El Zorro Gold Project Presentation June 2020
Tesoro Resources Limited ACN 106 854 175
ASX:TSO
DISCLAIMER
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have has been prepared by Tesoro Resources Limited (Tesoro or the Company). The information contained in
the Presentation (Information) is summary only and should be read in conjunction with any other documents provided to you by the Company. The Information is current as at 1 June 2020 and the Company does not
undertake to provide any additional or update information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the Company that you
have read, understood and accepted the terms of this disclaimer.
In accordance with section 734(6) of the Corporations Act 2001 (Cth), the Company notes:
(a) the Company (Tesoro Resources Limited (ASX:TSO)) will be the issuer of securities under the placement and entitlement offer referred to in this Presentation;
(b) the Company has lodged a Prospectus prepared under the Corporations Act in relation to the entitlement offer with ASIC on 12 June 2020, which is available at www.tesororesources.com.au;
(c) the offers of the securities under the retail component of the entitlement offer will be made in, or accompanied by, a copy of the Prospectus;
(d) a person should consider the Prospectus in deciding whether to acquire the securities in the Company; and
(e) anyone wishing to acquire the securities under the retail component of the entitlement offer will need to complete the entitlement acceptance form that will be in or will accompany the Prospectus.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or
fairness of the information, opinions and conclusions contained in this Presentation. Tesoro, or related bodies corporate, shareholders or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or
advisers (Agents) guarantee or make any representations or warranties, express or implied, as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and
conclusions contained in this Presentation. Tesoro does not represent or warrant that this Presentation is complete or that it contains all material information about Tesoro or which a prospective investor or purchaser may
require in evaluating a possible investment in Tesoro or acquisition of shares. To the maximum extent permitted by law, Tesoro and its Agents expressly disclaim any and all liability, including, without limitation, any liability
arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and
involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of Tesoro and which are subject to change without notice and could cause the
actual results, performance or achievements of Tesoro to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to
future performance and recipients of this Presentation are cautioned not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to be used as the basis
for making an investment decision. In providing this Presentation, Tesoro has not considered the objectives, financial position or needs of any particular recipients. Before making an investment decision prospective
investors should consider the appropriateness of the information in this Presentation having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their
jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments Commission or any
other foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of
securities for subscription, purchase or sale in the United States or any other jurisdiction in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under
the U.S. Securities Act of 1933 as amended or the securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States.
The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated, quoted or referred to, in whole or in part, without the express consent of Tesoro.
Competent Person’s Statement
The information in this Presentation that relates to Exploration Results is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian
Institute of Geoscientists and a Director and major shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the
inclusion in this Presentation of the matters based on this information in the form and context in which it appears.
Tesoro Resources Corporate Presentation June 2020
2
TESORO RESOURCES CAPITAL RAISING SUMMARY
▪
Offer to raise approximately A$6 million through:
▪
▪
OFFER DETAILS
USE OF FUNDS
Institutional placement to sophisticated and professional investors to raise approximately A$3.3 million (‘Placement”); and
Non-renounceable accelerated institutional and retail entitlement issue to raise approximately A$2.7 million, on the basis of one
share for every eight shares held by eligible shareholders (“Entitlement Offer”).
▪
▪
▪
▪
▪
The offer price under the Entitlement Offer and Placement is A$0.06 per New Share (“Offer Price”), which represents a:
13% discount to the last closing price on the 11 June 2020;
27% discount to the 5 day volume weighted average price (“VWAP”);
8% discount to the 30 Day VWAP; and
New shares under the Entitlement Offer are being offered to all eligible shareholders on a pro-rata basis.
▪
Proceeds from the Offer will be used to:
▪
▪
▪
▪
Accelerate infill and extensional drilling at the El Zorro Project for resource delineation;
Complete a detailed metallurgical testwork program at the El Zorro Project;
Commence a Scoping Study at the El Zorro Project; and
General working capital.
