Further wide high-grade gold intercepts at El Zorro
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
6 MAY 2020
ASX: TSO | ACN 106 854 175
Further Continuous Wide High-Grade Gold Intercepts at El Zorro
Significant assays returned of 34.73m @ 2.94 g/t Au including 15.00m @
5.99 g/t Au and 41.17m @ 1.38 g/t Au including 14.17m @ 3.25 g/t Au
▪
Assay results received for holes ZDDH00018, ZDDH00019 and ZDDH00022 have returned further
exceptional thick high-grade results from the El Zorro Project (Chile) including:
•
ZDDH00018 – 34.73m @ 2.94 g/t Au from 187.27m including;
▪
15.00m @ 5.99g/t Au from 189.00m; and
▪
2.70m @ 22.21g/t Au from 197.00m.
•
ZDDH00019 – 68.52m @ 0.47g/t Au from 21.00m including;
▪
9.00m @ 1.34 g/t Au from 36.00m; and
▪
5.00m @ 1.23g/t Au from 74.00m.
•
ZDDH00022 – 41.17m @ 1.38 g/t Au from 78.00m including;
▪
14.17m @ 3.25g/t Au from 105.00m; and
▪
5.32m @ 6.54 g/t Au from 105.00m.
▪
Assays confirm continuous high-grade gold mineralisation hosted within the CC500 fault zone,
which is now delineated over 180m of strike, between 20m and 80m wide and 250m deep.
▪
CC500 is one of seven currently identified high grade gold bearing fault zones within the
Coquetas mineralised zone, which is mineralised from surface to over 250m deep.
▪
Assay results from the remaining holes will continue to be progressively released as received.
Tesoro Resources Limited (Tesoro or the Company) (ASX:TSO) is pleased to announce that further
wide high-grade assay results have been received from the Coquetas prospect at the El Zorro Gold
Project, (Chile) for holes ZDDH00018, ZDDH00019 and ZDDH00022. Holes ZDDH00018 and ZDDH00022
intersected the CC500 mineralised structure (Figure 1) which has previously reported thick gold
intercepts including:
•
ZDDH00011* – 98.30m @ 1.58g/t Au from 176.00m including;
•
30.30m @ 3.03g/t Au from 181.70m;
•
ZDDH00012* – 58.80m @ 1.70g/t Au from 0.00m including;
•
20.30m @ 4.50g/t Au from 1.70m;
•
ZDDH00017* – 86.45m @ 2.29g/t Au from 167.55m including;
•
50.50m @ 3.63g/t Au from 182.70m; and
•
ZDDH00021* – 20.05m @ 2.86g/t Au from 189.25m including;
•
6.15m @ 7.37g/t Au from 189.25m.
*for full drill results see ASX:PKA Announcement of 5 August 2019 & TSO announcements 12 March 2020/27 April 2020
1
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 6 May 2020
Significant intercepts for ZDDH00018, ZDDH00019 and ZDDH00022 include (*down hole length
weighted average calculation):
Hole_ID
ZDDH0018
ZDDH0018
ZDDH0018
ZDDH0018
ZDDH0019
ZDDH0019
ZDDH0019
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0022
From (m)
187.27
187.27
197.00
189.00
21.00
36.00
74.00
30.00
78.00
94.40
105.00
105.00
To (m)
222.00
211.00
199.70
204.00
89.52
45.00
79.00
31.00
119.17
95.45
119.17
110.32
Interval
34.73
23.73
2.70
15.00
68.52
9.00
5.00
1.00
41.17
1.05
14.17
5.32
Au (g/t)
2.94
4.09
22.21
5.99
0.47
1.34
1.23
3.16
1.38
2.98
3.25
6.54
Comments
including
including
including
including
including
including
including
including
Table 1 – Significant drill results for hole ZDDH00018, ZDDH00019 and ZDDH00022. Results are uncut,
no top cut has been applied. A full table of significant intercepts presented in Appendix 1.
Tesoro Managing Director Zeff Reeves commented:
“Drill results from El Zorro continue to impress and we have now delineated a significant high-grade
gold zone associated with the CC500 fault. The team has identified multiple repeats of these fault
zones which provides significant scope to add additional high-grade mineralisation to any potential
resource. We’ve also drill tested the C200 and C400 fault zones and expect to receive assays for
those holes over the next few weeks.”
