EL ZORRO GOLD
DEVELOPMENT PROJECT
A HIGHLY ATTRACTIVE
SINGLE OPEN PIT CHILEAN
GOLD OPPORTUNITY
November 2025
ASX:TSO | OTCQB:TSORF
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have been prepared by Tesoro Gold Limited (Tesoro or the Company) and approved by the Board of the Company.
The information contained in the Presentation (Information) is summary only and should be read in conjunction with any other documents provided to you by the Company. The Information is current as at 3 November 2025 and
the Company does not undertake to provide any additional or update information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to
the Company that you have read, understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or
fairness of the information, opinions and conclusions contained in this Presentation. Tesoro, or related bodies corporate, shareholders or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or
advisers (Agents) guarantee or make any representations or warranties, express or implied, as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions
contained in this Presentation. Tesoro does not represent or warrant that this Presentation is complete or that it contains all material information about Tesoro or which a prospective investor or purchaser may require in
evaluating a possible investment in Tesoro or acquisition of shares. To the maximum extent permitted by law, Tesoro and its Agents expressly disclaim any and all liability, including, without limitation, any liability arising out of
fault or negligence, for any loss arising from the use of information contained in this Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and
involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of Tesoro and which are subject to change without notice and could cause the
actual results, performance or achievements of Tesoro to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to
future performance and recipients of this Presentation are cautioned not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to be used as the basis for
making an investment decision. In providing this Presentation, Tesoro has not considered the objectives, financial position or needs of any particular recipients. Before making an investment decision prospective investors should
consider the appropriateness of the information in this Presentation having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and
circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments Commission or any other
foreign regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for
subscription, purchase or sale in the United States or any other jurisdiction in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities
Act of 1933 as amended or the securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States. The information in this Presentation is strictly
confidential. It may not be disclosed, reproduced, disseminated, quoted or referred to, in whole or in part, without the express consent of Tesoro.
Competent Person’s Statements
The information in this report that relates to Exploration Results and Metallurgical Results is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the
Australian Institute of Geoscientists and a Director and shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in
this report of the matters based on this information in the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled by Mr Lynn Widenbar (B.Sc(Hons) Geology, M.Sc. FAusIMM, MAIG), a Competent Person who is a Fellow of The Australasian
Institute of Mining and Metallurgy. Mr Widenbar is acting as an independent consultant to Tesoro Gold Limited. Mr Widenbar has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The
Company confirms that it is not aware of any new information or data that materially affects the information contained the form and context in which the Competent Person’s findings are presented have not been materially
modified from in the original announcement on 4 August 2025, and all material assumptions and technical parameters underpinning the estimates in that announcement continue to apply and have not materially changed.
The information in this report that relates to the Production Target, assumptions on Modifying Factors and evaluation of other relevant factors are based on and fairly represents information and supporting documentation that
has been compiled for this announcement and have been compiled under the supervision of Mr Linton Putland BEng (Mining), MSc (Mineral Economics) & Member AusIMM. Mr Putland is a Director of the Company. Mr Putland
has reviewed and approved the technical content of this announcement. Mr Putland is a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC Code 2012). Mr Putland consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears. The Company confirms that it is not aware of any new
information or data that materially affects the information and all the material assumptions and technical parameters underpinning the production target and forecast financial information derived from the production target in
the original report continue to apply and have not materially changed.
The Company has released all material information that relates to Exploration Results for the El Zorro Gold Project, on a continuous basis to the ASX and in compliance with JORC 2012. The Company confirms that it is not aware of
any new information that materially affects the content of this ASX release.
2
DISCLAIMER
INVESTOR PRESENTATION |
EL ZORRO GOLD
PROJECT, CHILE
Refer to ASX announcement dated 11 September 2025. Tesoro Gold Limited confirms that it is not aware of any new
information or data that materially affects the information included in that release. All material assumptions and technical
parameters underpinning that release continue to apply and have not materially changed.
