Ternera Mineral Resource Estimate increases to 1.82 Moz
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
4 AUGUST 2025
ASX: TSO OTCQB: TSORF OTCQB FSE: 5D7
TERNERA RESOURCE GROWS TO 1.82 MOZ GOLD
ENHANCING ITS STRONG PROJECT DEVELOPMENT POTENTIAL
Tesoro Gold Limited (Tesoro or the Company) (ASX: TSO, OTCQB: TSORF, FSE: 5D7) is pleased
to announce an updated Mineral Resource Estimate (MRE) for the Ternera Gold Deposit at
its El Zorro Gold Project in Chile (El Zorro).
The updated MRE confirms a substantial increase in contained gold, with a 42% uplift
(530koz) to 1.82 million ounces (Moz), and a material upgrade in Mineral Resource
classification (refer to Table 1).
The updated MRE provides a basis for future exploration and Ternera as a compelling and
strategically significant emerging gold development project.
HIGHLIGHTS
•
Updated Ternera Mineral Resource of 51.2Mt @ 1.10g/t Au for 1.82Moz at a 0.30g/t Au
cut-off grade, constrained within a US$3,000/oz open pit shell.
•
530koz increase in contained gold, representing 42% growth versus the 2023 MRE1.
•
62% of the Mineral Resource, for 1.12 Moz, is now classified as Indicated.
•
Unconstrained MRE increases to 2Moz @ 1.07g/t Au (Indicated and Inferred).
•
Robust continuity of higher-grade zones, including 17Mt @ 2.10g/t Au for 1.14Moz at a
1.0g/t cut-off.
•
Updated MRE further supports an updated and enhanced Scoping Study for Tenera,
ahead of a Pre-Feasibility Study (PFS) currently scheduled for delivery in 2026.
•
Deposit remains open in all directions with further extensional and near-resource growth
identified across multiple mineralised horizons.
•
High-priority drill targets near Ternera scheduled for testing in coming months.
Tesoro Managing Director, Zeff Reeves, commented:
“Ternera continues to demonstrate its quality, scale, and ongoing growth potential. This
update to the MRE confirms a material uplift in both contained gold ounces and Mineral
Resource classification. The increase in Indicated ounces and ounces per vertical metre is
particularly significant and is expected to meaningfully benefit future mine design and
ultimately flow through to project economics.
Importantly, Ternera remains open in all directions, and recent drilling has identified new
mineralised zones to the north and south. We expect that the Mineral Resource will continue
to grow with additional drilling, and we believe Ternera is the first of multiple deposits that
will ultimately contribute to a broader, district-scale gold development opportunity."
Level 39, 152-158 St Georges Terrace, Perth | +61 8 6383 7883 | info@tesorogold.com.au | tesorogold.com.au
ASX ANNOUNCEMENT
4 AUGUST 2025
Table 1: Ternera Mineral Estimates for selected cut-off grades. Highlighted open pit Mineral Resource has been
constrained by an optimised pit shell using a gold price of US$3000/oz and process recovery of 94.5%. The
estimates in this table are rounded to reflect their precision; rounding errors are apparent.
Indicated
Tenera Updated MRE
Inferred
Total
Au g/t cut-off
Mt
Au g/t
Koz
Mt
Au g/t
Koz
Mt
Au g/t
Koz
Optimised Open Pit at 0.30
31.8
1.10
1,123
19.5
1.11
692
51.2
1.1
1,816
2.00
3.5
3.55
394
2.5
3.54
280
5.9
3.54
673
1.00
10.5
2.08
705
7.9
2.04
520
18.5
2.06
1,225
0.70
17.5
1.58
891
13
1.57
657
30.5
1.58
1,547
0.30
31.8
1.10
1,128
26.1
1.03
863
58.1
1.07
1,992
0.20
33.8
1.05
1,144
28.7
0.96
885
62.5
1.01
2,028
Figure 1: El Zorro Gold Project – Regional Location Map. Red area showing El Zorro Concessions. Ternera Gold
Deposit located at blue circle. Datum PSAD56 19S.
