Presentation
Released
Released
Announcement PDF
El Zorro Gold Project Presentation May 2020
Tesoro Resources Limited ACN 106 854 175
DISCLAIMER
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have has been prepared by Tesoro Resources Limited (Tesoro or the
Company). The information contained in the Presentation (Information) is summary only and should be read in conjunction with any other documents provided to you by the Company.
The Information is current as at 1 May 2020 and the Company does not undertake to provide any additional or update information, whether as a result of new information, future events
or results or otherwise. By receiving the Presentation, you acknowledge and represent to the Company that you have read, understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the
currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro, or related bodies corporate, shareholders
or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make any representations or warranties, express or implied,
as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro does not
represent or warrant that this Presentation is complete or that it contains all material information about Tesoro or which a prospective investor or purchaser may require in evaluating a
possible investment in Tesoro or acquisition of shares. To the maximum extent permitted by law, Tesoro and its Agents expressly disclaim any and all liability, including, without
limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication
or guarantee of future performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the
control of Tesoro and which are subject to change without notice and could cause the actual results, performance or achievements of Tesoro to be materially different from the future
results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of this Presentation
are cautioned not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and
is not intended to be used as the basis for making an investment decision. In providing this Presentation, Tesoro has not considered the objectives, financial position or needs of any
particular recipients. Before making an investment decision prospective investors should consider the appropriateness of the information in this Presentation having regard to their
own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities
and Investments Commission or any other foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction.
In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction in which such an
offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or the securities laws
of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States.
The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated, quoted or referred to, in whole or in part, without the express consent of
Tesoro.
Competent Person’s Statement
The information in this Presentation that relates to Exploration Results is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr
Reeves is a member of the Australian Institute of Geoscientists and a Director and major shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in this Presentation of the matters based on this information in
the form and context in which it appears.
Tesoro Resources Corporate Presentation May 2020
2
EMERGING PRECIOUS METALS DEVELOPER FOCUSED ON CHILE
▪ Focused on Chile, a Tier 1 geological & mining
jurisdiction with outstanding infrastructure
▪ Two high quality gold exploration projects with district
scale footprints in the coastal Cordillera Belt Chile
▪ Focussed on El Zorro discovery, thick high grade
intercepts, emerging gold deposit
▪ Strong Board and Management with significant in
country expertise
▪ Drilling continues at El Zorro, further assay results expected May 2020
▪ Targeting maiden resource during 2020
Tesoro Resources Corporate Presentation May 2020
3
EL ZORRO GOLD PROJECT
Gold Discovery in Region III Chile
View looking north along strike of the Coquetas deposit
EL ZORRO GOLD PROJECT – LOCATION*
▪
Located in Region III (Atacama) Chile
▪
10km from Pan American Hwy & Pacific Ocean
▪
55km by road north of the port of Caldera
▪
140km by road north of Copiapo
▪
Low altitude with existing infrastructure (water, roads, ports, power)
▪
JV signed with local vendor in 2017
▪
Tesoro accelerating to 70% ownership**
▪
Ability to Earn 80% by delivering a feasibility study over the project
& payment of USD50,000 by January 2022
▪
Remaining 20% can be acquired post feasibility study, subject to
contribute or dilute mechanism
▪
10,744 Ha project area
▪
Strike length >4km
▪
New gold district identified with multiple targets
▪
Coquetas prospect open in all directions
▪
World class mining region
▪
Inca de Oro (Codelco), Mantoverde (Anglo American), Candelaria
(Lundin Mining) & Maricunga (Kinross) operations within a 90km
radius
* Refer to the Company’s Prospectus dated 30 October 2019 and the Independent Geologist’s Report contained within it for
further information on the El Zorro Project
** Tesoro must gain shareholder approval to issue 5 million shares to the El Zorro vendor to complete 70% ownership hurdle.
