Tesoro Exhibiting at the PDAC Convention
Released
Released
Announcement PDF
Sign up HERE to our Investor Hub
ASX ANNOUNCEMENT
28 February 2024
ASX: TSO OTCQB: TSORF
Tesoro Exhibiting at the PDAC Convention
3-6 March 2024
Tesoro Gold Limited (“Tesoro” or “the Company”) (ASX:TSO, OTCQB:TSORF) advises that the
Company is exhibiting at the PDAC Convention on 3-6 March 2024, Toronto, Canada.
Please find attached the company’s latest Corporate Presentation.
The presentation can be downloaded from:
https://announcements.tesorogold.com.au/
Authorised by the Board of Tesoro Gold Ltd.
For more information:
Company:
Zeff Reeves Managing Director
Tesoro Gold Limited
info@tesorogold.com.au
About Tesoro
Tesoro Gold Limited was established with a strategy of
acquiring, exploring, and developing mining projects
in the Coastal Cordillera region of Chile. The Coastal
Cordillera region is host to multiple world class copper
and gold mines, has well established infrastructure,
service providers and an experienced mining
workforce. Large areas of the Coastal Cordillera
remain unexplored due to the unconsolidated nature
of mining concession ownership, but Tesoro, via its incountry network and experience has been able
secure rights to a district scale gold project in-line with
the Company’s strategy. Tesoro’s 95% owned Chilean
subsidiary owns 85% of the El Zorro Gold Project.
Level 48, 152-158 St Georges Terrace, Perth
+61 8 6311 9160
info@tesorogold.com.au
1
PDAC PRESENTATION
EL ZORRO GOLD PROJECT, CHILE
MARCH 2024
ASX:TSO | OTCQB:TSORF
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
DISCLAIMER
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have been prepared by Tesoro Gold Limited (Tesoro or the Company) and approved by the Board of the Company. The information
contained in the Presentation (Information) is summary only and should be read in conjunction with any other documents provided to you by the Company. The Information is current as at 28 February 2024 the Company does not undertake to
provide any additional or update information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the Company that you have read, understood and
accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or fairness of the
information, opinions and conclusions contained in this Presentation. Tesoro, or related bodies corporate, shareholders or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or
make any representations or warranties, express or implied, as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro does not
represent or warrant that this Presentation is complete or that it contains all material information about Tesoro or which, a prospective investor or purchaser may require in evaluating a possible investment in Tesoro or acquisition of shares. To
the maximum extent permitted by law, Tesoro and its Agents expressly disclaim any and all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this
Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of Tesoro and which are subject to change without notice and could cause the actual results, performance or
achievements of Tesoro to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of this
Presentation are cautioned not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to be used as the basis for making an
investment decision. In providing this Presentation, Tesoro has not considered the objectives, financial position or needs of any particular recipients. Before making an investment decision prospective investors should consider the
appropriateness of the information in this Presentation having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments Commission or any other foreign
regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase
or sale in the United States or any other jurisdiction in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or the
securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States. The information in this Presentation is strictly confidential. It may not be disclosed, reproduced,
disseminated, quoted or referred to, in whole or in part, without the express consent of Tesoro.
Competent Person’s Statements
The information in this report that relates to Exploration Results and Exploration Target is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in this report of the matters based on this information in
the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled by Mr Lynn Widenbar, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Widenbar is acting as an
independent consultant to Tesoro Gold Limited. Mr Widenbar has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person
as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Company confirms that Mr Widenbar consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears and that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original announcement on 9 March 2023.
