This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have has been prepared by Tesoro Resources Limited (Tesoro or the Company). The
information contained in the Presentation (Information) is summary only and should be read in conjunction with any other documents provided to you by the Company. The Information is current as at 1
April 2020 and the Company does not undertake to provide any additional or update information, whether as a result of new information, future events or results or otherwise. By receiving the
Presentation, you acknowledge and represent to the Company that you have read, understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy,
reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro, or related bodies corporate, shareholders or affiliates, nor any of their respective
officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make any representations or warranties, express or implied, as to or take responsibility for, the currency, accuracy,
reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro does not represent or warrant that this Presentation is complete or that it contains
all material information about Tesoro or which a prospective investor or purchaser may require in evaluating a possible investment in Tesoro or acquisition of shares. To the maximum extent permitted
by law, Tesoro and its Agents expressly disclaim any and all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in
this Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of
future performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of Tesoro and which are subject
to change without notice and could cause the actual results, performance or achievements of Tesoro to be materially different from the future results, performance or achievements expressed or implied
by such statements. Past performance is not necessarily a guide to future performance and recipients of this Presentation are cautioned not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to
be used as the basis for making an investment decision. In providing this Presentation, Tesoro has not considered the objectives, financial position or needs of any particular recipients. Before making
an investment decision prospective investors should consider the appropriateness of the information in this Presentation having regard to their own objectives, financial situation and needs, and seek
legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments
Commission or any other foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In particular, this Presentation does
not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction in which such an offer would be illegal. The securities referred to in this
Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or the securities laws of any state or other jurisdiction of the United States and may not be
offered or sold, directly or indirectly in the United States.
The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated, quoted or referred to, in whole or in part, without the express consent of Tesoro.
Competent Person’s Statement
The information in this presentation that relates to Exploration Results is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member
of the Australian Institute of Geoscientists and a Director and major shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Reeves consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.
Tesoro Resources Corporate Presentation April 2020
2
EMERGING PRECIOUS METALS DEVELOPER FOCUSED ON CHILE
▪ Focused on Chile, a Tier 1 geological & mining
jurisdiction with outstanding infrastructure
▪ Two high quality gold exploration projects with district
scale footprints in the coastal Cordillera Belt Chile
▪ Focussed on El Zorro discovery, thick high grade
intercepts, emerging gold deposit
▪ Strong Board and Management with significant in
country expertise
▪ Drilling continues at El Zorro, assay results expected April 2020
▪ Targeting maiden resource during 2020
Tesoro Resources Corporate Presentation April 2020
3
EL ZORRO GOLD PROJECT
Gold Discovery in Region III Chile
View looking north along strike of the Coquetas deposit
EL ZORRO GOLD PROJECT – LOCATION*
▪
Located in Region III (Atacama) Chile
▪
140km by road north of Copiapo
▪
55km by road north of the port of Caldera
▪
Low altitude with existing infrastructure (water, roads, ports, power)
▪
JV signed with local vendor in 2017
▪
Tesoro accelerating to 70% ownership**
▪
Ability to Earn 80% by delivering a feasibility study over the project
& payment of USD50,000 by January 2022
▪
Remaining 20% can be acquired post feasibility study, subject to
contribute or dilute mechanism
▪
10,744 Ha project area
▪
Strike length >4km
▪
New gold district identified with multiple targets
▪
Coquetas prospect open in all directions
▪
World class mining region
▪
Inca de Oro (Codelco), Mantoverde (Anglo American), Candelaria
(Lundin Mining) & Maricunga (Kinross) operations within a 90km
radius
* Refer to the Company’s Prospectus dated 30 October 2019 and the Independent Geologist’s Report contained within it for
further information on the El Zorro Project
** Tesoro must gain shareholder approval to issue 5 million shares to the El Zorro vendor to complete 70% ownership hurdle.