CC500 HIGH GRADE GOLD ZONE
The CC500 fault zone is a high-grade gold bearing zone cross cutting the El Zorro Tonalite (EZT) and
host sedimentary rocks. The CC500 fault zone is one of a series of NW trending fault zones
controlling gold mineralisation at Coquetas.
Gold mineralisation within the CC500 has been intersected in multiple diamond drill holes and has
currently been defined by drilling over 180m of its strike, between 20m and 80m wide with drill
intercepts within the high grade zone ranging between 3.00g/t Au and 7.50g/t Au (Figure 2).
The high-grade mineralisation occurs within a broad lower grade envelope up to 200m wide, with
gold grades between 0.50g/t and 1.50g/t defined by drilling and surface sampling.
High grade gold mineralisation within the CC500 is associated with quartz veins, breccias, intense
sheeted veining and lamprophyre dykes within the EZT and in some cases into the surrounding
sedimentary rocks (Figure 3).
A number of similar NW trending fault zones have been identified at Coquetas and have been
drilled as part of the current program of drilling and offer potential for repeats of the type of
mineralisation delineated within CC500.
2
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 6 May 2020
Figure 1 – Coquetas Prospect Interpreted geology map and drilling showing the interpreted
high-grade CC fault zones identified from surface sampling, mapping and drilling. Green
outline is the approximate position of the map presented in Figure 2.
3
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 6 May 2020
Figure 2- Coquetas Prospect Interpreted geology map and drilling of the CC500 area. Mineralised
intercepts for holes ZDDH0017to ZDDH00022 are highlighted in red.
4
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 6 May 2020
A
B
C
Figure 3 – Drill Core photos of different styles of gold mineralisation from the CC500 fault zone. A
ZDDH00018 - 197.40m to 200.020m high grade zone hosted in sheeted veins and quartz pyrite
veins within EZT and lamprophyre. B – ZDDH00018 - 192.39m to 194.95m, mid-grade gold
mineralisation hosted within sheeted veins within the EZT. C – ZDDH00022 – 107.78 to 110.45 midgrade gold mineralisation hosted within brecciated and silica altered sediments.
ZDDH00019 RESULTS
Hole ZDDH00019 was drilled approximately 200m to the north of the CC500 fault zone and returned
a broad, near surface low grade gold intercept predominantly hosted within sedimentary rocks.
The hole tested the CC750 fault zone and confirms that gold mineralisation continues a further
200m north of the CC500 structure. A large gap in data exists between the CC500 and ZDDH00019,
however recent surface sampling indicates the potential for gold mineralisation to be continuous
within this zone. Further drilling is required to test the area, positively the ZDDH00019 result
demonstrates the potential scale and continuity of the Coquetas mineralisation.
5
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 6 May 2020
EL ZORRO DRILLING
The current phase of drilling at El Zorro has now been completed. Tesoro drilled 11 holes
(ZDDH00017 to ZDDH00027) for 2,855.30m. Details of holes drilled are presented in Table 1.
The 11 holes completed tested 5 interpreted mineralised fault zones, CC200, CC400, CC450,
CC500 and CC750 as well as a northerly step out hole, ZDDH00020 (Figure 1). Assay results remain
outstanding for holes ZDDH00023 to ZDDH00027 and are expected to be received over the next
4 to 6 weeks.
Hole
Orientation Drill Depth
Hole ID
(m)
Easting Elevation
Azimut
Northing (m)
Dip
(m)
(m)
h
ZDDH00017 7036443
341897 645
-60 210
287.65
ZDDH00018 7036416
341936 638
-60 240
325.05
ZDDH00019 7036550
341996 649
-60 240
242.55
ZDDH00020 7036656
342030 682
-60 265
200.80
ZDDH00021 7036356
341938 635
-60 240
300.90
ZDDH00022 7036432
341853 624
-60 240
216.85
ZDDH00023 7036486
341861 633
-60 240
296.45
ZDDH00024 7036234
341807 596
-60 240
170.50
ZDDH00025 7036327
341830 617
-50 200
230.00
ZDDH00026 7036060
341722 589
-60 240
300.05
ZDDH00027 7036038
341754 581
-60 240
284.50
Collar Location
Table 1 – Drill Hole details for recently completed drilling at El Zorro. Co-ordinate system is
PSAD56-19S.
Authorised by the Board of Tesoro Resources Limited.