Tesoro Gold
2
ASX ANNOUNCEMENT
4 AUGUST 2025
1
2
3
Figure 2: Plan view of the Ternera Gold Deposit. Showing drill collars (black triangles) over the block model (>1g/t
blocks only) and US$3000/oz pit shell. Section lines 1-3 for Figures 7 to 9 shown in black. Datum PSAD56 19S.
TERNERA GOLD DEPOSIT
The Ternera Gold Deposit is situated within the El Zorro Gold Project, located 900km north of
Santigo in Chile’s mining-friendly Atacama Region. The Project is ideally positioned in a lowaltitude, coastal setting with excellent infrastructure, including sealed road access, grid
power and water.
Tesoro Gold
3
ASX ANNOUNCEMENT
4 AUGUST 2025
Chile is recognised as one of the world’s premier mining jurisdictions, with a well-established
regulatory framework and strong Government and investment support for responsible mine
development.
The updated MRE represents a 176% increase from the maiden 2021 MRE of 660koz Au2 and
highlights the Ternera Deposit’s consistent growth. Since the 2023 MRE of (1.3Moz of gold),
Tesoro has completed an additional 88 diamond drill holes for 21,989m, with drilling focused
on expansion and classification upgrade. Notably, recent drilling has intersected new zones
of mineralisation in the northern and southern extensions of the Deposit3. These areas remain
open and are considered high-priority targets for further growth.
The updated MRE is based on 126,761 metres of diamond drilling from 399 holes and utilises
a 0.30g/t Au cut-off and is constrained within a US$3,000/oz open pit shell. The
unconstrained global MRE now stands at 2.0Moz @ 1.07g/t Au, providing further
confirmation of the Deposit’s scale and continuity, and helping to solidify the already strong
foundation for the future potential development of a significant open pit gold mining
operation.
In addition, 62% of the MRE is now of an Indicated classification. Indicated material is
confined to areas where Resource definition diamond drilling is typically <25m spacing.
Inferred material is confined to areas where diamond drill spacing is generally <50m. Areas
of wider spacing are unclassified and not reported as part of the Mineral Resource.
The MRE has also been reported into multiple optimised pit shells, further demonstrating its
robustness across a range of gold price scenarios (refer to Figure 5).
In addition to the increase in Indicated classification, the additional drilling has also resulted
in a material improvement in the vertical distribution of gold within the Deposit. The ounce
per vertical metre (OVM) profile has significantly improved within the optimised open pit
shell compared to the 2023 MRE. The average OVM across the Deposit has increased from
3,570 OVM (2023) to 5,125 OVM between the 600m and 200m RL (refer to Figure 6), further
supporting Ternera’s development potential.
Tesoro Gold
4
ASX ANNOUNCEMENT
4 AUGUST 2025
Figure 3: Isometric view if the Ternera Gold Deposit block model looking north-west. Showing >1g/t blocks only
and US$3000/oz pit shell. Datum PSAD56 19S.
Figure 4: Isometric view of the Ternera Gold Deposit block model looking north-west. Showing indicated (red)
and Inferred (green) classified resources and US$3000/oz pit shell. Datum PSAD56 19S.
Tesoro Gold
5
ASX ANNOUNCEMENT
4 AUGUST 2025
Contained Au within
the MRE (koz)
Gold price (US$)
2,000
5,000
1,800
4,500
1,600
4,000
1,400
3,500
1,200
3,000
1,000
2,500
800
2,000
600
1,500
400
1,000
200
500
0
0
1,800
1,800
2,300
2,500
3,000
Gold price used to optimise pit shell (US$)
Indicated
Inferred
Au Price
Figure 5: Updated MRE displaying optimised open pits at various gold prices (Updated MRE shown in blue, 2023
MRE in grey).
Ounces per
vertical metre
8,000
7,000
2025 MRE
2023 MRE
6,000
5,000
4,000
3,000
2,000
1,000
0
690 665 640 615 590 565 540 515 490 465 440 415 390 365 340 315 290 265 240 215 190
mRL Above Sea Level
Figure 6: Ounce per vertical metre profile comparison (Updated MRE shown in blue, 2023 MRE in grey).
Tesoro Gold
6
ASX ANNOUNCEMENT
4 AUGUST 2025
Figure 7: Ternera Gold Deposit Section 1. Top showing block model coloured to gold >0.30g/t Au, bottom
coloured to Resource classification. Geological domains in pink, US$3000/oz Au optimised pit shell in blue.