The information in this report that relates to the Production Target, assumptions on Modifying Factors and evaluation of other relevant factors are based on and fairly represents information and supporting documentation that has been
compiled for this announcement and have been compiled under the supervision of Mr Linton Putland BEng (Mining), MSc (Mineral Economics) & Member AusIMM. Mr Putland is a Director of the Company. Mr Putland has reviewed and approved
the technical content of this announcement. Mr Putland is a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012). Mr Putland
consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
The Company has released all material information that relates to Exploration Results for the El Zorro Gold Project, on a continuous basis to the ASX and in compliance with JORC 2012. The Company confirms that it is not aware of any new
information that materially affects the content of this ASX release.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 2
RAPID RESOURCE DELINEATION
EXPLORATION SUCCESS CONFIRMED EL ZORRO AS A NEW GOLD DISTRICT
APRIL 20232
MAR 2021
Increased
ownership of
El Zorro to
85%
JUL 2021
Maiden Mineral
Resource
Estimate (MRE) at
Ternera,
661 koz Au
JAN 2022
Gold discovered
at Drone Hill
target, 2km north
and west of
Ternera
MAY 2022
Ternera MRE
increases to
1.1Moz @
1.12g/t Au
NOV 2022
Gold Fields Ltd
makes strategic
investment to
accelerate
exploration
FEB 2020
Listed on the
ASX TSO
2021
TERNERA GOLD
DEPOSIT PHASE 1
OPEN PIT SCOPING
STUDY
TECHNICALLY AND
FINANCIALLY ROBUST
STARTER PIT
GOLD MINING AND
PROCESSING
OPERATION
2022
SEP 2023
Surface sampling
highlight Ternera
expansion potential,
with grades up to
30.80g/t Au
returned
JAN 2024
Gold Fields Ltd increase investment to 19%
2023
2024
MARCH 20231
APR 2021
Gold
discovered at
Ternera East
and 100,000m
drill program
completed at
Ternera
1.
2.
SEP 2021
Metallurgical
test work
confirmed
+94%
recoveries
MAR 2022
Significant hit at
Ternera,
ZDDH0288
returned:
64m @ 7.61g/t
Au incl 7m @
66.10g/t Au
Significant
intersection at
Ternera ZDDH0297
returned: 435m @
1.22g/t Au incl 90m
@ 3.07g/t Au incl
21m @ 9.19g/t Au
INITIAL EXPLORATION
TARGET OF
48.5 – 101.0 Mt AT
0.91 – 1.45g/t
Drone Hill.
continuity of
Intersections
shallow sedimentreturned, included:
hosted gold
mineralisation up 47m @ 1.40g/t Au,
including 9m @
to 420m south of
4.66g/t Au
Ternera
Refer Tesoro ASX release dated 9 March 2023
For full Scoping Study details, refer Tesoro ASX release dated 4 April 2023, Ternera Gold Deposit Phase 1 Open Pit Scoping Study Outcomes. Tesoro Gold confirms that it is not aware of any new information or data that materially affects the information included in that release. All
material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
Refer Tesoro ASX release dated 23 March 2021 , 13 April 2021 , 28 July and 26 September 2021.
Refer Tesoro ASX release 22 January 2022 , 30 March 2022, 23 May 2022, 31 August 2022 and 19 October 2022 and 16 November 2022,
Refer Tesoro ASX release 21 June 2023..
Tesoro
Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
3.
4.
5.
AUG 2022
TERNERA MINERAL
RESOURCE
OCT 2023
JUN 2023
INCREASED TO 1.3
New large gold
Results from stepMoz AT 1.18g/t
(63% INDICATED) out drilling confirm anomaly defined at
INVESTOR PRESENTATION | 3
UNLOCKING EL ZORRO’S FULL POTENTIAL
RAPID GROWTH AND ADVANCEMENT OF THE EL ZORRO GOLD PROJECT
Au
$
Au
Cu/Fe
Cu
Cu/Au
A. LOCATION
Large surface
gold footprint on
570km1 of
tenure
B. RESOURCE
Increased and
upgraded
1.5 Moz2 Ternera
Gold Deposit
C. GROWTH
Further
unlocking a
district scale
gold system
Coastal location and
supporting
infrastructure in a
Tier 1 mining
jurisdiction
Scoping study
evidences robust
starter pit gold mining
and processing
operation
Numerous exciting,
untested targets and
district level potential
provides multi-million
ounce potential
1.