Tesoro Resources Corporate Presentation April 2020
5
EL ZORRO GOLD PROJECT – LARGE IRG SYSTEM
▪ El Zorro gold mineralisation has been classified
as an Intrusive Related Gold (IRG) System
▪ Coquetas gold mineralisation has been directly
related to a suite of gold bearing granitic
intrusions, an emerging IRG district
▪ IRG’s are globally significant gold producers, the
Tintina Province (Canada & US), host numerous
multi million ounces deposits
▪ El Zorro Tonalite has been mapped for >4km
along strike, faulted offsets to the west identified
▪ Toro Blanco, Drone Hill & Buzzard are
untested drill targets
▪ El Zorro is a district scale gold system
El Zorro Gold Project concession area, showing Coquetas and identified district targets at Toro Blanco, Drone Hill
and Buzzard
Tesoro Resources Corporate Presentation April 2020
6
EL ZORRO GOLD PROJECT – EMERGING MAJOR GOLD SYSTEM
▪
Exceptional drill results from Coquetas highlight the potential of El Zorro to host a significant gold
deposit – MULTIPLE 100g/m Au INTERCEPTS
▪
Mineralised zone to date defined >750 metres, up to 100 metres thick, down to 300 metres,
remains open in all directions
▪
Gold trend extends for >4km along strike
▪
Significant intercepts include*:
▪
A’
D
B’
ZDDH0017 - 86.45m @ 2.29g/t Au - 198g/m Au
▪
Incl 50.50m @ 3.63g/t Au
▪
Incl 23.0m @ 7.20 g/t Au
▪
ZDDH004 -10.00 metres @ 4.53g/t Au
▪
Incl 4.00 metres @ 9.60g/t Au
▪
ZDDH0005 - 1.00 metre @ 12.20g/t Au
▪
0.35 metres @ 20.10g/t Au
▪
ZDDH0010 - 84.30 metres @ 1.30g/t Au - 110g/m Au
▪
4.00 metres @ 8.50g/t Au
▪
ZDDH0011 - 98.30 metres @ 1.58g/t Au - 155g/m Au
▪
Incl 30.30 metres @ 3.03 g/t Au
▪
11.00 metres @ 4.70g/t Au
▪
9.00 metres @ 5.07 g/t Au
▪
0.70 metres @ 21.70g/t Au
▪
ZDDH0012 - 58.80 metres @ 1.70g/t Au - 100g/m Au
▪
Incl 20.30 metres @ 4.50g/t Au
▪
1.00m @ 56.20 g/t Au
▪
2.40 metres@ 33.35g/t Au
▪
6.70m @ 12.21 g/t Au
▪
ZDDH0016 - 0.32 metres @ 31.30 g/t Au
▪
EMERGING MAJOR NEW GOLD SYSTEM
D’
E’
C’
A
B
E
C
Coquetas Prospect
>500m strike drilled
>750m strike surface mineralisation
Section lines in blue
Hole ZDDH00017 is the first drill result from the
current program
Tesoro Resources Corporate Presentation April 2020
7
*for full drill results see ASX:PKA Announcement of 5 August 2019 & TSO announcement 12 March 2020
EL ZORRO GOLD PROJECT – DRILLING SUCCESS
▪ Tesoro’s exploration model is generating positive results
▪ NW tending faults control gold mineralisation
▪ Tesoro is optimising drilling to target prospective structures
▪ Majority of project area has fresh rock outcrop to map & sample
▪ Gold mineralisation has been defined from surface to >300m
deep, remains open at depth & along strike
▪ Repetitions of high grade zones, delineated from surface sampling
remain untested by drilling
▪ EL ZORRO IS GROWING
Section line A-A’ shown on slide 7 showing high grade intercept of hole
ZDDH0017. Proximity to NW faults controls gold mineralisation. For
additional drilling sections see Appendix 2
Tesoro Resources Corporate Presentation April 2020
8
EL ZORRO – NEW GOLD DISTRICT EMERGING
▪
Outcropping gold mineralisation has been identified at new prospects
▪
Surface channel sampling results include*:
▪
▪
▪
Buzzard - 26.00m @ 1.62g/t Au including 8.00m @ 3.08g/t Au
Coquetas North – 16.60m @ 1.33g/t Au
Gold mineralisation remains open in all directions
El Zorro Project
district map
showing
surface
sampling
highlights at
new prospects
Tesoro Resources Corporate Presentation April 2020
9
*for sampling results see ASX:PKA Announcement of 5 August 2019
EL ZORRO – IMMEDIATE NEWSFLOW
▪ COQUETAS CONTINUES TO GROW
▪ 10 HOLES COMPLETED
▪
AWAITING ASSAYS FOR 9 HOLES
▪ AWAITING CHANNEL SAMPLING ASSAYS
▪ POTENTIAL TO TRIPLE HIGH GRADE ZONE
▪ TEST DRONE HILL, BUZZARD, TORO BLANCO
▪ METALLURGICAL SAMPLE SUBMITTED
▪ RESOURCE ESTIMATION PLANNED FOR 2020
▪ 70% OWNERSHIP*
* Tesoro must gain shareholder approval to issue 5 million shares to the El Zorro vendor to complete 70%
ownership hurdle
Tesoro Resources Corporate Presentation April 2020
Outcrop Surface sampling results used to delineate mineralised lenses at surface.