Tesoro Resources Corporate Presentation June 2020
3
TESORO RESOURCES GOLD EXPLORER FOCUSED ON CHILE
▪ Chile a Tier One Geological & Mining Jurisdiction
▪ El Zorro Gold Project Positive Drill Results to Date
▪ Progressing El Zorro to Maiden Resource
▪ Strong Board & Management Significant Chilean Expertise
▪ Targeting Maiden Resource & Detailed Metallurgy in 2020
Tesoro Resources Corporate Presentation June 2020
4
EL ZORRO GOLD PROJECT
Gold Discovery in Region III Chile
View looking north along strike of the Ternera deposit
EL ZORRO GOLD PROJECT – LOCATION*
▪
JV signed with local vendor 2017
▪
Tesoro accelerating to 70% ownership**
▪
Ability to Earn 80% by delivering feasibility study &
USD50,000 reimbursement by January 2022
▪
Remaining 20% subject to contribute or dilute mechanism
▪
10,744 Ha project area
▪
Strike length >5km
▪
New gold district identified with multiple targets
▪
Ternera prospect open in all directions
▪
World class mining region
▪
Candelaria (Lundin Mining), Inca de Oro (Codelco),
Mantoverde (Anglo American) & Maricunga (Kinross) within
90km radius
* Refer to the Company’s Prospectus dated 30 October 2019 and the Independent Geologist’s Report contained within it for
further information on the El Zorro Project
** Tesoro must gain shareholder approval to issue 5 million shares to the El Zorro vendor to complete 70% ownership hurdle.
Tesoro Resources Corporate Presentation June 2020
6
EL ZORRO GOLD PROJECT – EXCELLENT INFRASTRUCTURE
▪ Region III (Atacama Desert) Chile
▪ Low Altitude – 600m to 1,600m ASL
▪ Pan American Highway 10km
▪ Pacific Ocean 10km (H20 Source)
▪ Caldera Port 57km
▪ International Airport 76km (Santiago 60min)
▪ Mining City of Copiapo 130km
Tesoro Resources Corporate Presentation June 2020
7
EL ZORRO GOLD PROJECT – LARGE IRG SYSTEM
▪ El Zorro a District Scale Gold System
▪ El Zorro Gold Mineralisation Classified as
an Intrusive Related Gold (IRG) System
▪ Gold Mineralisation Related to a Suite of
Gold Bearing Granitic Intrusions
▪ Emerging IRG District
▪ Tintina Province Deposits (Brewery Creek,
Donlin Creek, Fort Knox & Pogo)
▪ Strike Length >5km
▪ Toro Blanco, Toro Gordo, Drone Hill &
Buzzard untested Drill Targets
El Zorro Gold Project concession area, showing Ternera and identified district targets at Toro, Gordo, Toro Blanco,
Drone Hill and Buzzard
Tesoro Resources Corporate Presentation June 2020
8
EL ZORRO GOLD PROJECT – EMERGING MAJOR GOLD SYSTEM
▪ Positive drill results highlight potential for El Zorro to host a significant gold deposit
▪ 6 X 100g/m Au INTERCEPTS
▪ Mineralised zone >1,500m strike, up to 100m thick, down to 300m, open in all directions
▪ Significant intercepts include*:
▪ ZDDH004 -10.00 metres @ 4.53g/t Au
▪
Incl 4.00 metres @ 9.60g/t Au
▪ ZDDH0010 - 84.30 metres @ 1.30g/t Au - 110g/m Au
▪
Incl 4.00 metres @ 8.50g/t Au
▪
▪
▪
▪
▪
▪
▪ ZDDH0011 - 98.30 metres @ 1.58g/t Au - 155g/m Au
▪
Incl 30.30 metres @ 3.03 g/t Au
▪
ZDDH0017 - 86.45m @ 2.29g/t Au - 198g/m Au
Incl 50.50m @ 3.63g/t Au
Incl 23.0m @ 7.20 g/t Au
ZDDH00018 - 34.73m @ 2.94 g/t Au – 102g/m
Incl 15.00m @ 5.99g/t Au
Incl 2.70m @ 22.21g/t Au
▪
Incl 11.00 metres @ 4.70g/t Au
▪
Incl 9.00 metres @ 5.07 g/t Au
▪
Incl 6.15m @ 7.37 g/t Au
▪
Incl 0.70 metres @ 21.70g/t Au
▪
Incl 1.50m @ 20.82g/t Au
▪ ZDDH0012 - 58.80 metres @ 1.70g/t Au - 100g/m Au
▪
Incl 20.30 metres @ 4.50g/t Au
