Noosa Mining Investor Conference 22 to 24 July
Released
Released
Announcement PDF
El Zorro Gold Project
Rapidly Advancing
Towards Development
Noosa Presentation | July 2026
ASX: TSO | OTCQX: TSORF | FSE: 5DF
Disclaimer and Cautionary Statements
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have been prepared by Tesoro Gold Limited (Tesoro or the Company) and approved by the Board of the Company. The information contained in the Presentation (Information) is summary only and should be read in
conjunction with any other documents provided to you by the Company. The Information is current as at 20 April 2026 and the Company does not undertake to provide any additional or update information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you
acknowledge and represent to the Company that you have read, understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro, or
related bodies corporate, shareholders or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make any representations or warranties, express or implied, as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the
information, opinions and conclusions contained in this Presentation. Tesoro does not represent or warrant that this Presentation is complete or that it contains all material information about Tesoro or which a prospective investor or purchaser may require in evaluating a possible investment in Tesoro or acquisition of shares.
To the maximum extent permitted by law, Tesoro and its Agents expressly disclaim any and all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other important
factors, many of which are outside the control of Tesoro and which are subject to change without notice and could cause the actual results, performance or achievements of Tesoro to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is
not necessarily a guide to future performance and recipients of this Presentation are cautioned not to place undue reliance on such forward-looking statements.
Production target: The production target referred to in this announcement is based on a combination of Indicated and Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of
Indicated Mineral Resources or that the production target itself will be realised. The Scoping Study is based on lower-level technical and economic assessments and is insufficient to support estimation of Ore Reserves or to provide assurance of economic development.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to be used as the basis for making an investment decision. In providing this Presentation, Tesoro has not considered the
objectives, financial position or needs of any particular recipients. Before making an investment decision prospective investors should consider the appropriateness of the information in this Presentation having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice
appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments Commission or any other foreign regulator) and is not, and does not constitute, an invitation or offer of securities for
subscription, purchase or sale in any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not
be, registered under the U.S. Securities Act of 1933 as amended or the securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States. The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated,
quoted or referred to, in whole or in part, without the express consent of Tesoro.
Competent Person’s Statements
The information in this report that relates to Exploration Results and Metallurgical Results is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of Geoscientists and a Director and shareholder of the Company. Mr Reeves
has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr
Reeves consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled by Mr Lynn Widenbar (B.Sc(Hons) Geology, M.Sc. FAusIMM, MAIG), a Competent Person who is a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Widenbar is acting as an independent consultant to Tesoro
Gold Limited. Mr Widenbar has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. The Company confirms that it is not aware of any new information or data that materially affects the information contained the form and context in which the Competent Person’s findings are presented have not been materially modified from in the original announcement on 4 August 2025, and all
material assumptions and technical parameters underpinning the estimates in that announcement continue to apply and have not materially changed.
The information in this report that relates to the Production Target, assumptions on Modifying Factors and evaluation of other relevant factors are based on and fairly represents information and supporting documentation that has been compiled for this announcement and have been compiled under the supervision of Mr
Linton Putland BEng (Mining), MSc (Mineral Economics) & Member AusIMM. Mr Putland is a Director of the Company. Mr Putland is a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012). The Company
confirms that all material assumptions underpinning the production target and forecast financial information derived from the Scoping Study released on 11 September 2025 continue to apply and have not materially changed.
The Company has released all material information that relates to Exploration Results for the El Zorro Gold Project, on a continuous basis to the ASX and in compliance with JORC 2012. The Company confirms that it is not aware of any new information that materially affects the content of this ASX release.
TESORO GOLD | NOOSA PRESENTATION 2
El Zorro
Project
A GOLD PROJECT OF SCALE AND TECHNICAL
SIMPLICITY IN ONE OF THE WORLD’S PREMIER
MINING JURISDICTIONS
El Zorro Gold Project
Technical Workstreams and Development Readiness Activities Rapidly
Advancing
Chile’s Next Major New Gold Development
A leading new Chilean gold development, rapidly progressing through
advanced technical workstreams towards a Final Investment Decision.