Mineralisation controlled by NW trending faults zones, multiple repetitions up to 300m wide
10
ESPINA GOLD PROJECT
High Grade Gold in Maipo Valley Chile
View looking south toward the Espina Project
ESPINA GOLD PROJECT – LOCATION*
▪
Located 50km south of Santiago
▪
25km north of Yamana Gold’s Florida gold mine
▪
Low altitude with excellent access to infrastructure
▪
JV signed with local vendor in 2017
▪
Earn 90% via US$4.5M expenditure over 5 years
▪
Vendor payments totalling US$285k over 5 years
▪
Potential to acquire the remaining 10% post DFS
▪
5,530 Ha project area
▪
Large High grade epithermal vein system
▪
Historically mined over a strike length of 2.5km
▪
Widespread high grade sampling
▪
Never drilled
▪
World class mining region
▪
Florida (Yamana Gold), El Teniente (Codelco), Los
Bronces (Anglo America), Escalones (Tri Metals), Lo
Aquirre (closed), Vizcachitas (Los Andes), El Soldado
(Anglo) & Pimenton (Cerro Grande) within a 200km radius
Tesoro Resources Corporate Presentation April 2020
12
* Refer to the Company’s Prospectus dated 30th October 2019 and the Independent Geologist’s Report
contained within it for further information on the Espina Project
ESPINA GOLD PROJECT – EARLY STAGE EPITEHRMAL SYSTEM
▪
Porphyry related epithermal gold system
▪
Geologically similar to Yamana Gold’s Florida mine (>4Moz Au ) 25kms to the south
▪
▪
▪
▪
>2.5km of Mineralised structures identified
Surface geochemistry, mapping & geophysics indicates a large epithermal system
Numerous historic artisanal mine workings
Never drilled
Tesoro Resources Corporate Presentation April 2020
13
TESORO – NEAR TERM PROGRAM and NEWSFLOW
April 2020
May 2020
June 2020
July 2020
El Zorro Drilling –
Coquetas Phase 1
El Zorro Phase 1
Drilling Assays
El Zorro Surface
Assay results
El Zorro Drilling –
Phase 2
El Zorro
Metallurgical
testwork
▪ Drill results for Phase 1 from mid April onwards
▪ Awaiting additional assays from surface channel sampling at El Zorro (Coquetas, Drone Hill,
Toro Blanco & Buzzard)
▪ Metallurgical testwork sample submitted – results expected in June 2020 quarter
▪ Potential to deliver maiden Resource during 2020
Tesoro Resources Corporate Presentation April 2020
14
TESORO RESOURCES LTD – CORPORATE SNAP SHOT
BOARD & MANAGEMENT
CAPITAL STRUCTURE
Total shares on Issue (includes escrowed shares)*
362,673,387
Share price (AUD/sh)
$0.08
Market capitalisation (AUD)
$29m
Cash as at 31 March
$2.6 million
*Escrow Shares - 24 months
55,473,613
**PERFORMANCE RIGHTS 136,840,000
Series
Number
Milestone
Class A
46,720,000
Establish a JORC, Inferred Resource of equal or greater
than 250,000 ounces gold
Class B
50,060,000
Establish a JORC, Inferred Resource of equal or greater
than 1 million ounces gold
Class C
20,030,000
Establish a JORC, Inferred Resource of equal or greater
than 2 million ounces gold
Class D
20,030,000
Complete a BFS or a DFS, confirming commercial viability
at El Zorro or Espina
Tesoro Resources Corporate Presentation April 2020
15
John Toll (Chairman) - John is a Partner at Azure Capital Limited and has
over 15 years of experience in corporate advisory, focusing mainly on equity
financing transactions across a range of industries including mining,
technology, general industrials, biotech and infrastructure.