Tesoro Resources Corporate Presentation May 2020
5
EL ZORRO GOLD PROJECT – LARGE IRG SYSTEM
▪ El Zorro gold mineralisation has been classified
as an Intrusive Related Gold (IRG) System
▪ Coquetas gold mineralisation has been directly
related to a suite of gold bearing granitic
intrusions, an emerging IRG district
▪ IRG’s are globally significant gold producers, the
Tintina Province (Canada & US), host numerous
multi million ounces deposits
▪ El Zorro Tonalite has been mapped for >4km
along strike, faulted offsets to the west identified
▪ Toro Blanco, Drone Hill & Buzzard are
untested drill targets
▪ El Zorro is a district scale gold system
El Zorro Gold Project concession area, showing Coquetas and identified district targets at Toro Blanco, Drone Hill
and Buzzard
Tesoro Resources Corporate Presentation May 2020
6
EL ZORRO GOLD PROJECT – EMERGING MAJOR GOLD SYSTEM
▪
Exceptional drill results from Coquetas highlight the potential of El Zorro to host a significant gold
deposit – MULTIPLE 100g/m Au INTERCEPTS
▪
Mineralised zone to date defined >750 metres, up to 100 metres thick, down to 300 metres, remains
open in all directions
▪
Gold trend extends for >4km along strike
▪
Significant intercepts include*:
▪
A’
D
ZDDH0017 - 86.45m @ 2.29g/t Au - 198g/m Au
▪
Incl 50.50m @ 3.63g/t Au
▪
Incl 23.0m @ 7.20 g/t Au
▪
ZDDH0021** - 19.25m @ 2.86 g/t Au
▪
Incl 6.15m @ 7.37 g/t Au
▪
1.50m @ 20.82g/t Au
▪
ZDDH004 -10.00 metres @ 4.53g/t Au
▪
Incl 4.00 metres @ 9.60g/t Au
▪
ZDDH0005 - 1.00 metre @ 12.20g/t Au
▪
0.35 metres @ 20.10g/t Au
▪
ZDDH0010 - 84.30 metres @ 1.30g/t Au - 110g/m Au
▪
4.00 metres @ 8.50g/t Au
▪
ZDDH0011 - 98.30 metres @ 1.58g/t Au - 155g/m Au
▪
Incl 30.30 metres @ 3.03 g/t Au
▪
11.00 metres @ 4.70g/t Au
▪
9.00 metres @ 5.07 g/t Au
▪
0.70 metres @ 21.70g/t Au
▪
ZDDH0012 - 58.80 metres @ 1.70g/t Au - 100g/m Au
▪
Incl 20.30 metres @ 4.50g/t Au
▪
1.00m @ 56.20 g/t Au
▪
2.40 metres@ 33.35g/t Au
▪
6.70m @ 12.21 g/t Au
▪
ZDDH0016 - 0.32 metres @ 31.30 g/t Au
▪
EMERGING MAJOR NEW GOLD SYSTEM
B’
D’
E’
C’
A
B
E
C
Coquetas Prospect
>500m strike drilled
>750m strike surface mineralisation
Section lines in blue
100g/m intercept holes highlighted
*for full drill results see ASX:PKA Announcement of 5 August 2019 & TSO announcements 12 March 2020/27 April 2020
Tesoro Resources Corporate Presentation May 2020
7
**Partial results only, additional assays yet to be received
EL ZORRO GOLD PROJECT – DRILLING SUCCESS
▪ Tesoro’s exploration model is generating positive results
▪ NW trending faults control gold mineralisation
▪ Tesoro is optimising drilling to target prospective structures
▪ Majority of project area has fresh rock outcrop to map & sample
▪ Gold mineralisation has been defined from surface to >300m
deep, remains open at depth & along strike
▪ Repetitions of high grade zones, delineated from surface sampling
remain untested by drilling
▪ EL ZORRO IS GROWING
Section line A-A’ shown on slide 7 showing high grade intercept of hole
ZDDH0017. Proximity to NW faults controls gold mineralisation. For
additional drilling sections see Appendix 2
Tesoro Resources Corporate Presentation May 2020
8
EL ZORRO – NEW GOLD DISTRICT EMERGING
▪
Outcropping gold mineralisation has been identified at new prospects
▪
Surface channel sampling results include*:
▪
▪
▪
Buzzard - 26.00m @ 1.62g/t Au including 8.00m @ 3.08g/t Au
Coquetas North – 16.60m @ 1.33g/t Au
Gold mineralisation remains open in all directions
El Zorro Project
district map
showing
surface
sampling
highlights at
new prospects
Tesoro Resources Corporate Presentation May 2020
9
*for sampling results see ASX:PKA Announcement of 5 August 2019
