Additional assays extend gold zone at El Zorro
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
12 MARCH 2020
ASX: TSO | ACN 106 854 175
Additional Assays Extend Gold Zone in first hole to 86.45m @ 2.29g/t Au
including 50.50m @ 3.63g/t Au
▪
▪
Full gold results have now been received from the first drill hole at El Zorro (Chile)
Additional results extend the mineralised intercept previously reported to:
•
86.45m @ 2.29g/t Au from 167.55m* including:
•
50.50m @ 3.63g/t Au from 182.70m
▪
Previously reported results from hole ZDDH00017 include:
•
23.0m @ 7.20 g/t Au from 183.22m (ZDDH00017) including:
•
15.0m @ 10.82 g/t Au from 190.00m
•
5.3m @ 25.31 g/t Au from 197.00m
•
2.3m @ 46.41 g/t Au from 200m
▪
Strong gold mineralisation continues from the main host, the El Zorro tonalite, to over 20.00m
into the footwall sediments
▪
▪
▪
These results and earlier drilling indicate potential for a significant gold deposit at El Zorro.
4 holes now complete, drilling of the 5th hole in progress.
Assay results from completed holes pending, along with results from district sampling.
Tesoro Resources Limited (Tesoro or the Company) (ASX:TSO) is pleased to announce that final
assays have now been received for hole ZDDH00017, the first drill hole in the initial 10 hole program
currently underway at the El Zorro Gold Project, Chile.
The final results from ZDDH00017 have more than tripled the downhole width of the previously
reported drill intercept to 86.45m @ 2.29g/t Au, with a higher-grade zone returning 50.50m @ 3.63
g/t Au.
Significant intercepts include (*down hole length weighted average calculation):
Hole_ID
From (m) To (m) Interval Au (g/t) Comments
ZDDH0017 44.00
74.00 30.00
0.94
ZDDH0017 44.00
60.10 16.10
1.05
including
ZDDH0017 44.00
47.00 3.00
4.27
including
ZDDH0017 70.00
74.00 4.00
4.26
including
ZDDH0017 103.46
105.60 2.14
1.76
ZDDH0017 167.55
254.00 86.45
2.29
including
ZDDH0017 182.70
233.20 50.50
3.63
including
ZDDH0017 183.22
206.22 23.00
7.20
including
ZDDH0017 190.00
205.00 15.00
10.82
including
ZDDH0017 197.00
202.30 5.30
25.31
including
ZDDH0017 200.00
202.30 2.30
46.41
including
Table 1 – Significant drill results for hole ZDDH00017. Results are uncut no top cut has been applied.
1
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 12 March 2020
Tesoro Managing Director Zeff Reeves commented:
“The final assay results for ZDDH00017 further demonstrate the thick, high grade nature of the
mineralisation at El Zorro. This is the fourth hole Tesoro has drilled at El Zorro which has returned a
greater than 100g/m intercept which is phenomenal considering the stage the project is at. We are
encouraged by the strong mineralisation well into the footwall sediments, which demonstrates that
proximity to the wide controlling structures can provide the right ingredients for gold mineralisation
regardless of rock type. We have used this information to continue to fine tune our exploration
model and have identified further extensions that we intend to drill during the year and continue to
expand the scale of El Zorro.”
ZDDH00017 RESULTS
Tesoro has previously drilled 16 diamond drill holes at El Zorro, delineating a large gold system with
all holes intersecting gold mineralisation and multiple 100g/m intercepts reported from the
Coquetas target at El Zorro (see Appendix 1 for all significant intercepts).
The current drilling program commenced on 7 February 2020, with an initial 10 diamond drill holes
planned to extend the Coquetas drilled mineralised zone from 350m of strike to over 800m of strike
and up to 300m depth. Mineralisation at Coquetas has been identified at surface and to date has
been drilled to a depth of 300m. Gold mineralisation is controlled by north west striking fault systems
which intersect the main host rock (El Zorro Tonalite – EZT) which forms wide (identified to date up
to 250m wide) sheeted vein complexes, that have been subsequently mineralised with gold
bearing fluids.
