Annual Report to shareholders
Released
Released
Announcement PDF
2024
TRANSITIONAL
ANNUAL REPORT
Contents
CORPORATE DIRECTORY
3
CHAIRMAN’S LETTER
4
REVIEW OF OPERATIONS
6
ANNUAL MINERAL RESOURCE AND ORE RESERVES STATEMENT
19
DIRECTORS’ REPORT
20
AUDITOR’S INDEPENDENCE DECLARATION
39
FINANCIAL REPORT
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
42
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
43
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
44
CONSOLIDATED STATEMENT OF CASH FLOWS
45
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
46
CONSOLIDATED ENTITY DISCLOSURE STATEMENT
77
DIRECTORS’ DECLARATION
78
INDEPENDENT AUDITOR’S REPORT
79
ASX INFORMATION
83
SCHEDULE OF MINERAL TENEMENTS
90
Corporate Directory
Tesoro Gold Ltd is an Australian listed company focused on the acquisition, exploration and development of
commercially significant resource projects in Chile, with a focus on gold. For more details visit www.tesorogold.com.au.
DIRECTORS
Mr Mark Connelly
(Non-Executive Chairman)
Mr Zeffron Reeves
(Managing Director)
Mr Linton Putland
(Executive Director – Mining and Development)
Mr Geoffrey McNamara
(Non-Executive Director)
Mr Alan Gibson
(Non-Executive Director)
COMPANY SECRETARY
Ms Sue Wong
REGISTERED OFFICE
c/- Source Services
Level 39 Central Park
152 – 158 St Georges Terrace
PERTH WA 6000
Telephone: (08) 6383 7883
PRINCIPAL PLACE OF
BUSINESS
Level 39 Central Park
152 – 158 St Georges Terrace
PERTH WA 6000
SHARE REGISTRY
Automic Pty Ltd
Level 5
191 St Georges Terrace
PERTH WA 6000
GPO Box 5193,
SYDNEY, NSW 2000
Telephone: 1300 288 664 (within Australia)
Email: hello@automic.com.au
SECURITIES EXCHANGE
LISTING
Australian Securities Exchange Limited and OTC Markets Group
(Home Exchange: PERTH, Western Australia)
Code:
ASX: TSO, TSOO, TSOOA
OTCQB: TSORF
FSE: 5D7
AUDITOR
RSM Australia Partners
Level 32 Exchange Tower
2 The Esplanade
PERTH WA 6000
WEBSITE
www.tesorogold.com.au
TESORO GOLD LIMITED
|3
Chairman’s Letter
Dear Shareholders,
I am pleased to provide this update on Tesoro Gold Ltd (Tesoro, or the Company), as we continue to advance
exploration at the El Zorro Gold Project in Chile (El Zorro, the Project), setting the stage for future growth and value
creation.
The six months to 31 December 2024, the transition year period as Tesoro moves our year end from June to December,
was marked by the completion of key drilling programs at Ternera East and Drone Hill, both of which have delivered
exciting new zones of mineralisation.
Drilling at Ternera East has confirmed significant body of intrusive-hosted gold mineralisation beyond the existing
resource envelope, with diamond drill hole ZDDDH0341 intersecting two mineralised zones:
•
•
49.50m @ 0.55g/t Au from 179.00 m, including;
−
15.40m @ 1.21g/t Au from 182.00m; and
−
5.40 m@ 2.21g/t Au from 182.0 m and;
36.00 m @ 1.00 g/t Au from 281.50 m including;
−
17.50m @ 1.91g/t Au from 282.00m
−
7.70 m@ 3.64g/t Au from 283.30m
− 2.30 m@ 9.50g/t Au from 288.30m
Our work to date suggests that Ternera East is likely a fault-offset extension of the main Ternera Deposit, highlighting its
potential to be a repeat of the primary Ternera mineralisation.