EL ZORRO – IMMEDIATE NEWSFLOW
▪ COQUETAS CONTINUES TO GROW
▪ 11 HOLES COMPLETED
▪
AWAITING ASSAYS FOR 8 HOLES
▪ AWAITING CHANNEL SAMPLES
▪ POTENTIAL TO TRIPLE HIGH
GRADE ZONE
▪ TEST DRONE HILL, BUZZARD &
TORO BLANCO
▪ METALLURGICAL SAMPLE
▪ RESOURCE ESTIMATION
TARGETED 2020
▪ 70% OWNERSHIP*
Overview photo of the El Zorro Gold Project – Looking North east
* Tesoro must gain shareholder approval to issue 5 million shares to the El Zorro vendor to complete 70%
ownership hurdle
Tesoro Resources Corporate Presentation May 2020
10
ESPINA GOLD PROJECT
High Grade Gold in Maipo Valley Chile
View looking south toward the Espina Project
ESPINA GOLD PROJECT – LOCATION*
▪
Located 50km south of Santiago
▪
25km north of Yamana Gold’s Florida gold mine
▪
Low altitude with excellent access to infrastructure
▪
JV signed with local vendor in 2017
▪
Earn 90% via US$4.5M expenditure over 5 years
▪
Vendor payments totalling US$285k over 5 years
▪
Potential to acquire the remaining 10% post DFS
▪
5,530 Ha project area
▪
Large High grade epithermal vein system
▪
Historically mined over a strike length of 2.5km
▪
Widespread high grade sampling
▪
Never drilled
▪
World class mining region
▪
Florida (Yamana Gold), El Teniente (Codelco), Los
Bronces (Anglo America), Escalones (Tri Metals), Lo
Aquirre (closed), Vizcachitas (Los Andes), El Soldado
(Anglo) & Pimenton (Cerro Grande) within a 200km radius
Tesoro Resources Corporate Presentation May 2020
12
* Refer to the Company’s Prospectus dated 30th October 2019 and the Independent Geologist’s Report
contained within it for further information on the Espina Project
ESPINA GOLD PROJECT – EARLY STAGE EPITEHRMAL SYSTEM
▪
▪
▪
▪
▪
▪
Porphyry related epithermal gold system
Geologically similar to Yamana Gold’s Florida mine (>4Moz Au ) 25kms to the south
>2.5km of Mineralised structures identified
Surface geochemistry, mapping & geophysics indicates a large epithermal system
Numerous historic artisanal mine workings
Never drilled
Tesoro Resources Corporate Presentation May 2020
13
TESORO – NEAR TERM PROGRAM and NEWSFLOW
May 2020
June 2020
July 2020
August 2020
El Zorro Drilling –
Coquetas Phase 1
El Zorro Phase 1
Drilling Assays
El Zorro Surface
Assay results
El Zorro Drilling –
Phase 2
El Zorro
Metallurgical
testwork
▪ Drill results for Phase 1 during May & June
▪ Awaiting additional assays from surface channel sampling at El Zorro (Coquetas, Drone Hill,
Toro Blanco & Buzzard)
▪ Metallurgical testwork sample submitted – results expected in June 2020 quarter
▪ Maiden Resource targeted during 2020
Tesoro Resources Corporate Presentation May 2020
14
TESORO RESOURCES LTD – CORPORATE SNAP SHOT
BOARD & MANAGEMENT
CAPITAL STRUCTURE
Total shares on Issue (includes escrowed shares)*
362,673,387
Share price (AUD/sh)
$0.054
Market capitalisation (AUD)
$21m
Cash as at 31 March
$2.6 million
*Escrow Shares - 24 months
55,473,613
PERFORMANCE RIGHTS 136,840,000
Series
Number
Milestone
Class A
46,720,000
Establish a JORC, Inferred Resource of equal or greater
than 250,000 ounces gold
Class B
50,060,000
Establish a JORC, Inferred Resource of equal or greater
than 1 million ounces gold
Class C
20,030,000
Establish a JORC, Inferred Resource of equal or greater
than 2 million ounces gold
Class D
20,030,000
Complete a BFS or a DFS, confirming commercial viability
at El Zorro or Espina
John Toll (Chairman) - John is a Partner at Azure Capital Limited and has
over 15 years of experience in corporate advisory, focusing mainly on equity
financing transactions across a range of industries including mining,
technology, general industrials, biotech and infrastructure.
