El Zorro drill results continue to expand mineralisation
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
27 MAY 2020
ASX: TSO | ACN 106 854 175
El Zorro Drill Results Continue to Expand Mineralisation with More Wide HighGrade Gold Zones
Significant assays returned of 121.55m @ 1.32 g/t Au including 12.27m @ 4.98 g/t Au &
14.00m @ 3.06 g/t Au including 5.20m @ 6.97 g/t Au
▪
▪
Assay results received for holes ZDDH00023, ZDDH00024 and ZDDH00025
ZDDH0023 extends high grade mineralisation within the CC500 fault 50m to the north west
•
▪
ZDDH00023 – CC500 fault zone
•
4.30m @ 7.25 g/t Au from 146.70 including:
▪
2.30m @ 13.30 g/t Au from 146.70; and
▪
2.00m @ 1.86 g/t Au from 275.00m
ZDDH0024 and ZDDH0025 confirm wide gold zones within the CC375, CC400 and CC450 faults
•
ZDDH00024 - CC400 Fault Zone
•
36.00m @ 0.85g/t Au from 41.00m including:
▪
4.50m @ 2.12 g/t Au from 41.00m; and
▪
13.00m @ 1.21 g/t Au from 56.50m
•
ZDDH00024 – CC375 Fault Zone
▪
14.00m @ 3.06 g/t Au from 155.00m including:
▪
5.20m @ 6.97 g/t Au from 161.80m; and
▪
1.70m @ 19.72 g/t Au from 162.20m
•
ZDDH00025 – CC450 to CC425 Fault Zones
▪
121.55m @ 1.32 g/t Au from 49.00m including:
▪
10.90m @ 4.57g/t Au from 73.10m;
▪
12.27m @ 4.98 g/t Au from 148.00m; and
▪
4.70m @ 10.69 g/t Au from 155.20m
▪
▪
Results confirm mineralisation of multiple CC faults from surface to over 150m downhole.
▪
▪
Coquetas renamed “Ternera”, Coquetas South renamed “Toro Gordo”.
A preliminary independent review by Cube Consulting Pty Ltd has confirmed Tesoro’s
geological model, that higher-grade gold mineralisation is associated with the CC structures.
Assays remain outstanding for 2 holes and planning underway for Phase 2 drilling.
Tesoro Resources Limited (Tesoro or the Company) (ASX: TSO) is pleased to announce further assay
results received from the Ternera (formerly Coquetas) prospect at the El Zorro Gold Project, Chile,
for holes ZDDH00023, ZDDH00024 and ZDDH00025. All holes have successfully intersected the
targeted “CC” faults, and all returned significant intercepts of gold mineralisation consistent with
Tesoro’s geological model. Drilling has identified additional previously undrilled fault zones, CC425
and CC375.
1
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 27 May 2020
Significant intercepts for ZDDH00023, ZDDH00024 and ZDDH00025 include (*down hole length
weighted average calculation):
Hole_ID
ZDDH0023
ZDDH0023
ZDDH0023
ZDDH0023
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
From (m) To (m)
146.70
151.00
146.70
149.00
273.00
277.00
276.00
277.00
6.00
9.00
41.00
78.00
41.00
45.50
44.10
45.50
54.50
57.00
56.50
69.50
66.00
69.50
155.00
169.00
162.20
163.50
161.80
167.00
49.00
170.55
73.10
84.00
75.00
82.00
104.00
118.00
110.00
113.60
148.00
160.27
148.00
170.55
155.20
159.90
Interval
4.30
2.30
4.00
1.00
3.00
37.00
4.50
1.40
2.50
13.00
3.50
14.00
1.30
5.20
121.55
10.90
7.00
14.00
3.60
12.27
22.55
4.70
Au (g/t) Comments
7.25
13.30
including
1.06
3.32
including
1.63
0.86
2.12
including
5.93
including
1.87
including
1.12
including
2.53
including
3.06
19.72
including
6.97
including
1.32
4.57
including
6.14
including
1.63
including
4.97
including
4.98
including
2.98
including
10.69
including
Table 1 – Significant drill results for holes ZDDH00023, ZDDH00024 and ZDDH00025. Results are uncut,
no top cut has been applied. A full table of significant intercepts is presented in Appendix 1.
