Drilling results demonstrate wide gold zones at El Zorro
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
26 AUGUST 2020
ASX: TSO | ACN 106 854 175
Drilling results demonstrate wide gold zones at El Zorro including:
176.50m @ 0.85g/t Au and 54.00m @ 1.69g/t Au
▪
First assay results from current drilling program at Ternera prospect at the El Zorro Gold Project,
Chile have been received for holes ZDDH00028, ZDDH00029, ZDDH0030 and partial results for
ZDDH00031.
▪
Drilling is ongoing with two diamond drill rigs operating 24 hours per day. 18 drill holes
completed to date, with core samples from 6 holes currently in the laboratory awaiting assay.
Results to be announced as they come to hand.
▪
The current drill program has been expanded to include extensional and additional infill holes
as the defined mineralised footprint at Ternera continues to expand
▪
Significant intercepts include;
•
ZDDH00029
▪
176.50m @ 0.85g/t Au from 29.50m including:
•
•
•
•
•
•
ZDDH00031
▪
•
54.00m @ 1.69g/t Au from 72.00m including:
•
6.70m @ 11.57g/t Au from 118.30m.
ZDDH00030
▪
•
63.50m @ 1.81g/t Au from 29.50m;
5.20m @ 3.36g/t Au from 56.64m;
2.00 m @ 33.00g/t Au from 91.00m;
9.60m @ 1.82g/t Au from 176.30m; and
3.00m @ 4.75g/t Au from 180.00m.
26.00m @ 0.69g/t Au from 50.00m including:
•
10.00m @ 1.64g/t Au from 66.00m;
•
1.00m @ 6.89g/t Au from 66.00m;
•
2.13m @ 4.15g/t Au from 117.00m; and
•
0.95m @ 5.12g/t Au from 202.95m (open downhole).
ZDDH00028
▪
7.00m @ 0.85g/t Au from 21.00m including;
•
0.90m @ 5.03g/t Au from 25.00m; and
•
1.10m @ 1.10g/t Au from 43.90m.
Tesoro Resources Limited (Tesoro or the Company) (ASX: TSO) is pleased to announce assay results
received from the Ternera Prospect at the El Zorro Gold Project, Chile, for holes ZDDH00028,
ZDDH00029, ZDDH0030 and partial results for ZDDH00031 (Figure 1). All holes intersected gold
mineralisation associated with the targeted “CC” faults.
1
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 26 August 2020
Hole_ID
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
From (m) To (m)
14.00
14.75
21.00
28.00
25.00
25.90
42.00
49.00
43.90
45.00
29.50
206.00
29.50
93.00
29.50
31.20
43.00
48.00
56.64
61.84
72.00
80.00
91.00
93.00
121.00
130.70
121.00
122.00
167.40
195.00
176.30
185.90
180.00
183.00
193.00
195.00
5.20
6.40
50.00
76.00
66.00
76.00
66.00
71.10
66.00
67.00
70.00
71.10
101.00
102.50
117.00
120.00
117.00
119.13
165.00
167.00
195.40
199.00
202.95
203.90
72.00
126.00
72.00
75.60
100.00
104.44
118.30
125.00
146.40
154.00
Interval
0.75
7.00
0.90
7.00
1.10
176.50
63.50
1.70
5.00
5.20
8.00
2.00
9.70
1.00
27.60
9.60
3.00
2.00
1.20
26.00
10.00
5.10
1.00
1.10
1.50
3.00
2.13
2.00
3.60
0.95
54.00
3.60
4.44
6.70
7.60
Au (g/t) Comments
3.23
0.85
5.03
including
0.61
1.10
including
0.85
1.81
including
1.20
including
2.76
including
3.36
including
1.24
including
33.00
including
0.53
3.20
including
0.85
1.82
including
4.75
including
1.75
including
0.74
0.69
1.54
including
2.64
including
6.89
including
5.73
including
1.13
3.23
4.15
including
4.05
1.41
open downhole
5.12
open downhole
1.69
1.27
including
1.04
including
11.57
including
0.79
open downhole
Table 1 – Significant drill results for holes ZDDH00028, ZDDH00029, ZDDH00030 and ZDDH00031
Results are uncut, no top cut has been applied. A full table of significant intercepts is presented in
Appendix 1.