Zeff Reeves (Managing Director) - Geologist with > 20 years of experience
in the resources sector working on resource projects from greenfields
exploration, discovery, definition and feasibility, construction, production to
closure. Zeff previously Managing Director of ASX listed Metallum Ltd which
had a number of development and operational projects in Chile. He has also
held senior management positions with companies developing projects in
Brazil.
Geoff McNamara (Non-Executive Director) - Geologist with >25 years of
international resource sector experience as a geologist, project manager
and fund manager. Previously he worked in Private Equity (AUM USD800
million) and as a Director of Societe General’s Mining Finance Team in New
York. Operational roles include Project Manager, Senior Mine Geologist and
Mine Geologist for Ivanhoe Mines, Lion Ore International and Western
Mining Corporation.
Shannon Coates (Company Secretary) - Qualified lawyer with > 20 years’
experience in corporate law and compliance. She is currently non-executive
director of ASX listed company Vmoto Limited and company secretary to a
number of public unlisted and listed companies.
Tesoro Resources Corporate Presentation May 2020
15
CONTACT DETAILS
Zeffron Reeves, Managing Director
Geoff McNamara, Non-Executive Director
Mobile: +61 419 714 495
Mobile: +65 9754 6095
Email: zeff.reeves@tesororesources.com.au
Email: geoff.mcnamara@tesororesources.com.au
Address: Suite 5 | 62 Ord Street | West Perth | WA 6005
Address: Suite 5 |62 Ord Street | West Perth | WA 6005
Tesoro Resources Corporate Presentation May 2020
16
APPENDIX 1
EL ZORRO GOLD PROJECT SIGNIFICANT INTERCEPTS TABLE
Tesoro Resources Corporate Presentation May 2020
17
*for full drill results see ASX:PKA Announcement of 5 August 2019 and ASX:TSO announcement 12 March 2020
APPENDIX 2
EL ZORRO GOLD PROJECT – COQUETAS SECTIONS
B’
B
D’
D
E’
E
012°
C
C’
012°
012°
Tesoro Resources Corporate Presentation May 2020
18
*for full drill results see ASX:PKA Announcement of 5 August 2019
CHILE A PROVEN MINING JURISDICTION
MOST DEVELOPED SOUTH AMERICAN ECONOMY
▪
▪
▪
▪
▪
MINING
▪
▪
Mature institutional and
governance frameworks
Strong mining code
BUSINESS
LEGAL
INFRASTRUCTURE
Tesoro Resources Corporate Presentation May 2020
Mining since 1500’s
No. 1 global copper producer
Mining is 9% of employment
47% of export revenues
Tier 1 geological endowment
19
▪
▪
▪
•
•
•
Attractive business environment
Competitive tax regime
Strong sovereign rating: S&P AA–
Well developed infrastructure
Well maintained roads to both projects
Established mining services sector
Share your feedback
Discover