Tesoro Managing Director Zeff Reeves commented:
“The CC fault zones continue to produce high quality drill results. Tesoro has now delineated 9 of
these faults at Ternera and with all returning high grade results, the El Zorro project continues to grow.
These results further validate the exploration model and our ability to effectively target drilling into
the most productive mineralised structures both expanding existing mineralised zones and
delineating new ones. Every drill hole is adding value to the project and we are excited by what lies
ahead.”
COMMENTARY
ZDDH00023
ZDDH00023 has extended the high grade CC500 fault a further 50m to the NW, intersecting high
grade mineralisation hosted by quartz veins and breccias within sedimentary rocks. This is
particularly encouraging as it demonstrates the continuity of the high-grade CC structures into the
sedimentary country rocks while still containing significant high grade gold mineralisation.
ZDDH00023 also intersected mineralisation at 273.00m down hole hosted within the El Zorro Tonalite
(EZT). This intercept is interpreted to be related to the western extension of the CC450 fault zone.
2
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 27 May 2020
ZDDH00024
ZDDH00024 intersected a wide zone of mineralisation associated with the CC400 fault zone.
Mineralisation is hosted within the EZT by sheeted vein complexes and within the main CC400 fault,
characterised by quartz veins and breccias. ZDDH00024 is the first hole drilled into the CC400 and
demonstrates the repetition of the CC faults at Ternera.
ZDDH00025
ZDDH00025 intersected a wide zone of mineralisation linking the CC425 to the CC450 fault zones
(Figure 2). Mineralisation is hosted within the EZT by sheeted vein complexes and higher-grade
zones through the CC425 and CC450 characterised by strong quartz veining and brecciation. The
intercept demonstrates the potential for continuous zones of gold mineralisation to occur between
consecutive CC faults, where deformation of the host EZT is significant enough to allow gold
mineralisation to form.
Drill hole details are presented in Table 1.
3
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 27 May 2020
Figure 1 – Ternera Prospect Interpreted geology map and drilling showing the interpreted
high-grade CC fault zones identified from surface sampling, mapping and drilling. Green
outline is the approximate position of the map presented in Figure 2. New results highlighted
in gold.
4
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 27 May 2020
Figure 2- Ternera Prospect Interpreted geology map and drilling between CC400 and CC600 fault
zones. Mineralised intercepts for holes ZDDH0023 to ZDDH00025 are highlighted in gold. Mineralised
intercept’s highlighted in red.
EL ZORRO DRILLING
The current phase of drilling at El Zorro has now been completed. Tesoro drilled 11 holes
(ZDDH00017 to ZDDH00027) for 2,855.30m. Details of holes drilled in Phase 1 are presented in Table
1.
Assays remain outstanding for holes ZDDH00026 and ZDDH00027. Planning is underway for Phase 2
drilling which is currently scheduled to commence in July 2020. The Phase 2 drill program will focus
on infill and extensional drilling at Ternera to advance the project towards a maiden resource
estimate.
As part of Tesoro’s work programs at the El Zorro project the Company has engaged Cube
5
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 27 May 2020
Consulting Pty Ltd (Cube) to manage the Company’s geological database and provide
geological consulting services.
Cube has recently conducted a geological data review of Tesoro’s work completed at the El Zorro
Project to date with a focus on interrogating the exploration model proposed by Tesoro for gold
mineralisation at the project, with a particular focus on Ternera.
Cube’s preliminary review of the diamond hole drilling results has confirmed Tesoro’s interpretation
of higher-grade mineralisation is associated with the CC structures at El Zorro.