▪
Incl 1.00m @ 56.20 g/t Au
▪
Incl 2.40 metres@ 33.35g/t Au
▪
Incl 6.70m @ 12.21 g/t Au
▪ ZDDH0016 - 0.32 metres @ 31.30 g/t Au
ZDDH0021** - 19.25m @ 2.86 g/t Au
▪
▪
▪
ZDDH00022 - 41.17m @ 1.38 g/t Au
Incl 14.17m @ 3.25g/t Au
Incl 5.32m @ 6.54 g/t Au
▪
▪
▪
ZDDH00025 - 121.55m @ 1.32 g/t Au – 160g/m Au
Incl 10.90m @ 4.57g/t Au
Incl 12.27m @ 4.98 g/t Au
Incl 4.70m @ 10.69g/t Au
▪
Ternera Prospect
>500m strike drilled
>750m strike surface mineralisation
Multiple CC high grade fault zones
Tesoro Resources Corporate Presentation June 2020
9
*for full drill results see ASX:PKA Announcement of 5 August 2019 and ASX:TSO announcement 12 March, 27 April , 6 May ,27 May 2020 and 10 June
EL ZORRO GOLD PROJECT – RESOURCE DRILLING
Ternera Prospect – Schematic Long section looking north east. Showing mineralised CC Fault Zones and associated low grade haloes
Tesoro Resources Corporate Presentation June 2020
10
▪
Exploration Model is Generating Positive Results
▪
CC Faults are the Key
▪
10 CC Faults Identified to Date – All Mineralised
▪
CC Faults Contain Wide High Grade Gold Intercepts
▪
CC Faults Ave 180m long, 5m to 30m wide, >250m deep
▪
CC faults Grading 3.00g/t Au to 10.00g/t Au
▪
Broader Mineralised “Halo” of 0.30g/t Au to 2.00g/t Au
▪
Open in all Directions
▪
Majority of Project is Outcropping
▪
4,000m to 5,000m Drill Program Commencing July 2020
▪
Resource Drilling to Define Each CC “Lode”
▪
Test Newly Identified CC Faults North & South
▪
Targeting Maiden Resource 2020
EL ZORRO GOLD PROJECT IS GROWING
▪
New Vein System Discovered at Toro Gordo
▪
Proven Gold Mineralisation >1.5km of Strike
▪
Fault Offset Identified at Drone Hill
▪
Tonalite Mapped & Sampled >2.5km North of Ternera at Toro Blanco
Geology map
showing
Toro Gordo
mineralised
vein system
& recent channel
sampling results
Tesoro Resources Corporate Presentation June 2020
11
EL ZORRO – NEW GOLD DISTRICT
▪
Outcropping Mineralisation at Drone Hill, Toro Blanco, Ternera North, Toro Gordo & Buzzard
▪
Surface Channel Sampling includes*:
▪
Ternera North – 16.60m @ 1.33g/t Au
▪
Toro Gordo– 0.60m @ 4.65g/t Au & 2.10m @ 2.48 g/t Au
▪
Buzzard - 26.00m @ 1.62g/t Au including 8.00m @ 3.08g/t Au
El Zorro Project
district map
showing surface
sampling
highlights at
new prospects
Tesoro Resources Corporate Presentation June 2020
12
*for sampling results see ASX:PKA Announcement of 5 August 2019 and ASX:TSO announcement 12 May 2020
EL ZORRO – POSITIVE PRELIMINARY METALLURGY*
▪
Ternera Material Free Milling
▪
Gold Recoveries up to 99%
▪
Gold Recoveries 94% at 250 µm grind size
▪
Gold Recoveries 99% at 75µm grind size
▪
Amenable to Gravity Concentration
▪
55% to 75% of Gold Reporting to Gravity Circuit
▪
Initial Bond Work Index of 20.4kWh/t
▪
Initial Testwork Indicates Conventional Gravity
Concentration with CIL
▪
Detailed Metallurgical Test Program 3rd Qtr 2020
Ternera metallurgical sample old recovery kinetics at different grind sizes
*for full metallurgical results see ASX:TSO announcement 9 June 2020
Tesoro Resources Corporate Presentation June 2020
13
TESORO RESOURCES – WORK PROGRAMS
July 2020
August 2020
Sept 2020
Ternera Resource
Drilling
Modelling and
Resource
Estimation
Detailed Met Work
Program
District Target
Delineation
District Target
Drilling
Scoping Study
Tesoro Resources Corporate Presentation June 2020
14
October 2020