Rare Standalone Single Open Pit Gold Mine
and Processing Opportunity
A single open pit gold deposit in a market dominated by
major-owned projects, satellite deposits and brownfield expansions.
Immense Material Upside Beyond
the Current Development Case
Further deposit, near-mine growth and district-scale discoveries across
the broader gold corridor set to enable future project and satellite
optionality.
3
El Zorro Concessions
3rd Party Concessions
Ternera Gold Deposit
EXISTING TERNERA
GOLD DEPOSIT
1.82MOZ RESOURCE
Tesoro Corporate Snapshot
REGISTER DETAIL
Mark Connelly Independent Non-Executive Chair
Zeff Reeves Managing Director
Linton Putland Executive Director – Mining and Development
Emma Curnow Chief Financial Officer
Tim Williams Chief Development Officer
Sergio Uribe Country Manager Chile
Geoff McNamara Non-Executive Director
Alan Gibson Non-Executive Director
Sarah Wilson Company Secretary
Share price (14 July 2026) A$0.89
Shares on issue 179M
Performance rights 11.6M
Share rights 0.1M
Options 1.0M
Market Capitalisation (undiluted) A$158.4M
Net cash (31 March 2026) A$22.6M
Implied Enterprise Value (undiluted) A$135.8M
4.7%
12.9%
10.9%
35.9%
35.7%
BOARD AND MANAGEMENT
GOLD FIELDS
COLLINS STREET
INSTITUTIONAL INVESTORS
OTHER INVESTORS
Register Detail Broker Coverage
Capital Structure Board and Management
TESORO GOLD | NOOSA PRESENTATION
Shares, Performance Rights, Share Rights and Options as at 3 July 2026.
4
4
Advanced Study and Development Readiness Workstreams Accelerating
Demonstrated Material Progress Across All Key Project Workstreams
ALL DFS AND DEVELOPMENT READINESS
WORKSTREAMS UNDERWAY OR
MATERIALLY ADVANCED
Project Execution Capability Strengthened
A high-calibre team of subject-matter experts assembled to
advance and ultimately deliver El Zorro.
Mining Execution Partner Secured
STRACON Chile SpA. engaged under an alliance-style
framework to deliver the project with Tesoro as a
single, integrated team.
Processing Plant Design Set
GR Engineering engaged to deliver DFS-level process
design and engineering for a 3.0Mtpa gold
processing plant.
Water Processing Pathway Validated
Use of bittern wastewater in future processing is a key project
differentiator.
Clean Grid-Connected Power Pathway
Technocap agreement to support power transmission
studies and infrastructure planning with connection
authorisation request submitted.
Dry Stack Tailings Route Confirmed
Knight Piésold engaged to complete DFS
engineering and design of the life-of-project dry-
stack tailings storage facility.
Permitting Advancing on Schedule
Environmental baseline studies nearing completion and
on track for completion in August 2026.
People and Presence Strengthened
Chilean management and project capability enhanced
with experienced mining, engineering and project
development professionals.
5
Refer to ASX announcement dated 1 July 2026 for additional detail on Tesoro DFS and development readiness activities.
WATER SUPPLY - 25km
Just 13km inland from the Pacific Ocean and 25km from desalination plant near the
Pan American Highway
OPERATING PORT- 55km
By road to an operating port at Caldera
INTERNATIONAL ACCESS - 70km
Approximate distance to Copiapó airport
Location, Location, Location
El Zorro Project Area Possesses all the Ingredients Required to Support a New Gold Mining and Processing Operation
THE EL ZORRO GOLD PROJECT IS
PERFECTLY LOCATED AND HAS SOME
VERY GOOD COMPANY
Mantoverde | Cu-Au | Capstone |
Santo Domingo | Cu-Fe-Au-Co | Capstone |
Candelaria | Cu-Au-Ag | Lundin-Sumitomo |
Salares Norte | Au-Ag | Gold fields |
La Copia | Au-Ag | Kinross |
LOW ALTITUDE - 600m ABOVE SEA LEVEL
Avoids the harsh weather and complex logistics of high-Andes projects.
