Tesoro Gold Limited (Tesoro or the Company) (ASX: TSO, OTCQB: TSORF, FSE: 5D7) is pleased to report
stand-out assay results from extensional and infill diamond drilling programmes at the Ternera Gold
Deposit (Ternera), part of the El Zorro Gold Project in Chile (El Zorro, or the Project).
This batch of results includes fifteen holes completed at Ternera as part of the ongoing infill and
extensional drill programmes, which form part of the current 38,000m drilling campaign.
HIGHLIGHTS
• Very-high grade gold intersected at depth, with outstanding grades of 27.70g/t Au and
9.89g/t Au from new depth extensions at Ternera.
• Substantial down plunge extensions confirmed, with high grade mineralisation intersected
400m down plunge, or approximately 200 vertical metres below the Open Pit Shell defined in
the 2025 Scoping Study.
• Two holes specifically targeted deep southern extensions, returning strong results including:
• 8.84m @ 3.54g/t Au from 576.00m (ZDDH0411) including;
• 1.00m @ 27.70g/t Au from 576.00m
• 7.09m @ 1.31g/t Au from 670.45m including;
• 0.54m @ 9.89g/t Au from 677.00m
• A further high-grade intercept from extensional drilling to the north of the MRE returned:
4.26m @ 3.40g/t Au from 217.45m (ZDDH0398B), including 0.68m @ 19.45g/t Au
• Notable assay results also returned from shallow infill drilling including:
• 5.50m @ 1.95g/t Au from 50.00m (ZDDH0407A)
• 7.00m @ 2.05g/t Au from 51.40m (ZDDH0410)
• 17.50m @ 1.01g/t Au from 190.00m (ZDDH0412)
• 0.47m @ 24.90g/t Au from 130.93m (ZDDH0413)
• 4.20m @ 5.17g/t Au from 56.88m (ZDDH0422)
• Assays remain outstanding for a further 23 holes with five drill rigs currently on site.
• Drilling is ongoing with a total of 38,000m planned in the current campaign.
Tesoro Managing Director, Zeff Reeves, commented:
“Intersecting strong gold mineralisation 400m down plunge from the current open pit resource
confirms that Ternera remains open along strike and at depth, supporting our strong belief for the
potential of Ternera to support a materially longer mine life.
“This current batch of results also includes a hole that extends mineralisation along strike to the north
of the existing Mineral Resource.
Tesoro Gold 2
ASX ANNOUNCEMENT
9 FEBRUARY 2026
“In parallel, infill drilling is progressing well with five rigs operating around the clock. This work is critical
to upgrading Resource classification and positioning Ternera for a near-term Mineral Resource
upgrade, with infill drilling scheduled to be completed by the end of Q1 2026.”
DRILLING PROGRAMME OUTLINE
Tesoro is currently operating three concurrent, fully funded, diamond drilling programmes for a total
of approximately 38,000m;
• Infill Drilling: Approximately 20,000m to support Feasibility Study workstreams, to be
completed during Q1 2026.
• Extensional Drilling: Approximately 6,000m to define and extend shallow northern and
southern extensions and to test depth extensions to the existing Ternera Deposit.
• New Discovery Drilling: District scale drilling of approximately 12,000m focused on priority
undrilled targets and follow-up on previous results at Kitsune, Calderillas and Toro Blanco.
EXTENSIONAL DRILLING RESULTS
As part of the planned extensional drill programme at Ternera several holes have been designed to
test the depth extent of the Deposit to further understand and unlock the scale of the gold system at
Ternera.
An initial two holes have been completed (ZDDH00409 and ZDDH00411), which were both collared
between 300m and 400m southeast of the existing MRE (Figure 1) and targeting the down plunge,
deep southern extensions of the Deposit (Figure 2).
Both holes returned wide zones of anomalous gold results and several high-grade results (Table 1) at
the projected position of the down plunge extension, indicating that the Deposit continues, and
remains open at depth.
Results have also been received for an additional extensional hole to the north of the Deposit
(ZDDH00398B, Figure 1), targeting down dip extensions of shallow high-grade mineralisation. The hole
returned 4.26m @ 3.40g/t Au from 217.45m, which included a peak assay of 0.68m @ 19.45g/t Au
from 217.45m.