The first hole of the current drill program, ZDDH00017 was completed to a depth of 287.65m (Table
1) with zones up to 65.00m wide (downhole width) of the EZT being encountered which has been
subject to intense sheeted veining and alteration, caused by the introduction of gold bearing
fluids. Two zones of gold mineralisation have been intercepted in the hole (Figure 2).
Full assays have now been received for the lower, main mineralised zone which has returned results
of:
Hole_ID
From (m)
ZDDH0017 167.55
ZDDH0017 182.70
ZDDH0017 183.22
ZDDH0017 190.00
ZDDH0017 197.00
ZDDH0017 200.00
To (m)
254.00
233.20
206.22
205.00
202.30
202.30
Interval
86.45
50.50
23.00
15.00
5.30
2.30
Au (g/t)
2.29
3.63
7.20
10.82
25.31
46.41
Comments
including
including
including
including
including
including
The lower mineralised zone is typical of previously drilled mineralisation at El Zorro, with a high grade
zone, ranging from 5m to 30m wide, grading between 3.00g/t Au and 8.00g/t Au which is within a
broad lower grade interval ranging between 50m to 100m wide, grading between 1.30g/t Au and
2.50g/t Au. An increase in grade is associated with proximity to northwest trending fault zones
which have damaged the surrounding rocks allowing the introduction of gold bearing fluids.
Within the footwall zone of the ZDDH00017 drill intercept, gold mineralisation persisted for
approximately 20m out of the EZT into sedimentary rocks which have been subject to deformation
associated with the northwest faults. The Company considers this highly encouraging as it provides
additional targets and extensions to known mineralised zones (Figure 1).
A new, previously unknown, shallower body of the EZT was also encountered from 49.55m to
75.10m downhole with sheeted veining and trace visible gold at 57.70m (refer ASX
announcements 17 February 2020 and 6 March 2020).
This zone has returned positive assay results with a broad zone of 30.00m @ 0.94 g/t Au being
returned from 44.00m. Within that zone two higher grade intervals were returned of 3.00m @ 4.27g/t
Au from 44.00m and 4.00m @ 4.26g/t Au from 70.00m.
2
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 12 March 2020
Summary downhole geology log is presented in Table 1.
Figure 1 – El Zorro Gold Project, Coquetas area detailed geology showing mapped
mineralised faults and zones with drilling. ZDDH00021 currently drilling. Line A’-A shows
section location of Figure 2.
3
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 12 March 2020
Figure 2 – Simplified geological section looking east showing ZDDH00017 results. High
grade gold mineralisation is typically associated with faults intersecting the El Zorro
Tonalite. Section location marked on Figure 1.
4
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 12 March 2020
Hole_ID
Easting (m) Northing (m) Elevation Azimuth Dip EOH Depth
ZDDH00017 341897.00 7036443.00
645.00
210 -60
350
FROM (m)
TO (m)
0.00
1.60
Interval (m)
1.60
Overburden
Lithology
0.00
45.10
45.10
Pelitic Sediment
45.10
48.65
3.55
EZT
48.65
49.55
0.90
Pelitic Sediment
49.55
75.10
25.55
EZT +sheeted veins vis Au at 57.70m
75.10
88.47
13.37
Pelitic Sediment
88.47
89.42
0.95
Lamprohyre
88.92
98.35
9.43
Pelitic Sediment
98.35
99.43
1.08
Diorite Dyke
99.43
103.46
4.03
Pelitic Sediment
103.46
103.80
0.34
Diorite Dyke
103.80
116.30
12.50
EZT
116.30
124.00
7.70
Pelitic Sediment
124.00
126.45
2.45
Fault
126.45
166.95
40.50
Pelitic Sediment
166.95
172.85
5.90
EZT +sheeted veins
172.85
183.60
10.75
Silicified Pelitic Sediment
183.60
197.75
14.15
EZT +sheeted veins
197.75
206.20
8.45
Pelitic Sediment + sheeted veins
206.20
231.50
25.30
EZT +sheeted veins
231.50
270.00
38.50
Pelitic Sediment + sheeted veins,
strong brecciation and silicification
270.00
287.65
17.65
Pelitic Sediment + sheeted veins,
strong brecciation
Table 1 – ZDDH00017, summary lithology log. Yellow highlights intervals of El Zorro Tonalite
host rock (EZT) and sheeted veining.
