Ternera Gold Deposit drilling update
Released
Released
Announcement PDF
31 Cliff Street, Fremantle WA 6160 | +61 8 6383 7883 | info@tesorogold.com.au | tesorogold.com.au
ASX ANNOUNCEMENT
31 MARCH 2026
ASX: TSO OTCQB: TSORF FSE: 5D7
TERNERA GOLD DEPOSIT DRILLING UPDATE
Tesoro Gold Limited (Tesoro or the Company) (ASX: TSO, OTCQB: TSORF, FSE: 5D7) is pleased
to report assay results from drilling completed at the Ternera Gold Deposit (Ternera), part of
the El Zorro Gold Project in Chile (El Zorro, or the Project). Results have been received for a
further 20 holes completed as part of the ongoing >20,000m infill drilling programme.
Six diamond drill rigs continue to operate around the clock, focused on delivering the data
and samples required to support an updated Mineral Resource Estimate (MRE) and
Definitive Feasibility Study (DFS) workstreams.
Upon completion, three rigs will be allocated to the 14,000m new-discovery drilling
programme, targeting high-priority prospects across the district.
HIGHLIGHTS
• Multiple thick, high-grade intercepts returned, including:
• 2.94m @ 17.74g/t Au from 286.120m (ZDDH0424) and
• 21.00m @ 1.44g/t Au from 385.00m including:
• 5.54m @ 3.24g/t Au from 386.16m
• 26.00m @ 2.27g/t Au from 278.00m (ZDDH0432) including;
• 4.59m @ 9.10g/t Au from 287.60m
• 11.15m @ 0.94g/t Au from 109.50m (ZDDH0429) including:
• 4.70m @ 1.66g/t Au from 113.60m and:
• 2.77m @ 9.35g/t Au from 162.00m
• 11.00m @ 1.38g/t Au from 30.00m (ZDDH0431) including:
• 5.18m @ 2.44g/t Au from 30.00m and:
• 19.00m @ 0.91g/t Au from 287.00m including:
• 9.00m @ 1.44g/t Au from 288.00m
• Majority of reported holes are located along the western margin of the Deposit,
returning shallow, gold mineralisation at the predicted locations.
• Assays remain outstanding for 29 diamond drillholes, with the remaining 15% of the
programme scheduled for completion in April 2026.
Tesoro Gold 2
ASX ANNOUNCEMENT
31 MARCH 2026
Tesoro Managing Director, Zeff Reeves, commented:
“Infill drilling at Ternera has been steadily progressing and is now approximately 85%
complete and expected to complete shortly.
“Results returned to date, including this batch, continue to reinforce the continuity and
predictability of the Ternera orebody, which is one of its positive defining characteristics. Drill
holes reported in this batch intercepted mineralisation in multiple ore zones primarily from
the shallow western sector of the Deposit.
“In parallel, metallurgical drilling is 90% complete, with open pit geotechnical drilling now
approximately 30% complete. Results will be incorporated into an updated MRE to support
final design and engineering parameters as part of our ongoing Definitive Feasibility Studies.
“Pleasingly, we are now seeing improved assay turnaround times and remain on track to
deliver an updated and upgraded MRE by mid CY2026.
“While these results represent a critical component of Ternera’s advancement, we are
increasingly focused on transitioning rigs to the 14,000m new-discovery programme. We
expect to mobilise to high priority district targets during May 2026.”
TERNERA INFILL DRILLING
Tesoro is currently operating three fully funded, diamond drilling programmes for
approximately 38,000m. Six diamond drill rigs are active at Ternera, completing infill,
metallurgical and geotechnical drilling campaigns.
Results have been received for a further 20 holes completed as part of the >20,000m infill
drilling programme, primarily designed to upgrade the Resource classification status of
certain areas of the Ternera Deposit.
To date, 66 infill holes have been completed out of a planned 75 holes. Assay results have
now been received for 37 holes, with results from a further 29 holes still outstanding.
This current batch of results is derived predominantly from holes targeting the shallower
portions of the Deposit along the western edge of the current MRE (Figure 1). All holes
intersected gold mineralisation at the predicted downhole locations, providing strong
validation of the existing block model.