For more information:
Company:
Zeff Reeves Managing Director
Tesoro Resources Limited
+61 8 9322 1587
6
Investors:
Peter Taylor
NWR Communications
+61 (0) 412 036 231
peter@nwrcommunications.com.au
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 6 May 2020
About Tesoro
Tesoro Resources Limited was established with a strategy of acquiring,
exploring and developing mining projects in the Coastal Cordillera region of
Chile. The Coastal Cordillera region is host to multiple world class copper and
gold mines, has well established infrastructure, service providers and an
experienced mining workforce. Large areas of the Coastal Cordillera remain
unexplored due to the unconsolidated nature of mining concession
ownership, but Tesoro via its in-country network and experience has been
able secure rights to two district scale gold projects in-line with the Company’s
strategy. Tesoro has rights to acquire up to 80% of the El Zorro Gold Project
and 100% of the Espina Gold Project
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and major shareholder of the Company. Mr Reeves has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion
in this report of the matters based on this information in the form and context in which it appears.
Future Performance
This announcement may contain certain forward-looking statements and opinion. Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and should
not be relied on as an indication or guarantee of future performance and involve known and unknown risks,
uncertainties, assumptions, contingencies and other important factors, many of which are outside the control
of the Company and which are subject to change without notice and could cause the actual results,
performance or achievements of the Company to be materially different from the future results, performance
or achievements expressed or implied by such statements. Past performance is not necessarily a guide to
future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward looking statements or other forecast. Nothing contained in this announcement
nor any information made available to you is, or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future performance of Tesoro.
7
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 6 May 2020
APPENDIX 1 – Significant Intercept Table
Hole_ID
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0004
ZDDH0004
ZDDH0004
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
From (m)
5.00
5.00
5.00
12.00
14.30
33.64
44.30
64.00
75.50
75.50
107.00
117.00
5.70
8.80
8.80
51.70
58.00
21.00
21.00
21.00
37.20
47.30
64.00
90.00
5.00
56.00
57.00
4.00
4.00
9.80
9.80
51.60
65.00
72.00
72.00
72.00
100.60
130.00
135.80
0.00
2.40
22.60
24.00
46.70
61.10
108.30
133.50
148.00
180.10
180.10
184.00
207.00
To (m)
119.00
15.00
51.30
13.00
15.00
39.00
51.30
65.00
79.00
76.00
112.00
119.00
68.00
24.30
14.00
68.00
61.00
77.30
27.00
22.83
43.00
48.00
77.30
91.00
66.00
66.00
61.00
42.65
32.00
28.00
10.15
52.00
67.00
85.90
75.00
73.00
102.00
132.60
136.80
88.00
3.00
25.95
25.00
50.30
64.02
116.00
135.60
151.80
244.00
181.10
186.00
212.00
Interval
114.00
10.00
46.30
1.00
0.70
5.36
7.00
1.00
3.50
0.50
5.00
2.00
62.30
15.50
5.20
16.30
3.00
56.30
6.00
1.83
5.80
0.70
13.30
1.00
61.00
10.00
4.00
38.65
28.00
18.20
0.35
0.40
2.00
13.90
3.00
1.00
1.40
2.60
1.00
88.00
0.60
3.35
1.00
3.60
2.92
7.70
2.10
3.80
63.90
1.00
2.00
5.00
Au (g/t)
0.35
0.55
0.45
1.64
2.35
0.97
0.67
2.50
0.89
4.82
1.11
2.05
0.54
1.15
1.96
0.78
3.62
0.50
1.96
5.24
1.27
2.00
0.41
1.53
0.97
4.53
9.60
0.65
0.84
1.17
20.10
2.03
1.03
0.52
1.90
4.32
2.07
0.66
12.20
0.15
0.75
2.14
6.10
0.32
0.42
0.30
1.30
0.59
0.23
0.55
1.06
0.77
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
From (m) To (m)
ZDDH0006 226.00
