Maiden Mineral Resource Estimate sets foundation at El Zorro
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
28JULY 2021
ASX: TSO | ACN 106 854 175
Maiden Mineral Resource Estimate of 660 koz gold
sets foundation at El Zorro
Highlights
▪
Ternera Maiden Resource (MRE) of 25.1 Mt @ 0.8 g/t for 660 koz of gold using a 0.3g/t Au cutoff, within a pit optimised of gold from the Ternera Gold Deposit, is the preferred open pit
mining scenario, based on current mining and metallurgical inputs.
▪
▪
Includes 15.4Mt @ 1.09 g/t for 540koz using a 0.5g/t Au cut-off
▪
MRE calculated using assay results from 148 drill holes of a total 204 holes drilled. Multiple
mineralised holes fall outside of current optimised pit.
▪
Potential for continued growth of the Mineral Resource at Ternera, with multiple mineralised
zones open and significant potential to convert “unclassified” resources with infill drilling.
▪
Expansion potential at surrounding prospects Ternera East, Drone Hill, Toro Blanco and
Buzzard with multiple untested drill targets.
▪
Drilling continues 24/7, with 6 drill rigs at El Zorro to define and add additional Resource
ounces.
▪
48,202,854 Performance Rights vest and become capable of exercise.
MRE delivered in under 18 months since Company’s re-quotation on ASX at a discovery cost
of approximately $21.00 per ounce.
Indicated
Cut-off Au g/t
0.3
0.4
0.5
0.6
0.7
0.8
Mt
Au g/t
2.7
2.1
1.7
1.4
1.2
0.9
0.88
1.03
1.17
1.28
1.40
1.64
Ternera Gold Deposit Maiden Resource Table
Inferred
Total
koz
Au g/t
75
68
63
58
54
45
Mt
Au g/t
22.4
17.4
13.7
11.1
8.9
6.0
0.81
0.95
1.08
1.21
1.34
1.61
koz
586
529
476
430
385
312
Mt
25.1
19.4
15.4
12.5
10.1
6.9
0.82
0.96
1.09
1.22
1.35
1.62
koz
661
597
539
488
439
357
Table 1 – El Zorro Gold Project, Ternera Gold Deposit Mineral Resource Estimate reported at various
cut offs within a optimised pit shell
Tesoro Resources Limited (Tesoro or the Company) (ASX:TSO) is pleased to announce its maiden
Mineral Resource Estimate (MRE) for the Ternera Deposit at the Company’s El Zorro Gold Project,
Chile.
1
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Tesoro Managing Director, Zeff Reeves commented:
“Tesoro is pleased to be able to deliver a significant, but incremental MRE at the El Zorro Gold
Project within only 18 months of its re-quotation on ASX. This is an amazing achievement during
globally challenging times, full credit to our professional and diligent team in Chile who have not
missed a beat in executing the work required to deliver this MRE.
We see this as just the start for El Zorro, we are committed to significantly increasing this Mineral
Resource via our ongoing drilling programs with the deposit at Ternera open in all directions. We
are also seeing significant potential for additional resources to be added over the coming months
from other targets, particularly the adjoining Ternera East and Drone Hill targets, which is not
included in the MRE. Project studies including mining, metallurgy, environmental, hydrogeology
and infrastructure are all underway to be able to define the project and assess the potential of
developing a gold mine at El Zorro”.
Ternera Maiden Mineral Resource
The Ternera Gold Deposit occurs within Tesoro’s El Zorro Gold Project (El Zorro or The Project) which
covers a total concession holding area of approximately 550km2, located approximately 130km
north of Copiapo City, in Region III (Atacama) in northern Chile. The Ternera deposit is 13km inland
from the Pacific Ocean, 57 km by road from the port of Caldera and is well supported by existing
road, power, and water infrastructure.
Figure 1 – El Zorro Project Location Map – Ternera Gold Deposit shown at the yellow diamond
2
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Tesoro commenced work on the project in 2017 and has subsequently drilled 201 diamond drill holes,
at El Zorro and defined the Ternera Gold Deposit. The Maiden MRE is based on 148 diamond holes
(46,937 m of drilling). In total Tesoro has drilled 203 holes for 61,763 m of drilling at Ternera with
diamond drill programs ongoing throughout 2021.
