Presentation
Released
Released
Announcement PDF
El Zorro Gold Project Presentation December 2020
ASX:TSO
Tesoro Resources Limited ACN 106 854 175
DISCLAIMER
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have been prepared by Tesoro Resources Limited (Tesoro or the Company) and approved by the Board of the Company. The information
contained in the Presentation (Information) is summary only and should be read in conjunction with any other documents provided to you by the Company. The Information is current as at 9 December 2020 and the Company does not undertake to
provide any additional or update information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the Company that you have read, understood and accepted
the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or fairness of the
information, opinions and conclusions contained in this Presentation. Tesoro, or related bodies corporate, shareholders or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make
any representations or warranties, express or implied, as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro does not represent
or warrant that this Presentation is complete or that it contains all material information about Tesoro or which a prospective investor or purchaser may require in evaluating a possible investment in Tesoro or acquisition of shares. To the maximum
extent permitted by law, Tesoro and its Agents expressly disclaim any and all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or
otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of Tesoro and which are subject to change without notice and could cause the actual results, performance or achievements
of Tesoro to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of this Presentation are cautioned
not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to be used as the basis for making an investment
decision. In providing this Presentation, Tesoro has not considered the objectives, financial position or needs of any particular recipients. Before making an investment decision prospective investors should consider the appropriateness of the
information in this Presentation having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments Commission or any other foreign regulator) and
is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United
States or any other jurisdiction in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or the securities laws of any state or
other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States.
The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated, quoted or referred to, in whole or in part, without the express consent of Tesoro.
Competent Person’s Statements
The information in this Presentation that relates to Exploration Results is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of Geoscientists and
Managing Director and major shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in this Presentation of the matters based on this information in the form
and context in which it appears.
The information in this report that relates to Geophysical Results is based on information compiled by Dr Jayson Meyers who is a Fellow of the Australian Institute of Geoscientists. Dr Meyers is a consultant to Tesoro Resources Limited and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original announcement dated 1 December 2020.
Tesoro Resources Corporate Presentation December 2020
2
TESORO CAPITAL RAISING SUMMARY
Placement to raise A$18 million
▪ Placement to institutional and sophisticated investors to raise $18.0m (Placement).
Offer Structure and Size
▪ Tesoro also proposes to undertake a Share Purchase Plan (SPP) for $3.0m at the same issue price as the Placement.
▪ Together the Placement and the SPP are the Equity Raising Offer.
▪ New Shares will rank pari passu with existing shares.
Placement Price
Lead Manager
▪ $0.27 per new share (the Price).
▪ The Price represents a 9.3% discount to the last traded price and a 14.6% discount to the 5 day trading VWAP.
▪ PAC Partners Securities Pty Ltd.
▪ Eligible Tesoro Shareholders with a registered address in Australia or New Zealand will have the opportunity to apply for Tesoro shares pursuant to a
non-underwritten SPP
▪ Offer Price of $0.27 per share, the same as the Placement.
Share Purchase Plan (SPP)
▪ Up to $30,000 per Eligible Shareholder, with Shortfall Offer incuded.
▪ Board reserves the rights to accept oversubscription or to scale back applications at its absolute discretion.
▪ The Company encourages shareholders who wish to participate to act promptly in submitting their application forms.
▪ The Company reserves the right to change the SPP closing date, including closing early, or cancel the SPP, at its sole and absolute discretion.