The Company has also decided to change the names of the targets Coquetas and Coquetas
South at the El Zorro Project. Coquetas will now be known as Ternera and Coquetas South will be
known as Toro Gordo (Figure 3). This has been done in order to reflect the distinct differences
between each prospect’s mineralisation styles and reduce potential confusion between the
target name and the concession of the same name.
Figure 3- El Zorro Gold project area (yellow) and gold targets identified by drilling and surface
sampling.
6
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 27 May 2020
Hole
Orientation Drill Depth
Hole ID
(m)
Easting Elevation
Azimut
Northing (m)
Dip
(m)
(m)
h
ZDDH00017 7036443
341897 645
-60 210
287.65
ZDDH00018 7036416
341936 638
-60 240
325.05
ZDDH00019 7036550
341996 649
-60 240
242.55
ZDDH00020 7036656
342030 682
-60 265
200.80
ZDDH00021 7036356
341938 635
-60 240
300.90
ZDDH00022 7036432
341853 624
-60 240
216.85
ZDDH00023 7036486
341861 633
-60 240
296.45
ZDDH00024 7036234
341807 596
-60 240
170.50
ZDDH00025 7036327
341830 617
-50 200
230.00
ZDDH00026 7036060
341722 589
-60 240
300.05
ZDDH00027 7036038
341754 581
-60 240
284.50
Collar Location
Table 1 – Drill Hole details for recently completed drilling at El Zorro. Co-ordinate system is
PSAD56-19S.
Authorised by the Board of Tesoro Resources Limited.
For more information:
Company:
Zeff Reeves Managing Director
Tesoro Resources Limited
+61 8 9322 1587
7
Investors:
Peter Taylor
NWR Communications
+61 (0) 412 036 231
peter@nwrcommunications.com.au
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 27 May 2020
About Tesoro
Tesoro Resources Limited was established with a strategy of acquiring,
exploring and developing mining projects in the Coastal Cordillera region of
Chile. The Coastal Cordillera region is host to multiple world class copper and
gold mines, has well established infrastructure, service providers and an
experienced mining workforce. Large areas of the Coastal Cordillera remain
unexplored due to the unconsolidated nature of mining concession
ownership, but Tesoro via its in-country network and experience has been
able secure rights to two district scale gold projects in-line with the Company’s
strategy. Tesoro has rights to acquire up to 80% of the El Zorro Gold Project
and 100% of the Espina Gold Project
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and major shareholder of the Company. Mr Reeves has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion
in this report of the matters based on this information in the form and context in which it appears.
Future Performance
This announcement may contain certain forward-looking statements and opinion. Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and should
not be relied on as an indication or guarantee of future performance and involve known and unknown risks,
uncertainties, assumptions, contingencies and other important factors, many of which are outside the control
of the Company and which are subject to change without notice and could cause the actual results,
performance or achievements of the Company to be materially different from the future results, performance
or achievements expressed or implied by such statements. Past performance is not necessarily a guide to
future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward looking statements or other forecast. Nothing contained in this announcement
nor any information made available to you is, or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future performance of Tesoro.