2.
Refer Tesoro ASX release 31 October 2022.
Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023 and Appendix A, Tesoro Gold Limited confirms that it is
not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical
parameters underpinning that release continue to apply and have not materially changed.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
CHILE
INVESTOR PRESENTATION | 4
UNLOCKING EL ZORRO’S FULL POTENTIAL
DUAL TRACK ADVANCEMENT STRATEGY
DEVELOPING
TERNERA
DISTRICT
DISCOVERIES
REFINE THE DEVELOPMENT
PATHWAY
CONFIRM CONTINUITY OUTSIDE
TERNERA
CONTINUE GROWING THE
RESOURCE BASE
TEST TERNERA STYLE
TARGETS
Phase 2 metallurgical testwork,
planning and permitting
Define ounces outside of the
existing Ternera Deposit
Infill drilling and
resource growth
Aggressive drill testing of look-alike
targets
DISCOVER AND DEFINE
NEW TARGETS
CONTINUED TARGET
GENERATION
New and extensional
mineralisation discoveries
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Ongoing mapping and
sampling programs
INVESTOR PRESENTATION | 5
UNLOCKING EL ZORRO’S FULL POTENTIAL
EL ZORRO GOLD PROJECT | TOP TEN DRILL INTERCEPTS1
1.
ZDDH0297: 434.60m @ 1.22g/t Au; incl. 89.95m @ 3.07g/t Au, incl. 20.80m @ 9.19g/t Au;
2.
ZDDH0288: 63.93m @ 7.61g/t Au; incl. 7.00m @ 66.10g/t Au;
3.
ZDDH0069: 267.00m @ 1.12g/t Au; incl. 132.00m @ 1.89g/t Au;
4.
ZDDH0154: 67.00m @ 3.44g/t Au; incl. 13.50m @ 15.84g/t Au;
5.
ZDDH0017: 86.45m @ 2.29g/t Au; incl. 50.50m @ 3.63g/t Au;
6.
ZDDH0170: 205.00m @ 0.96g/t Au; incl. 35.00m @ 3.99g/t Au;
7.
ZDDH0290: 63.60m @ 2.89g/t Au; incl. 10.60m @ 14.34g/t Au;
8.
ZDDH0300: 129.60m @ 1.08g/t Au; incl. 22.60m @ 2.51g/t Au;
9.
ZDDH0025: 121.55m @ 1.32g/t Au; incl. 22.55m @ 2.98g/t Au; and
10.
ZDDH0011: 98.30 m @ 1.58g/t Au; incl. 30.30 m @ 3.03g/t Au .
DELIVERED AT A LOW US$14/OZ DISCOVERY COST
AND 99% SUCCESS RATE
1.
Refer to Prospectus dated 29 October 2019 and ASX announcements, 17 February 2020, 12 March 2020, 27 May 2020, 4 September 2020 , 22
Tesoro
Gold (ASX:TSO
OTCQB:TSORF)
| CORPORATE
PRESENTATION
December
2020, 5|August
2021, 19 August
2021, 30 March
2022, 31 August 2022 and 27 September 2022.
2. Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023 and Appendix A.
INVESTOR PRESENTATION | 6
CORPORATE SNAPSHOT
TESORO GOLD (ASX:TSO, OTCQB:TSORF)
Capital structure1
Gold Fields Strategic Investment
Share price
Shares on issue
Performance rights
A$0.023
•
Gold Fields a 19% shareholding in Tesoro Gold4
1,229.5 M
•
Continued support from one of the world’s largest gold mining
companies
•
Globally diverse South African gold producer with nine operating mines
in Australia, Peru, South Africa and Ghana (including the Asanko JV) and
two projects in Canada and Chile
•
Annual gold production of approximately 2.2 Moz5
•
Owns the Salares Norte high-grade open pit gold-silver project in
Northern Chile, 190 km north-east from the El Zorro Gold Project,
scheduled for first gold shortly 6
•
Processing capacity of 2.8 Moz per year of metal doré for
approximately 9.9 t of gold annually5
•
Tesoro strategic investment facilitates acceleration of regional and
district scale exploration at the El Zorro Gold Project
59.2 M
Share Rights
1m
Unlisted options
2m
Listed options (ASX:TSOO and ASX:TSOOA)2
196.6 M
Market capitalisation (undiluted)
A$30 M
3
Cash
Register
detail
A$3.70 M
Nil
Debt3
BOARD AND MANAGEMENT
9%
43%
GOLD FIELDS
19%
24%
COLLINS STREET VALUE FUND
5%
INSTITUTIONAL INVESTORS
OTHER INVESTORS
1.