Additionally, at Drone Hill, initial mapping and sampling results identified a broad, continuous zone of outcropping gold
mineralisation, associated within the northwest-trending fault system. Subsequent diamond drill testing of this target
(hole ZDDH0338) returned shallow, very high-grade gold, including:
•
•
•
1.8m @ 77.15g/t Au from 59.2m including;
0.8m @ 173.00g/t Au from 59.2m; and
3.0m @ 2.48g/t Au from 111.0m including;
− 1.0m @ 7.06g/t Au from 111.0m
In parallel with our exploration success, Tesoro has implemented a change to its financial year-end, aligning our
reporting period with the calendar year. This adjustment aligns our Chilean exploration activities with the financial
budgeting and reporting process, including the timing of year-end financial audit.
Our strategic focus remains on unlocking the full potential of El Zorro. The Company is well-positioned to continue
advancing exploration, growing our resource base, and progressing towards the development of a world-class gold
operation. I would like to take this opportunity to thank our Shareholders for their continued support, as well as our
dedicated team for their ongoing efforts in driving Tesoro forward.
I look forward to the coming year of activity as we continue to build on the strengths of 2024.
Yours faithfully,
Mark Connelly
Independent Non-Executive Chair
Tesoro Gold Ltd
TESORO GOLD LIMITED
|4
REVIEW OF
OPERATIONS
TESORO GOLD LIMITED
|5
REVIEW OF OPERATIONS
Tesoro is focused on exploration and development of the El Zorro Gold Project (El Zorro or the Project) in
the Coastal Cordillera region of Chile. El Zorro is proximate to well established infrastructure and is 140 km
from the city of Copiapo and approximately 800 km north of the Chilean capital, Santiago (refer Figure 1).
Successful exploration at the Project has resulted in the definition of the 1.46 Moz Au Ternera Gold Deposit
(Ternera or the Deposit) Mineral Resource Estimate (MRE) (refer Table 1 and 2). The combination of highly
prospective geology and positive results from regional exploration have confirmed El Zorro as a new
Chilean gold district.
Ternera was the subject of a Phase 1 Scoping Study (refer ASX Announcements 4 April 2023) (Scoping
Study) which demonstrated the potential development of an initial, stand-alone gold mining and
processing operation. The Scoping Study considered an initial development of a Phase 1 open pit mining
operation on the upper 200m of the Deposit to feed a 2.4Mtpa gold processing plant. Key outcomes
highlighted the ability of the Deposit to support the estimated capital required for the development of the
Project at a scale that would result in an annual average gold production of between 90 and 100 Koz per
annum (refer Table 3).
During the transitional financial year 1 July 2024 to 31 December 2024 (TY2024 or the Transitional Year), the
Company continued its extensive exploration of El Zorro via ongoing diamond drilling targeting both infill
and extensional drilling of the Ternera Deposit, along with key areas and high-priority targets within a 1.5km
radius of the existing Ternera MRE.
Figure 1: Location map for the El Zorro showing proximity to major mining projects, existing infrastructure and
population centres.
TESORO GOLD LIMITED
|6
Figure 2: El Zorro Gold Project district map showing highly prospective gold corridor and high priority targets along an
approximately 20km north-south trending zone. Blue outlines show approximate position of Figures 3 - 6. Datum PSAD56
19S.
TESORO GOLD LIMITED
|7
Table 1: Constrained Ternera MRE
Au g/t
Area
Open Pit
Resource
Underground
Resource
Total
Resources
Indicated
Inferred
Total
cut off
Mt
Au g/t
Koz
Mt
Au g/t
Koz
Mt
Au g/t
Koz
0.30
22.5
1.10
795
10.0
1.18
379
32.5
1.13
1,175
1.50
0.1
2.64
7
1.2
2.64
100
1.3
2.64
107
22.6
1.11
802
11.2
1.34
479
33.7
1.18
1,282
The updated MRE has been constrained to a US$1,800/oz optimised pit shell, with the underground
resource reported at a 1.50g/t Au cut-off. The underground resource is reported at a cut-off where gold
mineralisation is consistently well-developed below the optimised pit shell.