Zeff Reeves (Managing Director) - Geologist with > 20 years of experience
in the resources sector working on resource projects from greenfields
exploration, discovery, definition and feasibility, construction, production to
closure. Zeff previously Managing Director of ASX listed Metallum Ltd which
had a number of development and operational projects in Chile. He has also
held senior management positions with companies developing projects in
Brazil.
Geoff McNamara (Non-Executive Director) A Partner at investment
manager and advisor Medea Capital Partners, he was previously an owner
and Investment Director of private equity firm Pacific Road Capital. Prior to
this he was a Director of Société Generale’s Mining Finance group in New
York. Geoff is a geologist with >25 years of resource sector experience,
operational roles including Project Manager, Senior Mine Geologist and
Mine Geologist for Ivanhoe Mines, LionOre International and Western
Mining Corporation.
Shannon Coates (Company Secretary) - Qualified lawyer with > 20 years’
experience in corporate law and compliance. She is currently non-executive
director of ASX listed companies Vmoto Limited and Kopore Metals Limited
and company secretary to a number of public unlisted and listed companies.
CONTACT DETAILS
Zeffron Reeves, Managing Director
Geoff McNamara, Non-Executive Director
Mobile: +61 419 714 495
Mobile: +65 9754 6095
Email: zeff.reeves@tesororesources.com.au
Email: geoff.mcnamara@tesororesources.com.au
Address: Suite 5 | 62 Ord Street | West Perth | WA 6005
Address: Suite 5 |62 Ord Street | West Perth | WA 6005
Tesoro Resources Corporate Presentation April 2020
16
APPENDIX 1
EL ZORRO GOLD PROJECT SIGNIFICANT INTERCEPTS TABLE
Hole_ID
From (m) To (m) Interval
ZDDH0001 5.00
119.00 114.00
ZDDH0001 5.00
15.00 10.00
ZDDH0001 5.00
51.30 46.30
ZDDH0001 12.00
13.00 1.00
ZDDH0001 14.30
15.00 0.70
ZDDH0001 33.64
39.00 5.36
ZDDH0001 44.30
51.30 7.00
ZDDH0001 64.00
65.00 1.00
ZDDH0001 75.50
79.00 3.50
ZDDH0001 75.50
76.00 0.50
ZDDH0001 107.00
112.00 5.00
ZDDH0001 117.00
119.00 2.00
ZDDH0002 5.70
68.00 62.30
ZDDH0002 8.80
24.30 15.50
ZDDH0002 8.80
14.00 5.20
ZDDH0002 51.70
68.00 16.30
ZDDH0002 58.00
61.00 3.00
ZDDH0003 21.00
77.30 56.30
ZDDH0003 21.00
27.00 6.00
ZDDH0003 21.00
22.83 1.83
ZDDH0003 37.20
43.00 5.80
ZDDH0003 47.30
48.00 0.70
ZDDH0003 64.00
77.30 13.30
ZDDH0003 90.00
91.00 1.00
ZDDH0004 5.00
66.00 61.00
ZDDH0004 56.00
66.00 10.00
ZDDH0004 57.00
61.00 4.00
ZDDH0005 4.00
42.65 38.65
ZDDH0005 4.00
32.00 28.00
ZDDH0005 9.80
28.00 18.20
ZDDH0005 9.80
10.15 0.35
ZDDH0005 51.60
52.00 0.40
ZDDH0005 65.00
67.00 2.00
ZDDH0005 72.00
85.90 13.90
ZDDH0005 72.00
75.00 3.00
ZDDH0005 72.00