AN EXPANDING LARGE GOLD
RESOURCE AND CLEAR EXPANSION
POTENTIAL
OPEN PIT SCOPING STUDY
DEMONSTRATES A TECHNICALLY
SIMPLE AND ECONOMICALLY
ROBUST PROJECT
STRATEGIC COASTAL LOCATION
WITH ACCESS TO CRITICAL
INFRASTRUCTURE
CALDERILLAS
KITSUNE
DRONE HILL
LA BREA
BUZZARD
SIERRA DEL PORTERO
PENA BLANCA
GOLD CORRIDOR
TERNERA
GOLD DEPOSIT
1.82Moz RESOURCE
TWELVE MONTHS OF HIGH-IMPACT
PROJECT ADVANCEMENT ACTIVITIES
A GOLDEN OPPORTUNITY
ECONOMICALLY ROBUST, TECHNICALLY STRAIGHTFORWARD GOLD PROJECT
WITH DISTRICT-SCALE GROWTH POTENTIAL YET TO BE UNLOCKED
1. Refer to ASX announcement dated 4 August 2025 and the Appendix. Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the
information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
2. Refer to ASX announcement dated 29 August 2025.
3. Refer to ASX announcement dated 11 September 2025.
SIGNIFICANT 2025 MINERAL RESOURCE UPDATE1
VERY ATTRACTIVE METALLURGY2
UPDATED SCOPING STUDY OUTCOMES3
• Unconstrained MRE grows to 2.0Moz @ 1.07g/t Au.
• Pit-constrained MRE delivers 1.82Moz @ 1.10g/t Au with more than 60% of the Resource Indicated.
• Improved ounce per vertical metre profile supports future mine design.
• Excellent average gold recovery of >94% from Ternera
composite samples at large 125 μm grind size.
• Low cyanide consumption and highly-favourable
comminution characteristics.
• Expanded and upgraded Ternera open pit operation.
• Robust project economics.
• Simple development pathway.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
GOLD FIELDS STRATEGIC INVESTMENT
5
4.1%
13.0%
12.0%
38.1%
32.7%
BOARD AND MANAGEMENT
GOLD FIELDS
COLLINS STREET
INSTITUTIONAL INVESTORS
OTHER INVESTORS
INVESTOR PRESENTATION |
GOLD FIELDS STRATEGIC INVESTMENT
REGISTER DETAIL
REGISTER DETAIL
CORPORATE SNAPSHOT
TESORO GOLD (ASX: TSO, OTCQB:TSORF)1
REGISTER DETAIL
CAPITAL STRUCTURE
Share price (31 October 2025) A$0.057
Shares on issue 2,656M
Performance rights 76.3M
Share Rights 1.9M
Unlisted options 17.0M
Listed options 136.3M
Market capitalisation (undiluted) A$151M
Cash1 A$37.9M
Debt Nil
5
INVESTOR PRESENTATION |
GOLD FIELDS STRATEGIC INVESTMENT
Global gold producer - nine operating mines across
Australia, Chile, Ghana, Peru and South Africa
Owns Salares Norte gold-silver mine in Northern
Chile, near El Zorro Gold Project2
Large-scale industry player - 3.9 Moz Resource and
3.5 Moz Reserve (gold only)3
Partnership with Tesoro continues to accelerate
exploration at El Zorro Gold Project
BOARD AND MANAGEMENT
Mark Connelly Independent Non-Executive Chair
Zeff Reeves Managing Director
Linton Putland Executive Director – Mining and Development
Emma Curnow Chief Financial Officer
Tim Williams Chief Development Officer
Sergio Uribe Country Manager Chile
Geoff Mcnamara Non-Executive Director
Alan Gibson Non-Executive Director
Sarah Wilson Company Secretary
1. Note that Register Detail cash and Capital Structure are shown on a pro-forma basis, post settlement of Tranche 2 Placement
Shares, refer to ASX announcement dated 30 September 2025.