As at 25 February 2024
2. As at 7 March 2023: TSOO expiring 7 July 2025 and TSOOA expiring 13 December 2025
3. As at 31 December 2023
4. Refer ASX release 17 January 2024.
5. Source: www.goldfields.com
6. Source: https://www.bnamericas.com/en/features/5-chilean-gold-projects-set-to-help-boost-national-output
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 7
LOCATION | STRATEGICALLY POSITIONED TENURE
PROXIMATE TO ESTABLISHED INFRASTRUCTURE AND EXISTING MINES
• One of the largest and most prospective gold projects in
Chile, covering 570km2 of tenure
Au
Chanaral
• First mover advantage and first to identify an Intrusive
Related Gold System in Chile
• Surface gold confirmed over 50km of strike1
Cu/Fe
El Zorro
Gold Project
Cu
• Ternera Resource of 1.5M oz2
Cu/Au
• Tenera Exploration Target of 3M oz2
• Coastal location, surrounded by operating mines
Caldera
• 15km from Pan American Highway and Pacific Ocean
Fe
• Atacama airport a 1-hour drive from site
• Ready access to power and water
• Close to the cities of Caldera, Chanaral and Copiapo
• 45% of gold recovered via gravity @ 150um grind size3
Cities
Ternera Gold Deposit
Other Mines
Santo Domingo Proposed
Port
Tesoro License (570 km2)
Airport & Power
Pan American Highway
Copiapo
Cu/Au
Au
• Total recovery of 94.5% via conventional CIP Plant3
1.
Refer Tesoro ASX release 31 October 2022.
3.
information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
For full Scoping Study details, refer Tesoro ASX release dated 4 April 2023, Ternera Gold Deposit Phase 1 Open Pit Scoping Study Outcomes. Tesoro Gold confirms that it is not aware of any new information or data that
materially affects the information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
Tesoro
Gold
(ASX:TSO
OTCQB:TSORF)
| CORPORATE
PRESENTATION
2.
Refer
to Mineral
Resource Update |and
Exploration Target, ASX Announcement
9 March 2023 and Appendix
A, Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the
INVESTOR PRESENTATION | 8
A. LOCATION | TIER 1 MINING JURISDICTION
MINING REIGNS SUPREME IN THE CHILEAN NORTH
• Mining is a key contributor to the Chilean economy
representing over half of the country’s total exports
• The Fraser Institute’s 2020 annual survey ranked Chile as the
best country in South America for mining exploration
investment based on public policy factors such as tax rates
and regulation
CHILE
• Low sovereign risk and extremely low corruption
• Chile is the top copper producer in the world and second
largest producer of lithium
• Many of the world’s largest, most successful mining
companies operate in Chile
Source: www.trade.gov and World Bank, https://www.fraserinstitute.org/sites/default/files/annual-survey-of-mining-companies-2020.pdf
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 9
B. RESOURCE | CHILE’S NEWEST GOLD DISCOVERY
MAJOR NEW OUTCROPPING GOLD ANOMALY AT DRONE HILL
• Surface sampling has delineated a new large outcropping gold anomaly
at Drone Hill including:
• 47m @ 1.40g/t Au (EZTR004255) including;
• 9m @ 4.66g/t Au .