Section locations shown in Figure 2. Scale bar 80m.
Tesoro Gold
7
ASX ANNOUNCEMENT
4 AUGUST 2025
6
Figure 8: Ternera Gold Deposit Section 2 – Top showing block model coloured to gold >0.30g/t Au, bottom
coloured to Resource classification. Geological domains in pink, US$3000/oz Au optimised pit shell in blue.
Section locations shown in Figure 2. Scale bar 80m.
Tesoro Gold
8
ASX ANNOUNCEMENT
4 AUGUST 2025
Figure 9: Ternera Gold Deposit Section 3 – Top showing block model coloured to gold >0.30g/t Au, bottom
coloured to Resource classification. Geological domains in pink, US$3000/oz Au optimised pit shell in blue.
Section locations shown in Figure 2. Scale bar 80m.
Tesoro Gold
9
ASX ANNOUNCEMENT
4 AUGUST 2025
SCOPING STUDY AND DEVELOPMENT PATHWAY
This MRE forms the foundation for an updated Scoping Study, which is well advanced being
prepared by a consortium of Australian and Chilean technical consultants. Results of the
updated study are expected to be released in the coming weeks, following which Tesoro
intends to undertake a PFS in 2026.
The increase in the quantity of Indicated mineralisation in the Resource to 1.12Moz will
support higher levels of technical and economic assessment for the Project and provide the
confidence required to advance project financing and development discussions.
INFORMATION REQUIRED UNDER LISTING RULE 5.8.1
Mineral Tenement and Land Tenure Status
The Ternera Gold Deposit occurs within Tesoro’s El Zorro Gold Project which covers a total
concession holding area of approximately 570km2, located approximately 130km north of
Copiapo City, in Region III (Atacama) in northern Chile. The Ternera Deposit is 13km inland
from the Pacific Ocean, 57km by road from the port town of Caldera and is well supported
by existing road, power, and water infrastructure.
Tesoro’s 95% owned Chilean subsidiary, Tesoro Mining Chile SpA, currently owns 94.5% of the
El Zorro Gold Project within a fully diluting joint venture structure.
Geology
The Project is located within the Coastal Cordillera of Chile. At Ternera, gold mineralisation
is predominately hosted within numerous intermediate intrusions and associated quartz and
sulphide veins, veinlets, and alteration, within faulted and strongly altered tonalitic intrusions
(El Zorro Tonalite or EZT). The EZT intrusions have intruded Permian-aged basement
sedimentary sequences. Gold mineralisation at Ternera has been classified as an Intrusive
Related Gold System (IRGS) and Tesoro has discovered additional gold targets in the El Zorro
District which exhibit similar styles of gold mineralisation.
Gold mineralisation is interpreted to be related to regional scale, north-south striking fault
zones and associated local north-west striking strike slip faults. Mineralisation is interpreted to
occur as discontinuous shoots, controlled by a combination of the intersection of the
structures with the preferred host rock tonalite, and locally developed intersections of
fracture populations that developed during strike-slip deformation.
Drilling Techniques and Hole Spacing
Drilling was completed at the El Zorro Project and results used to support the MRE included
399 diamond HQ drill holes for 126,761 metres (Figure 8). All diamond holes are drilled from
surface with most holes drilled towards the south-west with a dip of 60 degrees. Drilling used
a HQ (~63.5 mm diameter) drill size. Drill core was collected from a core barrel and placed
Tesoro Gold
10
ASX ANNOUNCEMENT
4 AUGUST 2025
in appropriately marked core trays. Down hole core run depths were measured and marked
with core blocks, and orientation marks were routinely placed onto the core. The samples
were also measured for core loss and were photographed before geological and
geotechnical logging was completed.
Figure 10: Ternera Gold Deposit - Drill Hole Collar Location Plan (Pre-2023 MRE Holes, new holes)- new holes in red
Sampling
Half core was sampled at significant mineralisation and geological boundaries. Core
recovery was estimated using the drillers recorded depth marks against the length of the
core recovered. Occasional shears and faults where core is broken are noted from the core
photographs, but there is no significant core loss.