Tesoro Managing Director Zeff Reeves commented:
“Ternera continues to return excellent results with further wide zones of gold mineralisation defined
and multiple high-grade fault zones intersected. Our team is progressing well on site with 18 holes
now completed, including 2 step out holes to the north of Ternera targeting the recently identified
geophysical anomaly correlating to high grade gold mineralisation at Ternera.”
COMMENTARY
Drill holes ZDDH00028 and ZDDH00030 were drilled in the southern sector of the Ternera Prospect
to test mineralisation of the CC200, CC175 and CC150 faults. Hole ZDDH00028 intersected high
grade quartz veins associated with the CC150 and CC175 faults.
2
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 26 August 2020
ZDDH00030 intersected the CC200, CC175 and CC150 fault zones with broader zones of welldeveloped gold mineralisation. ZDDH00030 requires additional sampling with intercepts of 3.60m
@ 1.41g/t Au from 195.40m and 0.95m @ 5.12g/t Au both open downhole. Hole ZDDH00030 from
199.40m was not been continuously sampled, additional infill samples have now been submitted
for analysis. Both holes further define the southern extensions of the deposit and additional drilling
is planned to expand the southern zone.
ZDDH00029 returned a wide mineralised intercept of 176.30m @ 0.85g/t Au. ZDDH00029 drilled
through three higher grade zones associated with the CC475, CC450 and CC425 fault zones,
including 2.00m @ 33.00g/t Au from 91.00m associated with the CC450 fault. Mineralisation
between the fault zones is well developed within sheeted vein complexes interpreted to connect
each of the CC fault zones. This drill intercept is associated with the high chargeability IP anomaly
detected by the recent geophysics survey (Figure 2 and ASX announcement 10th August 2020).
Partial assays were received for ZDDH00031 which has been drilled to a depth of 320m. Assays
have been received from 0.00m to 156.00m with mineralisation open downhole. ZDDH00031
returned a wide well mineralised intercept of 54.00m @ 1.69g/t Au from 72.00m and an additional
deeper high grade intercept of 6.70m @ 11.57g/t Au from 118.30m. Mineralisation is associated
with the CC450 and CC425 fault zones and interconnecting sheeted vein complexes.
Mineralisation is associated with the high chargeability IP anomaly (Figure 2).
Results further indicate and confirm that wide high-grade zones of gold mineralisation are
correlated to the high chargeability IP response detected in the recent geophysics survey. This
further enhances the potential scale of the Ternera Prospect, and two holes have already been
completed approximately 200m north of the northernmost hole drilled to date (Figure 2).
3
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 26 August 2020
Figure 1 – Ternera Prospect Interpreted geology map and drilling showing the interpreted highgrade CC fault zones identified from surface sampling. New results highlighted in gold. Note
northernmost holes in green targeting the northern extension of the Ternera IP anomaly.
4
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 26 August 2020
Figure 2- Ternera prospect 0.5 Vertical derivative Gradient Array Induced Polarisation image and
current drill program completed holes. PSAD56/19S datum.
5
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 26 August 2020
Hole Location
Hole ID
Hole
Orientation
Easting Northing Elevation Dip Azimuth
ZDDH00028 341605
ZDDH00029 341849
ZDDH00030 341676
ZDDH00031 341875
7036049
7036351
7036061
7036290
581
603
569
605
-60
-60
-60
-60
240
240
240
240
Drill
Depth
220.60
250.00
250.00
320.00
Table 2 – Drill Hole details for ZDDH00028 to ZDDH00031. Co-ordinate system is PSAD56-19S.
NEXT STEPS
The Company continues to drill at Ternera with two diamond drill rigs operating 24 hours per day.
The current drill program has been expanded to a minimum of 10,000m, to include extensional
and additional infill holes as the defined mineralised footprint at Ternera continues to expand.