INFILL DRILLING RESULTS
Tesoro is currently completing infill drilling at Ternera of approximately 20,000m to improve resource
classification of the MRE and provide information for an updated MRE in the coming months.
Results have been received for 11 holes from infill drilling, with all holes retuning mineralised intercepts
at the expected positions of the current MRE block model mineralised zones. A full list of significant
intercepts is presented in Table 1 and hole details at Appendix 1.
Five drill rigs continue operating 24 hours a day at Ternera, advancing the infill and extensional
programmes.
Tesoro Gold 3
ASX ANNOUNCEMENT
9 FEBRUARY 2026
Figure 1: El Zorro Gold Project – Ternera Gold Deposit. Drill locations and results received this announcement.
Section shown at figure 2 located at A-A’. Datum PSAD56 19S.
Tesoro Gold 4
ASX ANNOUNCEMENT
9 FEBRUARY 2026
Figure 2: El Zorro Gold Project – Deep Drilling section. Showing holes ZDDH0409 and ZDDH0411with mineralised
intercepts relative to 2025 MRE and Scoping Study Open Pit Shell. Looking west and holes projected onto section.
Previous drilling shown as grey lines. Datum PSAD56 19S.
Tesoro Gold 5
ASX ANNOUNCEMENT
9 FEBRUARY 2026
Table 1: Significant intercepts table for results reported in this announcement. Results are uncut, no top cut has
been applied. Refer Appendix 1 - JORC Tables for data aggregation criteria. A significant intercept is defined
as any intercept with a down hole grade x width >0.25. NSI denotes No Significant Intercept.
Hole_ID From (m) To (m) Interval Au (g/t) Comments Hole_ID From (m) To (m) Interval Au (g/t) Comments
ZDDH0398 Abandoned ZDDH0412 438.00 439.69 1.69 2.40 including
ZDDH0398A Abandoned ZDDH0413 33.00 38.00 5.00 0.80
ZDDH0398B 94.47 96.00 1.53 0.66 ZDDH0413 37.00 38.00 1.00 2.81 including
ZDDH0398B 198.76 199.82 1.06 1.71 ZDDH0413 56.00 57.00 1.00 6.12
ZDDH0398B 217.45 221.71 4.26 3.40 ZDDH0413 130.93 131.40 0.47 24.60
ZDDH0398B 217.45 218.13 0.68 19.85 including ZDDH0414 39.28 44.00 4.72 1.03
ZDDH0400 0.00 NSI ZDDH0414 58.00 59.00 1.00 1.65
ZDDH0406 27.70 29.66 1.96 0.89 ZDDH0414 62.13 62.92 0.79 1.66
ZDDH0406 40.00 40.45 0.45 0.96 ZDDH0414 83.00 84.00 1.00 0.92
ZDDH0406 49.28 49.74 0.46 0.76 ZDDH0414 86.47 87.10 0.63 0.97
ZDDH0406 78.45 82.23 3.78 0.65 ZDDH0415 8.00 8.80 0.80 0.59
ZDDH0406 92.25 93.13 0.88 1.00 ZDDH0415 61.57 62.21 0.64 0.81
ZDDH0406 96.96 97.80 0.84 0.56 ZDDH0415 188.00 204.00 16.00 0.74
ZDDH0406 183.00 184.00 1.00 0.52 ZDDH0415 188.00 193.00 5.00 1.58 including
ZDDH0407A 50.00 55.50 5.50 1.95 ZDDH0415 256.06 257.00 0.94 0.77
ZDDH0407A 52.00 55.50 3.50 2.81 including ZDDH0416 110.00 114.00 4.00 1.52
ZDDH0408 43.00 44.00 1.00 0.74 ZDDH0417 0.00 Abandoned