Sample Preparation and Assaying
Sample preparation was conducted at the ALS laboratory in Copiapó, Chile. Diamond drill
core was split using an electric diamond saw. Typically, half core is sampled at 1m intervals
with adjustments made to reflect geological and mineralisation boundaries, with a minimum
sample length of 0.25m applied. Whole samples are split to generate a 1kg sample and
pulverised with 85% passing 75 microns.
Sample pulps were dispatched to ALS Santiago where 50g was used for a charge for fire
assay fusion with gravimetric finish. Multi-element assays were completed by 4-acid digest
with a 2.5 g charge.
Analysis results are returned via digital certificate for import into the drill hole database.
Tesoro Gold
11
ASX ANNOUNCEMENT
4 AUGUST 2025
Estimation Methodology
Three-dimensional (3D) modelling of the geology was carried out to generate domains for
further analysis and Resource estimation.
Statistical analysis was based on these 3D tonalite and fault domains, to determine the
capping (top cuts) to be applied to the gold assay data prior to Resource estimation. The
top cuts varied by domain from 10 to 30g/t Au. Analysis of density data was carried out to
determine parameters for density estimation. Variography was also carried out on both gold
and density to generate the parameters required for estimation.
Gold grade and density were estimated using the Ordinary Kriging (OK) method. The initial
estimation was used to generate mineralised and unmineralised envelopes. A second
kriging pass then used these sub-domains within the major tonalite and fault domains to
produce final estimates of gold grade and density. A third pass estimate was conducted
within tonalite domains using a search with a strike of 345⁰ and a vertical dip.
A dynamic search technique was used in the estimation of the tonalites, which allows the
search strategy to follow the local variations in dip and strike of the mineralisation. In the
fault domains between the tonalite intrusions a vertical, search was used with a strike of
345⁰. A three-pass search strategy was used, with search radii of 20m, 35m and 50m
respectively.
Resource Classification
Resource classification is based on a range of criteria including:
•
Geological continuity;
•
Data quality;
•
Drill hole spacing;
•
Modelling technique; and
•
Estimation properties including search strategy, number of informing data and
average distance of data from blocks
Drill hole location plots have been used to ensure that local drill spacing conforms to the
minimum expected for the Resource classification. Indicated material is confined to areas
where Resource definition drilling is typically <25m spacing. Inferred material is confined to
areas where drill spacing is generally <50m. Areas of wider spacing are unclassified and not
reported as part of the Mineral Resource.
Blocks with more widely spaced drill spacing are estimated but are not classified as part of
the Mineral Resource.
Tesoro Gold
12
ASX ANNOUNCEMENT
4 AUGUST 2025
Mining and Metallurgy
Development of this Mineral Resource adopts mining standard equipment and methods
using a conventional truck and hydraulic excavator and open pit mining at an appropriate
bench height.
Mineral Resource Statement
Mineralised material interpreted to have “reasonable prospects of eventual economic
extraction” by open pit mining methods was defined as mineralised material with a cut-off
above 0.30g/t within an optimised pit shell. The assumptions used in to model the optimised
open pit shell are presented in Table 2.
Table 2: Optimised open pit shell modelling assumptions.
Item
Units
Value
US$/t mined
2.70
Based on mining cycle time modelling. Includes closure cost provisions
Mining dilution
%
10.00
Industry standard assumption for open pit mining
Mining recovery
%
95.00
Industry standard assumption for open pit mining
Gold price
US$/oz
3,000
Discount to current spot gold price
Metallurgical recovery
% Au
94.50
Based on Phase 2 metallurgical test work results announced 10 Dec 2021
Processing cost
US$/t milled
11.50
Based on cost modelling from metallurgical tests and database costs
General and admin
US$/t milled
2.50
Based on cost estimate database
Owners mine
management
US$/t milled
0.90
Based on cost estimate database
Tailings disposal
US$/t milled
0.10
Based on cost estimate database
Degrees
42
Based on Scoping Study geotechnical assessment
Average mining cost
Overall pit slope angles
Justification
Authorised by the Board of Tesoro Gold Ltd.
