A broad, continuous zone of outcropping gold mineralisation, associated
within the northwest trending fault system of sedimentary rock was identified. Notable intersections
included:
•
•
•
•
•
47 m @ 1.40 g/t Au (EZTR004255) including;
–
9 m @ 4.66 g/t Au.
15 m @ 0.53 g/t Au (EZTR004132);
3 m @ 1.88 g/t Au (EZTR004110);
2 m @ 5.21 g/t Au (EZTR4108); and
3 m @ 2.11 g/t Au (EZTR004282)
Further positive surface sampling results were reported on 12 February 2024, extending the outcropping
gold anomaly to an area measuring over 750 m long by 250 m wide. Notable high-grade results included:
•
•
•
•
•
•
3 m @ 6.70 g/t Au (EZTR004662);
6 m @ 1.18 g/t Au (EZTR004668);
3 m @ 4.94 g/t Au (EZTR004669);
3 m @ 9.67 g/t Au (EZTR004673);
42 m @ 0.42 g/t Au (EZTR004674) including;
–
3 m @ 4.37 g/t Au; and
9 m @ 0.99 g/t Au (EZTR004714)
On 13 June 2024, Tesoro reported assay results from three diamond holes drilled to test the northwest
trending fault system, traced from Ternera, to northwest of the Drone Hill target area. Exceptional results
were reported, with shallow, very high-grade gold returned in hole ZDDH0338, including:
•
•
•
1.8 m @ 77.15 g/t Au from 59.2 m including;
0.8 m @ 173.00 g/t Au from 59.2 m; and
3.0 m @ 2.48 g/t Au from 111.0 m including;
–
1.0 m @ 7.06 g/t Au from 111.0 m
These results highlight the potential for the fault system to directly link Ternera to Drone Hill, thus extending
mineralisation to over 700 m of strike.
Ternera East
Subsequent to the Financial Year end, Tesoro announced significant assay results from a diamond drilling
program, which intersected a new, thick (+200 m), well-mineralised El Zorro Tonalite (EZT) intrusive (ASX
announcement “Significant New Discovery at Ternera East”, dated 2 July 2024). The Ternera East discovery
is a new intrusive body located approximately 300 m east of Ternera, potentially a major fault offset, or
repeat of Tenera (refer Figure 3).
Two substantial, well-mineralised zones were intersected in ZDDH0341, which included:
•
•
49.50 m @ 0.55 g/t Au from 179.00 m, including;
–
15.40 m @ 1.21 g/t Au from 182.00 m; and
–
5.40 m @ 2.2 g/t Au from 182.0 m and;
36.00 m @ 1.00 g/t Au from 281.50 m including;
–
17.50 m @ 1.91 g/t Au from 282.00 m
–
7.70 m @ 3.64 g/t Au from 283.30 m
–
2.30 m @ 9.50 g/t Au from 288.30 m
Additional drilling underway at Ternera East to rapidly define the extent of the mineralised EZT.
TESORO GOLD LIMITED
| 14
Buzzard
Buzzard is located approximately 1.5-km south of Ternera (refer to Figures 4 and 5) where previous mapping
and sampling programs identified an approximately 1,100 m long by 750 m wide gold bearing vein system.
Surface sampling results were reported on 14 May 2024, with the notable new intersection:
•
20 m @ 0.52 g/t Au (EZTR004765) including;
–
9 m @ 1.01 g/t Au.
These elevated gold values are associated with a strike extensive northwest to west trending vein system
linked to the Dorado Fault. Importantly, they significantly expanded the previously identified higher-grade
gold zone which is hosted by a stockwork vein system within a granodiorite intrusive body (Toro Gordo
Intrusion).
Further work through the Financial Year correlated the large intrusive Toro Gordo granodiorite to the main
gold host intrusive tonalite dykes observed throughout the district. The occurrence of a large, mineralised
vein system within the Toro Gordo Intrusion, provides an additional target type at El Zorro warranting further
review.