Six drill rigs continue, operating 24 hours a day at Ternera, advancing the infill and
extensional programmes.
Significant intercepts from this batch are presented in Appendix 1, with full details provided
in Appendix 2.
Tesoro Gold 3
ASX ANNOUNCEMENT
31 MARCH 2026
Figure 1: El Zorro Gold Project – Ternera Gold Deposit. Drill locations and results received in this announcement.
Section shown at figure 2 and 3 located at A-A’ and B-A’. Datum PSAD56 19S.
Tesoro Gold 4
ASX ANNOUNCEMENT
31 MARCH 2026
Figure 2: El Zorro Gold Project –Drilling section A-A’. Showing holes ZDDH0432 and ZDDH0442 drilled on the
periphery of existing MRE block model further expanding the Ternera Deposit Looking north west. Datum PSAD56
19S.
Figure 3: El Zorro Gold Project –Drilling section B-B’. Showing holes ZDDH0431 ZDDH0424 and ZDDH0417A drilled
to improve inferred resource classification of the existing MRE block model. Looking north west. Hole ZDDH0433
is awaiting assays Datum PSAD56 19S. Refer ASX announcement 9th February 2026 for results from ZDDH0417A.
Tesoro Gold 5
ASX ANNOUNCEMENT
31 MARCH 2026
Authorised by the Board of Tesoro Gold Ltd.
For more information:
Company
Zeff Reeves
Managing Director
info@tesorogold.com.au
Investor Relations & Media Enquiries
Grace Lauder
Fivemark Partners
Grace.lauder@fivemark.com.au
Follow Us
• Website
• LinkedIn
• X
Table 1: Ternera Mineral Estimates for selected cut-off grades. Highlighted open pit Mineral Resource has been
constrained by an optimised pit shell using a gold price of US$3000/oz and process recovery of 94.5%. The
estimates in this table are rounded to reflect their precision; rounding errors are apparent.
Tenera Updated MRE Indicated Inferred Total
Au g/t cut-off Mt Au g/t Koz Mt Au g/t Koz Mt Au g/t Koz
Optimised Open Pit at 0.30 31.8 1.10 1,123 19.5 1.11 692 51.2 1.1 1,816
2.00 3.5 3.55 394 2.5 3.54 280 5.9 3.54 673
1.00 10.5 2.08 705 7.9 2.04 520 18.5 2.06 1,225
0.70 17.5 1.58 891 13 1.57 657 30.5 1.58 1,547
0.30 31.8 1.10 1,128 26.1 1.03 863 58.1 1.07 1,992
0.20 33.8 1.05 1,144 28.7 0.96 885 62.5 1.01 2,028
Refer ASX announcement dated 4 August 2025
Tesoro Gold 6
ASX ANNOUNCEMENT
31 MARCH 2026
About Tesoro
Tesoro Gold Limited has discovered and defined the
first Intrusive Related Gold System in Chile. The 1.82M
oz Ternera discovery is in the Coastal Cordillera region
of Chile. The Coastal Cordillera region is host to
multiple world-class copper and gold mines, has well
established infrastructure, service providers and an
experienced mining workforce. Large areas of the
Coastal Cordillera remain unexplored due to the
unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and
experience has been able secure rights to the district-
scale El Zorro gold project in-line with the Company’s
strategy. Tesoro’s 95% owned Chilean subsidiary owns
95.4% of the El Zorro Gold Project (see ASX
announcement released 12 August 2025).
Future Performance
This announcement may contain certain forward-looking
statements and opinions. Forward-looking statements,
including projections, forecasts and estimates, are provided as
a general guide only and should not be relied on as an
indication or guarantee of future performance and involve
known and unknown risks, uncertainties, assumptions,
contingencies and other important factors, many of which are
outside the control of the Company and which are subject to
change without notice and could cause the actual results,
performance or achievements of the Company to be
materially different from the future results, performance or
achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance,
and no representation or warranty is made as to the likelihood
of achievement or reasonableness of any forward-looking
statements or other forecast. Nothing contained in this
announcement, nor any information made available to you is,
or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future
performance of Tesoro Gold.