227.00
ZDDH0006 236.00
244.00
ZDDH0007 1.00
4.00
ZDDH0007 39.00
66.20
ZDDH0007 39.00
58.00
ZDDH0007 104.85
110.00
ZDDH0007 117.40
118.00
ZDDH0008 35.00
41.10
ZDDH0008 58.00
59.00
ZDDH0009 4.00
6.00
ZDDH0009 12.55
38.00
ZDDH0009 21.00
26.00
ZDDH0009 48.00
48.50
ZDDH0009 78.00
83.00
ZDDH0010 31.00
33.00
ZDDH0010 60.00
61.00
ZDDH0010 66.00
67.00
ZDDH0010 75.00
159.30
ZDDH0010 75.00
104.00
ZDDH0010 82.50
86.45
ZDDH0010 91.00
102.00
ZDDH0010 93.00
97.00
ZDDH0010 120.00
126.00
ZDDH0010 149.00
159.00
ZDDH0011 176.00
274.30
ZDDH0011 181.70
212.00
ZDDH0011 196.40
212.00
ZDDH0011 203.00
203.70
ZDDH0011 203.00
212.00
ZDDH0011 217.00
222.00
ZDDH0011 246.60
256.40
ZDDH0012 0.00
58.80
ZDDH0012 1.70
22.00
ZDDH0012 1.70
8.40
ZDDH0012 2.30
4.70
ZDDH0012 17.60
22.00
ZDDH0012 17.60
20.00
ZDDH0012 53.20
58.80
ZDDH0012 53.20
56.00
ZDDH0012 151.80
152.20
ZDDH0013 0.00
3.00
ZDDH0013 9.00
14.30
ZDDH0013 25.00
29.80
ZDDH0013 28.55
29.80
ZDDH0013 46.30
70.00
ZDDH0013 46.30
51.50
ZDDH0013 51.25
65.35
ZDDH0013 58.00
65.35
ZDDH0013 102.00
104.00
ZDDH0013 136.00
137.30
ZDDH0013 165.00
173.60
ZDDH0013 170.40
173.00
Interval
1.00
8.00
3.00
27.20
19.00
5.15
0.60
6.10
1.00
2.00
25.45
5.00
0.50
5.00
2.00
1.00
1.00
84.30
29.00
3.95
11.00
4.00
6.00
10.00
98.30
30.30
15.60
0.70
9.00
5.00
9.80
58.80
20.30
6.70
2.40
4.40
2.40
5.60
2.80
0.40
3.00
5.30
4.80
1.25
23.70
5.20
14.10
7.35
2.00
1.30
8.60
2.60
Au (g/t) Comments
0.55
including
0.66
including
4.75
0.70
0.80
including
0.34
2.75
0.28
1.43
1.39
0.51
1.09
including
2.19
0.59
2.47
1.16
1.04
1.30
2.95
including
4.97
including
4.70
including
8.50
including
1.11
including
1.07
including
1.58
3.03
including
3.87
including
21.70
including
5.07
including
4.13
including
2.28
including
1.70
4.50
including
12.21
including
33.35
including
2.00
including
2.82
including
0.95
1.42
including
2.29
0.83
0.41
0.72
2.14
including
0.85
1.24
including
1.08
including
1.65
including
0.79
4.97
1.60
2.80
including
Hole_ID
From (m) To (m)
ZDDH0014 15.30
70.60
ZDDH0014 15.30
34.00
ZDDH0014 15.30
26.30
ZDDH0014 23.00
26.30
ZDDH0014 64.60
70.60
ZDDH0014 64.60
67.35
ZDDH0014 112.00
122.50
ZDDH0014 115.00
117.00
ZDDH0014 177.20
179.00
ZDDH0015 37.90
39.70
ZDDH0015 91.90
132.70
ZDDH0015 91.90
94.60
ZDDH0015 112.00
116.00
ZDDH0015 240.60
242.00
ZDDH0015 265.90
269.00
ZDDH0016 125.00
131.72
ZDDH0016 152.00
204.60
ZDDH0016 188.10
194.00
ZDDH0016 188.58
188.90
ZDDH0016 203.60
204.60
ZDDH0016 281.00
290.00
ZDDH0016 287.50
290.00
ZDDH0017 44.00
74.00
ZDDH0017 44.00
60.10
ZDDH0017 44.00
47.00
ZDDH0017 70.00
74.00
ZDDH0017 103.46
105.60
ZDDH0017 167.55
254.00
ZDDH0017 182.70
233.20
ZDDH0017 183.22
206.22
ZDDH0017 190.00
205.00
ZDDH0017 197.00
202.30
ZDDH0017 200.00
202.30
ZDDH0018 187.27
222.00
ZDDH0018 187.27
211.00
ZDDH0018 197.00
199.70
ZDDH0018 189.00
204.00
ZDDH0019 21.00
89.52
ZDDH0019 36.00
45.00
ZDDH0019 74.00
79.00
ZDDH0020 87.30
87.60
ZDDH0021 100.92
116.50
ZDDH0021 107.50
112.00
ZDDH0021 100.92
101.70
ZDDH0021 189.25
208.50
ZDDH0021 189.25
201.30
ZDDH0021 189.25
195.40
ZDDH0021 193.90
195.40
ZDDH0022 30.00
31.00
ZDDH0022 78.00
119.17
ZDDH0022 94.40
95.45
ZDDH0022 105.00
119.17
ZDDH0022 105.00
110.32
Interval
55.30
18.70
11.00
3.30
6.00
2.75
10.50
2.00
1.80
1.80
40.80
2.70
4.00
1.40
3.10
6.72
52.60
5.90
0.32
1.00
9.00
2.50
30.00
16.10
3.00
4.00
2.14
86.45
50.50
23.00
15.00
5.30
2.30
34.73
23.73
2.70
15.00
68.52
9.00
5.00
0.30
15.58
4.50
0.78
19.25
12.05
6.15
1.50
1.00
41.17
1.05
14.17
5.32
Au (g/t) Comments
1.01
2.19
including
3.40
including
6.18
including
2.03
including
5.00
including
0.52
1.75
including
2.37
1.11
0.37
1.64
including
1.13
including
8.46
0.64
1.47
0.62
3.30
including
31.30
including
3.00
including
0.36
0.77
including
0.94
1.05
including
4.27
including
4.26
including