Core from six holes is currently in the laboratory awaiting assaying with additional samples from
ongoing drilling being submitted regularly in batches. Results will be announced as they come to
hand.
Authorised by the Board of Tesoro Resources Limited.
For more information:
Company:
Zeff Reeves Managing Director
Tesoro Resources Limited
+61 8 9322 1587
6
Investors:
Peter Taylor
NWR Communications
+61 (0) 412 036 231
peter@nwrcommunications.com.au
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 26 August 2020
About Tesoro
Tesoro Resources Limited was established with a strategy of acquiring,
exploring and developing mining projects in the Coastal Cordillera region of
Chile. The Coastal Cordillera region is host to multiple world class copper and
gold mines, has well established infrastructure, service providers and an
experienced mining workforce. Large areas of the Coastal Cordillera remain
unexplored due to the unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and experience has been
able secure rights to a district scale gold project in-line with the Company’s
strategy. Tesoro has rights to acquire up to 80% of the El Zorro Gold Project.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and major shareholder of the Company. Mr Reeves has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion
in this report of the matters based on this information in the form and context in which it appears.
Future Performance
This announcement may contain certain forward-looking statements and opinion. Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and should
not be relied on as an indication or guarantee of future performance and involve known and unknown risks,
uncertainties, assumptions, contingencies and other important factors, many of which are outside the control
of the Company and which are subject to change without notice and could cause the actual results,
performance or achievements of the Company to be materially different from the future results, performance
or achievements expressed or implied by such statements. Past performance is not necessarily a guide to
future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward-looking statements or other forecast. Nothing contained in this announcement
nor any information made available to you is, or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future performance of Tesoro.
7
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 26 August 2020
APPENDIX 1 – Significant Intercept Table
Hole_ID
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0004
ZDDH0004
ZDDH0004
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0008
ZDDH0008
ZDDH0009
ZDDH0009
ZDDH0009
ZDDH0009
ZDDH0009
ZDDH0010
ZDDH0010
ZDDH0010
ZDDH0010
ZDDH0010
ZDDH0010
ZDDH0010
ZDDH0010
ZDDH0010
ZDDH0010
From (m)
5.00
5.00
5.00
12.00
14.30
33.64
44.30
64.00
75.50
75.50
107.00
117.00
5.70
8.80
8.80
51.70
58.00
21.00
21.00
21.00
37.20
47.30
64.00
90.00
5.00
56.00
57.00
4.00
4.00
9.80
9.80
51.60
65.00
72.00
72.00
72.00