5
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 12 March 2020
El Zorro Drilling Continues
To date four drill holes have been completed of the current program at El Zorro, see Figure 1.
All holes have encountered zones of altered El Zorro Tonalite and associated sheeted veining and
brecciation of between 15m and 50m down hole width.
Currently hole ZDDH00021 is being drilled which is designed to intersect the southern extensions of
mineralisation encountered in both the upper and lower zones of hole ZDDH00017.
Figure 5 – El Zorro Gold Project district geology and targets
Authorised by the Board of Tesoro Resources Limited.
6
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 12 March 2020
For more information:
Company:
Zeff Reeves Managing Director
Tesoro Resources Limited
+61 8 9322 1587
Investors:
Peter Taylor
NWR Communications
+61 (0) 412 036 231
peter@nwrcommunications.com.au
About Tesoro
Tesoro Resources Limited was established with a strategy of acquiring,
exploring and developing mining projects in the Coastal Cordillera region of
Chile. The Coastal Cordillera region is host to multiple world class copper and
gold mines, has well established infrastructure, service providers and an
experienced mining workforce. Large areas of the Coastal Cordillera remain
unexplored due to the unconsolidated nature of mining concession
ownership, but Tesoro via its in-country network and experience has been
able secure rights to two district scale gold projects in-line with the Company’s
strategy. Tesoro has rights to acquire up to 80% of the El Zorro Gold Project
and 100% of the Espina Gold Project
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and major shareholder of the Company. Mr Reeves has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion
in this report of the matters based on this information in the form and context in which it appears.
Future Performance
This announcement may contain certain forward-looking statements and opinion. Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and should
not be relied on as an indication or guarantee of future performance and involve known and unknown risks,
uncertainties, assumptions, contingencies and other important factors, many of which are outside the control
of the Company and which are subject to change without notice and could cause the actual results,
performance or achievements of the Company to be materially different from the future results, performance
or achievements expressed or implied by such statements. Past performance is not necessarily a guide to
future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward looking statements or other forecast. Nothing contained in this announcement
nor any information made available to you is, or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future performance of Tesoro.
7
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 12 March 2020
APPENDIX 1 – Significant Intercept Table
Hole_ID
From (m) To (m) Interval
ZDDH0001 5.00
