Intercept confirms large scale potential at El Zorro
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
4 SEPTEMBER 2020
ASX: TSO | ACN 106 854 175
Massive Drill Intercept Confirms Large Scale Potential at El Zorro
231.00m @ 0.83g/t Au (192g/m’s) from 72.00m, including
54.00m @ 1.69g/t Au, 25.00m @ 3.36g/t Au & 13.26m @ 3.25g/t Au
▪
▪
Additional assays have been received for hole ZDDH00031 and assays for hole ZDDH00032.
▪
Significant intercepts include;
Mineralised intercept previously reported for hole ZDDH00031(ASX Announcement 26 August
2020) has been extended to 231.00m @ 0.83g/t Au (192g/m’s) with hole passing through
multiple wide, higher grade, zones.
•
ZDDH00031
•
231.00m @ 0.83g/t Au from 72.00m – 192g/m’s -including:
•
54.00m @ 1.69g/t Au from 72.00m;
•
25.00m @ 3.36g/t Au from 100.00m;
•
6.70m @ 11.57g/t Au from 118.30m;
•
24.30m @ 2.43g/t Au from 193.30m;
•
13.26m @ 3.25g/t Au from 204.34m;
•
3.66m @ 10.76g/t Au from 204.34; and
•
15.90m @ 1.04g/t Au from 248.00m.
ZDDH00032
▪
▪
▪
Results demonstrate large scale potential at El Zorro.
▪
8 of 32 (one quarter) of the holes returned to date have now reported intercepts of >100g/m’s
including previously reported results of:
▪
1
76.00m @ 0.93g/t Au from 75.00m including:
•
12.00m @ 1.39g/t Au from 128.00m;
•
2.37m @ 4.30g/t Au from 132.63m;
•
18.70m @ 1.57g/t Au from 178.30m; and
•
6.00m @ 2.58g/t Au from 191.00m.
•
ZDDH00010 – 84.30m @ 1.30g/t Au from 75.00m – 110g/m’s;
•
ZDDH00011 – 98.30m @ 1.58g/t Au from 176.00m – 155g/m’s;
•
ZDDH00012 – 58.80m @ 1.70g/t Au from 0.00m – 100g/m’s;
•
ZDDH00017 – 86.45m @ 2.29g/t Au from 167.55m – 198g/m’s;
•
ZDDH00018 – 34.73m @ 2.94g/t Au from 187.27m – 102g/m’s;
•
ZDDH00025 – 121.55m @ 1.32g/t Au from 49.00m – 160g/m’s; and
•
ZDDH00029 – 176.50m @ 0.85g/t Au from 29.50m – 150g/m’s.
Drill program is now planned to double to a minimum of 10,000m
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
Tesoro Resources Limited (Tesoro or the Company) (ASX: TSO) is pleased to announce assay results
received from the Ternera Prospect at the El Zorro Gold Project, Chile, for holes ZDDH00031 and
ZDDH00032 (Figure 1). Results for ZDDH00031 are additional to results previously announced (ASX
announcement 26 August 2020) Both holes intersected gold mineralisation associated with the
targeted “CC” faults and adjacent sheeted vein and alteration zones.
Hole_ID
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
From (m) To (m)
72.00
303.00
72.00
126.00
72.00
75.60
100.00
104.44
100.00
125.00
118.30
125.00
146.40
154.00
171.60
173.00
193.30
217.60
193.30
208.00
193.30
197.00
204.34
217.60
204.34
208.00
228.00
229.00
248.00
263.90
291.00
295.00
3.20
6.00
17.30
18.30
43.50
44.00
75.00
76.00
128.00
204.00
128.00
140.00
132.63
135.00
157.00
162.00
171.00
174.80
178.30
197.00
178.30
179.40
191.00
197.00
Interval
231.00
54.00
3.60
4.44
25.00
6.70
7.60
1.40
24.30
14.70
3.70
13.26
3.66
1.00
15.90
4.00
2.80
1.00
0.50
1.00
76.00
12.00
2.37
5.00
3.80
18.70
1.10
6.00
Au (g/t) Comments
0.83
1.69
1.27
including
1.04
including
3.36
including
11.57
including
0.79
including
1.40
including
2.43
including
3.77
including
4.16
including
3.25
including
10.76
including
2.17
including
1.04
including
1.00
including
1.23
7.09
5.70
5.02
0.93
1.39
including
4.30
including
2.41
including
1.92
including
1.57
including
5.15
including
2.58
including
Table 1 – Significant drill results for holes ZDDH00031 and ZDDH00032. Results are uncut, no top cut
has been applied. A full table of significant intercepts is presented in Appendix 1.