100.60
130.00
135.80
0.00
2.40
22.60
24.00
46.70
61.10
108.30
133.50
148.00
180.10
180.10
184.00
207.00
226.00
236.00
1.00
39.00
39.00
104.85
117.40
35.00
58.00
4.00
12.55
21.00
48.00
78.00
31.00
60.00
66.00
75.00
75.00
82.50
91.00
93.00
120.00
149.00
To (m)
119.00
15.00
51.30
13.00
15.00
39.00
51.30
65.00
79.00
76.00
112.00
119.00
68.00
24.30
14.00
68.00
61.00
77.30
27.00
22.83
43.00
48.00
77.30
91.00
66.00
66.00
61.00
42.65
32.00
28.00
10.15
52.00
67.00
85.90
75.00
73.00
102.00
132.60
136.80
88.00
3.00
25.95
25.00
50.30
64.02
116.00
135.60
151.80
244.00
181.10
186.00
212.00
227.00
244.00
4.00
66.20
58.00
110.00
118.00
41.10
59.00
6.00
38.00
26.00
48.50
83.00
33.00
61.00
67.00
159.30
104.00
86.45
102.00
97.00
126.00
159.00
Interval
114.00
10.00
46.30
1.00
0.70
5.36
7.00
1.00
3.50
0.50
5.00
2.00
62.30
15.50
5.20
16.30
3.00
56.30
6.00
1.83
5.80
0.70
13.30
1.00
61.00
10.00
4.00
38.65
28.00
18.20
0.35
0.40
2.00
13.90
3.00
1.00
1.40
2.60
1.00
88.00
0.60
3.35
1.00
3.60
2.92
7.70
2.10
3.80
63.90
1.00
2.00
5.00
1.00
8.00
3.00
27.20
19.00
5.15
0.60
6.10
1.00
2.00
25.45
5.00
0.50
5.00
2.00
1.00
1.00
84.30
29.00
3.95
11.00
4.00
6.00
10.00
Au (g/t)
0.35
0.55
0.45
1.64
2.35
0.97
0.67
2.50
0.89
4.82
1.11
2.05
0.54
1.15
1.96
0.78
3.62
0.50
1.96
5.24
1.27
2.00
0.41
1.53
0.97
4.53
9.60
0.65
0.84
1.17
20.10
2.03
1.03
0.52
1.90
4.32
2.07
0.66
12.20
0.15
0.75
2.14
6.10
0.32
0.42
0.30
1.30
0.59
0.23
0.55
1.06
0.77
0.55
0.66
4.75
0.70
0.80
0.34
2.75
0.28
1.43
1.39
0.51
1.09
2.19
0.59
2.47
1.16
1.04
1.30
2.95
4.97
4.70
8.50
1.11
1.07
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
From (m) To (m)
Hole_ID
274.30
ZDDH0011 176.00
212.00
ZDDH0011 181.70
212.00
ZDDH0011 196.40
203.70
ZDDH0011 203.00
212.00
ZDDH0011 203.00
222.00
ZDDH0011 217.00
256.40
ZDDH0011 246.60
58.80
ZDDH0012 0.00
22.00
ZDDH0012 1.70
8.40
ZDDH0012 1.70
4.70
ZDDH0012 2.30
22.00
ZDDH0012 17.60
20.00
ZDDH0012 17.60
58.80
ZDDH0012 53.20
56.00
ZDDH0012 53.20
152.20
ZDDH0012 151.80
3.00
ZDDH0013 0.00
14.30
ZDDH0013 9.00
29.80
ZDDH0013 25.00
29.80
ZDDH0013 28.55
70.00
ZDDH0013 46.30
51.50
ZDDH0013 46.30
65.35
ZDDH0013 51.25
65.35
ZDDH0013 58.00
104.00
ZDDH0013 102.00
137.30
ZDDH0013 136.00
173.60
ZDDH0013 165.00
173.00
ZDDH0013 170.40
70.60
ZDDH0014 15.30
34.00
ZDDH0014 15.30
26.30
ZDDH0014 15.30
26.30
ZDDH0014 23.00
70.60
ZDDH0014 64.60
67.35
ZDDH0014 64.60
122.50
ZDDH0014 112.00
117.00
ZDDH0014 115.00
179.00
ZDDH0014 177.20
39.70
ZDDH0015 37.90
132.70
ZDDH0015 91.90
94.60
ZDDH0015 91.90
116.00
ZDDH0015 112.00
242.00
ZDDH0015 240.60
269.00
ZDDH0015 265.90
131.72
ZDDH0016 125.00
204.60
ZDDH0016 152.00
194.00
ZDDH0016 188.10
188.90
ZDDH0016 188.58
204.60
ZDDH0016 203.60
290.00
ZDDH0016 281.00
290.00
ZDDH0016 287.50
74.00
ZDDH0017 44.00
60.10
ZDDH0017 44.00
47.00
ZDDH0017 44.00
74.00
ZDDH0017 70.00
105.60
ZDDH0017 103.46
254.00
ZDDH0017 167.55
233.20
ZDDH0017 182.70
206.22
ZDDH0017 183.22
205.00
ZDDH0017 190.00
202.30
ZDDH0017 197.00
202.30
ZDDH0017 200.00
222.00
ZDDH0018 187.27
211.00
ZDDH0018 187.27