2. Source: https://www.bnamericas.com/en/features/5-chilean-gold-projects-set-to-help-boost-national-output
3. Source: www.goldfields.com
• Coastal location surrounded by mines
• Four of the world's largest gold company’s
operating in the region
• Just 15km from the Pan American Highway
and Pacific Ocean
• Grid power within 20km
• Water access within 30km
• Atacama Airport less than a 1-hour drive
• Chile’s Capital, Santiago a 1-hour flight away
• Close to population centres of Caldera,
Chañaral and Copiapó
6
INVESTOR PRESENTATION |
A PREMIER LOCATION FOR PROJECT DEVELOPMENT
PROXIMATE TO ESTABLISHED INFRASTRUCTURE AND EXISTING MINES
EL ZORRO GOLD
PROJECT
7
INVESTOR PRESENTATION |
Initial open pit mine
MINE SCHEDULE
40.7 MT AT 1.02 G/T GOLD
For initial 14-year operating life
MINING PHYSICALS
3.0 MTPA THROUGHPUT
Simple non-refractory metallurgy
STANDARD CIP PLANT
94.5% GOLD RECOVERY
Average 111 koz p.a. for first 9 years
GOLD OUTPUT
1.26 MOZ
Life of mine average
AISC
US$1,216/OZ
Including US$40.1M in pre-strip
UPFRONT CAPITAL COST
US$247.9M
Post-tax at US$2,750/oz gold
IRR
51.3%
Refer to ASX announcement dated 11 September 2025. Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the information
included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
Post-tax at US$2,750/oz gold
FREE CASH FLOW
US$1,230M
Post-tax at US$2,750/oz gold
NPV7.5%
US$663M
SCOPING STUDY OUTCOMES
ECONOMICALLY ATTRACTIVE ON ALL MEASURES
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION 8
INVESTOR PRESENTATION |
SCOPING STUDY OUTCOMES
STRONG PROJECT VALUE ACROSS A RANGE OF GOLD PRICE SCENARIOS
2,300 2,450 2,600 2,750 2,900 3,050 3,200 3,350 3,500 3,650 3,800 3,950
Pre-Tax
NPV(7.5%) US$M 578 691 804 917 1,030 1,143 1,256 1,369 1,482 1,595 1,708 1,821
IRR % 43% 49% 54% 60% 65% 70% 75% 80% 85% 90% 95% 100%
LOM FCF US$M 1,118 1,307 1,496 1,684 1,873 2,062 2,251 2,440 2,629 2,818 3,007 3,196
Post-Tax
NPV(7.5%) US$M 414 497 580 663 745 828 911 993 1,076 1,159 1,241 1,324
IRR % 37% 42% 46% 51% 56% 60% 65% 69% 73% 77% 81% 85%
LOM FCF US$M 816 954 1,092 1,230 1,368 1,505 1,643 1,781 1,919 2,057 2,195 2,333
358
795
702
966
530
623
Gold Price +/- 20%
Opex -/+ 20%
Capex -/+ 20%
US$663M
(post-tax)
THE RIGHT COMMODITY BASE CASE POST TAX NPV7.5% SENSITIVITY
DETAILED GOLD PRICE SENSITIVITY
• Greatest economic leverage to changes in gold
price and operating costs.
• Underlying macroeconomic environment
supportive of spot price stability with further
upside potential in the medium term.
Refer to ASX announcement dated 11 September 2025. Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the information
included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
TECHNICAL PFS WORKSTREAMS
EIA BASLINES STUDIES AND APPLICATION SUBMISSION
MINING APPROVAL PROCESS (PAS – PA)
DFS WORKSTREAM INCLUDING DETAILED ENGINEERING
ASSESSMENT OF FUNDING OPTIONS (ALL REMAIN AVAILABLE)
CONSTRUCTION AND TARGET FIRST PRODUCTION
2025 2026 2027 2028 2029
9
INVESTOR PRESENTATION |
UNLOCKING EL ZORRO’S FULL POTENTIAL
MILESTONES ON THE PROJECT DEVELOPMENT PATHWAY
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
6,000M TO DEFINE AND EXTEND SHALLOW
NORTHERN AND SOUTHERN EXTENSIONS AND