Tesoro Resources Corporate Presentation December 2020
3
TESORO RESOURCES CAPITAL RAISING
POST RAISE CAPITAL STRUCTURE*
Indicative Timetable*
2020/2021
Current shares on issue
476.3m
Placement
Performance rights**
146.2m
Trading halt
4pm Friday, 4 December
Placement and SPP shares to be issued
77.7m
Announcement and Recommencement of trading
Wednesday, 9 December
Shares on issue post Offer***
555m
DVP settlement
Monday, December 14
Market capitalisation (post Offer)
$149.8m
Allotment of shares
Tuesday, December 15
SPP
Allocation of Funds – December 2020 to December 2022*
Existing Cash
≈$4.0m
El Zorro exploration (50,000m of drilling)
$14.2m
El Zorro development and feasibility studies
$5.2m
Cost of the Offer
$1.3m
Corporate administration and general working capital
$4.3m
TOTAL
$25.0m
Record date for SPP
Tuesday, 8 December
SPP offer open
Friday, 11 December
SPP offer close
Friday, 8 January
SPP expected quotation
Tuesday, 19 January
*Timetable is subject to changes and references to time refer to Australian Eastern Daylight Time (AEDT)
*Use of funds is on the basis the maximum amount is raised under the Offer
*Assuming maximum placement and SPP subscriptions of $21m
** A number of performance rights with different vesting conditions
***Incudes 925,926 shares to be issued in lieu of fees for capital raising
services
Tesoro Resources Corporate Presentation December 2020
4
TESORO RESOURCES – GOLD DEVELOPER FOCUSED ON CHILE
▪ Chile a Tier One Geological Endowment & Mining Jurisdiction
▪ El Zorro Gold Project - Major Gold Deposit Emerging
▪ Progressing El Zorro Gold Project to Development
▪ Strong Board & Management with Significant Chilean Expertise
▪ >30,000m drill program underway
Tesoro Resources Corporate Presentation December 2020
5
TESORO RESOURCES – DELIVERING RESULTS
Management Focused on Creating Shareholder Value via Deploying Capital Effectively & Efficiently
Since Listing on 7 February 2020
▪
87% of Funds Spent in the Ground (Sept 2020 quarter)
▪
Average all in Cost for Drilling HQ Core ≈ AU$225.00 per metre
▪
Drilled 51 Diamond Holes since listing for 14,964 metres
▪
Every Hole has Returned Significant Gold Mineralisation
▪
Ternera has Tripled in Size
▪
Completed Induced Polarization (IP) Survey – Correlates well with Gold
▪
Completed Initial Metallurgy – Free Milling Ore
▪
Expanded Ground Position to ≈540km2
▪
4 Mineralised Surface Targets Outside of Ternera which Remain Undrilled
▪
Current Cash ≈ AU$4.5m
Source: www.asx.com.au
Tesoro Resources Corporate Presentation December 2020
6
EL ZORRO GOLD PROJECT LOCATION*
▪ Tesoro has Achieved 70% Ownership
▪ Ability to Earn 80% by Delivering Feasibility Study &
USD50,000 Reimbursement by January 2022
▪ Remaining 20% Subject to Contribute or Dilute Mechanism
▪ ≈540 km2 Project Area
▪ El Zorro Identified as an Intrusive Related Gold System (IRG)
▪ Mineralisation identified to date has a Strike Length >5km
▪ Open in All Directions
▪ World Class Mining Region
▪ Candelaria (Lundin Mining), Inca de Oro (Codelco),
Mantoverde (Mitsubishi) & Maricunga (Kinross) 90km radius
* Refer to the Company’s Prospectus dated 30 October 2019 and the Independent Geologist’s Report contained within
it for further information on the El Zorro Gold Project.