Toro Blanco
On 18 September 2023, results announced from a scout hole completed at Toro Blanco reported a shallow,
high-grade intercept of 0.50 m @ 15.00 g/t Au from 35.00 m within faulted EZT. This confirmed the
continuation of the mineralising Dorado fault from Ternera to over 1,900 m north to Toro Blanco.
La Brea
The La Brea target is characterised by the occurrence of an approximately 1.5 km by 1 km outcropping
intrusive ‘stock” called the La Isla Stock. This type of intrusive stock is of similar composition and type to the
larger intrusive Toro Gordo granite adjacent to Ternera, which is interpreted to be related to gold
mineralisation throughout the district.
Assay results reported on 29 January 2024 from the first-round surface mapping and sampling identified a
new zone of outcropping gold anomalism. Results reported from La Brea included:
•
•
•
2 m @ 12.00 g/t Au (EZTR004533);
2 m @ 4.14 g/t Au (EZTR004558); and
3 m @ 3.07 g/t Au (EZTR004525)
On 15 April 2024, Tesoro announced further high-grade results from La Brea. Follow-up assay results
identified further gold bearing fault zones within sedimentary rocks, with samples yielding grades of up to
22.70 g/t Au. Importantly, broad zones (up to 200 m in width) of alteration and gold anomalism (>0.10 g/t
Au), have been identified, with results suggesting the presence of a large-scale mineralised system,
controlled by multiple, sub-parallel northwest trending faults and associated quartz veins and alteration.
Further detailed, systematic channel sampling work is underway to define drill targets in anticipation of
near-term drilling at La Brea.
Sierra del Portrero
Located immediately south of La Brea, Sierra del Portrero is also within the +20 km north-south trending
corridor associated with the Darado fault. This corridor is defined by the occurrence of intrusive rocks of
tonalitic composition that have interacted with favourable fault systems.
It is characterised by widespread outcropping anomalous gold and multiple undrilled targets extending
north of Ternera. First-pass mapping and channel sampling from Sierra del Portrero, reported on 29 January
2024, returned gold grades of up to 43.20 g/t Au.
TESORO GOLD LIMITED
| 15
Kitsune
Results received for the initial eight scout drill holes from the Kitsune Target confirmed the prospectivity of
the area to host additional gold mineralisation within a similar geological setting to Ternera. All initial holes
intersected the target EZT lithology adjacent to the Dorado fault, which are the main gold host rocks at the
Ternera Gold Deposit. Due to rugged access and operational issues with the drilling contractor, the highest
priority holes at Kitsune are yet to be drilled. Kitsune warrants additional drilling to fully test the extensive
surface gold anomaly defined by mapping and sampling.
Calderillas
The Calderillas Target area occurs approximately 5km north of Ternera and immediately north of Tesoro’s
untested Kitsune Target. The proximity of Ternera, Calderillas and Kitsune (refer Figures 4 and 5) combined
with the presence of identified widespread outcropping gold occurrences, indicates the potential for a
large scale, linked mineralised system.
Animas Viejas
The Animas Viejas target is located 35 km north of Ternera. Positive results returned from channel sampling
with widespread outcropping mineralisation returned from prospective geology over an area of 7 km x
2 km.
Corporate
Board Changes
On 30 August 2023, Tesoro announced the appointment of Mr Alan Gibson to the Board as a Non-Executive
Director. Mr Gibson is a nominee of Corporate International Holdings BV, a wholly owned subsidiary of Gold
Fields Ltd, which currently owns approximately 18.91% of Tesoro’s issued capital. Alan Gibson is an
experienced and skilled M&A lawyer, with more than 20 years’ experience in Corporate, Energy and
Resources Law, including more than 10 years of that as part of the Gold Fields Corporate Development
team. Alan is currently Vice President: Corporate Development – Head of Legal for Gold Fields and has
played an important role in a number of the group’s key growth transactions around the world. Mr Gibson
is an admitted legal practitioner holding a Bachelor of Laws and Bachelor of Economics from Murdoch
University (WA).
On 5 October 2023, Tesoro announced the resignation of Ms Kristie Young as Non-Executive Director. Ms
Young stepped down from the Tesoro board to focus on her other commitments.