TEST DEPTH EXTENSIONS
EXTENSIONAL DRILLING
12,000M FOCUSED ON PRIORITY UNDRILLED
DISTRICT TARGETS AND TO FOLLOW-UP
PREVIOUS SUCCESS
NEW DISCOVERY DRILLING
10
INVESTOR PRESENTATION |
FULLY FUNDED FOR ACCELERATED EXPLORATION
THREE CONCURRENT DIAMOND DRILLING PROGRAMMES UNDERWAY
20,000M SCHEDULED TO SUPPORT PRE-
FEASIBILITY STUDY WORKSTREAMS
INFILL DRILLING
1. Refer to Tesoro ASX release dated 22 October 2025
• Constrained MRE 1.82Moz with 62% Indicated
• Deposit open in all directions
• Represents a significant improvement in
continuity and ounces per vertical metre
• Additional new zones to the north and south
Isometric view if the Ternera Gold Deposit block model looking north-west. Showing >1g/t blocks
only and US$3000/oz pit shell. Datum PSAD56 19S
NEXT STEPS
11
INVESTOR PRESENTATION |
RECENT SIGNIFICANT MINERAL RESOURCE UPDATE
CONTINUED GROWTH OF THE RESOURCE BASE
Refer to ASX Announcement dated 4 August 2025 .Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the information included
in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
ENABLES A SINGLE OPEN PIT PROJECT
TERNERA MINERAL RESOURCE ESTIMATE (2025)
CATEGORY INDICATED INFERRED TOTAL
Cut off (g/t Au) Mt Au g/t Koz Mt Au g/t Koz Mt Au g/t Koz
Optimised Open Pit 31.8 1.10 1,123 19.5 1.11 692 51.2 1.1 1,816
2.00 3.5 3.55 394 2.5 3.54 280 5.9 3.54 673
1.00 10.5 2.08 705 7.9 2.04 520 18.5 2.06 1,225
0.70 17.5 1.58 891 13 1.57 657 30.5 1.58 1,547
0.30 31.8 1.10 1,128 26.1 1.03 863 58.1 1.07 1,992
0.20 33.8 1.05 1,144 28.7 0.96 885 62.5 1.01 2,028
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
• 1.80m @ 77.15 g/t Au (ZDDH0338)5
• 68.23m @ 1.18 g/t Au (ZDDH0370)2
• 10.06 m @ 1.70 g/t Au (ZDDH0387)1
• 12.00m @ 3.34 g/t Au (ZDDH0135)11
• 130.00m @ 0.65 g/t Au (ZDDH0177)9
• 4.70m @ 7.95 g/t Au (ZDDH0344)3
• 53.50 m @ 1.17 g/t Au (ZDDH0309)7
• 18.20m@ 0.99 g/t Au (ZDDH0311)6
DRONE HILL
KITSUNE
TORO BLANCO
TERNERA EAST
Legend:
• Existing Ternera Gold Deposit
• Near Deposit target areas
• Select drill hole locations
• 7.50m @ 1.15 g/t Au (ZDDH0166)10
• 19.00 m @ 1.41 g/t Au (ZDDH0208)8
• 10.50m @ 1.61 g/t Au (ZDDH0344)3
• 36.00m @ 1.00 g/t Au (ZDDH0341)4
TERNERA POISED FOR GROWTH
MULTIPLE EXTENSIONS READY TO DEFINE WITH MORE DRILLING
1. Refer to Tesoro ASX release dated 22 October 2025 4. Refer to Tesoro ASX release dated 2 July 2024 7. Refer to Tesoro ASX release dated 8 November 2022 10. Refer to Tesoro ASX release dated 6 July 2021
2. Refer to Tesoro ASX release dated 22 March 2025 5. Refer to Tesoro ASX release dated 13 June 2024 8. Refer to Tesoro ASX release dated 3 November 2021 11. Refer to Tesoro ASX release dated 25 June 2021
3. Refer to Tesoro ASX release dated 28 October 2024 6. Refer to Tesoro ASX release dated 1 December 2022 9. Refer to Tesoro ASX release dated 27 August 2021
• Total of 6,000m drilling planned
• Expansion to north, south and at depth
• Potential to connect Ternera with Drone
Hill and Ternera East
EXTENSIONAL DRILLING
• Over 20,000m planned to upgrade
Resource categorisation
• Results returned from first three infill
holes included :
• 43.08m @ 1.98g/t1 Au from 476.00m
(ZDDH0385), including: 5.87m @
7.86g/t Au from 510.88m.