73.00 1.00
ZDDH0005 100.60
102.00 1.40
ZDDH0005 130.00
132.60 2.60
ZDDH0005 135.80
136.80 1.00
ZDDH0005 0.00
88.00 88.00
ZDDH0006 2.40
3.00
0.60
ZDDH0006 22.60
25.95 3.35
ZDDH0006 24.00
25.00 1.00
ZDDH0006 46.70
50.30 3.60
ZDDH0006 61.10
64.02 2.92
Tesoro Resources Corporate Presentation April 2020
Au (g/t) Comments
0.35
0.55
including
0.45
including
1.64
including
2.35
including
0.97
including
0.67
including
2.50
including
0.89
including
4.82
including
1.11
including
2.05
including
0.54
1.15
including
1.96
including
0.78
including
3.62
including
0.50
1.96
including
5.24
including
1.27
including
2.00
including
0.41
including
1.53
0.97
4.53
including
9.60
including
0.65
0.84
including
1.17
including
20.10
including
2.03
1.03
0.52
1.90
including
4.32
including
2.07
0.66
12.20
0.15
0.75
including
2.14
including
6.10
including
0.32
including
0.42
including
Hole_ID
From (m) To (m)
ZDDH0006 108.30
116.00
ZDDH0006 133.50
135.60
ZDDH0006 148.00
151.80
ZDDH0006 180.10
244.00
ZDDH0006 180.10
181.10
ZDDH0006 184.00
186.00
ZDDH0006 207.00
212.00
ZDDH0006 226.00
227.00
ZDDH0006 236.00
244.00
ZDDH0007 1.00
4.00
ZDDH0007 39.00
66.20
ZDDH0007 39.00
58.00
ZDDH0007 104.85
110.00
ZDDH0007 117.40
118.00
ZDDH0008 35.00
41.10
ZDDH0008 58.00
59.00
ZDDH0009 4.00
6.00
ZDDH0009 12.55
38.00
ZDDH0009 21.00
26.00
ZDDH0009 48.00
48.50
ZDDH0009 78.00
83.00
ZDDH0010 31.00
33.00
ZDDH0010 60.00
61.00
ZDDH0010 66.00
67.00
ZDDH0010 75.00
159.30
ZDDH0010 75.00
104.00
ZDDH0010 82.50
86.45
ZDDH0010 91.00
102.00
ZDDH0010 93.00
97.00
ZDDH0010 120.00
126.00
ZDDH0010 149.00
159.00
ZDDH0011 176.00
274.30
ZDDH0011 181.70
212.00
ZDDH0011 196.40
212.00
ZDDH0011 203.00
203.70
ZDDH0011 203.00
212.00
ZDDH0011 217.00
222.00
ZDDH0011 246.60
256.40
ZDDH0012 0.00
58.80
ZDDH0012 1.70
22.00
ZDDH0012 1.70
8.40
ZDDH0012 2.30
4.70
ZDDH0012 17.60
22.00
ZDDH0012 17.60
20.00
ZDDH0012 53.20
58.80
ZDDH0012 53.20
56.00
ZDDH0012 151.80
152.20
Interval
7.70
2.10
3.80
63.90
1.00
2.00
5.00
1.00
8.00
3.00
27.20
19.00
5.15
0.60
6.10
1.00
2.00
25.45
5.00
0.50
5.00
2.00
1.00
1.00
84.30
29.00
3.95
11.00
4.00
6.00
10.00
98.30
30.30
15.60
0.70
9.00
5.00
9.80
58.80
20.30
6.70
2.40
4.40
2.40
5.60
2.80
0.40
17
Au (g/t) Comments
0.30
including
1.30
including
0.59
including
0.23
including
0.55
including
1.06
including
0.77
including
0.55
including
0.66
including
4.75
0.70
0.80
including
0.34
2.75
0.28
1.43
1.39
0.51
1.09
including
2.19
0.59
2.47
1.16
1.04
1.30
2.95
including
4.97
including
4.70
including
8.50
including
1.11
including
1.07
including
1.58
3.03
including
3.87
including
21.70
including
5.07
including
4.13
including
2.28
including
1.70
4.50
including
12.21
including
33.35
including
2.00
including
2.82
including