Competent Persons Statements
The information in this report that relates to Mineral
Resources is based on information compiled by Mr Lynn
Widenbar (B.Sc. (Hons) Geology, M.Sc. FAusIMM,
MAIG), a Competent Person who is a Fellow of The
Australasian Institute of Mining and Metallurgy. Mr
Widenbar is acting as an independent consultant to
Tesoro Gold Limited. Mr Widenbar has sufficient
experience that is relevant to the style of mineralisation
and type of deposit under consideration, and to the
activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. The Company confirms
that it is not aware of any new information or data that
materially affects the information contained the form
and context in which the Competent Person’s findings
are presented have not been materially modified from
in the original announcement on 4 August 2025, and all
material assumptions and technical parameters
underpinning the estimates in that announcement
continue to apply and have not materially changed.
The information in this report that relates to Exploration
Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA,
MAIG). Mr Reeves is a member of the Australian Institute
of Geoscientists and a Director and shareholder of the
Company. Mr Reeves has sufficient experience that is
relevant to the style of mineralisation and type of
deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Reeves consents to the inclusion in this
report of the matters based on this information in the
form and context in which it appears.
Tesoro Gold 7
ASX ANNOUNCEMENT
31 MARCH 2026
APPENDIX 1: SIGNIFCANT INTERCEPT TABLE
Significant intercepts table for results reported in this announcement. Results are uncut, no top cut has been
applied. Refer Appendix 3 - JORC Tables for data aggregation criteria. A significant intercept is defined as any
intercept with a down hole grade x width >0.25. NSI denotes No Significant Intercept.
Hole_ID From (m) To (m) Interval Au (g/t) Comments Hole_ID From (m) To (m) Interval Au (g/t) Comments
ZDDH0418 124.67 126.00 1.33 0.80 ZDDH0428 137.50 138.00 0.50 0.60
ZDDH0418 227.50 228.00 0.50 0.51 ZDDH0428 158.60 160.00 1.40 1.33
ZDDH0419 6.60 7.24 0.64 0.50 ZDDH0428 171.80 172.52 0.72 0.56
ZDDH0419 89.00 90.00 1.00 0.54 ZDDH0429 47.00 51.00 4.00 0.44
ZDDH0419 99.00 100.00 1.00 0.59 ZDDH0429 81.00 82.00 1.00 3.57
ZDDH0419 181.00 182.00 1.00 5.83 ZDDH0429 91.54 92.50 0.96 1.38
ZDDH0420 46.24 47.05 0.81 0.55 ZDDH0429 100.12 101.00 0.88 1.16