8
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 27 May 2020
APPENDIX 1 – Significant Intercept Table
Hole_ID
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0004
ZDDH0004
ZDDH0004
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
From (m)
5.00
5.00
5.00
12.00
14.30
33.64
44.30
64.00
75.50
75.50
107.00
117.00
5.70
8.80
8.80
51.70
58.00
21.00
21.00
21.00
37.20
47.30
64.00
90.00
5.00
56.00
57.00
4.00
4.00
9.80
9.80
51.60
65.00
72.00
72.00
72.00
100.60
130.00
135.80
0.00
2.40
22.60
24.00
46.70
61.10
108.30
133.50
148.00
180.10
180.10
184.00
207.00
226.00
236.00
1.00
39.00
39.00
104.85
117.40
To (m)
119.00
15.00
51.30
13.00
15.00
39.00
51.30
65.00
79.00
76.00
112.00
119.00
68.00
24.30
14.00
68.00
61.00
77.30
27.00
22.83
43.00
48.00
77.30
91.00
66.00
66.00
61.00
42.65
32.00
28.00
10.15
52.00
67.00
85.90
75.00
73.00
102.00
132.60
136.80
88.00
3.00
25.95
25.00
50.30
64.02
116.00
135.60
151.80
244.00
181.10
186.00
212.00
227.00
244.00
4.00
66.20
58.00
110.00
118.00
Interval
114.00
10.00
46.30
1.00
0.70
5.36
7.00
1.00
3.50
0.50
5.00
2.00
62.30
15.50
5.20
16.30
3.00
56.30
6.00
1.83
5.80
0.70
13.30
1.00
61.00
10.00
4.00
38.65
28.00
18.20
0.35
0.40
2.00
13.90
3.00
1.00
1.40
2.60
1.00
88.00
0.60
3.35
1.00
3.60
2.92
7.70
2.10
3.80
63.90
1.00
2.00
5.00
1.00
8.00
3.00
27.20
19.00
5.15
0.60
Au (g/t)
0.35
0.55
0.45
1.64
2.35
0.97
0.67
2.50
0.89
4.82
1.11
2.05
0.54
1.15
1.96
0.78
3.62
0.50
1.96
5.24
1.27
2.00
0.41
1.53
0.97
4.53
9.60
0.65
0.84
1.17
20.10
2.03
1.03
0.52
1.90
4.32
2.07
0.66
12.20
0.15
0.75
2.14
6.10
0.32
0.42
0.30
1.30
0.59
0.23
0.55
1.06
0.77
0.55
0.66
4.75
0.70
0.80
0.34
2.75
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
From (m) To (m)
ZDDH0008 35.00
41.10
ZDDH0008 58.00
59.00
ZDDH0009 4.00
6.00
ZDDH0009 12.55
38.00
ZDDH0009 21.00
26.00
ZDDH0009 48.00
48.50
ZDDH0009 78.00
83.00
ZDDH0010 31.00
33.00
ZDDH0010 60.00
61.00
ZDDH0010 66.00
67.00
ZDDH0010 75.00
159.30
ZDDH0010 75.00
104.00
ZDDH0010 82.50
86.45
ZDDH0010 91.00
102.00
ZDDH0010 93.00
97.00
ZDDH0010 120.00
126.00
ZDDH0010 149.00
159.00
ZDDH0011 176.00
274.30
ZDDH0011 181.70
212.00
ZDDH0011 196.40
212.00
ZDDH0011 203.00
203.70
ZDDH0011 203.00
212.00
ZDDH0011 217.00
222.00
ZDDH0011 246.60
256.40
ZDDH0012 0.00
58.80
ZDDH0012 1.70
22.00
ZDDH0012 1.70
8.40
ZDDH0012 2.30
4.70
ZDDH0012 17.60
22.00
ZDDH0012 17.60
20.00
ZDDH0012 53.20
58.80
ZDDH0012 53.20
56.00
ZDDH0012 151.80
152.20
ZDDH0013 0.00
3.00
ZDDH0013 9.00
14.30
ZDDH0013 25.00
29.80
ZDDH0013 28.55
29.80
ZDDH0013 46.30
70.00
ZDDH0013 46.30
51.50
ZDDH0013 51.25
65.35
ZDDH0013 58.00
65.35
ZDDH0013 102.00
104.00
ZDDH0013 136.00
137.30
ZDDH0013 165.00
173.60
ZDDH0013 170.40
173.00
ZDDH0014 15.30
70.60
ZDDH0014 15.30
34.00
ZDDH0014 15.30
26.30
ZDDH0014 23.00
26.30
ZDDH0014 64.60
70.60
ZDDH0014 64.60
67.35
ZDDH0014 112.00
122.50
ZDDH0014 115.00
117.00
ZDDH0014 177.20
179.00
ZDDH0015 37.90
39.70
ZDDH0015 91.90
132.70
ZDDH0015 91.90
94.60
ZDDH0015 112.00
116.00
ZDDH0015 240.60
242.00
ZDDH0015 265.90
269.00
Interval
6.10
1.00
2.00
25.45
5.00
0.50
5.00
2.00
1.00
1.00
84.30
29.00
3.95
11.00