Tesoro Resources Corporate Presentation December 2020
7
EL ZORRO GOLD PROJECT HAS EXCELLENT INFRASTRUCTURE
▪ Regionally Dominant Concession Holding
▪ Region III (Atacama Desert) Chile, Low Altitude 600m to 1,600m ASL
▪ Pan American Highway & Pacific Ocean (processing H2O) 10km
▪ Caldera Port 57km, Atacama Airport 76km, Copiapo City 130km
▪ El Zorro an emerging IRG District
▪ IRG Deposits analogues – Tintina Province (Brewery Creek, Donlin
Creek, Fort Knox & Pogo)
▪ Toro Blanco, Toro Gordo, Drone Hill & Buzzard Untested Drill Targets
El Zorro Gold Project Concession area
540km2 of an emerging IRG Region
Yellow diamond – Ternera Deposit
Tesoro Resources Corporate Presentation December 2020
8
EL ZORRO GOLD PROJECT – DEFINING A MAJOR GOLD SYSTEM
▪ Exceptional Drill Results to Date - 57 Holes with Results - all Intercepted Strong Gold Mineralisation
▪ 10 X 100g/m Au Intercepts
▪ Mineralised from Surface
Significant intercepts include*:
ZDDH0010 - 84.30m @ 1.30g/t Au - 110g/m Au
▪ Incl 4.00m @ 8.50g/t Au
ZDDH0011 - 98.30m @ 1.58g/t Au - 155g/m Au
▪ Incl 30.30m @ 3.03g/t Au
▪ Incl 11.00m @ 4.70g/t Au
▪ Incl 9.00m @ 5.07g/t Au
▪ Incl 0.70m @ 21.70g/t Au
A’
A
ZDDH0012 - 58.80m @ 1.70g/t Au - 100g/m Au
▪ Incl 20.30m @ 4.50g/t Au
▪ Incl 1.00m @ 56.20g/t Au
▪ Incl 2.40m @ 33.35g/t Au
▪ Incl 6.70m @ 12.21g/t Au
ZDDH00018 - 34.73m @ 2.94g/t Au – 102g/m Au
▪ Incl 15.00m @ 5.99g/t Au
▪
Incl 2.70m @ 22.21g/t Au
ZDDH00025 - 121.55m @ 1.32g/t Au – 160g/m Au
▪ Incl 10.90m @ 4.57g/t Au
▪ Incl 12.27m @ 4.98g/t Au
▪ Incl 4.70m @ 10.69g/t Au
ZDDH00029 - 176.50m @ 0.85g/t Au – 150g/m Au
▪ Incl 63.50m @ 1.81g/t Au
▪ Incl 2.00m @ 33.00g/t Au
ZDDH00031- 231.00m @ 0.83g/t Au – 192g/m Au
▪ Incl 54.00m @ 1.69g/t Au
▪ Incl 25.00m @ 3.36g/t Au
ZDDH0017 - 86.45m @ 2.29g/t Au - 198g/m Au
▪ Incl 50.50m @ 3.63g/t Au
ZDDH00049 – 111.50m @ 1.17g/t Au – 139g/m Au
▪ Incl 23.0m @ 7.20g/t Au
ZDDH0055 - 221.20m @ 0.62g/t Au – 137g/m Au
▪ Incl 27.50m @ 3.57g/t Au
▪ Incl 74.00m @ 1.05g/t;
▪ Incl 33.00m @ 1.36g/t Au
▪ Incl 41.20m @ 1.13g/t Au
Ternera Prospect
>600m strike drilled
>750m strike surface mineralisation
Multiple high grade fault zones
*For full results for holes ZDDH00001 to ZDDH00016 refer to Plukka Ltd Prospectus 30 October 2019. For results of ZDDH00017 and ZDDH0054 refer to
TSO:ASX announcements 6 March,12 March, 27 April, 6 May, 27 May 2020, 10 June 2020, 26 August 2020, 4 November 2020 and 24 November 2020.