2
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
Hole_ID
From (m) To (m) Interval Au (g/t) g/m
ZDDH0010 75.00
159.30 84.30
1.30
109.59
ZDDH0010 75.00
104.00 29.00
2.95
ZDDH0010 91.00
102.00 11.00
4.70
ZDDH0011 176.00
274.30 98.30
1.58
155.31
ZDDH0011 181.70
212.00 30.30
3.03
ZDDH0011 196.40
212.00 15.60
3.87
ZDDH0012 0.00
58.80 58.80
1.70
99.96
ZDDH0012 1.70
22.00 20.30
4.50
ZDDH0017 167.55
254.00 86.45
2.29
197.97
ZDDH0017 183.22
206.22 23.00
7.20
ZDDH0017 190.00
205.00 15.00
10.82
ZDDH0018 187.27
222.00 34.73
2.94
102.11
ZDDH0018 187.27
211.00 23.73
4.09
ZDDH0025 49.00
170.55 121.55 1.32
160.45
ZDDH0025 148.00
160.27 12.27
4.98
ZDDH0029 29.50
206.00 176.50 0.85
150.03
ZDDH0029 29.50
93.00 63.50
1.81
ZDDH0031 72.00
303.00 231.00 0.83
191.73
ZDDH0031 100.00
125.00 25.00
3.36
ZDDH0031 193.30
208.00 14.70
3.77
ZDDH0031 204.34
217.60 13.26
3.25
Comment
including
including
including
including
including
including
including
including
including
including
including
including
including
Table 2 – List of Ternera drill holes returning greater than 100g/m drill intercepts to date, for full table
of significant intercepts refer Appendix 1.
Tesoro Managing Director Zeff Reeves commented:
“Drilling results continue to impress from Ternera with hole ZDDH00031 returning the widest intercept
we have drilled to date and it is the 8th hole of 32 holes with assays, that has returned a greater than
100g/m intercept. That is an exceptional result and a reflection of the potential of El Zorro and the
outstanding work being done by our technical team on the ground in Chile. Hole ZDDH00032 has
defined a good gold zone which remains open to the south. The geological model is holding up,
with multiple well mineralised faults being identified within a large lower grade halo. This bodes well
for further expanding the mineralisation already defined at Ternera.”
COMMENTARY
ZDDH00031 has been drilled to a depth of 320m. Assays have now been received for the entire
hole (0.00m-156.00m - results previously announced on 26 August 2020). ZDDH00031 returned a
wide, well mineralised intercept of 231.00m @ 0.83g/t Au from 72.00m with multiple higher-grade
zones associated with multiple “CC” faults.
CC450 Fault intercept returned 25.00m @ 3.36g/t from 100.00m including 6.70m @ 11.57g/t Au from
118.30m.
CC425 Fault intercept returned 24.30m @ 2.43 g/t Au from 193.30m including 14.70m @ 3.77g/t
from 193.30m and 3.66m @ 10.76g/t Au from 204.34m.
CC400 Fault intercept returned 15.90m @ 1.04 g/t Au from 248.00m.
Lower grade gold mineralisation was continuous between the CC fault zones, connected by
mineralised sheeted vein complexes. Mineralisation encountered in hole ZDDH00031 remains open
to the south and at depth.
3
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
ZDDH00032 tested the southern extension mineralisation associated with CC350, CC375 and
CC400 fault zones. It returned a broad intercept of 76.00m @ 0.93 g/t Au from 128.00m with multiple
higher-grade zones associated with multiple “CC” faults.