• 80.20m @ 0.93g/t1 Au from 118.80m
(ZDDH00389), including: 31.42m @
1.62g/t Au from 163.08m
INFILL DRILLING
Ternera Gold Deposit with extensional and targets
12
INVESTOR PRESENTATION |
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
5 km
2.5 km
Legend:
• Existing Ternera Gold Deposit
• Near Deposit targets
• District scale targets
CALDERILLAS
KITSUNE
TORO BLANCO
TERNERA EAST
BUZZARD
PENA BLANCA
DRONE HILL
LA FALDA
EL ZORRO NEAR DEPOSIT TARGETS
SIGNIFICANT GOLD HIGHLIGHTS NEAR DEPOSIT POTENTIAL
• Multiple targets with a 5km radius of
Ternera
• Strong gold mineralisation identified at
surface
• Additional drilling planned at Drone Hill,
Ternera East and Kitsune
• Intent is to deliver near deposit discoveries
for potential inclusion in any future mine
plan
FOCUSED EXPLORATION
• Pena Blanca and Calderillas emerging as
large, high-priority targets
• Work planned to derisk prior to drilling
EARLY STAGE TARGETS
13
INVESTOR PRESENTATION |
TERNERA
GOLD DEPOSIT
1.82MOZ RESOURCE
EL ZORRO GOLD
DEVELOPMENT PROJECT
Refer to ASX announcement dated 11 September 2025. Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the
information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially
changed.
PROJECT OPTIMISATION AND ADVANCEMENT
• Mine scheduling refinements to prioritise shallow, high-grade zones.
• Assessment of underground potential below current pit shell.
• Completion of environmental baseline studies and permitting.
• Detailed PFS-level workstreams.
THREE CONCURRENT DIAMOND DRILLING PROGRAMMES
• Infill Drilling: In support of PFS workstreams.
• Extensional Drilling: To test shallow northern and southern
extensions and mineralisation at depth.
• New Discovery Drilling: District scale drilling.
NEXT STEPS AND ADDITIONAL
PROJECT UPSIDE POTENTIAL
CALDERILLAS
TORO BLANCO
TERNERA EAST
BUZZARD
PENA BLANCA
KITSUNE
DRONE HILL
SIERRA DEL PORTRERO
LA BREA
CALDERILLAS NORTH
LA FALDA
2
GOLD CORRIDOR
3
1
1
2
2
3
2
3
3
3
LEGEND
• El Zorro Project Concessions
• Priority 1 Targets
• Priority 2 Targets
• Priority 3 Targets
1
2
3
LARGE, HIGHLY PROSPECTIVE GOLD PROJECT
LOCATED IN CHILE, UNQUESTIONABLY A PREMIER LOCATION FOR BUILDING A NEW MINE
2.0 MOZ UNCONSTRAINED MINERAL RESOURCE
1.82 MOZ CONSTRAINED WITH 62% CLASSIFIED AS INDICATED
EXCEPTIONAL METALLURGY FOR SIMPLE PROCESSING
LOW-COST, WELL UNDERSTOOD CIP PROCESS PROVIDES >94% GOLD RECOVERIES
RESOURCE AND DISTRICT LEVEL GROWTH POTENTIAL
SYSTEM WITH POTENTIAL TO COMPRISE MULTIPLE DISCOVERIES
HIGHLY EXPERIENCED BOARD AND MANAGEMENT TEAM
EMBEDDED LOCAL PRESENCE AND DEEP CHILEAN EXPERTISE
EXPANDED AND UPGRADED OPEN PIT GOLD PROJECT
SCOPING STUDY DEMONSTRATES A STRAIGHTFORWARD PROJECT OF SCALE
15
INVESTOR PRESENTATION |
TESORO GOLD
INVESTMENT HIGHLIGHTS
EL ZORRO GOLD
DEVELOPMENT PROJECT
DETAIL
ASX:TSO | OTCQB:TSORF
APPENDIX
16
INVESTOR PRESENTATION |
NEW METALLURGY DELIVERED EXCELLENT RESULTS
TERNERA ORE HIGHLY AMENABLE TO CONVENTIONAL CIP PROCESSING
• Overall recoveries of greater than 95% achieved
with cyanide leaching.
• Ores tested showed highly consistent performance
across both composite and master samples.
• No deleterious elements or preg-robbing
tendencies identified.
• Ore is siliceous, brittle and fractures easily during
crushing, however high BWi values indicate it is not
amendable to autogenous or semi-autogenous
grinding.
• Low variability across composites, providing
confidence to support advanced levels of technical
studies.