On 3 June 2024, Tesoro announced the appointment of experienced Mining and Corporate Executive Mr
Mark Connelly to the role of Independent Non-Executive Chair and Director of the Company, effective
immediately.
Mr Connelly is an internationally recognised financial, commercial, and operational executive with
extensive experience in the mining industry. He has held CEO and Managing Director roles in multi-national
companies based in Australia, Africa, Europe, North America, and South America.
Notably, Mr Connelly has an exceptional track record of value creation in the gold industry. He was NonExecutive Chair of Chesser Resources, during its AUD$89 million takeover by Fortuna Silver Mines Inc., which
was completed in September 2023. He was previously Non-Executive Chair of Oklo Resources, which was
subject to an AUD$90 million takeover by B2Gold in September 2022.
Earlier in his career, Mr Connelly was the Managing Director and Chief Executive Officer of Adamus
Resources, which was acquired by Endeavour Mining in an all-stock merger of equals valued at CAD$313
million. He subsequently held the role of Managing Director and CEO at Papillon Resources and was
instrumental in facilitating the USD$570 million takeover by B2Gold in October 2014. For his outstanding
contributions at Papillon Resources, he was the recipient of Mining Journal’s “Outstanding Achievement CEO of the Year 2014 Award”.
Mr Connelly is currently the Non- Executive Chairman of several publicly listed exploration companies.
TESORO GOLD LIMITED
| 16
Salary Sacrifice Plan
During the period, the Company issued 1,158,677 share rights to Executive Director, Mr Linton Putland in lieu
of approximately $30,000 of remuneration spanning across two financial years, pursuant to the Company’s
Salary Sacrifice Plan as approved by Shareholders at the Annual General Meeting held on 25 November
2022. The Salary Sacrifice Plan enables executives, employees and directors of Tesoro to receive share
rights in the Company, in lieu of remuneration or fees. The Salary Sacrifice Plan has been designed to further
align participants (being executives, employees and directors of the Company) with Shareholder interests
whilst being an effective way for the Company to conserve capital.
November 2023 Capital Raising
On 13 November 2023, Tesoro announced it had received binding commitments to raise approximately
A$3.0 million (before costs) (November 2023 Placement). Funds raised from the November 2023 Placement
were deployed towards drilling at Drone Hill, Ternera and district targets, to advance project studies,
metallurgical testing and for new target generation. The November 2023 Placement comprised the issue
of approximately 166.7 million new fully paid ordinary shares at an issue price of $0.018 per share
(November 2023 Placement Shares) in the Company to professional and sophisticated investors in the
following two tranches:
•
•
Tranche 1: Approximately $1,752,800 via the issue of 97,377,778 November 2023 Placement Shares
within the Company’s placement capacity under ASX Listing Rule 7.1 and 7.1A (4,016,521
November 2023 Placement Shares under Listing Rule 7.1 and 93,361,257 under Listing Rule 7.1A);
and
Tranche 2: Approximately $1,247,200 via the issue of 69,288,889 November 2023 Placement Shares
to Corporate International Holdings BV, a wholly owned subsidiary of Gold Fields Limited, which
were subject to obtaining Shareholder approval at an Extraordinary General Meeting held on 15
January 2024.
Appointment of Chief Financial Officer
On 20 November 2023, Tesoro appointed Mr Graeme Morissey as CFO to the Company, succeeding Ms
Pennee Osmond. Mr Morissey has held Director-level roles in the audit divisions of global accounting firms
EY, KPMG and Grant Thornton. He has over 15 years’ direct experience in servicing clients within the mining
exploration and development sector. This includes specific expertise extending across compliance with
the Australian Securities Exchange, the Australian Accounting Standards Board, the Corporations Act 2001
(Cth) and Department of Mines regulation. Mr Morissey has also consulted directly to CFOs within the
Australian mining sector, which has included services to assist management to optimise internal reporting
processes, cash management and cashflow forecasting. His clients have included gold production
companies Westgold and Ora Banda. Mr Morissey is a Chartered Accountant (CA), a Fellow of the
Governance Institute of Australia (FGIA) and a member of the Australian Institute of Company Directors
(MAICD). He holds a Bachelor of Commerce from McMaster University in Canada.