CC350 fault intercept returned a narrow high-grade intercept of 1.00m @ 5.02g/t Au from within
the hanging wall sediments.
CC375 Fault intercept returned 12.00m @ 1.39g/t Au from 128.00m including 2.37m @ 4.30g/t Au
from 132.63m.
CC400 Fault intercept returned 6.00m @ 2.58g/t Au from 191.00m.
Several zones of strong mineralisation were encountered associated with sheeted vein complexes
between the CC faults including 18.70m @ 1.57g/t Au from 178.30m and 1.10m @ 5.15g/t Au.
Mineralisation encountered in hole ZDDH00032 is strongly associated with a high chargeability IP
anomaly and is open to the south and at depth (Figure 2).
Tesoro has now completed 22 diamond drill holes in the current phase of drilling for 5,739m. Details
for all diamond drill holes completed to date are presented in Table 3.
Assay results remain outstanding for 18 diamond drill holes and drilling continues.
4
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
Figure 1 – Ternera Prospect Interpreted geology map and drilling showing the interpreted highgrade CC fault zones. New results in this announcement highlighted in gold.
5
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
Figure 2- Ternera prospect 0.5 Vertical derivative Gradient Array Induced Polarisation image and
current drill program completed holes. PSAD56/19S datum.
6
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
Figure 3 – Ternera long section looking NW showing mineralised CC Faults System. Section
window +/- 200m
Hole ID
Hole Location
Hole
Orientation Drill Depth
Northing Easting Elevation Dip Azimuth
ZDDH00028 7036049 341605 581
-60 240
220.60
ZDDH00029 7036351 341849 603
-60 240
250.00
ZDDH00030 7036061 341676 569
-60 240
250.00
ZDDH00031 7036290 341875 605
-60 240
320.00
ZDDH00032 7036047 341757 584
-60 60
285.90
ZDDH00033 7036305 341846 599
-60 240
205.00
ZDDH00034 7036149 341781 579
-60 240
220.60
ZDDH00035 7036349 341876 612
-60 240
283.20
ZDDH00036 7036169 341840 597
-60 240
280.30
ZDDH00037 7036387 341829 624
-60 240
230.00
ZDDH00038 7036118 341693 584
-60 240
299.30
ZDDH00039 7036452 341942 658
-60 240
310.00
ZDDH00040 7036257 341878 607
-60 240
300.00
ZDDH00041 7036092 341621 591
-60 240
200.00
ZDDH00042 7036595 341800 610
-60 240
201.00
ZDDH00043 7036203 341796 584
-60 240
250.00
ZDDH00044 7036501 341643 588
-60 240
308.20
ZDDH00045 7036243 341751 610
-60 240
271.20
ZDDH00046 7036220 341742 613
-60 240
260.00
ZDDH00047 7036100 341774 578
-60 240
320.00
ZDDH00048 7036298 341760 615
-60 240
230.00
ZDDH00049 7036228 341897 626
-60 240
243.50
Table 3 – Drill hole details for holes completed to date in the current phase of drilling. Assays
remain outstanding for holes ZDDH00033 to ZDDH00049. Co-ordinate system is PSAD56-19S.
7
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
NEXT STEPS
The Company continues to drill at Ternera with two diamond drill rigs operating 24 hours per day.
Additional holes are being planned to test the newly identified southern extension. The current drill
program has been expanded to a minimum of 10,000m, to include extensional and additional infill
holes as the defined mineralised footprint at Ternera continues to expand.
Authorised by the Board of Tesoro Resources Limited.