The project is located within the Coastal Cordillera of Chile. At Ternera gold mineralisation is
predominately hosted within numerous intermediate intrusions and associated quartz and sulphide
veins, veinlets, and alteration within faulted and strongly altered tonalitic intrusions (El Zorro Tonalite
or EZT). The EZT intrusions have intruded Permian aged basement sedimentary sequences. Gold
mineralisation at Ternera has been classified as an Intrusive Related Gold System (IRGS) which is a
new style of gold mineralisation, previously undescribed in Chile. Tesoro has discovered additional
gold targets in the El Zorro District which exhibit similar styles of gold mineralisation.
Figure 2 – El Zorro Gold Project Prospect map on geology
3
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Mineralisation within the reported MRE has been classified according to JORC 2012 code and has
been reported with an optimised pit shell.
A majority of the MRE area has been drilled on a 50m x 50m drill spacing and is classified as inferred
resources. A small portion in the Central Ternera area has been drilled at a sufficient density to be
classified as Indicated Resources (Figure 3).
Within the Ternera Mineral Resource envelope, higher grade gold mineralisation is associated with
distinct north-south faults which are both strike and dip extensive. These fault zones have formed a
number of higher-grade portions which remain open down dip and along strike (Figure 4).
FIGURE 3 – Long section view looking west of the classified Ternera block model within an optimised
open pit. Red = Indicated resource, blue = Inferred Resource, grey = optimised pit shell. Black drill
holes are used in the Resource calculation, green holes awaiting assays. Grid size = 200m. Datum =
PSAD56 19S
4
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Figure 4 – Plan view of the pit optimised classified Ternera Block Model. Optimised pit shown as pale
green. Red blocks >0.50 g/t Au highlighting grade associated with north-south trending faults. Black
holes included in resource calculation, green holes awaiting assays. 100m grid. Datum = PSAD56
19S
The Ternera Gold Deposit remains open in all directions, drilling continues to both improve the
reported resource categories, expand and add additional gold resources.
The company has now drilled >200 diamond drill holes at Ternera, with only 148 holes included in
the MRE, there is significant scope for Tesoro to increase the Resource inventory at El Zorro during
2021.
Exploration Potential
Since February 2020 Tesoro has been primarily focussed on defining and expanding a Mineral
Resource at the Ternera Deposit. However preliminary drilling was also completed which confirms
gold mineralisation outside of the Ternera Deposit at the Ternera East, Drone Hill and Toro Gordo
targets, all of which offer opportunities to increase gold Resources across the project area. A large
body of the prospective EZT has also been mapped at the Toro Blanco target to the north of Ternera.
5
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
The Company has 6 diamond drill rigs on site at El Zorro drilling 24/7.
Drilling will be focussed on:
•
Define Measured, expand Indicated and Inferred Resources at Ternera;
•
Delineation of gold resources at Ternera East and Toro Gordo;
•
Further drill testing at Drone Hill; and
•
Initial drill testing at Toro Blanco.
Significant exploration potential exists throughout the El Zorro concessions with identification of the
EZT host rocks in the wider El Zorro area. Exploration will continue throughout 2021 to assess and drill
test new targets as they are identified.
Figure 5 – Ternera MRE area on geology. Pink = Indicated Resource Area, Blue = Inferred resource
Area. Black dots = collars included in MRE, green dots = holes awaiting assays, pink circles =
resource expansion areas, blue dashed line = section 80 location.
6
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Figure 6 – Section 80. Ternera Block Model showing areas in pink circles for further expansion and
opportunity at Ternera. Red blocks >0.30g/t.
Project Studies
The Company is currently assessing the production potential of the El Zorro Gold Project, several
studies evaluating open pit mining scenarios have commenced, as well as providing inputs for
permitting.
This work includes:
•
Environmental flora and fauna surveys;
•
Social impact studies and stakeholder engagement;
•
Hydrology and hydrogeology studies;
•
Geotechnical assessment;
•
Power supply and trade off studies;
•
Detailed metallurgical testwork studies and ore classification; and
•
Preliminary mining and site infrastructure studies.