ENTIRE PROJECT LOCATED WITHIN GOVERNMENT LAND
Low impact/disruption to local communities
6
El Salvador
Diego de Almagro
Chanaral
Salina
Copiapo
(130km)
0 50km
N
Manto Verde
Volcan
Candelaria
80km
20km
57km
76km
Santo Domingo
EL ZORRO
GOLD
PROJECT
Cerro Negro
Caldera
Nueva Esperanza
Maricunga
Fenix
Inca de Oro
La Colpa
Salares Norte
La Pepe
Why Chile?
It is the True Definition of a Premier Mining Jurisdiction
Predictable Permitting and a Structured Process
Mining Powerhouse
World-class Geology
Established Existing Mining Infrastructure
Pro-investment, Key Economic Enabler
~12 months
Historical average
approval process
30–70%
Cut from 2025
reforms timelines
Exploitation concessions
awarded for indefinite duration
Ports, power, services, and
local engineering expertise
Deep mining services
ecosystem in-country
#1 copper
producer
Proven mineral endowment
in the Coastal Cordillera
Home to all the major
international mining companies
Strong institutional support
for responsible mining
US$56B
in active foreign mining
investment (2024)
27%
corporate tax, no
mining-specific royalties
TESORO GOLD | NOOSA PRESENTATION 7
#2 lithium producer,
growing gold sector
The Ternera Discovery
The First Intrusive Related Gold System Identified and Defined in Chile
Category Indicated Inferred Total
Cut-off (g/t Au) Mt Au g/t Koz Mt Au g/t Koz Mt Au g/t Koz
Optimised Open Pit 31.8 1.10 1,123 19.5 1.11 692 51.2 1.1 1,816
2.00 3.5 3.55 394 2.5 3.54 280 5.9 3.54 673
1.00 10.5 2.08 705 7.9 2.04 520 18.5 2.06 1,225
0.70 17.5 1.58 891 13 1.57 657 30.5 1.58 1,547
0.30 31.8 1.10 1,128 26.1 1.03 863 58.1 1.07 1,992
0.20 33.8 1.05 1,144 28.7 0.96 885 62.5 1.01 2,028
Refer to ASX Announcement dated 4 August 2025 .Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the
information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially
changed.
Ternera MRE Detail (2025)
We believe the Ternera Discovery is just the beginning. It was the first major target we drilled systematically across an almost 50km
mineralised belt and has already grown into a multi-million-ounce gold deposit. We find it difficult to believe that a district of this
scale and quality hosts only a single major discovery.
8
Initial Deposit Enables a Single Open Pit Development
1.82Mt at 1.10 g/t Au
Open-pit constrained Mineral Resource at 0.30 g/t Au cut-off
62% Indicated
1.12Moz classified as Indicated in the current MRE
2.0Mt at 1.07 g/t Au
Unconstrained MRE (Indicated and Inferred)
“ “
- Tesoro Managing Director, Zeff Reeves
Ternera Development Project
The Ternera Deposit Set the Stage
40.7 Mt at 1.02 g/t GOLD
Initial open pit mine
1.26Moz GOLD
111koz p.a. first 9 years
AISC US$1,216/oz
Life of mine average
UPFRONT CAPITAL US$248M
including US$41M pre-strip
TESORO GOLD | NOOSA PRESENTATION 9
An Economically Attractive Project on all Measures
NPV7.5% US$663M
Post-tax at US$2,750/oz gold
IRR 51.3%
Post-tax at US$2,750/oz gold
FREE CASH FLOW US$1,230M
Post-tax at US$2,750/oz gold
95% Au RECOVERY
Standard CIP plant
3.0 Mtpa THROUGHPUT
Initial 14-year operating life
Refer to ASX announcement dated 11 September 2025. Tesoro Gold Limited confirms that it is not aware of any new
information or data that materially affects the information included in that release. All material assumptions and technical
parameters underpinning that release continue to apply and have not materially changed.