8
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
For more information:
Company:
Zeff Reeves Managing Director
Tesoro Resources Limited
+61 8 9322 1587
Investors:
Peter Taylor
NWR Communications
+61 (0) 412 036 231
peter@nwrcommunications.com.au
About Tesoro
Tesoro Resources Limited was established with a strategy of acquiring,
exploring and developing mining projects in the Coastal Cordillera region of
Chile. The Coastal Cordillera region is host to multiple world class copper and
gold mines, has well established infrastructure, service providers and an
experienced mining workforce. Large areas of the Coastal Cordillera remain
unexplored due to the unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and experience has been
able secure rights to a district scale gold project in-line with the Company’s
strategy. Tesoro has rights to acquire up to 80% of the El Zorro Gold Project.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and major shareholder of the Company. Mr Reeves has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion
in this report of the matters based on this information in the form and context in which it appears.
Future Performance
This announcement may contain certain forward-looking statements and opinion. Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and should
not be relied on as an indication or guarantee of future performance and involve known and unknown risks,
uncertainties, assumptions, contingencies and other important factors, many of which are outside the control
of the Company and which are subject to change without notice and could cause the actual results,
performance or achievements of the Company to be materially different from the future results, performance
or achievements expressed or implied by such statements. Past performance is not necessarily a guide to
future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward-looking statements or other forecast. Nothing contained in this announcement
nor any information made available to you is, or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future performance of Tesoro.
9
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
APPENDIX 1 – Significant Intercept Table
Hole_ID
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0004
ZDDH0004
ZDDH0004
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
10
From (m)
5.00
5.00
5.00
12.00
14.30
33.64
44.30
64.00
75.50
75.50
107.00
117.00
5.70
8.80
8.80
51.70
58.00
21.00
21.00
21.00
37.20
47.30
64.00
90.00
5.00
56.00
57.00
4.00
4.00
9.80
9.80
51.60
65.00
72.00
72.00
72.00
100.60
130.00
135.80
0.00
2.40
22.60
24.00
46.70
61.10
108.30
133.50
148.00
180.10
180.10
184.00
207.00
226.00
236.00
1.00
39.00
39.00
104.85
117.40
To (m)
119.00
15.00
51.30
13.00
15.00
39.00
51.30
65.00
79.00
76.00
112.00
119.00
68.00
24.30
14.00
68.00
61.00
77.30
27.00
22.83
43.00
48.00
77.30
91.00
66.00
66.00
61.00
42.65
32.00
28.00
10.15
52.00
67.00
85.90
75.00
73.00
102.00
132.60
136.80
88.00
3.00
25.95
25.00
50.30
64.02
116.00
135.60
151.80
244.00
181.10
186.00
212.00
227.00
244.00
4.00
66.20
58.00
110.00
118.00
Interval
114.00
10.00
46.30
1.00
0.70
5.36
7.00
1.00
3.50
0.50
5.00
2.00
62.30
15.50
5.20
16.30
3.00
56.30
6.00
1.83
5.80
0.70
13.30
1.00
61.00
10.00
4.00
38.65
28.00
18.20
0.35
0.40
2.00
13.90
3.00
1.00
1.40
2.60
1.00
88.00
0.60
3.35
1.00
3.60
2.92
7.70
2.10
3.80
63.90
1.00
2.00
5.00
1.00
8.00
3.00
27.20
19.00
5.15
0.60
Au (g/t)
0.35
0.55
0.45
1.64