Table 2: Unconstrained Ternera MRE reported at various cut-offs to the 200mRL
INDICATED
Cut-off Au g/t
Mt
2.00
INFERRED
Au g/t
Koz
Mt
2.6
3.75
317
1.00
7.2
2.25
0.50
16.3
0.30
23.2
TOTAL
Au g/t
Koz
Mt
Au g/t
koz
2.0
3.71
241
4.7
3.73
558
523
5.6
2.24
400
12.8
2.24
923
1.39
727
12.8
1.37
561
29.1
1.38
1,288
1.09
815
19.4
1.03
645
42.6
1.07
1,459
For full details of the Ternera Deposit Mineral Resource Estimate (802 koz Indicated, 479 koz Inferred), refer to ASX
Announcement dated 9 March 2023.
TESORO GOLD LIMITED
|8
Table 3: Scoping Study evaluation period results and key assumptions (100% ownership basis) (April 2023)
Physicals and costs (± 35%)
Ore tonnage
Mt
17.1
Gold grade
g/t
1.25
Contained ounces
Koz
689
Plant throughput
Mtpa
2.4
Evaluation period (excluding pre-strip)
years
7.4
waste:ore
8.3:1
Process gold recovery (life of mine average)
%
94.5
Process production – total evaluation period
koz
651
Process production – average annual steady state
koz pa
93
Upfront capital – plant and process infrastructure
US$M
108.0
Upfront capital – open pit mining
US$M
13.5
Upfront capital – pre strip
US$M
10.4
Operating costs – mining
US$/oz Au
585
Operating costs – processing
US$/oz Au
368
Operating costs – general and administration
US$/oz Au
102
Strip ratio
Financials and key assumptions (± 35%)
Gold price
Discount rate (real)
Base
US$/oz
%
Spot
1,750
1,950
5
5
AISC (life of mine average)
US$/oz
1,068
1,068
NPV5% (pre-tax)
US$M
201
300
%
27.5
37.1
Net cash flow (undiscounted, pre-tax)
US$M
312
442.5
Payback period (pre-tax)
years
3.4
2.8
IRR (pre-tax)
TESORO GOLD LIMITED
|9
Ternera Gold Deposit
During the reporting period, Tesoro undertook a diamond drilling program targeting key areas within a
1.5km radius of the existing 1.3 Moz Ternera Deposit, which included infill and extensional drilling of the
Ternera MRE (refer to Figures 2 and 3). Subsequent to the end of the reporting period on 16 January 2025,
Tesoro announced further assay results which identified new zones of wide, high-grade gold mineralisation
intercepted outside of the current MRE boundary.
Figure 3: El Zorro Gold Project – Ternera area. Drill locations in the current program, with new results highlighted in gold.
Previously announced results shown in white (refer ASX Announcements 23 March 2021, 25 June 2021, 3 November
2021, 8 November 2022, 18 September 2023, 13 June 2024, 2 July 2024, 28 October 2024 and 16 January 2025). Section
location for Figure 2 shown at A-A. Datum PSAD56 19S.
TESORO GOLD LIMITED
| 10
Figure 4: Ternera East drilling, showing significant mineralised zones and location relative to the Ternera Gold Deposit
MRE Block Model show in in gold >0.5 g/t Au and USD1,800 optimised Pit Shell, looking north (Refer ASX Announcements
dated 2 July 2024 and 28 October 2024).
Figure 5: El Zorro Gold Project – Section looking north-west showing results from ZDDH0349A significantly broadening
the +1 g/t Au mineralised envelope in the northern part of the Deposit (shown in yellow). Results for ZDDH0356 were
TESORO GOLD LIMITED
| 11
returned post year end, intersecting a broad zone of mineralisation well outside of the existing MRE (Refer ASX
Announcements dated 28 October 2024 and 16 January 2025).
Drill hole ZDDH349A was part of the infill program designed to improve resource classification and extend
known mineralised zones within the Deposit. This hole returned three well-mineralised intercepts, including
a main zone of 46.67m @ 11.86g/t Au from 77.15m, featuring the highest gold assay recorded at Ternera
of 0.5m @ 924.00g/t Au from 78.15m (refer ASX Announcement dated 28 October 2024). Drilled in the
northern area, this hole has significantly widened the high-grade gold zones within the MRE.
Drill hole ZDDH0356 (refer to ASX Announcement dated 16 January 2025) intersected the boundary of the
existing MRE, continuing beyond its currently defined limits into previously untested zones. This drill hole
uncovered:
•
•
An upper zone that widens and upgrades a shallow portion of the MRE.