September 2025 Scoping Study at US$2,750/oz gold
COMPLETED TRADE-OFF STUDIES CONFIRMED OPTIMAL PROJECT CONFIGURATION
COMPRISING A SINGLE OPEN PIT MINING OPERATION WITH 3MTPA PROCESSING PLANT, CAPABLE OF
DELIVERING OVER 110KOZ PER ANNUM OF GOLD Refer to ASX announcement dated 11 September 2025
9
Production target: The production target referred to in this announcement is based on a combination of Indicated and Inferred
Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no
certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production
target itself will be realised. The Scoping Study is based on lower-level technical and economic assessments and is insufficient to
support estimation of Ore Reserves or to provide assurance of economic development.
Ternera Extensions Plus Near-Deposit Upside
• Additional extensional targets still to be drilled.
• Further drilling planned at priority proximate targets
including Drone Hill and Ternera East.
• Strong gold mineralisation recorded from surface.
• Extensional targets associated with same geological
system as Ternera – potential to connect and expand
Material Upside
Multiple Extensions to be Defined with More Drilling
1.80m at 77.15 g/t Au (ZDDH0338)5
• 68.23m at 1.18 g/t Au (ZDDH0370)2
• 10.06 m at 1.70 g/t Au (ZDDH0387)1
• 12.00m at 3.34 g/t Au (ZDDH0135)11
• 130.00m at 0.65 g/t Au (ZDDH0177)9
• 4.70m at 7.95 g/t Au (ZDDH0344)3
• 53.50 m at 1.17 g/t Au (ZDDH0309)7
• 18.20m at 0.99 g/t Au (ZDDH0311)6
DRONE HILL
KITSUNE
TORO BLANCO
TERNERA EAST
Legend:
• Existing Ternera Gold Deposit
• Near Deposit target areas
• Select drill hole locations
• 7.50m at 1.15 g/t Au (ZDDH0166)10
• 19.00 m at 1.41 g/t Au (ZDDH0208)8
• 10.50m at 1.61 g/t Au (ZDDH0344)3
• 36.00m at 1.00 g/t Au (ZDDH0341)4
10
1. Refer to Tesoro ASX release dated 22 October 2025
2. Refer to Tesoro ASX release dated 22 March 2025
3. Refer to Tesoro ASX release dated 28 October 2024
4. Refer to Tesoro ASX release dated 2 July 2024
5. Refer to Tesoro ASX release dated 13 June 2024
6. Refer to Tesoro ASX release dated 1 December 2022
7. Refer to Tesoro ASX release dated 8 November 2022
8. Refer to Tesoro ASX release dated 3 November 2021
9. Refer to Tesoro ASX release dated 27 August 2021
10. Refer to Tesoro ASX release dated 6 July 2021
11.Refer to Tesoro ASX release dated 25 June 2021
TESORO GOLD | NOOSA PRESENTATION
Material Upside Beyond Ternera
More Than 40km of Undrilled Greenfield Prospectivity
Priority 1 Targets
Drone Hill, Ternera East – all situated within 1km of Ternera
Priority 2 Targets
La Brea, Pena Blanca, Kitsune and Calderillas high-potential
opportunities requiring drill testing
Priority 3 Targets
Additional blue-sky potential
GOLD MINERALISATION DEFINED ACROSS
THE EL ZORRO CONCESSION AREA SPANS
OVER 50KM OF STRIKE
Refer to ASX Announcement dated 19 March 2026.