2.35
0.97
0.67
2.50
0.89
4.82
1.11
2.05
0.54
1.15
1.96
0.78
3.62
0.50
1.96
5.24
1.27
2.00
0.41
1.53
0.97
4.53
9.60
0.65
0.84
1.17
20.10
2.03
1.03
0.52
1.90
4.32
2.07
0.66
12.20
0.15
0.75
2.14
6.10
0.32
0.42
0.30
1.30
0.59
0.23
0.55
1.06
0.77
0.55
0.66
4.75
0.70
0.80
0.34
2.75
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
From (m) To (m)
ZDDH0008 35.00
41.10
ZDDH0008 58.00
59.00
ZDDH0009 4.00
6.00
ZDDH0009 12.55
38.00
ZDDH0009 21.00
26.00
ZDDH0009 48.00
48.50
ZDDH0009 78.00
83.00
ZDDH0010 31.00
33.00
ZDDH0010 60.00
61.00
ZDDH0010 66.00
67.00
ZDDH0010 75.00
159.30
ZDDH0010 75.00
104.00
ZDDH0010 82.50
86.45
ZDDH0010 91.00
102.00
ZDDH0010 93.00
97.00
ZDDH0010 120.00
126.00
ZDDH0010 149.00
159.00
ZDDH0011 176.00
274.30
ZDDH0011 181.70
212.00
ZDDH0011 196.40
212.00
ZDDH0011 203.00
203.70
ZDDH0011 203.00
212.00
ZDDH0011 217.00
222.00
ZDDH0011 246.60
256.40
ZDDH0012 0.00
58.80
ZDDH0012 1.70
22.00
ZDDH0012 1.70
8.40
ZDDH0012 2.30
4.70
ZDDH0012 17.60
22.00
ZDDH0012 17.60
20.00
ZDDH0012 53.20
58.80
ZDDH0012 53.20
56.00
ZDDH0012 151.80
152.20
ZDDH0013 0.00
3.00
ZDDH0013 9.00
14.30
ZDDH0013 25.00
29.80
ZDDH0013 28.55
29.80
ZDDH0013 46.30
70.00
ZDDH0013 46.30
51.50
ZDDH0013 51.25
65.35
ZDDH0013 58.00
65.35
ZDDH0013 102.00
104.00
ZDDH0013 136.00
137.30
ZDDH0013 165.00
173.60
ZDDH0013 170.40
173.00
ZDDH0014 15.30
70.60
ZDDH0014 15.30
34.00
ZDDH0014 15.30
26.30
ZDDH0014 23.00
26.30
ZDDH0014 64.60
70.60
ZDDH0014 64.60
67.35
ZDDH0014 112.00
122.50
ZDDH0014 115.00
117.00
ZDDH0014 177.20
179.00
ZDDH0015 37.90
39.70
ZDDH0015 91.90
132.70
ZDDH0015 91.90
94.60
ZDDH0015 112.00
116.00
ZDDH0015 240.60
242.00
ZDDH0015 265.90
269.00
Interval
6.10
1.00
2.00
25.45
5.00
0.50
5.00
2.00
1.00
1.00
84.30
29.00
3.95
11.00
4.00
6.00
10.00
98.30
30.30
15.60
0.70
9.00
5.00
9.80
58.80
20.30
6.70
2.40
4.40
2.40
5.60
2.80
0.40
3.00
5.30
4.80
1.25
23.70
5.20
14.10
7.35
2.00
1.30
8.60
2.60
55.30
18.70
11.00
3.30
6.00
2.75
10.50
2.00
1.80
1.80
40.80
2.70
4.00
1.40
3.10
Au (g/t) Comments
0.28
1.43
1.39
0.51
1.09
including
2.19
0.59
2.47
1.16
1.04
1.30
2.95
including
4.97
including
4.70
including
8.50
including
1.11
including
1.07
including
1.58
3.03
including
3.87
including
21.70
including
5.07
including
4.13
including
2.28
including
1.70
4.50
including
12.21
including
33.35
including
2.00
including
2.82
including
0.95
1.42
including
2.29
0.83
0.41
0.72
2.14
including
0.85
1.24
including
1.08
including
1.65
including
0.79
4.97
1.60
2.80
including
1.01
2.19
including
3.40
including
6.18
including
2.03
including
5.00
including
0.52
1.75
including
2.37
1.11
0.37
1.64
including
1.13
including
8.46
0.64
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
Hole_ID
ZDDH0016
ZDDH0016
ZDDH0016
ZDDH0016
ZDDH0016
ZDDH0016
ZDDH0016
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0018
ZDDH0018
ZDDH0018
ZDDH0018
ZDDH0019
ZDDH0019
ZDDH0019
ZDDH0020
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0023
ZDDH0023
ZDDH0023
ZDDH0023
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0026
ZDDH0026
ZDDH0026
ZDDH0026
From (m)
125.00
152.00
188.10
188.58
203.60
281.00
287.50
44.00
44.00
44.00
70.00
103.46
167.55
182.70
183.22
190.00
197.00
200.00
187.27
187.27
197.00
189.00
21.00
36.00
74.00
87.30
100.92
107.50
100.92
189.25
189.25
189.25
193.90
30.00
78.00
94.40
105.00
105.00
146.70
146.70
273.00
276.00
6.00
41.00
41.00
44.10
54.50
56.50
66.00
155.00
162.20
161.80
49.00
73.10
75.00
104.00
110.00
148.00
148.00
155.20
92.00
105.40
233.00