Appointment of Company Secretary
On 16 February 2024, Tesoro appointed Ms Sue Wong as Company Secretary to the Company, following
the resignation of Ms Sarah Wilson. Wong is a Company Secretary with national corporate advisory firm
Source Governance and has over 20 years’ experience in legal and corporate roles, including over
10 years in corporate governance. She holds a Bachelor of Commerce and a Bachelor of Laws from
University of Western Australia and is a Fellow of the Governance Institute of Australia (FGIA).
Administrative Matters
The Company held its Annual General Meeting of Shareholders on 16 November 2023 at which all
resolutions put to Shareholders were approved.
Partial Payment of Outstanding VAT Value Added Tax (VAT) Tax Credit Balance
On 10 January 2024, Tesoro advised of the refund of CLP745,796,841 (approximately A$1.25 million) in
historically paid VAT Tesoro’s 100%-owned Chilean subsidiary by ordinary shares, Tesoro Mining Chile SpA
(TMC), owns 93.8% of El Zorro S.C.M. the joint venture company that holds the El Zorro Gold Project
concessions. As previously announced (refer ASX announcement 18 September 2023), El Zorro S.C.M. was
approved for exporter status allowing the recovery of historical VAT made on project expenditure since
TESORO GOLD LIMITED
| 17
2017. Payment of the outstanding VAT tax credit balance of CLP626,585,681(approximately A$0.991
million) is yet to be refunded by the Chilean tax authority.
Advancement of Infrastructure Options
On 3 May 2024, the Company executed a non-binding Memorandum of Understanding (MOU) with Aguas
CAP subsidiary Cleanairtech Sudamérica SA which contemplates the advancement of water supply to
the El Zorro Gold Project.
The MOU, signed through Tesoro's 89% owned subsidiary El Zorro SCM, established an understanding
between Tesoro and Aguas CAP to jointly investigate the technical and economic feasibility for the
eventual execution of a contract for the supply of water and/or brine (wastewater from the desalination
process) and delivery to El Zorro (the Water Project).
Aguas CAP owns and operates a desalination plant located approximately 28km by road southwest of El
Zorro. The plant provides desalinated water treatment and supply services to industrial customers in the
Atacama region. As part of the desalination process it produces wastewater which is currently discarded
to the ocean. The Parties intend to investigate the technical and economic feasibility of the redirection of
the brine waters to El Zorro through development of a draft business plan which considers, among other
things:
•
•
•
•
•
the business model of the Project;
construction of infrastructure;
Project funding;
potential for future expansion; and
operating expenditure for the Water Project.
If a positive outcome is determined from the Water Project, potential benefits to Tesoro include:
•
•
•
Supply of a clean, filtered water for El Zorro.
Reduced permitting requirements, positively impacting costs and timelines.
Establishing an ongoing partnership with a major Chilean infrastructure provider.
Aguas CAP will also potentially benefit by being able to dispose of post desalination brine through an
environmentally low impact option.
The MOU is valid for two years and can be terminated at any time by either party without penalty.
Tesoro is planning additional metallurgical test work using the brine water supplied by Aguas CAP. Brine
water, with a salinity about twice that of sea water is still significantly less saline than the typical Eastern
Goldfields ground water, which is commonly used in gold processing plants in Western Australia.
El Zorro S.C.M. Capital Increase and Joint Venture with Wanaco SpA
Tesoro’s 100%-owned Chilean subsidiary by ordinary shares, Tesoro Mining Chile SpA (TMC) has increased
its ownership of the Joint Venture company that holds the El Zorro concessions, El Zorro S.C.M. to
approximately 94.42% (from 85%). At a Shareholder Meeting of El Zorro S.C.M. held on 7June 2023, it was
resolved to increase the capital base via contribution on a pro-rated basis. TMC subscribed its pro-rata
shares for an amount equal to CLP12,120,334,847 (approximately A$22.4 million), which reflects its funding
of exploration and development activities at El Zorro since March 2021. The minori
Share your feedback
Discover