November
2020
December
2020
January 2021
TESORO RESOURCES – CORPORATE SNAP SHOT
CURRENT CAPITAL STRUCTURE
Total shares on Issue (includes escrowed shares)*
Share price (AUD/sh)
Market capitalisation (AUD)
USE OF FUNDS
362,673,387
$0.075
Cash as at 30 April
$2.1 million
*Escrow Shares - 24 months
PERFORMANCE RIGHTS 146,231,405
55,473,613
Series
Number
Class A
46,720,000
Class B
50,060,000
Class C
20,030,000
Class D
20,030,000
Class E
9,391,405
Funds available
$22 m
Milestone
Establish a JORC, Inferred Resource of equal or greater than
250,000 ounces gold
Establish a JORC, Inferred Resource of equal or greater than 1
million ounces gold
Establish a JORC, Inferred Resource of equal or greater than 2
million ounces gold
Complete a BFS or a DFS, confirming commercial viability at the
El Zorro Project
Vest in three tranches in accordance with the milestones set out
in the prospectus
PRO- FORMA CAPITAL STRUCTURE
(AUD)
Existing cash reserves
2,127,284
Capital Raise
5,984,110
Total
8,111,394
Proposed Allocation of funds
(AUD)
El Zorro Exploration and Resource Estimation
4,681,394
El Zorro Detailed Metallurgical Testwork
200,000
Scoping Study and Project Development
1,250,000
Current shares on issue (includes escrowed shares)*
362,673,387
Costs of the Offer
480,000
Shares which may be issued under the Offers
Additional share issues
Total Shares on Issue
99,735,182
13,992,895
476,401,464
Corporate Overheads and administration costs
1,000,000
Working Capital
500,000
Market capitalisation (AUD) @ $0.06
Cash
EV
$28.5 m
$8.1 million
$20.4m
Total
8,111,394
Tesoro Resources Corporate Presentation June 2020
15
TESORO RESOURCES – EXPERIENCED TEAM
BOARD & MANAGEMENT
John Toll (Chairman) - John is a Partner at Azure Capital Limited and
has >15 years of experience in corporate advisory, focusing mainly on
equity financing transactions across a range of industries including
mining, technology, general industrials, biotech & infrastructure.
Zeff Reeves (Managing Director) - Geologist with >20 years of
experience in the resources sector on resource projects from
greenfields exploration, discovery, definition & feasibility, construction,
production to closure. Zeff previously Managing Director of ASX listed
Metallum Ltd which had a number of development & operational
projects in Chile. He has also held senior management positions with
companies developing projects in Brazil. He has had previous
exploration success identifying and delineating new gold districts in
Brazil and Chile
Geoff McNamara (Non-Executive Director) - Geologist with >25 years
of international resource sector experience as a geologist, project
manager & fund manager. Previously worked in Private Equity (AUM
USD800 million) & as a Director of Societe General’s Mining Finance
Team in New York. Operational roles include Project Manager, Senior
Mine Geologist & Mine Geologist for Ivanhoe Mines, Lion Ore
International & WMC.
▪
Successfully ASX listing February 2020 at $0.03
▪
Share Price as at 11 June 2020 (last traded) $0.069
▪
Tesoro Continues to Deliver
Shannon Coates (Company Secretary) - Qualified lawyer with >20
years’ experience in corporate law & compliance. She is currently nonexecutive director of ASX listed companies Vmoto Limited, Bellevue
Gold Limited & company secretary to a number of public unlisted &
listed companies.