0.95
1.42
including
2.29
Hole_ID
From (m) To (m)
ZDDH0013 0.00
3.00
ZDDH0013 9.00
14.30
ZDDH0013 25.00
29.80
ZDDH0013 28.55
29.80
ZDDH0013 46.30
70.00
ZDDH0013 46.30
51.50
ZDDH0013 51.25
65.35
ZDDH0013 58.00
65.35
ZDDH0013 102.00
104.00
ZDDH0013 136.00
137.30
ZDDH0013 165.00
173.60
ZDDH0013 170.40
173.00
ZDDH0014 15.30
70.60
ZDDH0014 15.30
34.00
ZDDH0014 15.30
26.30
ZDDH0014 23.00
26.30
ZDDH0014 64.60
70.60
ZDDH0014 64.60
67.35
ZDDH0014 112.00
122.50
ZDDH0014 115.00
117.00
ZDDH0014 177.20
179.00
ZDDH0015 37.90
39.70
ZDDH0015 91.90
132.70
ZDDH0015 91.90
94.60
ZDDH0015 112.00
116.00
ZDDH0015 240.60
242.00
ZDDH0015 265.90
269.00
ZDDH0016 125.00
131.72
ZDDH0016 152.00
204.60
ZDDH0016 188.10
194.00
ZDDH0016 188.58
188.90
ZDDH0016 203.60
204.60
ZDDH0016 281.00
290.00
ZDDH0016 287.50
290.00
ZDDH0017 44.00
74.00
ZDDH0017 44.00
60.10
ZDDH0017 44.00
47.00
ZDDH0017 70.00
74.00
ZDDH0017 103.46
105.60
ZDDH0017 167.55
254.00
ZDDH0017 182.70
233.20
ZDDH0017 183.22
206.22
ZDDH0017 190.00
205.00
ZDDH0017 197.00
202.30
ZDDH0017 200.00
202.30
Interval
3.00
5.30
4.80
1.25
23.70
5.20
14.10
7.35
2.00
1.30
8.60
2.60
55.30
18.70
11.00
3.30
6.00
2.75
10.50
2.00
1.80
1.80
40.80
2.70
4.00
1.40
3.10
6.72
52.60
5.90
0.32
1.00
9.00
2.50
30.00
16.10
3.00
4.00
2.14
86.45
50.50
23.00
15.00
5.30
2.30
Au (g/t) Comments
0.83
0.41
0.72
2.14
including
0.85
1.24
including
1.08
including
1.65
including
0.79
4.97
1.60
2.80
including
1.01
2.19
including
3.40
including
6.18
including
2.03
including
5.00
including
0.52
1.75
including
2.37
1.11
0.37
1.64
including
1.13
including
8.46
0.64
1.47
0.62
3.30
including
31.30
including
3.00
including
0.36
0.77
including
0.94
1.05
including
4.27
including
4.26
including
1.76
2.29
including
3.63
including
7.20
including
10.82
including
25.31
including
46.41
including
*for full drill results see ASX:PKA Announcement of 5 August 2019 and ASX:TSO announcement 12 March 2020
APPENDIX 2
EL ZORRO GOLD PROJECT – COQUETAS SECTIONS
B’
B
D’
D
E’
E
012°
C
C’
012°
012°
Tesoro Resources Corporate Presentation April 2020
18
*for full drill results see ASX:PKA Announcement of 5 August 2019
CHILE A PROVEN MINING JURISDICTION
MOST DEVELOPED SOUTH AMERICAN ECONOMY
▪
▪
▪
▪
▪
MINING
▪
▪
Mature institutional and
governance frameworks
Strong mining code
BUSINESS
LEGAL
INFRASTRUCTURE
Tesoro Resources Corporate Presentation April 2020
Mining since 1500’s
No. 1 global copper producer
Mining is 9% of employment
47% of export revenues
Tier 1 geological endowment
19
▪
▪
▪
•
•
•
Attractive business environment
Competitive tax regime
Strong sovereign rating: S&P AA–
Well developed infrastructure
Well maintained roads to both projects
Established mining services sector