ZDDH0409 137.56 138.90 1.34 2.94 ZDDH0417A 66.00 67.00 1.00 1.57
ZDDH0409 325.00 326.00 1.00 1.44 ZDDH0417A 82.00 84.00 2.00 3.87
ZDDH0409 560.55 572.00 11.45 0.97 ZDDH0417A 92.00 93.76 1.76 0.65
ZDDH0409 560.55 561.37 0.82 4.47 ZDDH0417A 98.65 99.25 0.60 1.25
ZDDH0409 570.00 572.00 2.00 2.08 including ZDDH0417A 135.51 136.11 0.60 1.47
ZDDH0409 652.35 677.54 25.19 0.59 ZDDH0417A 264.00 265.00 1.00 2.19
ZDDH0409 670.45 677.54 7.09 1.31 including ZDDH0417A 290.00 291.00 1.00 0.89
ZDDH0409 677.00 677.54 0.54 9.89 including ZDDH0417A 340.50 341.10 0.60 0.92
ZDDH0410 20.50 21.73 1.23 0.57 ZDDH0417A 365.00 366.00 1.00 0.81
ZDDH0410 30.90 31.35 0.45 1.06 ZDDH0417A 398.00 400.00 2.00 0.76
ZDDH0410 36.00 37.00 1.00 3.87 ZDDH0417A 438.70 446.75 8.05 0.60
ZDDH0410 71.00 78.00 7.00 2.05 ZDDH0417A 438.70 440.50 1.80 1.50
ZDDH0410 72.00 73.90 1.90 6.17 including ZDDH0418 0.00 awaiting assays
ZDDH0411 200.00 202.00 2.00 0.83 ZDDH0419 6.60 7.24 0.64 0.50
ZDDH0411 208.58 209.15 0.57 1.27 ZDDH0419 89.00 90.00 1.00 0.54
ZDDH0411 543.00 543.83 0.83 0.54 ZDDH0419 99.00 100.00 1.00 0.59
ZDDH0411 576.00 584.84 8.84 3.54 ZDDH0419 181.00 182.00 1.00 5.83
ZDDH0411 576.00 577.00 1.00 27.70 ZDDH0420 46.24 47.05 0.81 0.55
ZDDH0411 601.00 606.00 5.00 0.47 ZDDH0420 139.60 143.00 3.40 0.49
ZDDH0411 601.00 602.00 1.00 1.27 including ZDDH0420 139.60 140.20 0.60 1.14 including
ZDDH0411 615.57 616.35 0.78 1.12 ZDDH0421 0.00 awaiting assays
ZDDH0411 630.60 631.20 0.60 0.75 ZDDH0422 9.00 9.90 0.90 0.62
ZDDH0412 145.74 146.47 0.73 1.04 ZDDH0422 21.50 23.00 1.50 2.43
ZDDH0412 190.00 207.50 17.50 1.01 ZDDH0422 31.52 34.00 2.48 0.37
ZDDH0412 190.00 197.20 7.20 1.86 including ZDDH0422 56.88 61.08 4.20 5.17
ZDDH0412 190.00 191.00 1.00 11.50 including ZDDH0422 60.00 61.08 1.08 17.17 including
ZDDH0412 227.00 227.60 0.60 1.27 ZDDH0422 70.00 70.93 0.93 0.48
ZDDH0412 299.50 299.93 0.43 1.04 ZDDH0422 188.50 190.00 1.50 1.68
ZDDH0412 334.00 336.57 2.57 0.52 ZDDH0422 215.50 227.00 11.50 0.54
ZDDH0412 343.70 344.10 0.40 2.55 ZDDH0422 219.60 222.00 2.40 1.35
ZDDH0412 373.33 373.75 0.42 3.49 ZDDH0422 259.75 270.30 10.55 0.48
ZDDH0412 398.75 399.33 0.58 1.84 ZDDH0422 262.40 263.23 0.83 2.69
ZDDH0412 438.00 443.56 5.56 0.89
Tesoro Gold 6
ASX ANNOUNCEMENT
9 FEBRUARY 2026
Authorised by the Board of Tesoro Gold Ltd.
For more information:
Company:
Zeff Reeves, Managing Director
Tesoro Gold Limited
info@tesorogold.com.au
Table 2: Ternera Mineral Estimates for selected cut-off grades. Highlighted open pit Mineral Resource has been
constrained by an optimised pit shell using a gold price of US$3000/oz and process recovery of 94.5%. The
estimates in this table are rounded to reflect their precision; rounding errors are apparent.