Tesoro Resources Corporate Presentation June 2020
ASX:TSO Share price performance since listing in February 2020
16
CONTACT DETAILS
Zeffron Reeves, Managing Director
Geoff McNamara, Non-Executive Director
Mobile: +61 419 714 495
Mobile: +65 9754 6095
Email: zeff.reeves@tesororesources.com.au
Email: geoff.mcnamara@tesororesources.com.au
Address: Suite 5 | 62 Ord Street | West Perth | WA 6005
Address: Suite 5 |62 Ord Street | West Perth | WA 6005
Tesoro Resources Corporate Presentation June 2020
17
APPENDIX 1
EL ZORRO GOLD PROJECT SIGNIFICANT INTERCEPTS TABLE*
Hole_ID
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0004
ZDDH0004
ZDDH0004
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0008
ZDDH0008
ZDDH0009
ZDDH0009
ZDDH0009
From (m)
5.00
5.00
5.00
12.00
14.30
33.64
44.30
64.00
75.50
75.50
107.00
117.00
5.70
8.80
8.80
51.70
58.00
21.00
21.00
21.00
37.20
47.30
64.00
90.00
5.00
56.00
57.00
4.00
4.00
9.80
9.80
51.60
65.00
72.00
72.00
72.00
100.60
130.00
135.80
0.00
2.40
22.60
24.00
46.70
61.10
108.30
133.50
148.00
180.10
180.10
184.00
207.00
226.00
236.00
1.00
39.00
39.00
104.85
117.40
35.00
58.00
4.00
12.55
21.00
To (m)
119.00
15.00
51.30
13.00
15.00
39.00
51.30
65.00
79.00
76.00
112.00
119.00
68.00
24.30
14.00
68.00
61.00
77.30
27.00
22.83
43.00
48.00
77.30
91.00
66.00
66.00
61.00
42.65
32.00
28.00
10.15
52.00
67.00
85.90
75.00
73.00
102.00
132.60
136.80
88.00
3.00
25.95
25.00
50.30
64.02
116.00
135.60
151.80
244.00
181.10
186.00
212.00
227.00
244.00
4.00
66.20
58.00
110.00
118.00
41.10
59.00
6.00
38.00
26.00
Interval
114.00
10.00
46.30
1.00
0.70
5.36
7.00
1.00
3.50
0.50
5.00
2.00
62.30
15.50
5.20
16.30
3.00
56.30
6.00
1.83
5.80
0.70
13.30
1.00
61.00
10.00
4.00
38.65
28.00
18.20
0.35
0.40
2.00
13.90
3.00
1.00
1.40
2.60
1.00
88.00
0.60
3.35
1.00
3.60
2.92
7.70
2.10
3.80
63.90
1.00
2.00
5.00
1.00
8.00
3.00
27.20
19.00
5.15
0.60
6.10
1.00
2.00
25.45
5.00
Tesoro Resources Corporate Presentation June 2020
Au (g/t)
0.35
0.55
0.45
1.64
2.35
0.97
0.67
2.50
0.89
4.82
1.11
2.05
0.54
1.15
1.96
0.78
3.62
0.50
1.96
5.24
1.27
2.00
0.41
1.53
0.97
4.53
9.60
0.65
0.84
1.17
20.10
2.03
1.03
0.52
1.90
4.32
2.07
0.66
12.20
0.15
0.75
2.14
6.10
0.32
0.42
0.30
1.30
0.59
0.23
0.55
1.06
0.77
0.55
0.66
4.75
0.70
0.80
0.34
2.75
0.28
1.43
1.39
0.51
1.09
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
From (m) To (m)
ZDDH0009 48.00
48.50
ZDDH0009 78.00
83.00
ZDDH0010 31.00
33.00
ZDDH0010 60.00
61.00
ZDDH0010 66.00
67.00
ZDDH0010 75.00
159.30
ZDDH0010 75.00
104.00
ZDDH0010 82.50
86.45
ZDDH0010 91.00
102.00
ZDDH0010 93.00
97.00
ZDDH0010 120.00
126.00
ZDDH0010 149.00
159.00
ZDDH0011 176.00
274.30
ZDDH0011 181.70
212.00
ZDDH0011 196.40
212.00
ZDDH0011 203.00
203.70
ZDDH0011 203.00
212.00
ZDDH0011 217.00
222.00
ZDDH0011 246.60
256.40
ZDDH0012 0.00
58.80
ZDDH0012 1.70
22.00
ZDDH0012 1.70
8.40
ZDDH0012 2.30
4.70
ZDDH0012 17.60
22.00
ZDDH0012 17.60
20.00
ZDDH0012 53.20
58.80
ZDDH0012 53.20
56.00
ZDDH0012 151.80