240.00
To (m)
131.72
204.60
194.00
188.90
204.60
290.00
290.00
74.00
60.10
47.00
74.00
105.60
254.00
233.20
206.22
205.00
202.30
202.30
222.00
211.00
199.70
204.00
89.52
45.00
79.00
87.60
116.50
112.00
101.70
208.50
201.30
195.40
195.40
31.00
119.17
95.45
119.17
110.32
151.00
149.00
277.00
277.00
9.00
78.00
45.50
45.50
57.00
69.50
69.50
169.00
163.50
167.00
170.55
84.00
82.00
118.00
113.60
160.27
170.55
159.90
110.00
110.00
242.00
242.00
Interval
6.72
52.60
5.90
0.32
1.00
9.00
2.50
30.00
16.10
3.00
4.00
2.14
86.45
50.50
23.00
15.00
5.30
2.30
34.73
23.73
2.70
15.00
68.52
9.00
5.00
0.30
15.58
4.50
0.78
19.25
12.05
6.15
1.50
1.00
41.17
1.05
14.17
5.32
4.30
2.30
4.00
1.00
3.00
37.00
4.50
1.40
2.50
13.00
3.50
14.00
1.30
5.20
121.55
10.90
7.00
14.00
3.60
12.27
22.55
4.70
18.00
4.60
9.00
2.00
Au (g/t)
1.47
0.62
3.30
31.30
3.00
0.36
0.77
0.94
1.05
4.27
4.26
1.76
2.29
3.63
7.20
10.82
25.31
46.41
2.94
4.09
22.21
5.99
0.47
1.34
1.23
3.33
0.95
1.24
8.44
2.86
4.25
7.37
20.82
3.16
1.38
2.98
3.25
6.54
7.25
13.30
1.06
3.32
1.63
0.86
2.12
5.93
1.87
1.12
2.53
3.06
19.72
6.97
1.32
4.57
6.14
1.63
4.97
4.98
2.98
10.69
1.36
4.99
1.85
7.31
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
open downhole
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
ZDDH0027
ZDDH0027
ZDDH0027
ZDDH0027
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
From (m)
176.00
176.00
176.00
176.00
14.00
21.00
25.00
42.00
43.90
29.50
29.50
29.50
43.00
56.64
72.00
91.00
121.00
121.00
167.40
176.30
180.00
193.00
5.20
50.00
66.00
66.00
66.00
70.00
101.00
117.00
117.00
165.00
195.40
202.95
72.00
72.00
72.00
100.00
100.00
118.30
146.40
171.60
193.30
193.30
193.30
204.34
204.34
228.00
248.00
291.00
3.20
17.30
43.50
75.00
128.00
128.00
132.63
157.00
171.00
178.30
178.30
191.00
To (m)
206.50
202.00
188.00
182.00
14.75
28.00
25.90
49.00
45.00
206.00
93.00
31.20
48.00
61.84
80.00
93.00
130.70
122.00
195.00
185.90
183.00
195.00
6.40
76.00
76.00
71.10
67.00
71.10
102.50
120.00
119.13
167.00
199.00
203.90
303.00
126.00
75.60
104.44
125.00
125.00
154.00
173.00
217.60
208.00
197.00
217.60
208.00
229.00
263.90
295.00
6.00
18.30
44.00
76.00
204.00
140.00
135.00
162.00
174.80
197.00
179.40
197.00
Interval
30.50
26.00
12.00
6.00
0.75
7.00
0.90
7.00
1.10
176.50
63.50
1.70
5.00
5.20
8.00
2.00
9.70
1.00
27.60
9.60
3.00
2.00
1.20
26.00
10.00
5.10
1.00
1.10
1.50
3.00
2.13
2.00
3.60
0.95
231.00
54.00
3.60
4.44
25.00
6.70
7.60
1.40
24.30
14.70
3.70
13.26
3.66
1.00
15.90
4.00
2.80
1.00
0.50
1.00
76.00
12.00
2.37
5.00
3.80
18.70
1.10
6.00
Au (g/t)
0.40
0.44
0.64
1.21
3.23
0.85
5.03
0.61
1.10
0.85
1.81
1.20
2.76
3.36
1.24
33.00
0.53
3.20
0.85
1.82
4.75
1.75
0.74
0.69
1.54
2.64
6.89
5.73
1.13
3.23
4.15
4.05
1.41
5.12
0.83
1.69
1.27
1.04
3.36
11.57
0.79
1.40
2.43
3.77
4.16
3.25
10.76
2.17
1.04
1.00
1.23
7.09
5.70
5.02
0.93
1.39
4.30
2.41
1.92
1.57
5.15
2.58
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
open downhole
open downhole
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
*For full results for holes ZDDH00001 to ZDDH00016 refer to Plukka Ltd Prospectus 30 October 2019. For results of ZDDH00017 and
ZDDH0025 refer to TSO:ASX announcements 6 March,12 March, 27 April, 6 May, 27 May 2020, 10 June 2020 and 26 August 2020.
11
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
APPENDIX 2 – JORC TABLES
JORC Table 1
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as downhole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Tesoro has completed 49 diamond drill holes for 11,460.70m