• 42m @ 0.42g/t Au (EZTR004674) including;
• 3m @ 4.37g/t Au.
• 15m @ 0.53g/t Au (EZTR004132);
• 9m @ 0.99g/t Au (EZTR004714);
• 6m @ 1.18g/t Au (EZTR004668);
• 3m @ 9.67g/t Au (EZTR004673);
• 3m @ 6.70g/t Au (EZTR004662);
• 3m @ 4.94g/t Au (EZTR004669);
• 3m @ 2.11g/t Au (EZTR004282);
• 3m @ 1.88g/t Au (EZTR004110); and
• 2m @ 5.21g/t Au (EZTR4108).
1.
Refer Tesoro ASX release 12 February 2024.
2. Refer Tesoro ASX release 19 October 2023.
Tesoro
Gold
(ASX:TSO
| OTCQB:TSORF)
| CORPORATE
PRESENTATION
3. Refer
Tesoro
ASX release
18 September
2023.
Ternera Gold Deposit – near deposit targets highlighting significant drill intercepts
and sampling results from high priority areas
INVESTOR PRESENTATION | 10
B. RESOURCE | CHILE’S NEWEST GOLD DISCOVERY
MAJOR OUTCROPPING GOLD EXTENSIONS NORTH AND SOUTH
• Surface sampling has delineated a vast >10km continuous mineralised
system extending from south of Ternera at Buzzard, north to Kitsune and
continuing to Calderillas North
• Individual intrusive dykes at Kitsune identified continuous gold
anomalism along 1km, significant results include1:
• 18m @ 1.59g/t Au (EZTR003853) including;
• 6m @ 4.14g/t Au.
• 66m @ 0.32g/t Au (EZTR003842) including;
• 9m @ 1.22g/t Au; and
• 3m @ 6.25g/t Au (EZTR003850).
• Channel sampling at Calderillas returned very high-grades including:
• 2m @ 15.90g/t Au (EZTR003752); and
• 2m @ 3.01g/t Au (EZTR003753).
• Scout hole at Calderillas 4.7km north of Ternera returned:
• 21.00m @ 0.55 g/t Au incl 7.20m @ 1.43 g/t Au (ZDDH0310).
1.
ASX announcement 24 May 2023.
2. ASX announcement 1 December 2022.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Ternera District Gold Prospects and Prospective Gold Corridor
associated with the Dorado Fault
INVESTOR PRESENTATION | 11
B. RESOURCE | DEVELOPING TERNERA
CONTINUOUS HIGH-GRADE MINERALISATION FROM SURFACE
• Currently 802koz (63%) of total MRE within
Indicated classification1
• Orebody starting at surface to over 500m depth
1.50-2.50
2.50-5.00
>5.00
with 77.5% of Indicated Resource in upper 200m
• Additional well-defined, high-grade zones
350m
identified beneath existing pit shell
• Surface sampling results suggest significant
southern extension with grades of up to
30.80g/t Au returned, including2:
•
•
•
•
1.
2.
3.
4.00m @ 13.31g/t Au (EZTR004143);
13.00m @ 9.67g/t Au (EZTR004207) including;
•
•
6.00m @ 20.02g/t Au; and
3.00m @ 30.80g/t Au.
1100m
Ternera Gold Deposit Block Model Long Section looking northwest highlighting continuous high-grade
mineralisation from surface above 1.50g/t Au. US$1,800/oz pit shell shown as red outline
9.00m @ 4.60g/t Au (EZTR004208) including;
•
3.00m @ 12.60g/t Au.
3.00m @ 4.70 g/t Au (EZTR004209).
Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023 and Appendix A.
Refer to ASX Announcement 18 September 2023.
For full Scoping Study details, refer Tesoro ASX release dated 4 April 2023, Ternera Gold Deposit Phase 1 Open Pit Scoping Study Outcomes. Tesoro Gold confirms that it
is not
aware
of any| new
information |orCORPORATE
data that materially
affects the information included in that release. All material assumptions and technical parameters
Tesoro
Gold
(ASX:TSO
OTCQB:TSORF)
PRESENTATION
underpinning that release continue to apply and have not materially changed.