A lower, previously undiscovered zone of mineralisation located approximately 50m below the current
MRE boundary, returning 132.18m @ 1.28g/t Au from 363m, including 21.70m @ 4.26g/t Au from
371.30m.
Key intercepts received from within the existing boundary also include:
•
•
154m @ 1.61g/t from 83m (ZDDH0356), including;
− 26m @ 3.96g/t Au from 93m and;
− 44m @ 1.99g/t Au from 161m.
59m @ 2.10g/t Au from 264m (ZDDH0351), including;
− 33m @ 3.67g/t Au from 264m and;
− 2m @ 29.45g/t Au from 279m.
Figure 6 illustrates the continuity of gold mineralisation at Ternera, now extended to over 800m downplunge with hole ZDDH0356 contributing an additional 100m of continuity.
TESORO GOLD LIMITED
| 12
Figure 6: El Zorro Gold Project – Block Model Section (looking west): Hole ZDDH0356 shows new mineralised zone well
outside of existing MRE. Block model shows indicated and inferred material >0.60g/t Au and is colour coded to Au g/t.
Holes ZDDH0351 and ZDDH0351A projected onto section were drilled approximately 50m to the east.
This intercept requires additional drilling to delineate its full extent which is anticipated to significantly
expand the ongoing drill program.
Selected samples totalling 900kg of diamond drill core samples were received at the ALS Metallurgical
Laboratory in Perth WA. for the PFS metallurgical test work program. The samples are considered to be
representative of the anticipated mining and processing scenarios and sequences for the project. Other
PFS activities relating to pit geotechnical assessment and the provision of infrastructure and services have
also continued over the reporting period.
Regional Exploration
El Zorro’s total permitted tenure covers an area of over 570km2 (refer to ASX announcements on
23 September 2020 and 3 March 2022) with the area hosting the Ternera Deposit making up a small
fraction of the exploration footprint. To date, less than 2% of this ground has been subject to drilling.
During FY2024, previously identified regional gold anomalies were further investigated, with additional
surface sampling delineating multiple new target areas.
To date, three target areas have been identified for high-priority exploration drilling, designed to delineate
additional shallow gold extending from near to Ternera (refer to Figures 2 and 7). These target areas
comprise:
•
•
•
Drone Hill;
Ternera East; and
Toro Blanco.
Additional areas of mineralisation have been previously identified outside of the immediate Ternera MRE
zone, which are to be the subject of future regional drilling. These target areas include:
•
•
•
•
•
La Brea;
Sierra del Portrero;
Kitsune;
Calderillas; and
Animas Viejas.
TESORO GOLD LIMITED
| 13
Figure 7: Ternera area drill locations in current program, location of hole ZDDH0341 within the Ternera East target, and
significant results showing areas of open gold mineralisation close to Ternera (refer ASX Announcements 23 March
2021, 25 June 2021, 3 November 2021, 8 November 2022, 18 September 2023, and 13 June 2024). Datum PSAD56 19S.
TESORO GOLD LIMITED
| 14
Ternera East
On July 2024, Tesoro announced significant assay results from a diamond drilling program, which
intersected a new, thick (+200m), well-mineralised El Zorro Tonalite (EZT) intrusive (ASX announcement
“Significant New Discovery at Ternera East”, dated 2 July 2024). This intrusive body of mineralisation,
referred to as Ternera East, occurs approximately 300m east of the existing Ternera Mineral Resource and
Phase 1 Scoping Study open pit (refer Figures 2 and 7).
Two substantial, well-mineralised zones were intersected in ZDDH0341, which included:
•
•
49.50m @ 0.55g/t Au from 179.00m, including;
− 15.40m @ 1.21g/t Au from 182.00m; and
− 5.40m @ 2.21g/t Au from 182.0m.
36.00m @ 1.00 g/t Au from 281.50m including;
− 17.50m @ 1.91 g/tAu from 282.00m
− 7.70m @ 3.64 g/tAu from 283.30m; and
− 2.30m @ 9.50 g/tAu from 288.30m.