The Company’s immediate focus is on establishing Measured resources, expanding Indicated and
Inferred resources, incorporating Ternera East, Toro Gordo, Drone Hill, testing Toro Blanco, Buzzard
and making new discoveries across the project area.
All planned exploration and project studies are to be funded from existing cash reserves which
totalled $13.7M as at 30 June 2021.
Performance Rights
The Company confirms that a total of 48,202,854 Performance Rights held by Tesoro Directors Zeffron
Reeves and Geoff McNamara and two employees have vested and become capable of exercise
as a result of the MRE. These Performance Rights were subject to a performance milestone linked to
the establishment of a Mineral Resource of equal to or greater than 250,000oz at a gold grade of 1
g/t or greater, defined in accordance with the JORC Code. 46,720,000 of the vested Performance
Rights, held by Directors, remain subject to escrow.
7
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
TERNERA MINERAL RESOURCE ESTIMATE
The following is a summary of material information used to estimate the Mineral Resource, as required by Listing
Rule 5.8.1 and JORC 2012 Reporting Guidelines. Details of historic drill results and Tesoro’s exploration drilling at
Ternera including all collar tables and all significant intersections that have been previously released to the market
are listed in the announcements presented in the attached Appendices.
Mineral Tenement and Land Tenure Status
The Ternera Gold Deposit occurs within Tesoro’s El Zorro Gold Project (El Zorro or The Project) which covers a total
concession holding area of approximately 550km2, located approximately 130km north of Copiapo City, in Region
III (Atacama) in northern Chile. The Ternera deposit is 13km inland from the Pacific Ocean, 57 km by road from
the port of Caldera and is well supported by existing road, power and water infrastructure. A full list of the El Zorro
Concessions is presented in Appendix 3.
Tesoro’s 95% owned Chilean subsidiary, Tesoro Mining Chile Ltda, currently owns 85% of the El Zorro Gold Project
within a fully diluting joint venture structure.
Geology
In the El Zorro Project, the main mineralised intrusions are underlain by a Devonian age sedimentary rock sequence
consisting of interbedded siltstone, volcaniclastics, and minor quartzite, all of which has been variably
metamorphosed and folded.
In the El Zorro project area, both the sediments have been intruded by multiple mineralised tonalite to diorite
intrusions interpreted as a possible late stage differentiate of a larger granodiorite body, and have been emplaced
as dykes and sills. The granodiorite intrusion has significantly thermally metamorphosed the sediments within
several hundred metres of the contact resulting in highly resistant phyllite, dark fine grained hornfels and quartzite.
The phyllite is a very fine grained, foliated, black, dense rock.
Mineralisation is interpreted to be related to regional scale north-south striking fault zones and associated local
north-west striking strike slip faults. Mineralisation is interpreted to occur as discontinuous shoots, controlled by a
combination of the intersection of the structures with the preferred host rock tonalite, and locally developed
intersections of fracture populations that developed during strike-slip deformation.
8
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Figure 1: Schematic Section through the Ternera Deposit showing gold mineralisation associated with N-S strike
slip faults (MF faults)
Drilling Techniques and Hole Spacing
Drilling completed at the El Zorro Project and used to support the MRE includes 148 diamond core (DDH) holes for
a total of 46,937 m (Figure 2). All diamond holes are drilled from surface with most holes drilled towards the southwest with a dip of 60 degrees. Earlier holes were drilled in various orientations to define the main mineralised
trends. Drilling used a HQ (~63.5 mm diameter) drill size. Drill core was collected from a core barrel and placed in
appropriately marked core trays. Down hole core run depths were measured and marked with core blocks, and
orientation marks were routinely placed onto the core. Core was measured for core loss and core photography and
geological and geotechnical logging completed.
9
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Figure 2: Ternera Gold Deposit Drillhole Location Plan with classified shells. Pink = Indicated resource Area, Blue
= Inferred resource Area. Black dots = Drill collar locations used in resource Estimate. Green Dots = Drill hole
collars for holes awaiting assay and not used in the MRE. PSAD56-19S datum
Sampling
Sample lengths were determined by geological and significant mineralisation boundaries with a maximum sample
length of 1 metre. Core was cut in half longitudinally with an electric core saw. Core was cut such that the
orientation line remained in the core tray, and the same half of the core was collected for sampling. Quarter core
was submitted to ALS Santiago for chemical analysis using industry standard sample preparation and analytical
techniques.