1.76
2.29
including
3.63
including
7.20
including
10.82
including
25.31
including
46.41
including
2.94
4.09
including
22.21
including
5.99
including
0.47
1.34
including
1.23
including
3.33
0.95
1.24
including
8.44
including
2.86
open downhole
4.25
including
7.37
including
20.82
including
3.16
1.38
2.98
including
3.25
including
6.54
including
For full results for holes ZDDH00001 to ZDDH00016 refer to Plukka Ltd Prospectus 30 October 2019. For results of ZDDH00017 and ZDDH0021
refer to TSO:ASX announcements 6 March,12 March and 27 April 2020.
8
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 6 May 2020
APPENDIX 2 – JORC TABLES
JORC Table 1
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as downhole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Tesoro has completed 27 diamond drill holes for 5901.70m in
2017, 2018 and 2020 (ZDDH0001 to ZDDH0027) and 171
trenches for 4008.2m. Trenches were undertaken as
continuous channel samples and Diamond drill holes were
drilled with HQ. Sampling was half core at geologically defined
and significant mineralisation boundaries.
Tesoro considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Tesoro Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Tesoro consider this appropriate for the style of
mineralisation.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done,
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Diamond drilling was used to obtain ½ core samples of various
lengths (minimum 0.25m), from which 1kg of material was
pulverised passing 200 mesh to produce a 50g charge for fire
assay fusion with a gravimetric finish. Multielement assays
were completed by 4-acid digest with a 2.5g charge. Tesoro
consider these appropriate assay techniques.
Drilling techniques • Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Tesoro has completed 27 diamond drill holes for 5901.70m.
Diamond drill holes were drilled with HQ. Sampling was half
core at geological and significant mineralisation boundaries.
Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
Core recovery was estimated using the drillers recorded depth
marks against the length of the core recovered. Reviewing the
core photos, there are occasional shears/faults where core is
broken. There is however no significant core loss.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
A single tube system was employed and in general core
recovery good.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
There appears to be no potential sample bias as there was no
regular loss of core.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour, lithology,
weathering, grain size, mineralisation, alteration, geotechnical
characteristics etc. Diamond core is stored at the Company’s
warehouse.
Tesoro consider the data to be of an appropriate level of detail
to support a future resource estimation.
Logging
• Whether logging is qualitative or quantitative in Logging of diamond core was qualitative and diamond core was
photographed.
nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the relevant All drilled intervals are logged and recorded.
intersections logged.
Subsampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
Drill core was cut, and half core was collected for analysis
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.
Tesoro has not completed any percussion drilling.
9
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 6 May 2020
Criteria
JORC Code explanation
Commentary
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
The sample preparation of crushing half core at the lab to mm
size prior to splitting off a 50g charge (either by cone/quarter
or riffle) for pulverisation provides an appropriate and
representative sample for analysis.