Tenera Updated MRE Indicated Inferred Total
Au g/t cut-off Mt Au g/t Koz Mt Au g/t Koz Mt Au g/t Koz
Optimised Open Pit at 0.30 31.8 1.10 1,123 19.5 1.11 692 51.2 1.1 1,816
2.00 3.5 3.55 394 2.5 3.54 280 5.9 3.54 673
1.00 10.5 2.08 705 7.9 2.04 520 18.5 2.06 1,225
0.70 17.5 1.58 891 13 1.57 657 30.5 1.58 1,547
0.30 31.8 1.10 1,128 26.1 1.03 863 58.1 1.07 1,992
0.20 33.8 1.05 1,144 28.7 0.96 885 62.5 1.01 2,028
Refer ASX announcement dated 4 August 2025
Tesoro Gold 7
ASX ANNOUNCEMENT
9 FEBRUARY 2026
About Tesoro
Tesoro Gold Limited has discovered and defined the
first Intrusive Related Gold System in Chile. The 1.82M
oz Ternera discovery is in the Coastal Cordillera region
of Chile. The Coastal Cordillera region is host to
multiple world-class copper and gold mines, has well
established infrastructure, service providers and an
experienced mining workforce. Large areas of the
Coastal Cordillera remain unexplored due to the
unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and
experience has been able secure rights to the district-
scale El Zorro gold project in-line with the Company’s
strategy. Tesoro’s 95% owned Chilean subsidiary owns
95.4% of the El Zorro Gold Project (see ASX
announcement released 12 August 2025).
Future Performance
This announcement may contain certain forward-looking
statements and opinions. Forward-looking statements,
including projections, forecasts and estimates, are provided as
a general guide only and should not be relied on as an
indication or guarantee of future performance and involve
known and unknown risks, uncertainties, assumptions,
contingencies and other important factors, many of which are
outside the control of the Company and which are subject to
change without notice and could cause the actual results,
performance or achievements of the Company to be
materially different from the future results, performance or
achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance,
and no representation or warranty is made as to the likelihood
of achievement or reasonableness of any forward-looking
statements or other forecast. Nothing contained in this
announcement, nor any information made available to you is,
or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future
performance of Tesoro Gold.
Competent Persons Statements
The information in this report that relates to Mineral
Resources is based on information compiled by Mr Lynn
Widenbar (B.Sc. (Hons) Geology, M.Sc. FAusIMM,
MAIG), a Competent Person who is a Fellow of The
Australasian Institute of Mining and Metallurgy. Mr
Widenbar is acting as an independent consultant to
Tesoro Gold Limited. Mr Widenbar has sufficient
experience that is relevant to the style of mineralisation
and type of deposit under consideration, and to the
activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. The Company confirms
that it is not aware of any new information or data that
materially affects the information contained the form
and context in which the Competent Person’s findings
are presented have not been materially modified from
in the original announcement on 4 August 2025, and all
material assumptions and technical parameters
underpinning the estimates in that announcement
continue to apply and have not materially changed.
The information in this report that relates to Exploration
Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA,
MAIG). Mr Reeves is a member of the Australian Institute
of Geoscientists and a Director and shareholder of the
Company. Mr Reeves has sufficient experience that is
relevant to the style of mineralisation and type of
deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Reeves consents to the inclusion in this
report of the matters based on this information in the
form and context in which it appears.
Tesoro Gold 8
ASX ANNOUNCEMENT
9 FEBRUARY 2026
APPENDIX 1: DRILLING DETAILS
Northing Easting Elevation Dip Azimuth
ZDDH00398 342051 7036671 721 -60 240 116.60
ZDDH00399 342040 7036698 703 -60 240 241.70
ZDDH00398A 342051 7036670 715 -60 240 89.30
ZDDH00398B 342048 7036666 719 -60 240 250.10
ZDDH00400 341991 7036746 682 -60 240 229.90
ZDDH00406 341572 7036394 579 -60 240 207.70
ZDDH00407 341561 7036218 557 -60 240 56.50
ZDDH00407A 341567 7036220 566 -60 240 130.10
ZDDH00408 341505 7036285 563 -60 240 109.00
ZDDH00409 342280 7035724 549 -60 240 964.50
ZDDH00410 341600 7036067 600 -60 240 192.30
ZDDH00411 342213 7035800 574 -60 240 700.00
ZDDH00412 341874 7036012 632 -60 240 450.00
ZDDH00413 341848 7036478 638 -60 240 200.10
ZDDH00414 341573 7036155 556 -60 240 172.10
ZDDH00415 341897 7036505 637 -60 240 290.65
ZDDH00416 341618 7036248 565 -60 240 174.50
ZDDH00417 342207 7036402 639 -60 240 205.80
ZDDH00418 341828 7036501 641 -60 240 268.00
ZDDH00417A 342207 7036402 639 -60 240 481.00
ZDDH00420 341643 7036262 572 -60 240 175.00
ZDDH00419 341871 7036457 633 -60 240 209.50
ZDDH00421 342237 7035698 543 -60 240 680.10
ZDDH00422 341748 7036080 574 -60 240 287.50
Hole ID
Hole Location
Hole
Orientation
Drill
Depth
(m)
Tesoro Gold 9
ASX ANNOUNCEMENT
9 FEBRUARY 2026
APPENDIX 2: JORC TABLES
Section 1: Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
Tesoro has completed 437 diamond drill holes at the El
Zorro Gold Project for 136,767m.