The Scale of the Exploration Opportunity is Immense
SIERRA DEL PORTRERO
3
KITSUNE
2
BUZZARD
3
LA FALDA
3
El Zorro
Gold Project
LA BREA
2
DRONE HILL
1
TERNERA EAST
1
EXISTING TERNERA
GOLD DEPOSIT
1.82MOZ RESOURCE
CALDERILLAS NORTH
3
MINERALISED
CORRIDOR
CALDERILLAS
2
TORO BLANCO
3
PENA BLANCA
2
Development
Readiness Detail
DFS and Development Readiness
Workstreams Underway or Materially Advanced
The Evolution from Advanced Technical
Studies to an Integrated Development
Schedule is Already Well Underway
Execution Capability Strengthened
Stracon Chile SpA (STRACON)
Strategic Alliance to support Mining
studies, mining and operating costs
BurnVoir Corporate Finance (BurnVoir)
Optimal project financing mix and key
debt facilities.
High-calibre Team of Partners Assembled to Deliver the El Zorro Development
GR Engineering Services (GRES)
Study compilation, metallurgical test work, process
engineering and design, operating and capital costs
Knight Piésold Pty Ltd (KP)
Tailings disposal and design
Fivemark
Investor relations and media
TESORO GOLD | NOOSA PRESENTATION
Lynn Widenbar and Associates
Resource Estimation
Peter O’Bryan and Associates
Geotechnical
ALS Perth
Metallurgical Test Work
Aguas CAP, TECHNOCAP, Servicios de Ingeniería IMA S.A.
Infrastructure and capital costs
Parez & Alverez
Environmental, social and permitting
13
WASTE DUMP
TERNERA FINAL PIT OUTLINE
MAGAZINE
DRY STACKED TAILS
PROPOSED ACCESS ROAD AND WATER PIPELINE
ACCOMMODATION VILLAGE
PROPOSED HIGH -VOLTAGE POWER
MINE WORKSHOP
LOW -GRADE STOCKPILE
PROCESSING PLANT
N
Fenix Gold Project, Rio2 Limited, STRACON
Configuration and Construction
TESORO GOLD | NOOSA PRESENTATION
Ternera Gold Deposit Site layout diagram
Clear, Optimised Development Pathway Defined
• Completed trade-off studies confirmed optimal project configuration.
• A simple, single open pit mining operation with 3Mtpa processing
plant, capable of delivering over 110koz per annum of gold.
Construction Partner Engaged Under Alliance-Style Framework
• Alliance-style framework established between STRACON and Tesoro
to deliver the project as a single, integrated team.
• STRACON is a well-known, engineering-led mining infrastructure
services group operating across the Americas, providing end-to-end
solutions across the mining lifecycle.
• STRACON have demonstrated experience in Chile – Rio2’s Fenix
Gold Project
• Arrangement structured to enable disciplined performance against
agreed targets, for the mutual benefit of both parties.
Project Configuration Set, with Advanced Design Underway
Refer to ASX announcement dated 1 July 2026 and ASX announcement dated 25 February 2026.
14
Processing Plant Design Set, Advanced Cost Analysis
Crushing
Ore stockpile
Process Water
Desalination Plant
Leaching
Tanks
Ball Milling
Grind Size =125µm
Gravity
Circuit
Interstage Screens
Carbon Advance
Pulp Advance
Transfer Pumps
Electrowinning Smelting Gold doré
Fresh carbon after
pre-attritioning
Carbon acid
wash
Cyanide
and other
reagents
Carbon elution
Carbon
regeneration
Carbon fines reused for
other applications
Regenerated carbon
Simple, Low-cost Carbon in Pulp Processing Route
Dry-stacked
Tailings
+
-
Screens
Screens
15
TESORO GOLD | NOOSA PRESENTATION
Refer to ASX announcement dated 29 August 2025
TOP: El Zorro Gold Project proposed powerline and water pipeline routes
Refer to ASX announcements dated 3 May 2024 and dated 1 July 2026
Process Water Pathway Validated
The El Zorro Water Pathway is a Key Project Differentiator
Testwork Confirms Bittern Wastewater Delivers Strong Recoveries
• Aguas CAP Totoralillo desalination plant just 25km from Ternera,
with an MoU agreed for the supply of water to El Zorro.