119.00 114.00
ZDDH0001 5.00
15.00 10.00
ZDDH0001 5.00
51.30 46.30
ZDDH0001 12.00
13.00 1.00
ZDDH0001 14.30
15.00 0.70
ZDDH0001 33.64
39.00 5.36
ZDDH0001 44.30
51.30 7.00
ZDDH0001 64.00
65.00 1.00
ZDDH0001 75.50
79.00 3.50
ZDDH0001 75.50
76.00 0.50
ZDDH0001 107.00
112.00 5.00
ZDDH0001 117.00
119.00 2.00
ZDDH0002 5.70
68.00 62.30
ZDDH0002 8.80
24.30 15.50
ZDDH0002 8.80
14.00 5.20
ZDDH0002 51.70
68.00 16.30
ZDDH0002 58.00
61.00 3.00
ZDDH0003 21.00
77.30 56.30
ZDDH0003 21.00
27.00 6.00
ZDDH0003 21.00
22.83 1.83
ZDDH0003 37.20
43.00 5.80
ZDDH0003 47.30
48.00 0.70
ZDDH0003 64.00
77.30 13.30
ZDDH0003 90.00
91.00 1.00
ZDDH0004 5.00
66.00 61.00
ZDDH0004 56.00
66.00 10.00
ZDDH0004 57.00
61.00 4.00
ZDDH0005 4.00
42.65 38.65
ZDDH0005 4.00
32.00 28.00
ZDDH0005 9.80
28.00 18.20
ZDDH0005 9.80
10.15 0.35
ZDDH0005 51.60
52.00 0.40
ZDDH0005 65.00
67.00 2.00
ZDDH0005 72.00
85.90 13.90
ZDDH0005 72.00
75.00 3.00
ZDDH0005 72.00
73.00 1.00
ZDDH0005 100.60
102.00 1.40
ZDDH0005 130.00
132.60 2.60
ZDDH0005 135.80
136.80 1.00
ZDDH0005 0.00
88.00 88.00
ZDDH0006 2.40
3.00
0.60
ZDDH0006 22.60
25.95 3.35
ZDDH0006 24.00
25.00 1.00
ZDDH0006 46.70
50.30 3.60
ZDDH0006 61.10
64.02 2.92
Au (g/t) Comments
0.35
0.55
including
0.45
including
1.64
including
2.35
including
0.97
including
0.67
including
2.50
including
0.89
including
4.82
including
1.11
including
2.05
including
0.54
1.15
including
1.96
including
0.78
including
3.62
including
0.50
1.96
including
5.24
including
1.27
including
2.00
including
0.41
including
1.53
0.97
4.53
including
9.60
including
0.65
0.84
including
1.17
including
20.10
including
2.03
1.03
0.52
1.90
including
4.32
including
2.07
0.66
12.20
0.15
0.75
including
2.14
including
6.10
including
0.32
including
0.42
including
Hole_ID
From (m) To (m) Interval
ZDDH0006 108.30
116.00 7.70
ZDDH0006 133.50
135.60 2.10
ZDDH0006 148.00
151.80 3.80
ZDDH0006 180.10
244.00 63.90
ZDDH0006 180.10
181.10 1.00
ZDDH0006 184.00
186.00 2.00
ZDDH0006 207.00
212.00 5.00
ZDDH0006 226.00
227.00 1.00
ZDDH0006 236.00
244.00 8.00
ZDDH0007 1.00
4.00
3.00
ZDDH0007 39.00
66.20 27.20
ZDDH0007 39.00
58.00 19.00
ZDDH0007 104.85
110.00 5.15
ZDDH0007 117.40
118.00 0.60
ZDDH0008 35.00
41.10 6.10
ZDDH0008 58.00
59.00 1.00
ZDDH0009 4.00
6.00
2.00
ZDDH0009 12.55
38.00 25.45
ZDDH0009 21.00
26.00 5.00
ZDDH0009 48.00
48.50 0.50
ZDDH0009 78.00
83.00 5.00
ZDDH0010 31.00
33.00 2.00
ZDDH0010 60.00
61.00 1.00
ZDDH0010 66.00
67.00 1.00
ZDDH0010 75.00
159.30 84.30
ZDDH0010 75.00
104.00 29.00
ZDDH0010 82.50
86.45 3.95
ZDDH0010 91.00
102.00 11.00
ZDDH0010 93.00
97.00 4.00
ZDDH0010 120.00
126.00 6.00
ZDDH0010 149.00
159.00 10.00
ZDDH0011 176.00
274.30 98.30
ZDDH0011 181.70
212.00 30.30
ZDDH0011 196.40
212.00 15.60
ZDDH0011 203.00
203.70 0.70
ZDDH0011 203.00
212.00 9.00
ZDDH0011 217.00
222.00 5.00
ZDDH0011 246.60
256.40 9.80
ZDDH0012 0.00
58.80 58.80
ZDDH0012 1.70
22.00 20.30
ZDDH0012 1.70
8.40
6.70
ZDDH0012 2.30
4.70
2.40
ZDDH0012 17.60
22.00 4.40
ZDDH0012 17.60
20.00 2.40
ZDDH0012 53.20
58.80 5.60
ZDDH0012 53.20
56.00 2.80