INVESTOR PRESENTATION | 12
B. RESOURCE | DEVELOPING TERNERA
TECHNICALLY AND FINANCIALLY ROBUST SCOPING STUDY OUTCOMES1
MINE SCHEDULE
MINING PHYSICALS
STANDARD CIP PLANT
17.1 Mt at 1.25 g/t gold
2.4 Mtpa throughput
94.5% gold recovery
Initial open pit mine
For initial 8-year operating life
Simple non-refractory metallurgy
PHASE 1 GOLD OUTPUT
AISC
UPFRONT CAPITAL COST
651 koz
US$1,068/oz
US$132M
Average production 93 koz p.a.
Including US$8.6M of sustaining capital
Including US$10.4M in pre-strip
NPV5%
IRR
PAYBACK
US$201M
27.5%
3.4 years
Pre-tax at US$1,750/oz gold
1.
Pre-tax at US$1,750/oz gold
Pre-tax from first production
For full Scoping Study details, refer Tesoro ASX release dated 4 April 2023, Ternera Gold Deposit Phase 1 Open Pit Scoping Study Outcomes. Tesoro Gold confirms that it is not aware of any new information or data that
materially affects the information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 13
B. RESOURCE | DEVELOPING TERNERA
DETAILED PHASE 1 OPEN PIT SCOPING STUDY OUTCOMES
Key parameter (± 35%)
Unit
Ore throughput
Mt
17.1
Gold grade
g/t
1.25
Production ounces
koz
651
Plant throughput
Mtpa
2.4
Average annual steady state production
koz pa
93
Production life (excluding pre-strip)
years
7.4
Forecast average All‐In‐Sustaining‐Cost (AISC)
US$/oz
1,068
Total pre‐production capital cost (including pre-strip)
US$M
132
Economic outcomes (± 35%)
Unit
Base
Spot1
Gold price
US$/oz
1,750
1,950
NPV5% (pre-tax, ungeared)
US$M
201
302
%
27.5
37.4
Net cashflow (pre-tax, undiscounted, ungeared)
US$M
312.3
444.6
Payback from first production
years
3.4
2.8
IRR (pre-tax, ungeared)
Study estimate
STARTER PIT
Base case
assessment of
development
potential
VALUE UPSIDE
Significant
leverage to
future resource
growth
Initial project derived
from the shallowest
portion of the Ternera
Deposit MRE
Project economics
highly attractive at
current gold prices
1.
2.
Approximate gold spot price as 9 November 2023.
For full Scoping Study details, refer Tesoro ASX release dated 4 April 2023, Ternera Gold Deposit Phase 1 Open Pit Scoping Study Outcomes. Tesoro Gold confirms that it is
not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical parameters underpinning
Tesoro
Gold
(ASX:TSO
| OTCQB:TSORF)
| CORPORATE
PRESENTATION
that
release
continue
to apply and have
not materially
changed.
INVESTOR PRESENTATION | 14
C. GROWTH | CURRENT MRE IS JUST THE BEGINNING
EXISTING DRILLING INFORMS SIGNIFICANT GROWTH POTENTIAL
• Exploration Target of 48.5 Mt to 101.0 Mt at
Drilled metres
0.91g/t Au to 1.45g/t Au1
120,000
• Indicates Ternera could potentially contain
Ternera constrained MRE
3,500
3,000
between 1.6 Moz and 3.0 Moz gold1
100,000
• Exploration Target constrained to the extent of
the current drill footprint
3,000
2,500
80,000
2,000
• Ternera Deposit remains open in all directions
60,000
• Multiple continuous high-grade zones
40,000
• Wide-spaced drill intercepts outside of Resource
20,000
Ternera Exploration Target1
Au Grade (g/t)
1,096
661
586
0
Tonnage (Mt)
Resource (kOz Au)
75
July 2021 MRE
Lower
Upper
Lower
Upper
Lower
Upper
48.5
101.0
0.91
1.45
1.6
3.0
479
1,460
1,600
645
1,500
1,000
593
503
May 2022 MRE
Drilled metres
Contained Au (Moz)
1,281
802
March 2023 MRE
815
March 2023
Tenera Gold Deposit
unconstrained MRE Exploration Target
Indicated Resource
Inferred Resource
500
0
Ternera MRE growth updates and initial Exploration Target highlighting improved classification and
consistent resource growth with efficient drilling. The Exploration Target has been prepared and
reported in accordance with the 2012 edition of the JORC Code. The potential quantity and grade
are conceptual in nature and there has been insufficient exploration to estimate a Mineral
Resource. It is uncertain if further exploration will result in the estimation of a JORC-compliant
Mineral Resource.