• Advanced testwork using bittern wastewater delivered strong gold
recoveries and very low cyanide consumption.
• Alignment between process design and permitting requirements
reduces late-stage configuration and permitting risk.
PROPOSED ACCESS ROAD AND WATER PIPELINE
PROPOSED HIGH -VOLTAGE POWER
N
TOTORALILLO SUB -
STATION AND
DESALINATION PLANT
16
LEFT: Aguas CAP desalination plant
Connection Authorisation Request Submitted
• A “Solicitud de Autorización de Conexión” submitted to Coordinator
Eléctrico Nacional for a 21MW power connection to El Zorro
Energy Delivery Via Tecnocap Infrastructure
• Non-binding MOU executed with Tecnocap.
• Tecnocap’s 110KV high-capacity transmission line extends to
Totoralillo, about 25km west of Ternera.
Chilean Grid Supplied Predominately by Renewables
• Hydro, solar and wind are the primary sources of grid power in Chile
• Provision of low cost (≈US12c/kwh) clean reliable power.
175MVA
Transmission capacity of the
Tecnocap line
25km
Approximate distance
from Totoralillo to Ternera
84% renewable electricity
Peak hourly share of 84.4% in
2025
Chile is a Regional Clean Energy Leader
Clean Grid-Connected Power Pathway
TESORO GOLD | NOOSA PRESENTATION
Refer to ASX announcement dated 9 May 2025 and ASX announcement dated 1 July 2026
Energía Estratégica (2026), https://www.energiaestrategica.com/en/notes/gobierno-de-chile-publica-su-hoja-de-ruta-para-alcanzar-un-peak-renovable-total-
que-cambios-impulsa
https://blog.investchile.gob.cl/electricity-generation-chile-2024
17
Tailings Design Adopts Leading-Practice Management Principles
Why Dry Stack Tailings?
• Reduced operational and geotechnical risk through elimination
of conventional slurry storage.
• Improved water stewardship, reducing process water demand
and supporting operations in water-constrained environments.
• Enhanced environmental performance, including reduced
seepage potential and improved closure outcomes.
• Reduces risk over the life of the facility in a high seismic zone.
• Alignment with stakeholder and regulatory expectations as
industry standards continue to evolve.
• Supports long-term project resilience through lower lifecycle
risk and greater operational flexibility.
Advancing Dry-stack Tailings Storage Facility Engineering and Design for Life-of-project Requirements
Refer to ASX announcement dated 1 July 2026.
ADOPTING A DRY STACK TAILINGS DESIGN IS A DELIBERATE AND PROACTIVE, RISK-BASED APPROACH THAT
STRENGTHENS PROJECT CREDENTIALS AND AIDS DEVELOPMENT READINESS
18
Expanding Our People and Presence
In Support of Our Chilean Execution Model
TESORO GOLD | NOOSA PRESENTATION 19
EIA kick-off meeting in Santiago, Chile.
New Tesoro office in Santiago Chile.
19
Tesoro Chilean Office Now Established
• Dedicated Chile operating presence established, with project
management and stakeholder engagement embedded in-
country.
• Executive development capability to drive the transition from
developer to development.
• Specialist consultants and in-country contractors engaged.
• Cross-disciplinary execution model supports schedule
compression and early risk identification.
Environmental and Permitting Activities
Advancing Concurrently with Technical Workstreams
TESORO GOLD | NOOSA PRESENTATION 20
Clearly Defined Permitting Process
• Following initial environmental desktop assessments, baseline
field studies commenced in August 2025.
• These field study programmes are scheduled for completion in
August 2026.