The newly identified mineralisation at Ternera East is currently interpreted to be a fault offset of the main
Ternera Deposit, with the east side of the fault having uplifted the EZT to shallower levels.
Drone Hill
Detailed, systematic mapping and sampling work was conducted at Drone Hill in 2024, with initial results
successfully delineating a new large outcropping gold anomaly. A broad, continuous zone of outcropping
gold mineralisation, associated within the northwest trending fault system of sedimentary rock was
identified.
On 13 June 2024, Tesoro reported assay results from three diamond holes drilled to test the northwest
trending fault system, traced from Ternera, to northwest of the Drone Hill target area. Exceptional results
were reported, with shallow, very high-grade gold returned in hole ZDDH0338, including:
•
•
•
1.8m @ 77.15g/t Au from 59.2m including;
0.8m @ 173.00g/t Au from 59.2m; and
3.0m @ 2.48g/t Au from 111.0m including;
− 1.0m @ 7.06g/t Au from 111.0m
These results highlight the potential for the fault system to directly link Ternera to Drone Hill, thus extending
mineralisation to over 700m of strike.
TESORO GOLD LIMITED
| 15
CORPORATE
Administrative Matters
The Company held its Annual General Meeting of shareholders on 28 November 2024 at which all
resolutions put to Shareholders were approved.
Capital Raising Activities
On 18 July 2024, Tesoro announced it had received binding commitments to raise approximately
A$9.7 million (before costs) at A$0.03 per share (July 2024 Placement) to advance El Zorro.
Strong demand was received from long term Australian, United Kingdom and European Union based
specialist precious metals institutional and sophisticated investors including a commitment of A$1.2 million
from strategic partner Gold Fields Limited (JSE:GFI, NYSE:GFI) (Gold Fields.
The July 2024 Placement comprised the issue of approximately 323.3 million new fully paid ordinary shares
(July 2024 Placement Shares) in the Company to professional and sophisticated investors, in two tranches:
•
•
Tranche 1: raised approximately A$8.5 million via the issue of 284,000,000 July 2024 Placement Shares,
comprising of 161,041,929 July 2024 Placement Shares under Listing Rule 7.1 and 122,958,071 under
Listing Rule 7.1A.
Tranche 2: raised approximately A$1.2 million via the issue of 39,833,333 July 2024 Placement Shares to
Corporate International Holdings BV, a wholly owned subsidiary of GoldFields Limited, subject to
shareholder approval which was obtained at a General Meeting held on October 2024. Following
Tranche 2 approval, Gold Fields’ investment, via its nominee increased its total shareholding in Tesoro
to approximately 17.53% (refer to ASX Announcement dated 7 October 2024).
Update on legal proceedings involving Wanaco SPA
On 9 September 2024, Tesoro provided an update on legal proceedings initiated by Wanaco SpA
(Wanaco), the joint venture partner in the El Zorro Gold Project.
On 31 August 2024, the Company received notice that certain claims filed by Wanaco in February 2024
relating to an alleged “abandonment” of works under the option and joint venture agreement between
Wanaco and Tesoro’s 95% owned Chilean subsidiary had been dismissed by the 29th Civil Court of
Santiago (the Court). The Court ordered Wanaco to pay costs in favour of Tesoro, with Wanaco retaining
the right to appeal this decision.
The Court’s dismissal represents a further rejection of Wanaco SpA's attempts to have mining concessions,
currently owned by Tesoro subsidiary El Zorro S.C.M., transferred.
Change of Financial Year End
Tesoro announced on 2 December 2024 that it had resolved to change its financial year end from 30 June
to 31 December. The change was made to facilitate better alignment with the Company’s Chilean
exploration activities with financial budgeting and reporting, including the timing of year-end financial
audit.
The Company made the change in accordance with section 323D(2A) of the Corporations Act 2001 (Cth).
TESORO GOLD LIMITED
| 16
Commencement of trading on the Frankfurt Stock Exchange
On 16 December 2024, Tesoro advised that its shares commenced trading on the Frankfurt Stock Exchange
(FSE) under the ticker code FSE: 5D7. The dual listing on the FSE now provides European investors with an
efficient mechanism to purchase Tesoro shares in euros during European market hours, allowing for
reduced transaction costs for European investors.