ZDDH0012 151.80
152.20 0.40
Au (g/t) Comments
0.30
including
1.30
including
0.59
including
0.23
including
0.55
including
1.06
including
0.77
including
0.55
including
0.66
including
4.75
0.70
0.80
including
0.34
2.75
0.28
1.43
1.39
0.51
1.09
including
2.19
0.59
2.47
1.16
1.04
1.30
2.95
including
4.97
including
4.70
including
8.50
including
1.11
including
1.07
including
1.58
3.03
including
3.87
including
21.70
including
5.07
including
4.13
including
2.28
including
1.70
4.50
including
12.21
including
33.35
including
2.00
including
2.82
including
0.95
1.42
including
2.29
Hole_ID
From (m) To (m) Interval
ZDDH0013 0.00
3.00
3.00
ZDDH0013 9.00
14.30 5.30
ZDDH0013 25.00
29.80 4.80
ZDDH0013 28.55
29.80 1.25
ZDDH0013 46.30
70.00 23.70
ZDDH0013 46.30
51.50 5.20
ZDDH0013 51.25
65.35 14.10
ZDDH0013 58.00
65.35 7.35
ZDDH0013 102.00
104.00 2.00
ZDDH0013 136.00
137.30 1.30
ZDDH0013 165.00
173.60 8.60
ZDDH0013 170.40
173.00 2.60
ZDDH0014 15.30
70.60 55.30
ZDDH0014 15.30
34.00 18.70
ZDDH0014 15.30
26.30 11.00
ZDDH0014 23.00
26.30 3.30
ZDDH0014 64.60
70.60 6.00
ZDDH0014 64.60
67.35 2.75
ZDDH0014 112.00
122.50 10.50
ZDDH0014 115.00
117.00 2.00
ZDDH0014 177.20
179.00 1.80
ZDDH0015 37.90
39.70 1.80
ZDDH0015 91.90
132.70 40.80
ZDDH0015 91.90
94.60 2.70
ZDDH0015 112.00
116.00 4.00
ZDDH0015 240.60
242.00 1.40
ZDDH0015 265.90
269.00 3.10
ZDDH0016 125.00
131.72 6.72
ZDDH0016 152.00
204.60 52.60
ZDDH0016 188.10
194.00 5.90
ZDDH0016 188.58
188.90 0.32
ZDDH0016 203.60
204.60 1.00
ZDDH0016 281.00
290.00 9.00
ZDDH0016 287.50
290.00 2.50
ZDDH0017 44.00
74.00 30.00
ZDDH0017 44.00
60.10 16.10
ZDDH0017 44.00
47.00 3.00
ZDDH0017 70.00
74.00 4.00
ZDDH0017 103.46
105.60 2.14
ZDDH0017 167.55
254.00 86.45
ZDDH0017 182.70
233.20 50.50
ZDDH0017 183.22
206.22 23.00
ZDDH0017 190.00
205.00 15.00
ZDDH0017 197.00
202.30 5.30
ZDDH0017 200.00
202.30 2.30
Au (g/t) Comments
0.83
0.41
0.72
2.14
including
0.85
1.24
including
1.08
including
1.65
including
0.79
4.97
1.60
2.80
including
1.01
2.19
including
3.40
including
6.18
including
2.03
including
5.00
including
0.52
1.75
including
2.37
1.11
0.37
1.64
including
1.13
including
8.46
0.64
1.47
0.62
3.30
including
31.30
including
3.00
including
0.36
0.77
including
0.94
1.05
including
4.27
including
4.26
including
1.76
2.29
including
3.63
including
7.20
including
10.82
including
25.31
including
46.41
including
For full results for holes ZDDH00001 to ZDDH00016 refer to Plukka Ltd Prospectus 30 October 2019
8
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 12 March 2020
APPENDIX 2 – JORC TABLES
JORC Table 1
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as downhole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
El Zorro Project:
Tesoro has completed 20 diamond drill holes for 4,140.40m in
2017, 2018 and 2020 (ZDDH0001 to ZDDH0019) and 171
trenches for 4008.2m. Trenches were undertaken as
continuous channel samples and Diamond drill holes were
drilled with HQ. Sampling was half core at geologically defined
and significant mineralisation boundaries.