For more information:
Company:
Zeff Reeves, Managing Director
Tesoro Gold Limited
info@tesorogold.com.au
References:
1 ASX Announcement 9 March 2023 – Ternera Mineral Resource Update and Initial Exploration Target
2 ASX Announcement 28 July 2021 - Maiden Mineral Resource Estimate of 660 koz gold sets foundation at El
Zorro
Tesoro Gold
13
ASX ANNOUNCEMENT
4 AUGUST 2025
About Tesoro
Future Performance
Tesoro Gold Limited has discovered and defined the
first Intrusive Related Gold System in Chile. The 1.3M oz
Ternera discovery is in the Coastal Cordillera region of
Chile. The Coastal Cordillera region is host to multiple
world-class copper and gold mines, has well
established infrastructure, service providers and an
experienced mining workforce. Large areas of the
Coastal Cordillera remain unexplored due to the
unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and
experience has been able secure rights to the districtscale El Zorro gold project in-line with the Company’s
strategy. Tesoro’s 95% owned Chilean subsidiary owns
93.8% of the El Zorro Gold Project.
This announcement may contain certain forward-looking
statements and opinions. Forward-looking statements,
including projections, forecasts and estimates, are provided as
a general guide only and should not be relied on as an
indication or guarantee of future performance and involve
known and unknown risks, uncertainties, assumptions,
contingencies and other important factors, many of which are
outside the control of the Company and which are subject to
change without notice and could cause the actual results,
performance or achievements of the Company to be
materially different from the future results, performance or
achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance
and no representation or warranty is made as to the likelihood
of achievement or reasonableness of any forward-looking
statements or other forecast. Nothing contained in this
announcement, nor any information made available to you is,
or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future
performance of Tesoro Gold.
Competent Persons Statements
The information in this report that relates to Mineral
Resources is based on information compiled by Mr Lynn
Widenbar (B.Sc(Hons) Geology, M.Sc. FAusIMM, MAIG),
a Competent Person who is a Fellow of The Australasian
Institute of Mining and Metallurgy. Mr Widenbar is acting
as an independent consultant to Tesoro Gold Limited.
Mr Widenbar has sufficient experience that is relevant
to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore
Reserves’. The Company confirms that it is not aware of
any new information or data that materially affects the
information contained the form and context in which
the Competent Person’s findings are presented have
not been materially modified from in the original
announcement on 9 March 2023, and all material
assumptions and technical parameters underpinning
the estimates in that announcement continue to apply
and have not materially changed. The Mineral
Resource comprises 802koz in the Indicated and 479koz
in the Inferred category.
The information in this report that relates to Exploration
Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA,
MAIG). Mr Reeves is a member of the Australian Institute
of Geoscientists and a Director and shareholder of the
Company. Mr Reeves has sufficient experience that is
relevant to the style of mineralisation and type of
deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Reeves consents to the inclusion in this
report of the matters based on this information in the
form and context in which it appears.
Tesoro Gold
14
ASX ANNOUNCEMENT
4 AUGUST 2025
APPENDIX 1: JORC TABLES
JORC Code, 2012 Edition - Table 1
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under investigation,
such as downhole gamma sondes, or handheld
XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of
sampling.
Tesoro has completed 401 diamond drill holes for 127,162m in
2017, 2018, 2020, 2021, 2022, 2023, 2024 and 2025(ZDDH0001
to ZDDH00387) at the El Zorro Gold Project. Diamond drill holes
were drilled with HQ. Sampling was half core at geologically
defined and significant mineralisation boundaries.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Tesoro has completed 401 diamond drill holes for 127,162m at
the El Zorro Gold Project. Diamond drill holes were drilled with
HQ. Sampling was half core at geological and significant
mineralisation boundaries. Standard tube was used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done,
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Core recovery was estimated using the drillers recorded depth
marks against the length of the core recovered. Reviewing the
core photos, there are occasional shears/faults where core is
broken. There is however no significant core loss.
Drilling techniques
• Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc.).
A single tube system was employed and in general core recovery
good.
Drill sample
recovery
• Method of recording and assessing core and chip There appears to be no potential sample bias as there was no
regular loss of core.
sample recoveries and results assessed.
The CP considers the sampling methodologies to be appropriate
for this style of mineralisation.