17
INVESTOR PRESENTATION |
Refer to ASX announcement dated 29 August 2025
• Excellent average gold recovery of 95% from
Ternera composite samples at large 125 μm
grind size.
• Low (<0.2 kg/t) cyanide consumption and
highly-favourable comminution characteristics.
HIGH RECOVERIES DELIVERED
WITH VERY LOW REAGENT CONSUMPTION
AND COARSE GRIND SIZE
METALLURGICAL OUTCOMES
Au
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
• Exceptional cash flow generation even in a
conservative Base Case scenario
• Rising to almost US$2 billion over the initial
life of mine in a Spot Case scenario
HIGHLY ATTRACTIVE CHILEAN
GOLD DEVELOPMENT
OPPORTUNITY
ECONOMICALLY ROBUST,
TECHNICALLY STRAIGHTFORWARD,
WITH A SIMPLE DEVELOPMENT
PATHWAY
DETAILED FINANCIAL OUTCOMES
DEMONSTRATE THE ECONOMIC VIABILITY OF THE PROJECT
18
INVESTOR PRESENTATION |
FINANCIALS (± 35%) UoM BASE SPOT
Gold price US$/oz 2,750 3,300
NPV7.5% (pre-tax) US$M 917 1,331
IRR (pre-tax) % 60 79
Net cash flow (undiscounted, pre-tax) US$M 1,684 2,377
NPV7.5% (post-tax) US$M 663 966
IRR (post-tax) % 51 68
Net cash flow (undiscounted, post-tax) US$M 1,230 1,983
Payback period (post-tax) months 20 16
Refer to ASX announcement dated 11 September 2025. Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the information
included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
SIMPLE CRUSH, GRAVITY AND CIP
MINING AND PROCESSING DETAIL
RELATIVELY LOW UPFRONT CAPITAL REQUIRED
19
INVESTOR PRESENTATION |
MILL THROUGHPUT BY MINERAL RESOURCE CATEGORY
Refer to ASX announcement dated 11 September 2025. Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the information
included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
• Contract open pit mining with costs estimated
using a 200-tonne diesel hydraulic excavator
paired with a 120-tonne truck fleet.
• Mine design incorporates staged pits, run-of-mine
pads and waste dumps.
• Open pit schedules were prepared for a three-
stage development plan, targeting delivery of
3.0Mtpa of mill feed at the highest possible grades.
• Process plant design by GR Engineering and
informed by three metallurgical test work
programmes at ALS Metallurgy in Perth.
PIT DEVELOPMENT PLAN AT US$2,750 AT 0.40G/T AU
INDICATED INFERRED TOTAL OUNCES% OUNCES%
Pit Tonnes g/tAu Ounces Tonnes g/tAu Ounces Tonnes g/tAu Ounces Indicated Inferred
Stage1 13,045,495 1.03 433,868 923,114 1.25 37,205 13,968,609 1.25 471,073 92% 8%
Stage2 12,068,008 0.98 379,853 2,953,598 1.03 97,874 15,021,606 1.25 477,727 80% 20%
Stage3 4,175,920 0.95 127,975 7,552,567 1.05 256,023 11,728,487 2.25 383,998 33% 67%
TOTAL 29,289,423 1.00 941,696 11,429,280 1.06 391,102 40,718,703 1.02 1,332,798 71% 29%
0%
94%
89% 90% 92%
75%
88%
80%
72%
57%
38% 40%
50% 50% 50%
44%
-
6% 11% 10% 8%
25% 12% 20% 28% 43% 62% 60% 50% 50% 50% 56%
YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7 YR 8 YR 9 YR 10 YR 11 YR 12 YR 13 YR 14 YR 15 YR 16
Indicated Inferred
A SIMPLE, CONVENTIONAL FLOWSHEET
TESTWORK CONFIRMS LOW-COST CIP PROCESSING ROUTE
20
INVESTOR PRESENTATION |
PROCESS
WATER
LEACHING
TANKS BALL MINING
CRUSHING
ORE STOCKPILES
Carbon fines
reused for
other
applications
Carbon
Regeneration
Carbon
Elution
Carbon
Acid Wash
Fresh Carbon after
Pre-attritioning
Regenerated Carbon
ELECTROWINNING
SMELTING
Gold Dore
TAILINGS
SCREENS
SCREENS
Pulp Advance
Interstage
Screens
Carbon Advance
TransferPumps
Cyanide and other reagents
Desalination plant
Refer to ASX announcement dated 29 August 2025
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
PHYSICALS (± 35%) UoM OUTCOME
Ore tonnage Mt 40.7
Gold grade g/t 1.02
Contained ounces Moz 1.33