Tesoro considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
El Zorro Project:
Tesoro Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Tesoro consider this appropriate for the style of
mineralisation.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done,
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
El Zorro Project:
Diamond drilling was used to obtain ½ core samples of various
lengths (minimum 0.25m),from which 0.5kg of material was
pulverised passing 200 mesh to produce a 50g charge for fire
assay fusion with a gravimetric finish. Multielement assays
were completed by 4-acid digest with a 2.5g charge. Tesoro
consider these appropriate assay techniques.
Drilling techniques • Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
El Zorro Project:
Tesoro has completed 19 diamond drill holes for 3,939.60m.
Diamond drill holes were drilled with HQ. Sampling was half
core at geological and significant mineralisation boundaries.
Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
El Zorro Project
Tesoro Diamond drilling: Core recovery was estimated using
the drillers recorded depth marks against the length of the core
recovered. Reviewing the core photos, there are occasional
shears/faults where core is broken. There is however no
significant core loss.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
El Zorro Project:
Tesoro Diamond drilling: A single tube system was employed
and in general core recovery good.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
El Zorro Project:
There appears to be no potential sample bias as there was no
regular loss of core.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
El Zorro Project:
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour, lithology,
weathering, grain size, mineralisation, alteration, geotechnical
characteristics etc. Diamond core is stored at the Company’s
warehouse.
Tesoro consider the data to be of an appropriate level of detail
to support a future resource estimation.
Logging
• Whether logging is qualitative or quantitative in El Zorro Project:
nature. Core (or costean, channel, etc.)
Logging of diamond core was qualitative and diamond core was
photography.
photographed.
• The total length and percentage of the relevant El Zorro Project:
intersections logged.
All drilled intervals are logged and recorded.
Subsampling
techniques and
• If core, whether cut or sawn and whether
quarter, half or all core taken.
9
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
El Zorro Project:
ASX Announcement 12 March 2020
Criteria
JORC Code explanation
sample
preparation
Commentary
Drill core was cut, and half core was collected for analytical
analysis
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.
El Zorro Project:
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
El Zorro Project:
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
The sample preparation of crushing half core at the lab to mm
size prior to splitting off a 50g charge (either by cone/quarter
or riffle) for pulverisation provides an appropriate and
representative sample for analysis.
Tesoro has not complete any percussion drilling.
El Zorro Project:
• Quality control procedures adopted for all
subsampling stages to maximise representivity Half core was collected for the entirety of the Tesoro drilling, as
of samples.
such there was consistency throughout the drilling. Core was
logged by a qualified geoscientist. Each subsample is
considered to be representative of the interval.
Quality of assay
data and
laboratory tests
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
El Zorro Project:
Sampling of half core is representative of the in-situ material.
There are field duplicate samples collected from the diamond
core with irregular results. Field drill core duplicates are
irregular by nature and it has been recommend by Tesoro’s
consultants to use coarse reject material to monitor the
sample preparation.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
El Zorro Project:
sample sizes collected were considered appropriate to
reasonably represent the material being tested.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
El Zorro Project
Assays were undertaken at the accredited laboratories at
Bureau Veritas, Santiago and ALS Santiago, both of which are
fully certified. Core samples of various lengths were assayed
(minimum 0.25m) from which 0.5kg of material was pulverized
passing 200 mesh to produce a 50 g charge for fire assay
fusion with gravimetric finish. Multielement assays were
completed by 4-acid digest with a 2.5 g charge.
All techniques are appropriate for the element being
determined.
• For geophysical tools, spectrometers, handheld Standard chemical analyses were used for grade
XRF instruments, etc., the parameters used in determination. There was no reliance on determination of
determining the analysis including instrument analysis by geophysical tools.
make and model, reading times, calibrations
factors applied and their derivation, etc.