199.70
ZDDH0018 197.00
204.00
ZDDH0018 189.00
89.52
ZDDH0019 21.00
45.00
ZDDH0019 36.00
79.00
ZDDH0019 74.00
87.60
ZDDH0020 87.30
116.50
ZDDH0021 100.92
112.00
ZDDH0021 107.50
101.70
ZDDH0021 100.92
208.50
ZDDH0021 189.25
201.30
ZDDH0021 189.25
195.40
ZDDH0021 189.25
195.40
ZDDH0021 193.90
Interval
98.30
30.30
15.60
0.70
9.00
5.00
9.80
58.80
20.30
6.70
2.40
4.40
2.40
5.60
2.80
0.40
3.00
5.30
4.80
1.25
23.70
5.20
14.10
7.35
2.00
1.30
8.60
2.60
55.30
18.70
11.00
3.30
6.00
2.75
10.50
2.00
1.80
1.80
40.80
2.70
4.00
1.40
3.10
6.72
52.60
5.90
0.32
1.00
9.00
2.50
30.00
16.10
3.00
4.00
2.14
86.45
50.50
23.00
15.00
5.30
2.30
34.73
23.73
2.70
15.00
68.52
9.00
5.00
0.30
15.58
4.50
0.78
19.25
12.05
6.15
1.50
Au (g/t) Comments
1.58
including
3.03
including
3.87
including
21.70
including
5.07
including
4.13
including
2.28
1.70
including
4.50
including
12.21
including
33.35
including
2.00
including
2.82
0.95
including
1.42
2.29
0.83
0.41
0.72
including
2.14
0.85
including
1.24
including
1.08
including
1.65
0.79
4.97
1.60
including
2.80
1.01
including
2.19
including
3.40
including
6.18
including
2.03
including
5.00
0.52
including
1.75
2.37
1.11
0.37
including
1.64
including
1.13
8.46
0.64
1.47
0.62
including
3.30
including
31.30
including
3.00
0.36
including
0.77
0.94
including
1.05
including
4.27
including
4.26
1.76
including
2.29
including
3.63
including
7.20
including
10.82
including
25.31
including
46.41
2.94
including
4.09
including
22.21
including
5.99
0.47
including
1.34
including
1.23
3.33
0.95
including
1.24
including
8.44
open downhole
2.86
including
4.25
including
7.37
including
20.82
From (m) To (m)
Hole_ID
31.00
ZDDH0022 30.00
119.17
ZDDH0022 78.00
95.45
ZDDH0022 94.40
119.17
ZDDH0022 105.00
110.32
ZDDH0022 105.00
151.00
ZDDH0023 146.70
149.00
ZDDH0023 146.70
277.00
ZDDH0023 273.00
277.00
ZDDH0023 276.00
9.00
ZDDH0024 6.00
78.00
ZDDH0024 41.00
45.50
ZDDH0024 41.00
45.50
ZDDH0024 44.10
57.00
ZDDH0024 54.50
69.50
ZDDH0024 56.50
69.50
ZDDH0024 66.00
169.00
ZDDH0024 155.00
163.50
ZDDH0024 162.20
167.00
ZDDH0024 161.80
170.55
ZDDH0025 49.00
84.00
ZDDH0025 73.10
82.00
ZDDH0025 75.00
118.00
ZDDH0025 104.00
113.60
ZDDH0025 110.00
160.27
ZDDH0025 148.00
170.55
ZDDH0025 148.00
159.90
ZDDH0025 155.20
110.00
ZDDH0026 92.00
110.00
ZDDH0026 105.40
242.00
ZDDH0026 233.00
242.00
ZDDH0026 240.00
206.50
ZDDH0027 176.00
202.00
ZDDH0027 176.00
188.00
ZDDH0027 176.00
182.00
ZDDH0027 176.00
14.75
ZDDH0028 14.00
28.00
ZDDH0028 21.00
25.90
ZDDH0028 25.00
49.00
ZDDH0028 42.00
45.00
ZDDH0028 43.90
206.00
ZDDH0029 29.50
93.00
ZDDH0029 29.50
31.20
ZDDH0029 29.50
48.00
ZDDH0029 43.00
61.84
ZDDH0029 56.64
80.00
ZDDH0029 72.00
93.00
ZDDH0029 91.00
130.70
ZDDH0029 121.00
122.00
ZDDH0029 121.00
195.00
ZDDH0029 167.40
185.90
ZDDH0029 176.30
183.00
ZDDH0029 180.00
195.00
ZDDH0029 193.00
6.40
ZDDH0030 5.20
76.00
ZDDH0030 50.00
76.00
ZDDH0030 66.00
71.10
ZDDH0030 66.00
67.00
ZDDH0030 66.00
71.10
ZDDH0030 70.00
102.50
ZDDH0030 101.00
120.00
ZDDH0030 117.00
119.13
ZDDH0030 117.00
167.00