Tesoro Resources Corporate Presentation December 2020
9
EL ZORRO GOLD PROJECT – GEOPHYSICS DEMONSTRATES SCALE
Ternera Prospect
Gradient Array IP Chargeability Image and Drilling
Tesoro Resources Corporate Presentation December 2020
▪
IP Survey Correlates to Drilling Results*
▪
Multiple Untested IP Targets Identified
▪
Potential Ternera repeat 300m East
▪
Continuous High-Grade Core Emerging
▪
Drilling continues to Rapidly Expand the Scale
▪
Mineralised Zone >1,500m Strike, up to 100m Thick,
Down to 300m
▪
Open in All Directions
▪
Surface Sampling, Drilling & Geophysics Define System
▪
>30,000m Diamond Drill Program underway
▪
Rapidly Growing Large Scale Gold Project
▪
High Grade Core
Ternera Prospect
Potential Ternera repeat IP Anomaly in yellow circle
10
* refer ASX Announcement 1 December 2020
EL ZORRO GOLD PROJECT RESOURCE DRILLING
A
Ternera Prospect
Schematic Long section looking north west. Showing mineralised CC Fault Zones and associated low grade haloes –
results shown downhole m’s/Au g/t.
A’
Ternera Prospect Typical Section
Drill section looking northwest along line A-A’ as shown on slide 7
▪ CC Faults are the Key
▪ CC Faults 3.00g/t Au to 10.00g/t Au
▪ CC Faults Contain Wide High Grade Gold Intercepts
▪ Broader Mineralised “Halo” of 0.30g/t Au to 2.00g/t Au
▪ CC Faults Ave 180m Long, 5m to 30m Wide, >250m Deep
Tesoro Resources Corporate Presentation December 2020
▪ Open in All Directions
11
EL ZORRO – A NEW GOLD DISTRICT WITH MULTIPLE TARGETS
▪
Outcropping Mineralisation at Drone Hill, Toro Blanco, Ternera North, Toro Gordo & Buzzard
▪
Surface Channel Sampling includes*:
▪
Ternera North – 16.60m @ 1.33g/t Au
▪
Toro Gordo – 0.60m @ 4.65g/t Au & 2.10m @ 2.48g/t Au
▪
Buzzard – 26.00m @ 1.62g/t Au including 8.00m @ 3.08g/t Au
El Zorro Project
District map showing
surface sampling
highlights at new
prospects
*for sampling results see ASX:PKA Announcement of 5 August 2019 and ASX:TSO announcement 12 May 2020
Tesoro Resources Corporate Presentation December 2020
12
EL ZORRO POSITIVE PRELIMINARY METALLURGY*
▪ Ternera Material Free Milling
▪ Gold Recoveries up to 99%
▪ Gold Recoveries 94% at 250 µm grind size
▪ Gold Recoveries 99% at 75µm grind size
▪ Amenable to Gravity Concentration
▪ 55% to 75% of Gold Reports to Gravity
▪ Initial Bond Work Index of 20.4kWh/t
▪ Initial Testwork Indicates Conventional
Gravity Concentration with CIL
▪ Detailed Metallurgical Test Program 2021
Ternera metallurgical sample gold recovery kinetics at different grind sizes
*for full metallurgical results see ASX:TSO announcement 9 June 2020
Tesoro Resources Corporate Presentation December 2020
13
EL ZORRO GOLD PROJECT DEVELOPMENT
El Zorro is Ideally Located to Leverage off Existing Infrastructure & Support Services
▪
Order of Magnitude Conceptual Studies Commenced
▪
Environmental Studies & Permitting Process Commenced
▪
▪
Access to Existing Powerline – 20km to the South
Use of Seawater for Processing – Infrastructure Corridor & Establish Easements for Access
Tesoro Focused & Well Positioned to Progress El Zorro through Development
El Zorro access road looking west to
Pacific Ocean & Pan American Hwy
Tesoro Resources Corporate Presentation December 2020
14
TESORO RESOURCES WORK PROGRAMS
Dec 2020
Jan 2021
Feb 2021
Mar 2021
Q2 2021
Q3 2021
Q4 2021
Ternera
Resource
Drilling*
Modelling &
Resource
Estimation
Detailed Met
Work Program
District Target
Delineation
District Target
Drilling
Scoping Study
Ternera Target Continues to Grow with Drilling
*drill program duration dependant on eventual deposit size
Tesoro Resources Corporate Presentation December 2020
15
TESORO RESOURCES HAS AN EXPERIENCED TEAM
BOARD AND MANAGMENT
John Toll - Chairman
John is a Partner at Azure Capital Limited & has >15 years of experience in corporate advisory, focusing mainly on equity financing transactions across a range of industries including
mining, technology, general industrials, biotech & infrastructure.