Half core was collected for the entirety of the Tesoro drilling, as
• Quality control procedures adopted for all
subsampling stages to maximise representivity such there was consistency throughout the drilling. Core was
logged by a qualified geoscientist. Each subsample is
of samples.
considered to be representative of the interval.
Quality of assay
data and
laboratory tests
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Sampling of half core is representative of the in-situ material.
There are field duplicate samples collected from the diamond
core with irregular results. Field drill core duplicates are
irregular by nature and it has been recommended by Tesoro’s
consultants to use coarse reject material to monitor the
sample preparation.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
sample sizes collected were considered appropriate to
reasonably represent the material being tested.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Assays were undertaken at the accredited laboratories at
Bureau Veritas, Santiago and ALS Santiago, both of which are
fully certified. Core samples of various lengths were assayed
(minimum 0.25m) from which 1kg of material was pulverized
passing 200 mesh to produce a 50 g charge for fire assay
fusion with gravimetric finish. Multielement assays were
completed by 4-acid digest with a 2.5 g charge.
All techniques are appropriate for the element being
determined.
• For geophysical tools, spectrometers, handheld Standard chemical analyses were used for grade
XRF instruments, etc., the parameters used in determination. There was no reliance on determination of
determining the analysis including instrument analysis by geophysical tools.
make and model, reading times, calibrations
factors applied and their derivation, etc.
El Zorro Project
• Nature of quality control procedures adopted
QAQC procedures included the insertion of Certified Reference
(e.g. standards, blanks, duplicates, external
Materials (CRMs) (5%) and blank material (2%), Check samples
laboratory checks) and whether acceptable
(5%) and check assaying 5%
levels of accuracy (i.e. lack of bias) and
Cube Consulting Pty Ltd manage the database for Tesoro and
precision have been established.
note in there
The laboratories used have generally demonstrated analytical
accuracy at an acceptable level within 95% confidence limits.
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
• The verification of significant intersections by
either independent or alternative company
personnel.
A number of independent consulting geoscientists (Cube
Consulting, Oliver, and Cooley) external to Tesoro have verified
the intersections for holes ZDDH0001 to ZDDH0016. Holes
ZDDH0017 onwards have been verified by multiple
appropriately qualified Company personnel..
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
no twinned holes have been completed
Tesoro drilling is digitally entered and stored following
documented core handling protocols.
. The protocols are considered adequate.
• Discuss any adjustment to assay data.
No adjustments were made to Tesoro Drilling
• Accuracy and quality of surveys used to locate
drillholes (collar and downhole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Tesoro drill hole collars have been surveyed accurately using
differential GPS for holes ZDDH0001 to ZDDH00016. Holes
ZDDH0017 onwards have been surveyed using handheld GPS
and will be surveyed using differential GPS once the drill
program has concluded.
• Specification of the grid system used.
The grid system used PSAD56 19S
• Quality and adequacy of topographic control.
The topography generated from the historical data has been
used for the current control. A new topographic survey is
planned.
Drill hole spacing is variable between 40m and 200m
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
10
The spacing of drill holes is variable and satisfactory for
reconnaissance level drilling. The holes are not intended to be
used for resource estimates at this stage of exploration.
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 6 May 2020
Criteria
JORC Code explanation
Commentary
• Whether sample compositing has been
applied.
Sample composites was not employed.
Orientation of data • Whether the orientation of sampling achieves
in relation to
unbiased sampling of possible structures and
geological
the extent to which this is known, considering
structure
the deposit type.
Drill holes were drilled across the interpreted strike of the
mineralization
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Tesoro diamond drilling at various orientations does not reveal
any bias regarding the orientation of the mineralised horizons.
Sample security
• The measures taken to ensure sample
security.
Chain of Custody of digital data is managed by the Company.
Physical material was stored on site and, when necessary,
delivered to the assay laboratory. Thereafter laboratory
samples were controlled by the nominated laboratory which to
date has been Bureau Veritas and ALS Santiago. All sample
collection was controlled by digital sample control file(s) and
hardcopy ticket books.
Audits or reviews
• The results of any audits or reviews of
sampling techniques and data.
No audits have been undertaken.
(Criteria in this section apply to all succeeding sections)
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
Information regarding tenure is incl
Share your feedback
Discover