Certified reference materials (CRM) at a rate of 1 in 20, and analytical blanks (1:50) were used as part of the QAQC
procedures. Field duplicates were generated from coarse reject material from the laboratory and targeted
mineralised zones at a rate of 1 in 20.
10
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Sample Analysis
All DDH samples were dispatched to ALS Copiapo Chile for sample preparation. Sample preparation included whole
sample crushing to 70% less than 2mm, Boyd rotary slitting to generate a 1 kg sub-sample, and pulverising to
achieve better than 85% passing 75 microns (ALS code PREP-31B). Sample pulps were dispatched to ALS Santiago
Chile for analysis using 50 g fire assay with atomic adsorption finish (ALS code Au-AA26). This method is considered
a total analysis.
Estimation Methodology
The geological interpretation utilised lithological logging data, and assay data to guide and control the Mineral
Resource estimation. Leapfrog™ implicit modelling software was utilised to generate three-dimensional
wireframes of the applicable lithology and fault zone horizons. Estimation domains were based on interactions
between the north-south striking fault domains and the intersecting tonalite lithology domains.
Drill hole sample data was flagged using domain codes generated from three-dimensional mineralisation domains.
Sample data was composited to one-metre downhole lengths using a best fit-method. No residuals were generated.
Statistical analysis was carried out on data from all estimated domains, with hard boundary techniques employed
within each estimation domain.
Analysis of the composite data indicated the presence of outlier values indicating grade capping was required for
selected domains. Capped values were generally selected above the 99th percentile. Additionally, distance
restrictions on samples with elevated grades were applied whereby the composite grade is capped at a specified
threshold outside of a nominated influence distance, typically 20 m.
Grade estimates were completed for gold (Au g/t) and density (g/cm3). The grade estimation process was
completed using Maptek Vulcan software using Ordinary Kriging (OK) together with dynamic anisotropy to guide
the grade interpolation parallel to the domain boundaries. For estimation domains with insufficient sample data a
variogram model from a comparable domain was assigned.
Interpolation parameters were derived using standard exploratory data analysis techniques of statistical and
continuity analysis. Appropriate interpolation strategies were developed on a domain basis using kriging
neighbourhood analysis (KNA) with a minimum number of 8 composites and a maximum number of 20 composites.
Blocks were estimated in a two-pass strategy with first pass maximum search distances of 50 metres. The second
pass search distance was increased to between 100 m to 180 m depending on domain and modelled variogram
continuity. An image showing the estimated grades across the model is presented in Error! Reference source not
found..
11
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Figure 3 - Oblique view looking north west showing Indicated and Inferred blocks above 0.3 g/t Au
The model has a block size of 20 m (X) by 20 m (Y) by 5 m (Z) within the moderately dipping tonalite domains, and
5 m (X) by 20 m (Y) by 20 m (Z) within the steeply dipping north-south striking fault domains. Sub-celling of 2.5 m
(X) by 2.5 m (Y) by 1.25m (Z) was applied across the block model to aid in suitable volume definition. Grades were
estimated into the parent cells.
The block model was validated using a combination of visual and statistical techniques including global statistics
comparisons, and trend plots, and grade-tonnage assessments.
Resource Classification
A range of criteria was considered by Cube when addressing the suitability of the classification boundaries. These
criteria include:
•
Geological continuity and volume;
•
Drill spacing and drill data quality;
•
Modelling technique; and
•
Estimation properties, including search strategy, number of informing composites, average
distance of composites from blocks and kriging quality parameters.
Blocks have been classified in both the Indicated (11%) and Inferred (89%) categories, primarily based on
geological interpretation confidence and drill data spacing in combination with other model estimate quality
parameters.
The Indicated Resource is constrained to the central portion of the project area with the greatest drill density and
restricted to the main tonalite lithology unit and associated fault domains.