Zeffron Reeves - Managing Director
Geologist with >20 years of experience in the resources sector on resource projects from greenfields exploration, discovery, definition & feasibility, construction, production to closure.
Zeff previously Managing Director of ASX listed Metallum Ltd which had a number of development & operational projects in Chile. He has also held senior management positions with
companies developing projects in Brazil. He has had previous exploration success identifying & delineating new gold districts in Brazil and Chile.
Geoff McNamara - Non-Executive Director
>25 years of international resource sector experience as a Geologist, Project Manager & Fund Manager. Previously worked in Private Equity (FUM USD800 million) & as a Director of
Societe General’s Mining Finance Team in New York. Operational roles include Project Manager, Senior Mine Geologist & Mine Geologist for Ivanhoe Mines, Lion Ore International &
Western Mining Corporation.
Sergio Uribe - Country Manager, Chile
Administrative, management & development professional with experience in Chile. He has worked on numerous resource projects from greenfields exploration, discovery, production,
closure, retreatment & tailings reclamation. Part of the development team with Fortescue Metals Group during development of its Pilbara mining operations, he has 10 years of
resource sector experience. Sergio has represented numerous foreign companies investing into resource projects in Chile & was Commercial Manager of Metallum Chile Ltd. where he
was involved in the acquisition & development of their operation in Chile. Prior to this he was General Manager of Acorn Mining Chile Ltd & Country Manager for Cleveland Mining Chile
Ltd. Sergio has a Business Management degree from Universidad del Desarrollo & is a member of the civil police & a military reserve officer.
Shannon Coates - Company Secretary
Qualified lawyer with >20 years’ experience in corporate law & compliance. She is currently Non-Executive Director of ASX listed companies Vmoto Limited, Bellevue Gold Limited &
Company Secretary to a number of public unlisted & listed companies.
Tesoro Resources Corporate Presentation December 2020
16
CONTACT DETAILS
Zeffron Reeves, Managing Director
Email: info@tesororesources.com.au
Phone: +61 8 9322 1587
Web: www.tesororesources.com.au
Address: Suite 5 | 62 Ord Street | West Perth | WA 6005
Tesoro Resources Corporate Presentation December 2020
17
APPENDIX 1
EL ZORRO GOLD PROJECT SIGNIFICANT INTERCEPTS TABLE*
Hole_ID
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0004
ZDDH0004
ZDDH0004
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0008
ZDDH0008