ZDDH0030 165.00
199.00
ZDDH0030 195.40
203.90
ZDDH0030 202.95
126.00
ZDDH0031 72.00
75.60
ZDDH0031 72.00
104.44
ZDDH0031 100.00
125.00
ZDDH0031 118.30
154.00
ZDDH0031 146.40
Interval
1.00
41.17
1.05
14.17
5.32
4.30
2.30
4.00
1.00
3.00
37.00
4.50
1.40
2.50
13.00
3.50
14.00
1.30
5.20
121.55
10.90
7.00
14.00
3.60
12.27
22.55
4.70
18.00
4.60
9.00
2.00
30.50
26.00
12.00
6.00
0.75
7.00
0.90
7.00
1.10
176.50
63.50
1.70
5.00
5.20
8.00
2.00
9.70
1.00
27.60
9.60
3.00
2.00
1.20
26.00
10.00
5.10
1.00
1.10
1.50
3.00
2.13
2.00
3.60
0.95
54.00
3.60
4.44
6.70
7.60
Au (g/t) Comments
3.16
1.38
including
2.98
including
3.25
including
6.54
7.25
including
13.30
1.06
including
3.32
1.63
0.86
including
2.12
including
5.93
including
1.87
including
1.12
including
2.53
3.06
including
19.72
including
6.97
1.32
including
4.57
including
6.14
including
1.63
including
4.97
including
4.98
including
2.98
including
10.69
1.36
including
4.99
1.85
including
7.31
0.40
including
0.44
including
0.64
including
1.21
3.23
0.85
including
5.03
0.61
including
1.10
0.85
including
1.81
including
1.20
including
2.76
including
3.36
including
1.24
including
33.00
0.53
including
3.20
0.85
including
1.82
including
4.75
including
1.75
0.74
0.69
including
1.54
including
2.64
including
6.89
including
5.73
1.13
3.23
including
4.15
4.05
open downhole
1.41
open downhole
5.12
1.69
including
1.27
including
1.04
including
11.57
open downhole
0.79
For full results for holes ZDDH00001 to ZDDH00016 refer to Plukka Ltd Prospectus 30 October 2019. For results of ZDDH00017 and ZDDH0025
refer to TSO:ASX announcements 6 March,12 March, 27 April, 6 May, 27 May 2020 and 10 June 2020.
8
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 26 August 2020
APPENDIX 2 – JORC TABLES
JORC Table 1
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as downhole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Tesoro has completed 44 diamond drill holes for 10,136m in
2017, 2018 and 2020 (ZDDH0001 to ZDDH0044). Diamond
drill holes were drilled with HQ. Sampling was half core at
geologically defined and significant mineralisation boundaries.
Tesoro considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Tesoro Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Tesoro consider this appropriate for the style of
mineralisation.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done,
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Diamond drilling was used to obtain ½ core samples of various
lengths (minimum 0.25m), from which 1kg of material was
pulverised passing 200 mesh to produce a 50g charge for fire
assay fusion with a gravimetric finish. Multielement assays
were completed by 4-acid digest with a 2.5g charge. Tesoro
consider these appropriate assay techniques.
Drilling techniques • Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Tesoro has completed 44 diamond drill holes for 10,136m.
Diamond drill holes were drilled with HQ. Sampling was half
core at geological and significant mineralisation boundaries.
Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
Core recovery was estimated using the drillers recorded depth
marks against the length of the core recovered. Reviewing the
core photos, there are occasional shears/faults where core is
broken. There is however no significant core loss.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
A single tube system was employed and in general core
recovery good.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
There appears to be no potential sample bias as there was no
regular loss of core.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour, lithology,
weathering, grain size, mineralisation, alteration, geotechnical
characteristics etc. Diamond core is stored at the Company’s
warehouse.
Tesoro consider the data to be of an appropriate level of detail
to support a future resource estimation.
Logging
• Whether logging is qualitative or quantitative in Logging of diamond core was qualitative and diamond core was
photographed.
nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the relevant All drilled intervals are logged and recorded.
intersections logged.
Subsampling
techniques and
sample
preparation
9
• If core, whether cut or sawn and whether
quarter, half or all core taken.
Drill core was cut, and half core was collected for analysis
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.
Tesoro has not completed any percussion drilling.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 26 August 2020
Criteria
JORC Code explanation
Commentary
The sample preparation of crushing half core at the lab to mm
size prior to splitting off a 50g charge (either by cone/quarter
or riffle) for pulverisation provides an appropriate and
representative sample for analysis.
Half core was collected for the entirety of the Tesoro drilling, as
• Quality control procedures adopted for all
subsampling stages to maximise representivity such there was consistency throughout the drilling. Core was
logged by a qualified geoscientist. Each subsample is
of samples.
considered to be representative of the interval.
Quality of assay
data and
laboratory tests
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Sampling of half core is representative of the in-situ material.
There are field duplicate samples collected from the diamond
core with irregular results. Field drill core duplicates are
irregular by nature and it has been recommended by Tesoro’s
consultants to use coarse reject material to monitor the
sample preparation.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
sample sizes collected were considered appropriate to
reasonably represent the material being tested.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Assays were undertaken at the accredited laboratories at
Bureau Veritas, Santiago and ALS Santiago, both of which are
fully certified. Core samples of various lengths were assayed
(minimum 0.25m) from which 1kg of material was pulverized
passing 200 mesh to produce a 50 g charge for fire assay
fusion with gravimetric finish. Multielement assays were
completed by 4-acid digest with a 2.5 g charge.
All techniques are appropriate for the element being
determined.
• For geophysical tools, spectrometers, handheld Standard chemical analyses were used for grade
XRF instruments, etc., the parameters used in determination. There was no reliance on determination of
determining the analysis including instrument analysis by geophysical tools.
make and model, reading times, calibrations
factors applied and their derivation, etc.
QAQC procedures included the insertion of Certified Reference
• Nature of quality control procedures adopted
Materials (CRMs) (5%) and blank material (2%), Check samples
(e.g. standards, blanks, duplicates, external
(5%) and check assaying 5%
laboratory checks) and whether acceptable
Cube Consulting Pty Ltd manage the database for Tesoro and
levels of accuracy (i.e. lack of bias) and
note in there
precision have been established.
The laboratories used have generally demonstrated analytical
accuracy at an acceptable level within 95% confidence limits.
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
A number of independent consulting geoscientists (Cube
Consulting, Oliver, and Cooley) external to Tesoro have verified
the intersections for holes ZDDH0001 to ZDDH0016. Holes
ZDDH0017 onwards have been verified by multiple
appropriately qualified Company personnel.
• The use of twinned holes.
no twinned holes have been completed
Tesoro drilling is digitally entered and stored following
documented core handling protocols.
The protocols are considered adequate.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Location of data
points
Data spacing and
distribution
• Discuss any adjustment to assay data.
No adjustments were made to Tesoro Drilling
• Accuracy and quality of surveys used to locate
drillholes (collar and downhole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Tesoro drill hole collars have been surveyed accurately using
differential GPS for holes ZDDH0001 to ZDDH00027. Holes
ZDDH0028 onwards have been surveyed using handheld GPS
and will be surveyed using differential GPS once the drill
program has concluded.
• Specification of the grid system used.
The grid system used PSAD56 19S
• Quality and adequacy of topographic control.
The topography generated from an accurate topographic
survey data completed by a registered surveyor and has been
used for the current control.
Drill hole spacing is variable between 25m and 200m
• Data spacing for reporting
Share your feedback
Discover