Plant throughput Mtpa 3.0
Evaluation period (excluding pre-strip) years 13.5
Strip ratio waste:ore 8.0:1
Process gold recovery (life of mine average) % 94.5
Process production (total evaluation period) Moz 1.26
Process production (average annual steady state) koz pa 111
DETAILED PHYSICAL OUTCOMES
INITIAL PROJECT DELIVERS 1.26 Moz GOLD PRODUCTION
21
INVESTOR PRESENTATION |
Refer to ASX announcement dated 11 September 2025. Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the information
included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
-
32
90
108
116
76
95
83
74
58
52
27 24 24 24
6
-
2
11
11
10
25
13
20 28 43
85
41
24 24 24
8
-
1.30
1.11
1.31
1.39
1.11
1.18
1.14 1.13 1.11
1.51
0.75
0.52 0.52 0.52 0.52
-
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
-
20
40
60
80
100
120
140
160
YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7 YR 8 YR 9 YR 10 YR 11 YR 12 YR 13 YR 14 YR 15 YR 16
Production Ounces - Indicated (koz) Production Ounces - Inferred (koz)
Head Grade (g/tAu)
ANNUAL PRODUCTION OUNCES AND HEAD GRADE
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
DETAILED COST ANALYSIS
LOW UPFRONT CAPITAL BURDEN
22
INVESTOR PRESENTATION |
COSTS (± 35%) UoM OUTCOME
Upfront capital (plant and process infrastructure) US$M 180.1
Upfront capital (open pit mining) US$M 26.4
Upfront capital (pre strip) US$M 41.4
Total upfront capital US$M 247.9
Sustaining capital US$M 39.7
Operating costs (mining) US$/oz Au 640
Operating costs (processing) US$/oz Au 444
Operating costs (general and administration) US$/oz Au 101
AISC (life of mine average) US$/oz Au 1,216
Refer to ASX announcement dated 11 September 2025. Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the information
included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
DEVELOPMENT PLAN AT US$2,750 AT 0.40G/T AU
WHY CHILE?
A PREMIER MINING JURISDICTION
23
INVESTOR PRESENTATION |
WORLD-CLASS GEOLOGY
• #1 copper producer, #2
lithium producer,
growing gold sector
• Proven mineral endowment
PREDICTABLE PERMITTING
• Structured process,
~12 months average
for approvals
• 2025 reforms cut
timelines by 30–70%
MINING POWERHOUSE
• Home to Anglo American ,
BHP, Barrick, Glencore,
Kinross, Newmont, Rio Tinto.
• Strong institutional support
for responsible mining
PRO-INVESTMENT
• US$56B in active foreign
mining investment (2024)
• 27% corporate tax, no
mining-specific royalties
EXISTING INFRASTRUCTURE
• Ports, power, services,
and local engineering
expertise
• Deep mining services
ecosystem in-country
ALIGNED TO THE UNITED NATIONS SUSTAINABLE DEVELOPMENT GOALS WITH A COMMITMENT TO ENSURING
EXPLORATION AND OPERATIONAL ACTIVITIES GENERATE POSITIVE SUSTAINABILITY OUTCOMES
HEALTH AND SAFETY
Occupational Health and Safety are fundamental responsibilities Tesoro has towards its workforce. Our strategies
and practices are based on providing a safe workplace for all employees, suppliers and contractors.
CLIMATE CHANGE
Total GHG emissions on a $ per value basis for newly mined gold is significantly lower than that for other major
metals and mined products. Tesoro is committed to put in place a framework to ensure future mine developments
are built and operated to support global greenhouse mitigation targets.
ENVIRONMENT
Tesoro applies leading exploration techniques, technology and practices to promote drilling efficiency and
minimise environmental impacts. Furthermore, Tesoro is committed to continual improvement of its
environmental performance through a robust environmental management program.
PEOPLE AND CULTURE
Attracting, developing and re
Share your feedback
Discover