From (m)
5.00
5.00
5.00
12.00
14.30
33.64
44.30
64.00
75.50
75.50
107.00
117.00
5.70
8.80
8.80
51.70
58.00
21.00
21.00
21.00
37.20
47.30
64.00
90.00
5.00
56.00
57.00
4.00
4.00
9.80
9.80
51.60
65.00
72.00
72.00
72.00
100.60
130.00
135.80
0.00
2.40
22.60
24.00
46.70
61.10
108.30
133.50
148.00
180.10
180.10
184.00
207.00
226.00
236.00
1.00
39.00
39.00
104.85
117.40
35.00
58.00
To (m)
119.00
15.00
51.30
13.00
15.00
39.00
51.30
65.00
79.00
76.00
112.00
119.00
68.00
24.30
14.00
68.00
61.00
77.30
27.00
22.83
43.00
48.00
77.30
91.00
66.00
66.00
61.00
42.65
32.00
28.00
10.15
52.00
67.00
85.90
75.00
73.00
102.00
132.60
136.80
88.00
3.00
25.95
25.00
50.30
64.02
116.00
135.60
151.80
244.00
181.10
186.00
212.00
227.00
244.00
4.00
66.20
58.00
110.00
118.00
41.10
59.00
Interval
114.00
10.00
46.30
1.00
0.70
5.36
7.00
1.00
3.50
0.50
5.00
2.00
62.30
15.50
5.20
16.30
3.00
56.30
6.00
1.83
5.80
0.70
13.30
1.00
61.00
10.00
4.00
38.65
28.00
18.20
0.35
0.40
2.00
13.90
3.00
1.00
1.40
2.60
1.00
88.00
0.60
3.35
1.00
3.60
2.92
7.70
2.10
3.80
63.90
1.00
2.00
5.00
1.00
8.00
3.00
27.20
19.00
5.15
0.60
6.10
1.00
Au (g/t)
0.35
0.55
0.45
1.64
2.35
0.97
0.67
2.50
0.89
4.82
1.11
2.05
0.54
1.15
1.96
0.78
3.62
0.50
1.96
5.24
1.27
2.00
0.41
1.53
0.97
4.53
9.60
0.65
0.84
1.17
20.10
2.03
1.03
0.52
1.90
4.32
2.07
0.66
12.20
0.15
0.75
2.14
6.10
0.32
0.42
0.30
1.30
0.59
0.23
0.55
1.06
0.77
0.55
0.66
4.75
0.70
0.80
0.34
2.75
0.28
1.43
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
From (m) To (m)
ZDDH0009 4.00
6.00
ZDDH0009 12.55
38.00
ZDDH0009 21.00
26.00
ZDDH0009 48.00
48.50
ZDDH0009 78.00
83.00
ZDDH0010 31.00
33.00
ZDDH0010 60.00
61.00
ZDDH0010 66.00
67.00
ZDDH0010 75.00
159.30
ZDDH0010 75.00
104.00
ZDDH0010 82.50
86.45
ZDDH0010 91.00
102.00
ZDDH0010 93.00
97.00
ZDDH0010 120.00
126.00
ZDDH0010 149.00
159.00
ZDDH0011 176.00
274.30
ZDDH0011 181.70
212.00
ZDDH0011 196.40
212.00
ZDDH0011 203.00
203.70
ZDDH0011 203.00
212.00
ZDDH0011 217.00
222.00
ZDDH0011 246.60
256.40
ZDDH0012 0.00
58.80
ZDDH0012 1.70
22.00
ZDDH0012 1.70
8.40
ZDDH0012 2.30
4.70
ZDDH0012 17.60
22.00
ZDDH0012 17.60
20.00
ZDDH0012 53.20
58.80
ZDDH0012 53.20
56.00
ZDDH0012 151.80
152.20
ZDDH0013 0.00
3.00
ZDDH0013 9.00
14.30
ZDDH0013 25.00
29.80
ZDDH0013 28.55
29.80
ZDDH0013 46.30
70.00
ZDDH0013 46.30
51.50
ZDDH0013 51.25
65.35
ZDDH0013 58.00
65.35
ZDDH0013 102.00
104.00
ZDDH0013 136.00
137.30
ZDDH0013 165.00
173.60
ZDDH0013 170.40
173.00
ZDDH0014 15.30
70.60
ZDDH0014 15.30
34.00
ZDDH0014 15.30
26.30
ZDDH0014 23.00
26.30
ZDDH0014 64.60
70.60
ZDDH0014 64.60
67.35
ZDDH0014 112.00
122.50
ZDDH0014 115.00
117.00
ZDDH0014 177.20
179.00
ZDDH0015 37.90
39.70
ZDDH0015 91.90
132.70
ZDDH0015 91.90