4.00
6.00
10.00
98.30
30.30
15.60
0.70
9.00
5.00
9.80
58.80
20.30
6.70
2.40
4.40
2.40
5.60
2.80
0.40
3.00
5.30
4.80
1.25
23.70
5.20
14.10
7.35
2.00
1.30
8.60
2.60
55.30
18.70
11.00
3.30
6.00
2.75
10.50
2.00
1.80
1.80
40.80
2.70
4.00
1.40
3.10
Au (g/t) Comments
0.28
1.43
1.39
0.51
1.09
including
2.19
0.59
2.47
1.16
1.04
1.30
2.95
including
4.97
including
4.70
including
8.50
including
1.11
including
1.07
including
1.58
3.03
including
3.87
including
21.70
including
5.07
including
4.13
including
2.28
including
1.70
4.50
including
12.21
including
33.35
including
2.00
including
2.82
including
0.95
1.42
including
2.29
0.83
0.41
0.72
2.14
including
0.85
1.24
including
1.08
including
1.65
including
0.79
4.97
1.60
2.80
including
1.01
2.19
including
3.40
including
6.18
including
2.03
including
5.00
including
0.52
1.75
including
2.37
1.11
0.37
1.64
including
1.13
including
8.46
0.64
Hole_ID
From (m) To (m)
ZDDH0016 125.00
131.72
ZDDH0016 152.00
204.60
ZDDH0016 188.10
194.00
ZDDH0016 188.58
188.90
ZDDH0016 203.60
204.60
ZDDH0016 281.00
290.00
ZDDH0016 287.50
290.00
ZDDH0017 44.00
74.00
ZDDH0017 44.00
60.10
ZDDH0017 44.00
47.00
ZDDH0017 70.00
74.00
ZDDH0017 103.46
105.60
ZDDH0017 167.55
254.00
ZDDH0017 182.70
233.20
ZDDH0017 183.22
206.22
ZDDH0017 190.00
205.00
ZDDH0017 197.00
202.30
ZDDH0017 200.00
202.30
ZDDH0018 187.27
222.00
ZDDH0018 187.27
211.00
ZDDH0018 197.00
199.70
ZDDH0018 189.00
204.00
ZDDH0019 21.00
89.52
ZDDH0019 36.00
45.00
ZDDH0019 74.00
79.00
ZDDH0020 87.30
87.60
ZDDH0021 100.92
116.50
ZDDH0021 107.50
112.00
ZDDH0021 100.92
101.70
ZDDH0021 189.25
208.50
ZDDH0021 189.25
201.30
ZDDH0021 189.25
195.40
ZDDH0021 193.90
195.40
ZDDH0022 30.00
31.00
ZDDH0022 78.00
119.17
ZDDH0022 94.40
95.45
ZDDH0022 105.00
119.17
ZDDH0022 105.00
110.32
ZDDH0023 146.70
151.00
ZDDH0023 146.70
149.00
ZDDH0023 273.00
277.00
ZDDH0023 276.00
277.00
ZDDH0024 6.00
9.00
ZDDH0024 41.00
78.00
ZDDH0024 41.00
45.50
ZDDH0024 44.10
45.50
ZDDH0024 54.50
57.00
ZDDH0024 56.50
69.50
ZDDH0024 66.00
69.50
ZDDH0024 155.00
169.00
ZDDH0024 162.20
163.50
ZDDH0024 161.80
167.00
ZDDH0025 49.00
170.55
ZDDH0025 73.10
84.00
ZDDH0025 75.00
82.00
ZDDH0025 104.00
118.00
ZDDH0025 110.00
113.60
ZDDH0025 148.00
160.27
ZDDH0025 148.00
170.55
ZDDH0025 155.20
159.90
Interval
6.72
52.60
5.90
0.32
1.00
9.00
2.50
30.00
16.10
3.00
4.00
2.14
86.45
50.50
23.00
15.00
5.30
2.30
34.73
23.73
2.70
15.00
68.52
9.00
5.00
0.30
15.58
4.50
0.78
19.25
12.05
6.15
1.50
1.00
41.17
1.05
14.17
5.32
4.30
2.30
4.00
1.00
3.00
37.00
4.50
1.40
2.50
13.00
3.50
14.00
1.30
5.20
121.55
10.90
7.00
14.00
3.60
12.27
22.55
4.70
Au (g/t) Comments
1.47
0.62
3.30
including
31.30
including
3.00
including
0.36
0.77
including
0.94
1.05
including
4.27
including
4.26
including
1.76
2.29
including
3.63
including
7.20
including
10.82
including
25.31
including
46.41
including
2.94
4.09
including
22.21
including
5.99
including
0.47
1.34
including
1.23
including
3.33
0.95
1.24
including
8.44
including
2.86
open downhole
4.25
including
7.37
including
20.82
including
3.16
1.38
2.98
including
3.25
including
6.54
including