152.20
ZDDH0013 0.00
3.00
ZDDH0013 9.00
14.30
ZDDH0013 25.00
29.80
ZDDH0013 28.55
29.80
ZDDH0013 46.30
70.00
ZDDH0013 46.30
51.50
ZDDH0013 51.25
65.35
ZDDH0013 58.00
65.35
ZDDH0013 102.00
104.00
ZDDH0013 136.00
137.30
ZDDH0013 165.00
173.60
ZDDH0013 170.40
173.00
ZDDH0014 15.30
70.60
ZDDH0014 15.30
34.00
ZDDH0014 15.30
26.30
ZDDH0014 23.00
26.30
ZDDH0014 64.60
70.60
ZDDH0014 64.60
67.35
ZDDH0014 112.00
122.50
ZDDH0014 115.00
117.00
ZDDH0014 177.20
179.00
ZDDH0015 37.90
39.70
ZDDH0015 91.90
132.70
ZDDH0015 91.90
94.60
ZDDH0015 112.00
116.00
ZDDH0015 240.60
242.00
ZDDH0015 265.90
269.00
ZDDH0016 125.00
131.72
ZDDH0016 152.00
204.60
ZDDH0016 188.10
194.00
ZDDH0016 188.58
188.90
ZDDH0016 203.60
204.60
ZDDH0016 281.00
290.00
ZDDH0016 287.50
290.00
Interval
0.50
5.00
2.00
1.00
1.00
84.30
29.00
3.95
11.00
4.00
6.00
10.00
98.30
30.30
15.60
0.70
9.00
5.00
9.80
58.80
20.30
6.70
2.40
4.40
2.40
5.60
2.80
0.40
3.00
5.30
4.80
1.25
23.70
5.20
14.10
7.35
2.00
1.30
8.60
2.60
55.30
18.70
11.00
3.30
6.00
2.75
10.50
2.00
1.80
1.80
40.80
2.70
4.00
1.40
3.10
6.72
52.60
5.90
0.32
1.00
9.00
2.50
Au (g/t) Comments
2.19
0.59
2.47
1.16
1.04
1.30
2.95
including
4.97
including
4.70
including
8.50
including
1.11
including
1.07
including
1.58
3.03
including
3.87
including
21.70
including
5.07
including
4.13
including
2.28
including
1.70
4.50
including
12.21
including
33.35
including
2.00
including
2.82
including
0.95
1.42
including
2.29
0.83
0.41
0.72
2.14
including
0.85
1.24
including
1.08
including
1.65
including
0.79
4.97
1.60
2.80
including
1.01
2.19
including
3.40
including
6.18
including
2.03
including
5.00
including
0.52
1.75
including
2.37
1.11
0.37
1.64
including
1.13
including
8.46
0.64
1.47
0.62
3.30
including
31.30
including
3.00
including
0.36
0.77
including
including
18
Hole_ID
From (m) To (m)
ZDDH0017 44.00
74.00
ZDDH0017 44.00
60.10
ZDDH0017 44.00
47.00
ZDDH0017 70.00
74.00
ZDDH0017 103.46
105.60
ZDDH0017 167.55
254.00
ZDDH0017 182.70
233.20
ZDDH0017 183.22
206.22
ZDDH0017 190.00
205.00
ZDDH0017 197.00
202.30
ZDDH0017 200.00
202.30
ZDDH0018 187.27
222.00
ZDDH0018 187.27
211.00
ZDDH0018 197.00
199.70
ZDDH0018 189.00
204.00
ZDDH0019 21.00
89.52
ZDDH0019 36.00
45.00
ZDDH0019 74.00
79.00
ZDDH0020 87.30
87.60
ZDDH0021 100.92
116.50
ZDDH0021 107.50
112.00
ZDDH0021 100.92
101.70
ZDDH0021 189.25
208.50
ZDDH0021 189.25
201.30
ZDDH0021 189.25
195.40
ZDDH0021 193.90
195.40
ZDDH0022 30.00
31.00
ZDDH0022 78.00
119.17
ZDDH0022 94.40
95.45
ZDDH0022 105.00
119.17
ZDDH0022 105.00
110.32
ZDDH0023 146.70
151.00
ZDDH0023 146.70
149.00
ZDDH0023 273.00
277.00
ZDDH0023 276.00
277.00
ZDDH0024 6.00
9.00
ZDDH0024 41.00
78.00
ZDDH0024 41.00
45.50
ZDDH0024 44.10
45.50
ZDDH0024 54.50
57.00
ZDDH0024 56.50
69.50
ZDDH0024 66.00
69.50
ZDDH0024 155.00
169.00
ZDDH0024 162.20
163.50
ZDDH0024 161.80
167.00
ZDDH0025 49.00
170.55
ZDDH0025 73.10
84.00
ZDDH0025 75.00
82.00
ZDDH0025 104.00
118.00
ZDDH0025 110.00
113.60
ZDDH0025 148.00
160.27