94.60
ZDDH0015 112.00
116.00
ZDDH0015 240.60
242.00
ZDDH0015 265.90
269.00
ZDDH0016 125.00
131.72
ZDDH0016 152.00
204.60
ZDDH0016 188.10
194.00
ZDDH0016 188.58
188.90
ZDDH0016 203.60
204.60
ZDDH0016 281.00
290.00
ZDDH0016 287.50
290.00
Interval
2.00
25.45
5.00
0.50
5.00
2.00
1.00
1.00
84.30
29.00
3.95
11.00
4.00
6.00
10.00
98.30
30.30
15.60
0.70
9.00
5.00
9.80
58.80
20.30
6.70
2.40
4.40
2.40
5.60
2.80
0.40
3.00
5.30
4.80
1.25
23.70
5.20
14.10
7.35
2.00
1.30
8.60
2.60
55.30
18.70
11.00
3.30
6.00
2.75
10.50
2.00
1.80
1.80
40.80
2.70
4.00
1.40
3.10
6.72
52.60
5.90
0.32
1.00
9.00
2.50
Au (g/t) Comments
1.39
0.51
1.09
including
2.19
0.59
2.47
1.16
1.04
1.30
2.95
including
4.97
including
4.70
including
8.50
including
1.11
including
1.07
including
1.58
3.03
including
3.87
including
21.70
including
5.07
including
4.13
including
2.28
including
1.70
4.50
including
12.21
including
33.35
including
2.00
including
2.82
including
0.95
1.42
including
2.29
0.83
0.41
0.72
2.14
including
0.85
1.24
including
1.08
including
1.65
including
0.79
4.97
1.60
2.80
including
1.01
2.19
including
3.40
including
6.18
including
2.03
including
5.00
including
0.52
1.75
including
2.37
1.11
0.37
1.64
including
1.13
including
8.46
0.64
1.47
0.62
3.30
including
31.30
including
3.00
including
0.36
0.77
including
Hole_ID
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0018
ZDDH0018
ZDDH0018
ZDDH0018
ZDDH0019
ZDDH0019
ZDDH0019
ZDDH0020
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0023
ZDDH0023
ZDDH0023
ZDDH0023
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0026
ZDDH0026
ZDDH0026
ZDDH0026
ZDDH0027
ZDDH0027
ZDDH0027
ZDDH0027
From (m)
44.00
44.00
44.00
70.00
103.46
167.55
182.70
183.22
190.00
197.00
200.00
187.27
187.27
197.00
189.00
21.00
36.00
74.00
87.30
100.92
107.50
100.92
189.25
189.25
189.25
193.90
30.00
78.00
94.40
105.00
105.00
146.70
146.70
273.00
276.00
6.00
41.00
41.00
44.10
54.50
56.50
66.00
155.00
162.20
161.80
49.00
73.10
75.00
104.00
110.00
148.00
148.00
155.20
92.00
105.40
233.00
240.00
176.00
176.00
176.00
176.00
To (m)
74.00
60.10
47.00
74.00
105.60
254.00
233.20
206.22
205.00
202.30
202.30
222.00
211.00
199.70
204.00
89.52
45.00
79.00
87.60
116.50
112.00
101.70
208.50
201.30
195.40
195.40
31.00
119.17
95.45
119.17
110.32
151.00
149.00
277.00
277.00
9.00
78.00
45.50
45.50
57.00
69.50
69.50
169.00
163.50
167.00
170.55
84.00
82.00
118.00
113.60
160.27
170.55
159.90
110.00
110.00
242.00
242.00
206.50
202.00
188.00
182.00
Interval
30.00
16.10
3.00
4.00
2.14
86.45
50.50
23.00
15.00
5.30
2.30
34.73
23.73
2.70
15.00
68.52
9.00
5.00
0.30
15.58
4.50
0.78
19.25
12.05
6.15
1.50
1.00
41.17
1.05
14.17
5.32
4.30
2.30
4.00
1.00
3.00