Significant changes in the state of affairs
As of end of the reporting period, there were no matters or circumstances that have arisen which have
significantly affected or may significantly affect the operations of the Group, the results of those operations
or the state of affairs of the Group.
Annual Mineral Resource and Ore Reserves Statement
The Company’s Exploration Results, Mineral Resource and Ore Reserve estimates are reported in
accordance with the ASX Listing Rules and the requirements and guidelines of the 2012 edition of The
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves ('the JORC
Code').
The Company carries out an annual review of its Mineral Resources and Ore Reserves, as required by the
ASX Listing Rules. The review was carried out as at 31 December 2024. The Company’s Mineral Resource
estimates did not change during the six months ended 31 December 2024.
The Company confirms that it is not aware of any new information or data that materially affects the
Mineral Resource as reported on 9 March 2023 and all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed.
The Company’s Mineral Resource Estimate for the Ternera Gold Deposit at the El Zorro Project as at 31
December 2024 and the comparatives to 30 June 2024 are listed in the tables below.
Mineral Resource Estimate as at 31 December 2024
Table 1 – El Zorro Gold Project, Ternera Gold Deposit updated Mineral Resource Estimate
Au g/t
Indicated
Inferred
Total
Area
cut off
Mt
Au g/t
Koz
Mt
Au g/t
Koz
Mt
Au g/t
Koz
Open Pit Resource
Underground
Resource
0.30
22.5
1.10
795
10.0
1.18
379
32.5
1.13
1,175
1.50
0.1
2.64
7
1.2
2.64
100
1.3
2.64
107
22.6
1.11
802
11.2
1.34
479
33.7
1.18
1,282
Total Resources
The open pit portion of the updated MRE has been constrained to a US$1,800/oz optimised pit shell reported at a 0.30g/tAu cut off. The
underground resource is reported where gold mineralisation is consistently well developed outside the optimised pit shell reported at a 1.50g/t Au cut off.
Mineral Resource Estimate as at 30 June 2024
Table 1 – El Zorro Gold Project, Ternera Gold Deposit updated Mineral Resource Estimate
Au g/t
Indicated
Inferred
Total
Area
cut off
Mt
Au g/t
Koz
Mt
Au g/t
Koz
Mt
Au g/t
Koz
Open Pit Resource
Underground
Resource
0.30
22.5
1.10
795
10.0
1.18
379
32.5
1.13
1,175
1.50
0.1
2.64
7
1.2
2.64
100
1.3
2.64
107
22.6
1.11
802
11.2
1.34
479
33.7
1.18
1,282
Total Resources
TESORO GOLD LIMITED
| 17
The open pit portion of the updated MRE has been constrained to a US$1,800/oz optimised pit shell reported at a 0.30g/tAu cut off. The
underground resource is reported where gold mineralisation is consistently well developed outside the optimised pit shell reported at a 1.50g/t Au cut off.
The Company to date has not reported any Ore Reserves for the Project.
Estimation Governance Statement
The Company ensures that all Mineral Resource and Ore Reserves estimations are subject to appropriate
levels of governance and internal controls.
Exploration results are collected and managed by an independent competent qualified geologist. All
data collection activities are conducted to industry standards based on a framework of quality assurance
and quality control protocols covering all aspects of sample collection, topographical and geophysical
surveys, drilling, sample preparation, physical and chemical analysis and data and sample management.
Mineral Resource and Ore Reserves estimates are prepared by appropriately qualified, independent
Competent Persons. If there is a material change in the estimate of a Mineral Resource or Ore Reserves,
the estimate and supporting documentation in question is reviewed by a suitable qualified independent
Competent Persons and announced to the ASX in accordance with the Listing Rules.
The Company reports its Mineral Resources and Ore Reserves on an annual basis in accordance with JORC
Code 2012.
Competent Person Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr
Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian
Institute of Geoscientists and a Director and shareholder of the Company. Mr Reeves has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves
consents to the inclusion in this report of the matters based on this information in the form and context in
which it appears.
The information in this report that relates to Mineral Resources is based on information compiled by Mr Lynn
Widenbar, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy.