• Preparation and submission of EIA documentation to the
Chilean Environmental Impact Assessment System expected to
follow in late 2026 to early 2027.
CHILE HAS ADOPTED A DISTINCTLY PRO-
MINING APPROACH TO PERMITTING AND
APPROVALS
Developing El Zorro
CY26 CY27 CY28 CY29
QUARTER 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Decision Taken to Proceed to DFS
DFS Workstreams
DFS Delivery
Approvals to Work and FID
EIA and RCA Approval
Detailed Engineering Design
Early Works and Long Lead Items
Construction Water Available
Construction and Commissioning
Grid Power Online
Process Water Available
Target First Gold
Advanced DFS-level and Operational Readiness Activities Underway
TESORO GOLD | NOOSA PRESENTATION
Mineral Resource Update and Maiden Ore Reserve
Currently scheduled for August 2026
Environmental Baseline Study Completion
August 2026
Definitive Feasibility Study Completion
On track for delivery by calendar year end
DFS OUTCOMES EXPECTED TO PROVIDE
NECESSARY CONFIDENCE TO TAKE KEY EARLY
DEVELOPMENT DECISIONS
Multiple Critical Milestones Scheduled for Delivery Through CY26
21
Current El Zorro Project Development Schedule
Tesoro Gold Investment Highlights
Set to be Chile’s Next Major
New Gold Development
A leading new Chilean gold development,
advancing through DFS-level workstreams
towards a Final Investment Decision.
Rare Standalone Greenfield Gold
Mine and Processing Opportunity
In a market dominated by major-
owned projects, satellite deposits and
brownfield expansions.
Immense Material Upside Beyond
the Current Development Case
Near-mine growth and district-scale
discoveries across the broader >40km
gold corridor.
TESORO GOLD | NOOSA PRESENTATION 22
Appendix
23
Our Licence to Operate
Our Strategy is Guided by Our Deep In-country Experience and Sensitivity to People and the Environment
Health and Safety
Occupational Health and Safety are fundamental responsibilities Tesoro has towards its workforce. Our strategies and practices are
based on providing a safe workplace for all employees, suppliers and contractors.
Climate Change
Total GHG emissions on a $ per value basis for newly mined gold is significantly lower than that for other major metals and mined
products. Tesoro is committed to put in place a framework to ensure future mine developments are built and operated to support
global greenhouse mitigation targets.
Environment
Tesoro applies leading exploration techniques, technology and practices to promote drilling efficiency and minimise environmental
impacts. Furthermore, Tesoro is committed to continual improvement of its environmental performance through a robust
environmental management program.
People and Culture
Attracting, developing and retaining a diverse, inclusive and competent workforce is important to Tesoro and a key foundation to the
company's policies and practices.
Community Partnerships
Tesoro partners with the local and host communities of the Coastal Cordillera region of Chile to share value through the creation of
local jobs and business opportunities.
Economic Sustainability
Generating economic growth and value for all our investors, employees and stakeholders through successful exploration and
investment in the Coastal Cordillera region of Chile.
ALIGNED TO THE UNITED NATIONS SUSTAINABLE DEVELOPMENT GOALS WITH A COMMITMENT TO
ENSURING EXPLORATION AND OPERATIONAL ACTIVITIES GENERATE POSITIVE SUSTAINABILITY OUTCOMES
24
ITEM UOM OUTCOME
Pit Shell Optimisation US$/oz 2,250
Ore tonnage Mt 40.7
Strip ratio w:o 8.0:1
Gold grade g/t 1.02
Contained ounces Moz 1.33
Plant throughput Mtpa 3.0
Gravity Gold Recovery % ~45
Overall Gold recovery % 94.5
Production (steady state) koz pa 111
Mining Cost US$/oz 640
Processing Cost US$/oz 444
G & A Cost US$/oz 101
Sustaining Capital US$/oz 31
AISC US$/oz 1,216
Scopin