1.
Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023 and Appendix A
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 15
C. GROWTH | ADDITIONAL DISTRICT DISCOVERIES
IS TERNERA THE FIRST OF MANY?
•
Surface gold confirmed over 50km of strike - major gold belt potential
•
More than 570km2 of unexplored tenure
•
Multiple El Zorro Tonalite dyke swarms (EZT, gold host rock) – strong
potential for Ternera repeats
•
Channel sampling results from the Toro Blanco and Kitsune targets defined a
large 3.2km by 1.5km anomalous gold zone – highlights the potential for
Ternera to extend 3km to the north1
• Positive results returned from channel sampling on widespread outcropping
mineralisation at Animas Viejas Target (35km north of Ternera) defined
prospective geology over an area of approximately 7km x 2km
• Ongoing district-wide target generation
1.
Refer Tesoro ASX release 17 January 2023.
2. Refer Tesoro ASX release December 2022.
3. Refer Tesoro ASX release 31 October 2022.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
El Zorro Gold Project concession map. Yellow indicates mapped intrusions
(EZT) prospective for gold mineralisation
INVESTOR PRESENTATION | 16
HIGHLY EXPERIENCED BOARD
WITH A TRACK RECORD OF EXPLORATION AND DEVELOPMENT SUCCESS
Linton Putland
Zeffron Reeves
Executive Director
Managing Director
•
•
•
Geologist with more than 20 years
of resource experience, spanning
greenfield exploration, mineral
discovery, definition and feasibility,
construction, production and
closure.
Previously Managing Director of ASX
listed Metallum Ltd, a company with
development projects and
operations in Chile.
Track record of exploration success
identifying and delineating new gold
districts in Brazil and Chile.
•
•
•
More than 30 years of experience in
mining in Australia, Africa and the
Americas covering a wide range of
commodities.
Current Principal of private mining
consultancy company, LJ Putland &
Associates.
Previously held senior management
roles in IAMGOLD, Aurion Gold,
Delta Gold and Pancontinental
Mining.
Member of AusIMM and a Graduate
Member of Australian Institute of
Company Directors.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Non-Executive Director
Non-Executive Director
Mining and Development
•
Alan Gibson
Geoff McNamara
•
•
•
•
•
More than 30 years of international
resource sector experience.
Previously Director of Mining
Finance at Societe General, NYC
Private Equity Manager for PRCM
(FUM US$800M).
Previous operational roles include
Project Manager, Senior Mine
Geologist and Mine Geologist for
Ivanhoe Mines, Lion Ore
International and Western Mining
Corporation.
Fellow of AusIMM and a Graduate
Member of Australian Institute of
Company Directors.
•
•
•
Currently Vice President Corporate
Development and Head of Legal for
Gold Fields Ltd with more than 20
years’ experience in Corporate,
Energy and Resources Law.
Carried out a number of key growth
transactions, acquisitions and joint
ventures globally.
Holds a Bachelor of Laws and
Bachelor of Economics from
Murdoch University (WA).
INVESTOR PRESENTATION | 17
DEEP CHILEAN EXPERTISE
DE
Share your feedback
Discover