ZDDH0420 139.60 143.00 3.40 0.49 ZDDH0429 109.50 120.65 11.15 0.94
ZDDH0420 139.60 140.20 0.60 1.14 including ZDDH0429 111.30 116.00 4.70 1.66 including
ZDDH0421 555.00 556.00 1.00 0.91 ZDDH0429 152.00 152.92 0.92 0.62
ZDDH0421 579.78 592.70 12.92 1.03 ZDDH0429 162.00 164.77 2.77 9.35
ZDDH0421 583.45 585.00 1.55 3.30 including ZDDH0429 202.00 204.00 2.00 1.07
ZDDH0421 607.00 616.00 9.00 1.96 ZDDH0429 239.28 239.75 0.47 1.55
ZDDH0421 611.85 614.25 2.40 5.72 including ZDDH0430 0.00 Awaiting Assays
ZDDH0423 10.20 11.40 1.20 0.33 ZDDH0431 30.00 60.00 30.00 0.64
ZDDH0423 36.00 38.73 2.73 0.61 ZDDH0431 30.00 41.00 11.00 1.38 including
ZDDH0423 52.00 55.25 3.25 1.31 ZDDH0431 30.00 35.18 5.18 2.44 including
ZDDH0423 94.00 95.57 1.57 0.85 ZDDH0431 74.05 75.00 0.95 0.50
ZDDH0424 19.00 20.00 1.00 0.65 ZDDH0431 93.00 95.30 2.30 0.51
ZDDH0424 42.10 42.80 0.70 1.18 ZDDH0431 117.00 118.00 1.00 1.45
ZDDH0424 45.00 46.00 1.00 0.51 ZDDH0431 217.00 218.00 1.00 0.95
ZDDH0424 272.00 273.00 1.00 1.04 ZDDH0431 226.00 229.00 3.00 0.44
ZDDH0424 286.12 289.06 2.94 17.74 ZDDH0431 287.00 306.00 19.00 0.91
ZDDH0424 311.00 312.00 1.00 1.19 ZDDH0431 288.00 297.00 9.00 1.44 including
ZDDH0424 385.00 406.00 21.00 1.44 ZDDH0431 341.15 341.95 0.80 2.94
ZDDH0424 386.16 391.70 5.54 3.24 including ZDDH0432 178.21 184.86 6.65 0.87
ZDDH0424 400.40 404.00 3.60 3.09 including ZDDH0432 183.00 184.86 1.86 2.61 including
ZDDH0425 6.00 7.00 1.00 0.59 ZDDH0432 212.20 214.30 2.10 0.97
ZDDH0425 17.60 18.10 0.50 0.57 ZDDH0432 233.00 233.65 0.65 0.82
ZDDH0425 38.45 39.28 0.83 1.26 ZDDH0432 278.00 304.00 26.00 2.27
ZDDH0425 41.00 42.00 1.00 0.54 ZDDH0432 287.60 292.19 4.59 9.10 including
ZDDH0425 87.30 100.00 12.70 0.58 ZDDH0433 0.00 Awaiting Assays
ZDDH0425 89.86 90.60 0.74 2.68 including ZDDH0434 0.00 Awaiting Assays
ZDDH0425 113.50 114.10 0.60 0.79 ZDDH0435 27.45 28.00 0.55 0.90
ZDDH0426 15.00 26.00 11.00 0.77 ZDDH0435 73.00 74.00 1.00 0.43
ZDDH0426 15.00 18.50 3.50 1.97 including ZDDH0435 100.00 102.50 2.50 0.76
ZDDH0426 158.00 159.00 1.00 2.47 ZDDH0435 113.90 114.50 0.60 0.49
ZDDH0426 211.50 214.00 2.50 4.94 ZDDH0435 119.00 120.00 1.00 0.46
ZDDH0426 220.00 221.00 1.00 0.82 ZDDH0435 126.00 127.00 1.00 0.73
ZDDH0426 265.00 266.00 1.00 1.16 ZDDH0436 0.00 Awaiting Assays
ZDDH0427 3.70 6.00 2.30 3.05 ZDDH0437 29.50 30.00 0.50 9.95
ZDDH0427 12.00 13.00 1.00 1.38 ZDDH0437 34.48 35.00 0.52 0.60
ZDDH0427 31.00 32.00 1.00 0.91 ZDDH0437 43.00 44.00 1.00 0.48