Diamond drill holes were drilled with HQ. Sampling was
half core at geologically defined and significant
mineralisation boundaries.
The CP considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Tesoro Diamond drill holes were drilled with HQ.
Sampling was half core at geological and significant
mineralisation boundaries. The CP consider this
appropriate for the style of mineralisation.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done; this
would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’).
In other cases, more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
Diamond drilling was used to obtain ½ core samples of
various lengths (minimum 0.25m), from which 1kg of
material was pulverised passing 200 mesh to produce
a 50g charge for fire assay fusion with a gravimetric
finish. Multielement assays were completed by 4-acid
digest with a 2.5g charge. The CP consider these
appropriate assay techniques.
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
Tesoro has completed 437 diamond drill holes at the El
Zorro Gold Project for 136,767m.
Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
Core recovery was estimated using the drillers
recorded depth marks against the length of the core
recovered. Reviewing the core photos, there are
occasional shears/faults where core is broken. There is
however no significant core loss.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
A single tube system was employed and in general
core recovery good.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have occurred
due to preferential loss/gain of
fine/coarse material.
There appears to be no potential sample bias as there
was no regular loss of core.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour,
lithology, weathering, grain size, mineralisation,
alteration, geotechnical characteristics etc. Diamond
core is stored at the Company’s warehouse.
Tesoro consider the data to be of an appropriate level
of detail to support a future resource estimation.
Tesoro Gold 10
ASX ANNOUNCEMENT
9 FEBRUARY 2026
Criteria JORC Code explanation Commentary
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
Logging of diamond core was qualitative, and
diamond core was photographed.
• The total length and percentage of the
relevant intersections logged.
All drilled intervals are logged and recorded.
Subsampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
Drill core was cut, and half core was collected for
analysis
• If non-core, whether riffled, tube
sampled, rotary split, etc. and whether
sampled wet or dry.
Tesoro has not completed any percussion drilling.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
The sample preparation of crushing half core at the
lab to mm size prior to splitting off a 50g charge (either
by cone/quarter or riffle) for pulverisation provides an
appropriate and representative sample for analysis.
• Quality control procedures adopted for
all subsampling stages to maximise
representivity of samples.
Half core was collected for the entirety of the Tesoro
drilling, as such there was consistency throughout the
drilling. Core was logged by a qualified geoscientist.
Each subsample is considered to be representative of
the interval.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Sampling of half core is representative of the in-situ
material. There are field duplicate samples collected
from the diamond core with irregular results. Field drill
core duplicates are irregular by nature, and it has
been recommended by Tesoro’s consultants to use
coarse reject material to monitor the sample
preparation.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Sample sizes collected were considered appropriate
to reasonably represent the material being tested.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Assays reported in this report were undertaken at the
accredited laboratory of ALS Santiago, which is fully
certified. Core samples of various lengths were
assayed (minimum 0.25m) from which 1kg of material
was pulverized passing 200 mesh to produce a 50 g
charge for fire assay fusion with gravimetric finish.
Multielement assays were completed by 4-acid digest
with a 2.5 g charge.
All techniques are appropriate for the element being
determined.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Standard chemical analyses were used for grade
determination. There was no reliance on determination
of analysis by geophysical tools.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
QAQC procedures included the insertion of Certified
Reference Materials (CRMs) (5%) and blank material
(2%), Check samples (5%) and check assaying (5%)
The laboratories used have generally demonstrated
analytical accuracy at an acceptable level within 95%
confidence limits.