Cut-off Grade
The Mineral Resource has been reported above a 0.30 g/t Au cut-off. Selection of the cut-off has considered results
of metallurgical testing (ASX release 9 June 2020). The applied cut-off has been reviewed against that reported
from peer projects with similar mineralisation styles and proposed processing options and is considered
comparable.
Reporting of Mineral Resources have been assessed against a resource limiting optimisation shell using
appropriate cost, metallurgical recovery, and price assumptions. Material within the optimised pit shell has, in the
opinion of the Competent Person, met the conditions for reporting of a Mineral Resource with reasonable prospects
of eventual economic extraction.
Mining and Metallurgy
Development of this Mineral Resource assumes mining using standard equipment and methods. The assumed
mining method is conventional truck and shovel, open pit mining at an appropriate bench height.
Mineral Resource Statement
The mineralised material that has been interpreted to have “reasonable prospects of eventual economic
extraction” by open pit mining methods was defined as mineralised material that has a cut-off grade above 0.30
g/t within an optimised pit shell. The assumptions used in to model the optimised open pit shell are presented in
the table below.
12
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Item
Average Mining Cost
Value
2.10
Mining Dilution
Mining Recovery
Gold price
Recovery Au
Units
US$/t
mined
%
%
US$ per oz
%
Processing cost
US$/t milled
13.60
General and Administration
Tailings
Closure cost provisions
Overall slope angle
$/t milled
$/t milled
$/t milled
Degree
3.60
0.15
1.00
42.5
10
95
2,500
94
Justification
Based on mining cycle time modelling
Industry Standard assumption for open pit
Industry Standard assumption for open pit
Based on preliminary metallurgical testwork as announced to the
ASX on 9th June 2020
Based on cost modelling from metallurgical testwork and
database costs
Based on previous costs estimates database
Based on previous costs estimates database
Based on previous costs estimates database
Based on geotechnical logging and groundwater measurements
in host rock units.
Competent Persons Statement
The information in this report that relates to Mineral Resources is based on information compiled by Mr Daniel
Saunders, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr
Saunders is a full-time employee of Cube Consulting Pty Ltd, acting as independent consultants to Tesoro
Resources Limited. Mr Saunders has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’.
Mr Saunders consents to the inclusion in the report of the matters based on his information in the form and context
in which it appears.
13
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
Authorised by the Board of Tesoro Resources Limited.
For more information:
Company:
Zeff Reeves Managing Director
Tesoro Resources Limited
+61 8 9322 1587
Investors:
Peter Taylor
NWR Communications
+61 (0) 412 036 231
peter@nwrcommunications.com.au
About Tesoro
Tesoro Resources Limited was established with a strategy of acquiring,
exploring, and developing mining projects in the Coastal Cordillera region of
Chile. The Coastal Cordillera region is host to multiple world class copper and
gold mines, has well established infrastructure, service providers and an
experienced mining workforce. Large areas of the Coastal Cordillera remain
unexplored due to the unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and experience has been
able secure rights to a district scale gold project in-line with the Company’s
strategy. Tesoro’s 95% owned Chilean subsidiary owns 85% of the El Zorro Gold
Project.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and shareholder of the Company. Mr Reeves has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in
this report of the matters based on this information in the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled by Mr Daniel
Saunders, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr
Saunders is a full-time employee of Cube Consulting Pty Ltd, acting as independent consultants to Tesoro
Resources Limited. Mr Saunders has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Saunders consents to the inclusion in the report of the matters based on his information
in the form and context in which it appears.
Future Performance
This announcement may contain certain forward-looking statements and opinion. Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and should
not be relied on as an indication or guarantee of future performance and involve known and unknown risks,
uncertainties, assumptions, contingencies and other important factors, many of which are outside the control
of the Company and which are subject to change without notice and could cause the actual results,
performance or achievements of the Company to be materially different from the future results, performance
or achievements expressed or implied by such statements. Past performance is not necessarily a guide to
future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward-looking statements or other forecast. Nothing contained in this announcement
nor any information made available to you is, or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future performance of Tesoro.