ZDDH0427 36.00 37.00 1.00 0.50 ZDDH0437 50.20 50.65 0.45 5.34
ZDDH0427 46.14 47.50 1.36 1.82 ZDDH0437 55.81 57.20 1.39 0.61
ZDDH0427 67.60 68.00 0.40 1.84 ZDDH0437 66.00 67.00 1.00 0.71
ZDDH0427 193.63 194.15 0.52 0.59 ZDDH0437 106.50 111.44 4.94 1.31
ZDDH0427 236.00 236.85 0.85 0.56 ZDDH0437 106.50 107.10 0.60 8.73 including
ZDDH0427 274.00 274.65 0.65 1.89 ZDDH0438 16.00 20.00 4.00 0.95
Tesoro Gold 8
ASX ANNOUNCEMENT
31 MARCH 2026
Hole_ID From (m) To (m) Interval Au (g/t) Comments Hole_ID From (m) To (m) Interval Au (g/t) Comments
ZDDH0438 26.00 27.00 1.00 1.06 ZDDH0443 74.00 75.00 1.00 0.59
ZDDH0438 45.60 46.08 0.48 0.76 ZDDH0443 182.52 183.00 0.48 0.72
ZDDH0438 47.64 48.00 0.36 1.04 ZDDH0443 195.57 201.00 5.43 0.85
ZDDH0438 52.35 54.00 1.65 0.89 ZDDH0443 200.00 201.00 1.00 2.44 including
ZDDH0438 59.00 60.00 1.00 1.41 ZDDH0443 309.25 311.17 1.92 0.87
ZDDH0438 68.00 79.95 11.95 0.55 ZDDH0443 314.60 315.30 0.70 0.53
ZDDH0438 68.00 69.00 1.00 1.04 including ZDDH0443 324.80 325.25 0.45 1.52
ZDDH0438 76.00 77.00 1.00 1.45 including ZDDH0443 331.90 339.55 7.65 0.59
ZDDH0438 110.75 111.20 0.45 0.87 ZDDH0444 5.70 6.20 0.50 0.48
ZDDH0438 121.00 122.00 1.00 0.57 ZDDH0444 12.79 13.40 0.61 0.43
ZDDH0438 140.80 142.00 1.20 0.41 ZDDH0444 27.00 31.00 4.00 0.85
ZDDH0438 188.75 189.50 0.75 6.46 ZDDH0444 27.00 29.00 2.00 1.20 including
ZDDH0438 210.00 210.70 0.70 0.82 ZDDH0444 62.60 64.00 1.40 0.56
ZDDH0439 7.50 8.10 0.60 0.89 ZDDH0444 93.83 99.00 5.17 1.04
ZDDH0439 115.00 116.00 1.00 0.72 ZDDH0444 96.40 98.00 1.60 2.83 including
ZDDH0439 172.00 173.00 1.00 1.13 ZDDH0444 138.00 139.00 1.00 3.97
ZDDH0439 183.50 184.23 0.73 0.62 ZDDH0444 146.30 149.70 3.40 0.89
ZDDH0439 199.34 200.00 0.66 0.64 ZDDH0445 0.00 Awaiting Assays
ZDDH0439 215.00 217.00 2.00 0.64 ZDDH0446 10.00 11.00 1.00 0.54
ZDDH0440 0.00 Awaiting Assays ZDDH0446 22.00 26.00 4.00 1.96
ZDDH0441 0.00 Awaiting Assays ZDDH0446 22.00 23.70 1.70 3.64
ZDDH0442 7.00 8.00 1.00 2.05 ZDDH0446 41.70 42.30 0.60 0.50
ZDDH0442 32.75 39.53 6.78 0.93 ZDDH0446 66.00 67.50 1.50 0.98
ZDDH0442 33.22 37.80 4.58 1.26 ZDDH0446 123.35 123.70 0.35 2.50
ZDDH0442 123.00 123.60 0.60 1.62 ZDDH0446 138.97 139.40 0.43 2.49
ZDDH0442 129.45 130.00 0.55 1.36 ZDDH0447 0.00 Awaiting Assays
ZDDH0442 157.00 157.55 0.55 0.99 ZDDH0448 75.40 76.10 0.70 1.18
ZDDH0448 90.64 91.10 0.46 0.51
ZDDH0448 94.56 95.60 1.04 1.17
Tesoro Gold 9
ASX ANNOUNCEMENT
31 MARCH 2026
APPENDIX 2: DRILLING DETAILS
Drillhole details for holes reported in this announcement.