ZDDH0025 148.00
170.55
ZDDH0025 155.20
159.90
ZDDH0026 92.00
110.00
ZDDH0026 105.40
110.00
ZDDH0026 233.00
242.00
ZDDH0026 240.00
242.00
ZDDH0027 176.00
206.50
ZDDH0027 176.00
202.00
ZDDH0027 176.00
188.00
ZDDH0027 176.00
182.00
Interval
30.00
16.10
3.00
4.00
2.14
86.45
50.50
23.00
15.00
5.30
2.30
34.73
23.73
2.70
15.00
68.52
9.00
5.00
0.30
15.58
4.50
0.78
19.25
12.05
6.15
1.50
1.00
41.17
1.05
14.17
5.32
4.30
2.30
4.00
1.00
3.00
37.00
4.50
1.40
2.50
13.00
3.50
14.00
1.30
5.20
121.55
10.90
7.00
14.00
3.60
12.27
22.55
4.70
18.00
4.60
9.00
2.00
30.50
26.00
12.00
6.00
Au (g/t) Comments
0.94
1.05
including
4.27
including
4.26
including
1.76
2.29
including
3.63
including
7.20
including
10.82
including
25.31
including
46.41
including
2.94
4.09
including
22.21
including
5.99
including
0.47
1.34
including
1.23
including
3.33
0.95
1.24
including
8.44
including
2.86
open downhole
4.25
including
7.37
including
20.82
including
3.16
1.38
2.98
including
3.25
including
6.54
including
7.25
13.30
including
1.06
3.32
including
1.63
0.86
2.12
including
5.93
including
1.87
including
1.12
including
2.53
including
3.06
19.72
including
6.97
including
1.32
4.57
including
6.14
including
1.63
including
4.97
including
4.98
including
2.98
including
10.69
including
1.36
4.99
including
1.85
7.31
including
0.40
0.44
including
0.64
including
1.21
including
*for full drill results see ASX:PKA Announcement of 5 August
2019 and ASX:TSO announcement 12 March, 27 April , 6 May
,27 May 2020 and 10 June
APPENDIX 2
EL ZORRO GOLD PROJECT – TERNERA SECTIONS
B’
B
D
E
C
’
’ B
012°
C’
C
B
’
D
’
A
’
A
E
C
Drilling Sections through the Ternera Prospect. Blue letters
denote section location on the plan above
012°
Tesoro Resources Corporate Presentation June 2020
19
*for full drill results see ASX:PKA Announcement of 5 August 2019 & TSO announcements 12 March 2020/27 April and 6 May 2020
**Partial results only, additional assays yet to be received
APPENDIX 2
EL ZORRO GOLD PROJECT – TERNERA SECTIONS
D’
D
E’
E
012°
Drilling Sections through the Ternera Prospect. Blue letters denote section location on the plan on slide 21
*for full drill results see ASX:PKA Announcement of 5 August 2019 & TSO announcements 12 March 2020/27 April and 6 May 2020
**Partial results only, additional assays yet to be received
Tesoro Resources Corporate Presentation June 2020
20
CHILE A PROVEN MINING JURISDICTION
MOST DEVELOPED SOUTH AMERICAN ECONOMY
▪
▪
▪
▪
▪
MINING
▪
▪
Mature institutional &
governance frameworks
Strong mining code
BUSINESS
LEGAL
INFRASTRUCTURE
Tesoro Resources Corporate Presentation June 2020
Mining since 1500’s
No. 1 global copper producer
Mining is 9% of employment
47% of export revenues
Tier 1 geological endowment
21
▪
▪
▪
•
•
•
Attractive business environment
Competitive tax regime
Strong sovereign rating: S&P AA–
Well developed infrastructure
Well maintained roads to both projects
Established mining services sector
Share your feedback
Discover