Mr Widenbar is acting as an independent consultant to Tesoro Gold Ltd. Mr Widenbar has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration, and to
the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The
Company confirms that the form and context in which the Competent Person’s findings are presented
have not been materially modified from the original announcement on 9 March 2023.
The information in this report that relates to the Production Target, assumptions on modifying factors and
evaluation of other relevant factors are based on and fairly represents information and supporting
documentation that has been compiled for this announcement and have been compiled under the
supervision of Mr Linton Putland BEng (Mining), MSc (Mineral Economics) & Member AusIMM. Mr Putland is
a Director of the Company. Mr Putland has reviewed and approved the technical content of this report.
Mr Putland is a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012). Mr Putland consents to the
inclusion in this report of the matters based on his information in the form and context in which it appears.
TESORO GOLD LIMITED
| 18
This Annual Mineral Resource and Ore Reserves Statement is based on and fairly represents the information
and supporting documentation prepared by the above-mentioned Competent Persons. It is approved as
a whole by Mr Zeffron Reeves.
TESORO GOLD LIMITED
| 19
DIRECTORS’
REPORT
TESORO GOLD LIMITED
| 20
The Directors present their report, together with the financial statements, of the Group (referred to hereafter
as the “Consolidated Entity” or “the Group”) and the entities it controlled at the end of, or during, the
transitional year ended 31 December 2024 (“TY2024”).
Directors
The following persons were Directors of Tesoro Gold Ltd during, or since the end of TY2024 and up to the
date of this report, unless otherwise stated:
Mr Mark Connelly
Mr Zeffron Reeves
Mr Linton Putland
Mr Geoffrey McNamara
Mr Alan Gibson
Non-Executive Chairman
Managing Director
Executive Director – Mining and Development
Non-Executive Director
Non-Executive Director
Information on Directors
Mr Mark Connelly Non-Executive Chairman (Appointed 3 June 2024)
Mr Connelly is a seasoned financial and commercial executive with extensive resource industry experience
in management leadership and Board roles. His direct operational and capital markets experience spans
many jurisdictions including Australia, North America, South America, Africa and Europe. Mr Connelly has
an outstanding track record of Shareholder value growth and realisation, particularly over the last decade.
This includes the development and eventual sale of Papillon Resources for approximately US$570M, and
the US$597M consolidation of Endeavour Mining with Adamus Resources.
Mr Zeffron Reeves Managing Director (Appointed 29 January 2020)
BSc (Hons) (Applied Geology), MBA, MAIG
Mr Reeves is a geologist with over 25 years’ experience in the resources sector working on mineral resource
projects through all facets of development from greenfield exploration, discovery, definition and feasibility,
construction, production to closure. Mr Reeves was Managing Director of ASX listed Metallum Ltd (now
ENRG Elements Ltd) which had several development and operational projects in Chile. He has also held
senior management positions with Cleveland Mining Ltd and Ashburton Minerals Ltd, developing projects
in Brazil. Mr Reeves has a Bachelor of Applied Geology (Honours), a Masters of Business Administration from
Curtin University and is a member of the Australia Institute of Geoscientists.
Mr Linton Putland Executive Director – Mining and Development (Appointed 14 September 2021)
BEng, MSc (Economics)
Mr Putland holds degrees in Mining Engineering (Bachelor of Engineering, Western Australian School of
Mines) and a Masters of Science (Mineral Economics, Western Australian School of Mines) with more than
30 years’ experience in mining operations, joint ventures and corporate management in Australia, Africa
and the Americas, over a wide range of commodities. Mr Putland is principal of LJ Putland & Associates, a
private mining consultancy company which was founded in 2002, providing advisory and consultancy
services in mining project and company evaluation and due diligence appraisals with a focus on
corporate growth. During this period, he has also been Managing Director of a privately-owned exploration
company with joint venture interests in Africa. Prior to this he held corporate and senior management roles
in IAMGOLD, Aurion Gold, Delta Gold and Pancontinental Mining. He is a Member of AusIMM and a
Graduate Member of AICD.
TESORO GOLD LIMITED
| 21
Mr Geoffrey McNamara Non-Executive Director (Appointed 29 January 2020)
BSc (App
Share your feedback