14
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 28 July 2021
APPENDIX 1 – SIGNIFICANT INTERCEPT TABLE
Hole_ID
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0004
ZDDH0004
ZDDH0004
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0008
ZDDH0008
15
From (m)
5.00
5.00
5.00
12.00
14.30
33.64
44.30
64.00
75.50
75.50
107.00
117.00
5.70
8.80
8.80
51.70
58.00
21.00
21.00
21.00
37.20
47.30
64.00
90.00
5.00
56.00
57.00
4.00
4.00
9.80
9.80
51.60
65.00
72.00
72.00
72.00
100.60
130.00
135.80
0.00
2.40
22.60
24.00
46.70
61.10
108.30
133.50
148.00
180.10
180.10
184.00
207.00
226.00
236.00
1.00
39.00
39.00
104.85
117.40
35.00
58.00
To (m)
119.00
15.00
51.30
13.00
15.00
39.00
51.30
65.00
79.00
76.00
112.00
119.00
68.00
24.30
14.00
68.00
61.00
77.30
27.00
22.83
43.00
48.00
77.30
91.00
66.00
66.00
61.00
42.65
32.00
28.00
10.15
52.00
67.00
85.90
75.00
73.00
102.00
132.60
136.80
88.00
3.00
25.95
25.00
50.30
64.02
116.00
135.60
151.80
244.00
181.10
186.00
212.00
227.00
244.00
4.00
66.20
58.00
110.00
118.00
41.10
59.00
Interval
114.00
10.00
46.30
1.00
0.70
5.36
7.00
1.00
3.50
0.50
5.00
2.00
62.30
15.50
5.20
16.30
3.00
56.30
6.00
1.83
5.80
0.70
13.30
1.00
61.00
10.00
4.00
38.65
28.00
18.20
0.35
0.40
2.00
13.90
3.00
1.00
1.40
2.60
1.00
88.00
0.60
3.35
1.00
3.60
2.92
7.70
2.10
3.80
63.90
1.00
2.00
5.00
1.00
8.00
3.00
27.20
19.00
5.15
0.60
6.10
1.00
Au (g/t)
0.35
0.55
0.45
1.64
2.35
0.97
0.67
2.50
0.89
4.82
1.11
2.05
0.54
1.15
1.96
0.78
3.62
0.50
1.96
5.24
1.27
2.00
0.41
1.53
0.97
4.53
9.60
0.65
0.84
1.17
20.10
2.03
1.03
0.52
1.90
4.32
2.07
0.66
12.20
0.15
0.75
2.14
6.10
0.32
0.42
0.30
1.30
0.59
0.23
0.55
1.06
0.77
0.55
0.66
4.75
0.70
0.80
0.34
2.75
0.28
1.43
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
From (m) To (m)
ZDDH0009 4.00
6.00
ZDDH0009 12.55
38.00
ZDDH0009 21.00
26.00
ZDDH0009 48.00
48.50
ZDDH0009 78.00
83.00
ZDDH0010 31.00
33.00
ZDDH0010 60.00
61.00
ZDDH0010 66.00
67.00
ZDDH0010 75.00
159.30
ZDDH0010 75.00
104.00
ZDDH0010 82.50
86.45
ZDDH0010 91.00
102.00
ZDDH0010 93.00
97.00
ZDDH0010 120.00
126.00
ZDDH0010 149.00
159.00
ZDDH0011 176.00
274.30
ZDDH0011 181.70
212.00
ZDDH0011 196.40
212.00
ZDDH0011 203.00
203.70
ZDDH0011 203.00
212.00
ZDDH0011 217.00
222.00
ZDDH0011 246.60
256.40
ZDDH0012 0.00
58.80
ZDDH0012 1.70
22.00
ZDDH0012 1.70
8.40
ZDDH0012 2.30
4.70
ZDDH0012 17.60
22.00
ZDDH0012 17.60
20.00
ZDDH0012 53.20
58.80
ZDDH0012 53.20
56.00
ZDDH0012 151.80
152.20
ZDDH0013 0.00
3.00
ZDDH0013 9.00
14.30
ZDDH0013 25.00
29.80
ZDDH0013 28.55
29.80
ZDDH0013 46.30
70.00
ZDDH0013 46.30
51.50
ZDDH0013 51.25
65.35
ZDDH0013 58.00
65.35
ZDDH0013 102.0
Share your feedback
Discover