Northing Easting Elevation Dip Azimuth
ZDDH00418 341828 7036501 641 -60 240 268.00
ZDDH00421 342237 7035698 543 -60 240 680.10
ZDDH00423 341652 7036335 581 -60 240 150.00
ZDDH00424 342156 7036374 649 -60 240 493.60
ZDDH00425 341971 7036580 668 -60 240 191.00
ZDDH00426 341656 7036167 585 -60 240 267.60
ZDDH00427 341724 7036204 611 -60 240 281.10
ZDDH00428 341879 7036564 628 -60 240 223.40
ZDDH00429 341703 7036089 574 -60 240 250.95
ZDDH00430 342135 7036294 656 -60 240 435.00
ZDDH00431 341740 7036178 604 -60 240 391.74
ZDDH00432 342136 7036568 717 -60 240 310.00
ZDDH00433 341588 7036094 588 -60 240 110.55
ZDDH00434 341947 7036567 659 -60 240 176.20
ZDDH00435 341563 7035977 572 -60 240 150.00
ZDDH00436 342156 7036271 640 -60 240 460.30
ZDDH00437 341583 7035920 566 -60 240 146.60
ZDDH00438 341655 7036097 598 -60 240 220.60
ZDDH00439 341706 7036228 597 -60 240 230.00
ZDDH00440 342059 7036251 690 -60 240 607.20
ZDDH00440A 342059 7036251 690 -60 240 573.40
ZDDH00441 341670 7035900 556 -60 240 250.23
ZDDH00442 341688 7036321 597 -60 240 205.70
ZDDH00443 341870 7035976 617 -60 240 418.10
ZDDH00444 341591 7036130 574 -60 240 175.20
ZDDH00445 342063 7036220 680 -60 240 265.82
ZDDH00445A 342065 7036222 680 -60 240 404.00
ZDDH00446 341674 7036347 594 -60 240 150.00
ZDDH00447 342119 7036422 677 -60 240 352.40
ZDDH00447A 342119 7036422 677 -60 240 440.00
ZDDH00448 341562 7036080 575 -60 240 121.10
Hole Location
Hole
Orientation
Drill
Depth
(m)
Hole ID
Tesoro Gold 10
ASX ANNOUNCEMENT
31 MARCH 2026
APPENDIX 3: JORC TABLES
Section 1: Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
Tesoro has completed 479 diamond drill holes at the El
Zorro Gold Project for 149,405m.
Diamond drill holes were drilled with HQ. Sampling was
half core at geologically defined and significant
mineralisation boundaries.
The CP considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Tesoro Diamond drill holes were drilled with HQ.
Sampling was half core at geological and significant
mineralisation boundaries. The CP consider this
appropriate for the style of mineralisation.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done; this
would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’).
In other cases, more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
Diamond drilling was used to obtain ½ core samples of
various lengths (minimum 0.25m), from which 1kg of
material was pulverised passing 200 mesh to produce
a 50g charge for fire assay fusion with a gravimetric
finish. Multielement assays were completed by 4-acid
digest with a 2.5g charge. The CP consider these
appropriate assay techniques.
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
Tesoro has completed 479 diamond drill holes at the El
Zorro Gold Project for 149,405m.
Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
Core recovery was estimated using the drillers
recorded depth marks against the length of the core
recovered. Reviewing the core photos, there are
occasional shears/faults where core is broken. There is
however no significant core loss.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
A single tube system was employed and in general
core recovery good.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have occurred
due to preferential loss/gain of
fine/coarse material.
There appears to be no potential sample bias as there
was no regular loss of core.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour,
lithology, weathering, grain size, mineralisation,
alteration, geotechnical characteristics etc. Diamond
core is stored at the Company’s warehouse.
Tesoro consider the data to be of an appropriate level
of detail to support a future resource estimation.
Tesoro Gold 11
ASX ANNOUNCEMENT
31 MARCH 2026
Criteria JORC Code explanation Commentary
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
Logging of diamond core was qualitative, and
diamond core was photographed.
• The total length and percentage of the
relevant intersections logged.
All drilled intervals are logged and recorded.
Subsampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
Drill core was cut, and half core was collected for
analysis
• If non-core, whether riffled, tube
sampled, rotary split, etc. and whether
sampled wet or dry.
Tesoro has not completed any percussion drilling.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
The sample preparation of crushing half core at the
lab to mm size prior to splitting off a 50g charge (either
by cone/quarter or riffle) for pulverisation provides an
appropriate and representative sample for analysis.
• Quality control procedures adopted for
all subsampling stages to maximise
representivity of samples.
Half core was collected for the entirety of the Tesoro
drilling, as such there was consistency throughout the
drilling. Core was logged by a qualified geoscientist.
Each subsample is considered to be representative of
the interval.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Sampling of half core is representative of the in-situ
material. There are field duplicate samples collected
from the diamond core with irregular results. Field drill
core duplicates are irregular by nature, and it has
been recommended by Tesoro’s consultants to use
coarse reject material to monitor the sample
preparation.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Sample sizes collected were considered appropriate
to reasonably represent the material being tested.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Assays reported in this report were undertaken at the
accredited laboratory of ALS Santiago, which is fully
certified. Core samples of various lengths were
assayed (minimum 0.25m) from which 1kg of material
was pulverized passing 200 mesh to produce a 50 g
charge for fire assay fusion with gravimetric finish.