7.25
13.30
including
1.06
3.32
including
1.63
0.86
2.12
including
5.93
including
1.87
including
1.12
including
2.53
including
3.06
19.72
including
6.97
including
1.32
4.57
including
6.14
including
1.63
including
4.97
including
4.98
including
2.98
including
10.69
including
For full results for holes ZDDH00001 to ZDDH00016 refer to Plukka Ltd Prospectus 30 October 2019. For results of ZDDH00017 and ZDDH0022
refer to TSO:ASX announcements 6 March,12 March, 27 April and 6 May 2020.
9
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 27 May 2020
APPENDIX 2 – JORC TABLES
JORC Table 1
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as downhole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Tesoro has completed 27 diamond drill holes for 5901.70m in
2017, 2018 and 2020 (ZDDH0001 to ZDDH0027) and 171
trenches for 4008.2m. Trenches were undertaken as
continuous channel samples and Diamond drill holes were
drilled with HQ. Sampling was half core at geologically defined
and significant mineralisation boundaries.
Tesoro considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Tesoro Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Tesoro consider this appropriate for the style of
mineralisation.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done,
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Diamond drilling was used to obtain ½ core samples of various
lengths (minimum 0.25m), from which 1kg of material was
pulverised passing 200 mesh to produce a 50g charge for fire
assay fusion with a gravimetric finish. Multielement assays
were completed by 4-acid digest with a 2.5g charge. Tesoro
consider these appropriate assay techniques.
Drilling techniques • Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Tesoro has completed 27 diamond drill holes for 5901.70m.
Diamond drill holes were drilled with HQ. Sampling was half
core at geological and significant mineralisation boundaries.
Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
Core recovery was estimated using the drillers recorded depth
marks against the length of the core recovered. Reviewing the
core photos, there are occasional shears/faults where core is
broken. There is however no significant core loss.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
A single tube system was employed and in general core
recovery good.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
There appears to be no potential sample bias as there was no
regular loss of core.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour, lithology,
weathering, grain size, mineralisation, alteration, geotechnical
characteristics etc. Diamond core is stored at the Company’s
warehouse.
Tesoro consider the data to be of an appropriate level of detail
to support a future resource estimation.
Logging
• Whether logging is qualitative or quantitative in Logging of diamond core was qualitative and diamond core was
photographed.
nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the relevant All drilled intervals are logged and recorded.
intersections logged.