Verification of
sampling and
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
All intercepts have been verified by multiple
appropriately qualified Company personnel.
• The use of twinned holes. No twinned holes have been completed
• Documentation of primary data, data
entry procedures, data verification, data
Tesoro drilling is digitally entered and stored following
documented core handling protocols.
The protocols are considered adequate.
Tesoro Gold 11
ASX ANNOUNCEMENT
9 FEBRUARY 2026
Criteria JORC Code explanation Commentary
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data. No adjustments were made to Tesoro Drilling
Location of data
points
• Accuracy and quality of surveys used to
locate drillholes (collar and downhole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Tesoro drill hole collars have been surveyed accurately
using differential GPS for all holes.
• Specification of the grid system used. The grid system used PSAD56 19S
• Quality and adequacy of topographic
control.
The topography generated from an accurate
topographic survey data completed by a registered
surveyor and has been used for the current control.
Data spacing
and distribution
• Data spacing for reporting of Exploration
Results.
Drill hole spacing is variable between 25m and 200m
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
The current data spacing and distribution is not
considered suitable for Mineral Resource and Ore
reserve estimation at this early exploration stage.
• Whether sample compositing has been
applied.
Sample compositing was not employed at the
sampling stage.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
Drill holes were drilled across the interpreted strike of
the mineralisation.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Tesoro diamond drilling at various orientations does not
reveal any bias regarding the orientation of the
mineralised horizons.
Sample security • The measures taken to ensure sample
security.
Chain of Custody of digital data is managed by the
Company. Physical material was stored on site and,
when necessary, delivered to the assay laboratory.
Thereafter laboratory samples were controlled by the
nominated laboratory which to date has been Bureau
Veritas and ALS Santiago. All sample collection was
controlled by digital sample control file(s) and
hardcopy ticket books.
Audits or reviews • The results of any audits or reviews of
sampling techniques and data.
No audits have been undertaken.
Section 2: Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
Information regarding tenure is included in the
Company’s December 2025 quarterly report released to
the ASX on 27 January 2026.
Tesoro Resources Ltd, 95% owned Chilean subsidiary,
Tesoro Mining Chile SpA, owns 95.4% of the El Zorro Gold
Project Concessions.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The Concessions are believed to be in good standing with
the governing authority and there is no known
impediment to operating in the area.
Exploration
done by
other parties
• Acknowledgment and appraisal of
exploration by other parties.
Little historical exploration has been undertaken in either
project area. Coeur d’Alene’s Chilean exploration division
undertook activities on the Ternera prospect, under an
Tesoro Gold 12
ASX ANNOUNCEMENT
9 FEBRUARY 2026
Criteria JORC Code explanation Commentary
option agreement with the previous owners between April
1990 and January 1993.
Geology • Deposit type, geological setting and
style of mineralisation.
The mineralisation model is considered to be an intrusive
related gold deposit. The key characteristics that are
consistent with this style deposit include:
• Low sulphide content, (typically <5%); reduced ore
mineral assemblage that typically comprises pyrite and
lacks primary magnetite or hematite
• Mineralisation occurs as sheeted vein deposits or
stockwork assemblages and often combine gold with
variably elevated Bi, W, As, Mo, Te, and/or Sb but low
concentrations of base metals as seen in the initial four
holes by Tesoro at El Zorro
• Restricted and commonly weak proximal hydrothermal
alteration
• Intrusions of intermediate to felsic composition.
Drillhole
information
• A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material
drillholes:
o easting and northing of the drillhole
collar
o elevation or RL (Reduced Level –
elevation above sea level in m) of
the drillhole collar
o dip and azimuth of the hole
o downhole length and interception
depth
o hole length.
• If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of
the report, the Competent Person
should clearly explain why this is the
case.
Relevant information is presented in this report.
Data
aggregation
methods
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Significant intercepts have been calculated as downhole
width weighted averages. No top cut has been used.
• Where aggregate intercepts
incorporate short lengths of high-grade
results and longer lengths of low-grade
results, the procedure used for such
aggregation should be stated and
some typical examples of such
aggregations should be shown in detail.
Relevant information is presented in this report.
• The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation
with respect to the drillhole angle is
known, its nature should be reported.
The mineralisation forms sub-vertical sheeted veins and
individual veins and may form plunging zones within the
Tesoro Gold 13