Multielement assays were completed by 4-acid digest
with a 2.5 g charge.
All techniques are appropriate for the element being
determined.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Standard chemical analyses were used for grade
determination. There was no reliance on determination
of analysis by geophysical tools.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
QAQC procedures included the insertion of Certified
Reference Materials (CRMs) (5%) and blank material
(2%), Check samples (5%) and check assaying (5%)
The laboratories used have generally demonstrated
analytical accuracy at an acceptable level within 95%
confidence limits.
Verification of
sampling and
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
All intercepts have been verified by multiple
appropriately qualified Company personnel.
• The use of twinned holes. No twinned holes have been completed
• Documentation of primary data, data
entry procedures, data verification, data
Tesoro drilling is digitally entered and stored following
documented core handling protocols.
The protocols are considered adequate.
Tesoro Gold 12
ASX ANNOUNCEMENT
31 MARCH 2026
Criteria JORC Code explanation Commentary
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data. No adjustments were made to Tesoro Drilling
Location of data
points
• Accuracy and quality of surveys used to
locate drillholes (collar and downhole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Tesoro drill hole collars have been surveyed accurately
using differential GPS for all holes.
• Specification of the grid system used. The grid system used PSAD56 19S
• Quality and adequacy of topographic
control.
The topography generated from an accurate
topographic survey data completed by a registered
surveyor and has been used for the current control.
Data spacing
and distribution
• Data spacing for reporting of Exploration
Results.
Drill hole spacing is variable between 25m and 200m
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
The current data spacing and distribution is not
considered suitable for Mineral Resource and Ore
reserve estimation at this early exploration stage.
• Whether sample compositing has been
applied.
Sample compositing was not employed at the
sampling stage.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
Drill holes were drilled across the interpreted strike of
the mineralisation.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Tesoro diamond drilling at various orientations does not
reveal any bias regarding the orientation of the
mineralised horizons.
Sample security • The measures taken to ensure sample
security.
Chain of Custody of digital data is managed by the
Company. Physical material was stored on site and,
when necessary, delivered to the assay laboratory.
Thereafter laboratory samples were controlled by the
nominated laboratory which to date has been Bureau
Veritas and ALS Santiago. All sample collection was
controlled by digital sample control file(s) and
hardcopy ticket books.
Audits or reviews • The results of any audits or reviews of
sampling techniques and data.
No audits have been undertaken.
Section 2: Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
Information regarding tenure is included in the
Company’s December 2025 quarterly report released to
the ASX on 27 January 2026.
Tesoro Resources Ltd, 95% owned Chilean subsidiary,
Tesoro Mining Chile SpA, owns 95.4% of the El Zorro Gold
Project Concessions.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The Concessions are believed to be in good standing with
the governing authority and there is no known
impediment to operating in the area.
Exploration
done by
other parties
• Acknowledgment and appraisal of
exploration by other parties.
Little historical exploration has been undertaken in either
project area. Coeur d’Alene’s Chilean exploration division
undertook activities on the Ternera prospect, under an
Tesoro Gold 13
ASX ANNOUNCEMENT
31 MARCH 2026
Criteria JORC Code explanation Commentary
option agreement with the previous owners between April
1990 and January 1993.
Geology • Deposit type, geological setting and
style of mineralisation.
The mineralisation model is considered to be an intrusive
related gold deposit. The key characteristics that are
consistent with this style deposit include:
• Low sulphide content, (typically <5%); reduced ore
mineral assemblage that typically comprises pyrite and
lacks primary magnetite or hematite
• Mineralisation occurs as sheeted vein deposits or
stockwork assemblages and often combine gold with
variably elevated Bi, W, As, Mo, Te, and/or Sb but low
concentrations of base metals as seen in the initial four
holes by Tesoro at El Zorro
• Restricted and commonly weak proximal hydrothermal
alteration
• Intrusions of i
Share your feedback
Discover