Geological core logging to a resolution of 25 cm was undertaken
• Measures taken to maximise sample recovery
and ensure representative nature of the samples. with a record kept of, inter alia, colour, lithology, weathering,
grain size, mineralisation, alteration, geotechnical characteristics
etc. Diamond core is stored at the Company’s warehouse.
Tesoro consider the data to be of an appropriate level of detail to
support a future resource estimation.
Logging
Subsampling
techniques and
Tesoro Gold
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Logging of diamond core was qualitative, and diamond core was
photographed.
• Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
All drilled intervals are logged and recorded.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
Drill core was cut, and half core was collected for analysis
• The total length and percentage of the relevant
intersections logged.
Tesoro has not completed any percussion drilling.
• If core, whether cut or sawn and whether
quarter, half or all core taken.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
15
ASX ANNOUNCEMENT
4 AUGUST 2025
Criteria
JORC Code explanation
sample
preparation
Commentary
The sample preparation of crushing half core at the lab to mm
size prior to splitting off a 50g charge (either by cone/quarter or
riffle) for pulverisation provides an appropriate and
representative sample for analysis.
• If non-core, whether riffled, tube sampled, rotary Half core was collected for the entirety of the Tesoro drilling, as
such there was consistency throughout the drilling. Core was
split, etc. and whether sampled wet or dry.
logged by a qualified geoscientist. Each subsample is considered
to be representative of the interval.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Sampling of half core is representative of the in-situ material.
There are field duplicate samples collected from the diamond
core with irregular results. Field drill core duplicates are irregular
by nature, and it has been recommended by Tesoro’s consultants
to use coarse reject material to monitor the sample preparation.
Sample sizes collected were considered appropriate to
• Quality control procedures adopted for all
subsampling stages to maximise representivity of reasonably represent the material being tested.
samples.
Quality of assay
data and
laboratory tests
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Sampling of half core is representative of the in-situ material.
There are field duplicate samples collected from the diamond
core with irregular results. Field drill core duplicates are irregular
by nature and it has been recommended by Tesoro’s consultants
to use coarse reject material to monitor the sample preparation.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
Sample sizes collected were considered appropriate to
reasonably represent the material being tested.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Assays reported in this report were undertaken at the accredited
laboratory of ALS Santiago, which is fully certified. Core samples
of various lengths were assayed (minimum 0.25m) from which
1kg of material was pulverized passing 200 mesh to produce a 50
g charge for fire assay fusion with gravimetric finish.
Multielement assays were completed by 4-acid digest with a 2.5 g
charge.
All techniques are appropriate for the element being determined.
Verification of
sampling and
assaying
Location of data
points
Tesoro Gold
• For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Standard chemical analyses were used for grade determination.
There was no reliance on determination of analysis by
geophysical tools.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels
of accuracy (i.e. lack of bias) and precision have
been established.
QAQC procedures included the insertion of Certified Reference
Materials (CRMs) (9.5%), blank material (4.7%),and duplicate
samples (1.1%).
Cube Consulting Pty Ltd manage the database for Tesoro.
• The verification of significant intersections by
either independent or alternative company
personnel.
A number of independent consulting geoscientists (Cube
Consulting, Oliver, and Cooley) external to Tesoro have verified
the intersections for holes ZDDH0001 to ZDDH0080. Holes
ZDDH0081 onwards have been verified by multiple appropriately
qualified Company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
No twinned holes have been completed
Tesoro drilling is digitally entered and stored following
documented core handling protocols.
The protocols are considered adequate.
• Discuss any adjustment to assay data.
No adjustments were made to Tesoro Drilling
• Accuracy and quality of surveys used to locate
drillholes (collar and downhole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Tesoro drill hole collars have been surveyed accurately using
differential GPS for all holes.
• Specification of the grid system used.
The grid system used PSAD56 19S
The laboratories used have generally demonstrated analytical
accuracy at an acceptable level within 95% confidence limits.
16
ASX ANNOUNCEMENT
4 AUGUST 2025
Criteria
JORC Code explanation
Commentary
• Quality and adequacy of topographic control.
Data spacing and
distribution
The topography generated from an accurate topographic survey
data completed by a registered surveyor and has been used for
the current control.
• Data spacing
Share your feedback