37.00
4.50
1.40
2.50
13.00
3.50
14.00
1.30
5.20
121.55
10.90
7.00
14.00
3.60
12.27
22.55
4.70
18.00
4.60
9.00
2.00
30.50
26.00
12.00
6.00
Au (g/t)
0.94
1.05
4.27
4.26
1.76
2.29
3.63
7.20
10.82
25.31
46.41
2.94
4.09
22.21
5.99
0.47
1.34
1.23
3.33
0.95
1.24
8.44
2.86
4.25
7.37
20.82
3.16
1.38
2.98
3.25
6.54
7.25
13.30
1.06
3.32
1.63
0.86
2.12
5.93
1.87
1.12
2.53
3.06
19.72
6.97
1.32
4.57
6.14
1.63
4.97
4.98
2.98
10.69
1.36
4.99
1.85
7.31
0.40
0.44
0.64
1.21
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
open downhole
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0033
ZDDH0033
ZDDH0033
ZDDH0033
ZDDH0033
ZDDH0033
From (m)
14.00
21.00
25.00
42.00
43.90
29.50
29.50
29.50
43.00
56.64
72.00
91.00
121.00
121.00
167.40
176.30
180.00
193.00
5.20
50.00
66.00
66.00
66.00
70.00
101.00
117.00
117.00
165.00
195.40
202.95
72.00
72.00
72.00
100.00
100.00
118.30
146.40
171.60
193.30
193.30
193.30
204.34
204.34
228.00
248.00
291.00
3.20
17.30
43.50
75.00
128.00
128.00
132.63
157.00
171.00
178.30
178.30
191.00
40.00
57.00
59.00
100.00
134.70
143.00
To (m)
14.75
28.00
25.90
49.00
45.00
206.00
93.00
31.20
48.00
61.84
80.00
93.00
130.70
122.00
195.00
185.90
183.00
195.00
6.40
76.00
76.00
71.10
67.00
71.10
102.50
120.00
119.13
167.00
199.00
203.90
303.00
126.00
75.60
104.44
125.00
125.00
154.00
173.00
217.60
208.00
197.00
217.60
208.00
229.00
263.90
295.00
6.00
18.30
44.00
76.00
204.00
140.00
135.00
162.00
174.80
197.00
179.40
197.00
68.00
67.00
63.00
104.00
137.00
144.00
*For full results for holes ZDDH00001 to ZDDH00016 refer to Plukka Ltd Prospectus 30 October 2019. For results of ZDDH00017 and ZDDH0054 refer to
TSO:ASX announcements 6 March,12 March, 27 April, 6 May, 27 May 2020, 10 June 2020, 26 August 2020, 4 November 2020 and 24 November 2020.
Tesoro Resources Corporate Presentation December 2020
18
Interval
0.75
7.00
0.90
7.00
1.10
176.50
63.50
1.70
5.00
5.20
8.00
2.00
9.70
1.00
27.60
9.60
3.00
2.00
1.20
26.00
10.00
5.10
1.00
1.10
1.50
3.00
2.13
2.00
3.60
0.95
231.00
54.00
3.60
4.44
25.00
6.70
7.60
1.40
24.30
14.70
3.70
13.26
3.66
1.00
15.90
4.00
2.80
1.00
0.50
1.00
76.00
12.00
2.37
5.00
3.80
18.70
1.10
6.00
28.00
10.00
4.00
4.00
2.30
1.00
Au (g/t)
3.23
0.85
5.03
0.61
1.10
0.85
1.81
1.20
2.76
3.36
1.24
33.00
0.53
3.20
0.85
1.82
4.75
1.75
0.74
0.69
1.54
2.64
6.89
5.73
1.13
3.23
4.15
4.05
1.41
5.12
0.83
1.69
1.27
1.04
3.36
11.57
0.79
1.40
2.43
3.77
4.16
3.25
10.76
2.17
1.04
1.00
1.23
7.09
5.70
5.02
0.93
1.39
4.30
2.41
1.92
1.57
5.15
2.58
1.22
3.17
5.96
1.51
1.27
1.45
Comments
including
including
including
including
including
including
including
including
including
including
including
includin
Share your feedback
Discover