El Zorro Project
• Nature of quality control procedures adopted
QAQC procedures included the insertion of Certified Reference
(e.g. standards, blanks, duplicates, external
Materials (CRMs) (5%) and blank material (2%), Check samples
laboratory checks) and whether acceptable
(5%) and check assaying 5%
levels of accuracy (i.e. lack of bias) and
Similar levels of QAQC are applied to channel and rock chip
precision have been established.
sampling whilst soil sampling is 2% each of standards, blanks,
check samples and check assays and 1% Grind checks.
Cube manage the database for Tesoro and note in there
March 2018 quarterly report
The following issues were noted during the review:
• The CRM insertion rate is low at 6%;
• No coarse reject or umpire duplicate sampling has been
undertaken for the project;
• There were issues identified for two CRMs across three
lab jobs which require further investigation;
• The other three CRMs performed well over the JanuaryMarch period; and
• An issue was identified for one CRM within a multi
element lab job which requires further investigation.
Tesoro has implemented these procedures and they were
applied to drilling of drill holes ZDDH0011 to ZDDH0017 and
channel sampling. The QAQC report by Cube through this
period of drilling notes the following:
Cube Consulting has reviewed the QAQC protocols and control
assays as supplied (i.e. CRM samples and field duplicates) for
all sample data at the El Zorro Project from January to August
2018.
10
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 12 March 2020
Criteria
JORC Code explanation
Commentary
Analytical data for a total of 3,508 diamond core samples, 270
CRMs, 163 Blanks, along with 1,122 pulp duplicates and 106
quarter core duplicates were reviewed.
For ALS Santiago 1,813 samples with 156 CRMs, 117 Blank
values and 106 quarter core duplicates in 22 batches
submitted to between June and July 2018 were evaluated,
resulting in one failed sample removed (272 CRMs and
Blanks).
From Bureau Veritas, 1,695 original samples, with 83 CRM and
31 Blank values were evaluated in 11 batches submitted
between January and July 2018. This included 3 pulp duplicate
jobs re-analysing 1,050 original samples, with 31 CRMs and 15
Blanks, resulting in two failed samples removed (159 CRMs
and Blanks).
The laboratories used have generally demonstrated analytical
accuracy at an acceptable level within 95% confidence limits.
There were a number of handling and misidentification issues
that were identified and rectified.
Although eh QAQC is generally considered adequate, Cube
Consulting recommend the following;
The recommended insertion rate of client control samples is
15-20% of the sample batch submitted. It is currently a healthy
17% which should be maintained.
• While there has been an improved insertion rate of 5% for
core “duplicates” (quarter core duplicate versus original half
core), the recommended core duplicate sample is to utilise a
second sample of the coarse reject from the original half core
crushing rather than using quarter core. This also prevents
wasted analysis by assisting the client in selecting duplicate
samples from above the mineralised threshold. The review
showed that of the 106 quarter core duplicates taken, only 31
were mineralised (Au >0.10ppm), the other 75 being unmineralised, close to detection limits and of limited value.
• It is recommended that coarse reject samples be retained for
all batches. Coarse rejects can be used as duplicate sample
material to assess the precision and accuracy of the laboratory
assays. It is recommended that any available coarse reject
material within the mineralised zone of Au = >0.10ppm be
retrieved and utilised as a duplicate sample. Any check
samples re-submitted to the primary or umpire laboratories
should specify that the same sample preparation and assaying
techniques are used as for the original sample with additional
CRMs inserted in each batch submitted.
• Any samples that leave the primary laboratory are currently
being weighed before despatch. This assists with identification
between primary and CRM samples and the practise should be
maintained
For the three error affected batches containing failed CRMs, it
is recommended that further checks be carried out on the
coarse reject samples rather than existing pulps due to
potential sample identification issues. This process will confirm
the grade on any faile
Share your feedback
Discover