Subsampling
techniques and
sample
preparation
10
• If core, whether cut or sawn and whether
quarter, half or all core taken.
Drill core was cut, and half core was collected for analysis
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.
Tesoro has not completed any percussion drilling.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 27 May 2020
Criteria
JORC Code explanation
Commentary
The sample preparation of crushing half core at the lab to mm
size prior to splitting off a 50g charge (either by cone/quarter
or riffle) for pulverisation provides an appropriate and
representative sample for analysis.
Half core was collected for the entirety of the Tesoro drilling, as
• Quality control procedures adopted for all
subsampling stages to maximise representivity such there was consistency throughout the drilling. Core was
logged by a qualified geoscientist. Each subsample is
of samples.
considered to be representative of the interval.
Quality of assay
data and
laboratory tests
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Sampling of half core is representative of the in-situ material.
There are field duplicate samples collected from the diamond
core with irregular results. Field drill core duplicates are
irregular by nature and it has been recommended by Tesoro’s
consultants to use coarse reject material to monitor the
sample preparation.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
sample sizes collected were considered appropriate to
reasonably represent the material being tested.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Assays were undertaken at the accredited laboratories at
Bureau Veritas, Santiago and ALS Santiago, both of which are
fully certified. Core samples of various lengths were assayed
(minimum 0.25m) from which 1kg of material was pulverized
passing 200 mesh to produce a 50 g charge for fire assay
fusion with gravimetric finish. Multielement assays were
completed by 4-acid digest with a 2.5 g charge.
All techniques are appropriate for the element being
determined.
• For geophysical tools, spectrometers, handheld Standard chemical analyses were used for grade
XRF instruments, etc., the parameters used in determination. There was no reliance on determination of
determining the analysis including instrument analysis by geophysical tools.
make and model, reading times, calibrations
factors applied and their derivation, etc.
El Zorro Project
• Nature of quality control procedures adopted
QAQC procedures included the insertion of Certified Reference
(e.g. standards, blanks, duplicates, external
Materials (CRMs) (5%) and blank material (2%), Check samples
laboratory checks) and whether acceptable
(5%) and check assaying 5%
levels of accuracy (i.e. lack of bias) and
Cube Consulting Pty Ltd manage the database for Tesoro and
precision have been established.
note in there
The laboratories used have generally demonstrated analytical
accuracy at an acceptable level within 95% confidence limits.
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
11
• The verification of significant intersections by
either independent or alternative company
personnel.
A number of independent consulting geoscientists (Cube
Consulting, Oliver, and Cooley) external to Tesoro have verified
the intersections for holes ZDDH0001 to ZDDH0016. Holes
ZDDH0017 onwards have been verified by multiple
appropriately qualified Company personnel..
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
no twinned holes have been completed
Tesoro drilling is digitally entered and stored following
documented core handling protocols.
. The protocols are considered adequate.
• Discuss any adjustment to assay data.
No adjustments were made to Tesoro Drilling
• Accuracy and quality of surveys used to locate
drillholes (collar and downhole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Tesoro drill hole collars have been surveyed accurately using
differential GPS for holes ZDDH0001 to ZDDH00016. Holes
ZDDH0017 onwards have been surveyed using handheld GPS
and will be surveyed using differential GPS once the drill
program has concluded.
• Specification of the grid system used.
The grid system used PSAD56 19S
• Quality and adequacy of topographic control.
The topography generated from the historical data has been
used for the current control. A new topographic survey is
planned.
Drill hole spacing is variable between 40m and 200m
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
The spacing of drill holes is variable and satisfactory for
reconnaissance level drilling. The holes are not intended to be
used for resource estimates at this stage of exploration.
• Whether sample compositing has been
applied.
Sample composites was not employed.
+61 8 9322 1587 | info
Share your feedback
Discover