in 2017, 2018 and 2020 (ZDDH0001 to ZDDH0049).
Diamond drill holes were drilled with HQ. Sampling was half
core at geologically defined and significant mineralisation
boundaries.
Tesoro considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Tesoro Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Tesoro consider this appropriate for the style of
mineralisation.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done,
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Diamond drilling was used to obtain ½ core samples of various
lengths (minimum 0.25m), from which 1kg of material was
pulverised passing 200 mesh to produce a 50g charge for fire
assay fusion with a gravimetric finish. Multielement assays
were completed by 4-acid digest with a 2.5g charge. Tesoro
consider these appropriate assay techniques.
Drilling techniques • Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Tesoro has completed 49 diamond drill holes for 11,460.70m.
Diamond drill holes were drilled with HQ. Sampling was half
core at geological and significant mineralisation boundaries.
Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
Core recovery was estimated using the drillers recorded depth
marks against the length of the core recovered. Reviewing the
core photos, there are occasional shears/faults where core is
broken. There is however no significant core loss.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
A single tube system was employed and in general core
recovery good.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
There appears to be no potential sample bias as there was no
regular loss of core.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour, lithology,
weathering, grain size, mineralisation, alteration, geotechnical
characteristics etc. Diamond core is stored at the Company’s
warehouse.
Tesoro consider the data to be of an appropriate level of detail
to support a future resource estimation.
Logging
• Whether logging is qualitative or quantitative in Logging of diamond core was qualitative and diamond core was
photographed.
nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the relevant All drilled intervals are logged and recorded.
intersections logged.
Subsampling
techniques and
sample
preparation
12
• If core, whether cut or sawn and whether
quarter, half or all core taken.
Drill core was cut, and half core was collected for analysis
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.
Tesoro has not completed any percussion drilling.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 4 September 2020
Criteria
JORC Code explanation
Commentary
The sample preparation of crushing half core at the lab to mm
size prior to splitting off a 50g charge (either by cone/quarter
or riffle) for pulverisation provides an appropriate and
representative sample for analysis.
Half core was collected for the entirety of the Tesoro drilling, as
• Quality control procedures adopted for all
subsampling stages to maximise representivity such there was consistency throughout the drilling. Core was
logged by a qualified geoscientist. Each subsample is
of samples.
considered to be representative of the interval.
Quality of assay
data and
laboratory tests
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Sampling of half core is representative of the in-situ material.
There are field duplicate samples collected fro
Share your feedback
Discover