Phase 2 detailed metallurgical test work results - updated
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
10 DECEMBER 2021
ASX: TSO | ACN 106 854 175
Detailed Metallurgical Test Work Confirms Gravity Recovery of
45% and overall recovery of 94.5% at a 150 µm grind size
▪
Detailed metallurgical test work results indicate achievable gravity recovery of 45% and
overall recovery of 94.5% at a 150 µm grind size and up to 98% at finer grind sizes.
▪
As with the Phase 1 test work, the Phase 2 leach test work demonstrated rapid leach times
with the majority of tests achieving total gold extraction in excess of 90% within 8 hours.
▪
Phase 2 metallurgical test work completed on representative drill core samples from the
Tenera Gold Deposit resulted in high gravity and leach recoveries.
▪
These results will be used to set the process design criteria for Tenera confirming the potential
for ore processing using a simple, conventional crush, grind, gravity recovery and leach
flowsheet achieving high recoveries.
Tesoro Resources Limited (Tesoro or the Company) (ASX: TSO) is pleased to announce the final results
from the Phase 2 metallurgical test work conducted on mineralised material from the Ternera Gold
Deposit (Ternera) at the Company’s El Zorro Gold Project, Chile.
The Phase 2 test work program was designed to assess the gravity recovered gold component and
cyanide leaching characteristics over a range of gold grades using different grind sizes to allow the
selection of the most appropriate grind size for future processing. The Phase 2 test work was
completed using sea water.
The Phase 2 test work was conducted on representative samples from the various mineralised zones
at Tenera over a range of grades. A total of 526kg of samples selected from the various mineralised
zones that lie within the optimisation pit shell that was used to constrain the Tenera Mineral Resource
Estimate as released on 29 July 2021. Samples were sent to the ALS Metallurgical Laboratory in Perth
WA for test work.
The results of this testwork program and the main conclusions drawn regarding the possible
metallurgical treatment of the El Zorro deposits are as follows:
•
1
The test programme successfully determined a simple processing method for recovering gold
from the Ternera gold deposit with the optimal results being:
•
Bond Ball Mill work index (BWi) = 20.4 kWh/t (from Phase 1 Test Work Program);
•
A leach feed grind size distribution of P80 = 150µm;
•
Cyanide consumptions of 0.5kg/t;
•
Lime consumption of 4.0kg/t;
•
Gravity recovery of 45%;
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
•
Overall Au recovery of 94.5%; and
•
Test work undertaken using seawater.
Results of the overall test work are summarised below for a 200 micron and 150 micron grind sizes:
COMP_ID
NSF_FR_LG
NSF_FR_MG
NSF_FR_HG
EZT_FR_LG
EZT_FR_MG
EZT_FR_HG
SED_FR_LG
SED_FR_MG
SED_FR_HG
AVERAGE
MEDIAN
OX_HG
OX_LG
Recoveries
P80 = 200µm
P80 = 150µm
Gravity
Leach Overall
Gravity
Leach
Overall
%
%
%
%
%
%
48.6
51.6
54.8
48.5
51.8
49.1
42.3
49.5
47.6
49.3
49.1
60.1
28.1
42.2
40.6
37.0
47.3
39.9
42.3
49.6
42.3
43.0
42.7
42.3
37.6
67.0
90.8
92.2
92.4
95.8
91.6
91.5
92.0
91.8
90.5
92.1
91.8
97.6
95.1
48.2
52.9
57.7
48.0
52.1
49.9
35.9
52.2
48.3
49.5
49.9
44.5
42.7
39.8
47.9
42.5
42.5
50.3
42.5
45.5
44.2
42.7
92.7
95.5
97.5
95.9
94.6
93.4
88.9
94.6
93.9
94.1
94.6
Tesoro Managing Director Zeff Reeves commented:
“These are first class metallurgical results confirming high gravity and cyanide leach recoveries that
can be achieved for processing material from Ternera using conventional gravity and CIL processes
at coarse grind sizes. These results have enabled the development of a very simple, generic,
preliminary processing flowsheet and largely de-risks one of the projects key revenue drivers as it
advances toward development.”
2
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
TERNERA PHASE 2 METALLURGICAL TESTWORK PROGRAM
A total of 526kg of mineralised rock samples were collected from 53 diamond drill holes from Tenera,
representing each of the mineralised and grade zones within the Mineral Resource.
Drillhole and sample locations are presented in Appendices 1 and 2 to this report. For full drillhole
details please refer to ASX announcement of 6 December 2021.
In all, twenty-five tests were conducted in the Phase 2 program. This is in addition to the three tests
conducted on the Phase 1 program in 2020 (ASX Announcement 9 June 2020).
Testwork Sample Selection
A total of 326 half HQ core samples were delivered to ALS Metallurgy Laboratory, Perth, weighing
526kg. The mineralogical and domain make-up of the samples is shown below:
•
Material from the Ternera deposit of tonalite (intrusive igneous rock), identified as EZT-FR or EZ
tonalite fresh samples;
•
Material from the Ternera deposit which are not tonalite but are fresh, identified as NS-FR or
EZ non-sediment fresh samples;
•
Material from the Ternera deposit of sediments and are fresh, identified as SED-FR or fresh
sedimentary samples; and
•
Material from the Ternera deposit of weathered or “oxide” samples, identified as OX samples.
Details of the composite samples are shown below:
COMP_ID
EST Wgt (kg)
Calc Grade
Au g/t
NSF_FR_LG
NSF_FR_MG
NSF_FR_HG
EZT_FR_LG
EZT_FR_MG
EZT_FR_HG
SED_FR_LG
SED_FR_MG
SED_FR_HG
OX_LG
OX_HG
LOM Composite
49.00
49.00
49.00
50.75
50.75
49.00
49.00
50.75
49.22
80.61
99.05
0.76
1.70
6.57
0.58
1.76
5.07
0.66
1.88
4.88
0.54
5.13
ALS Assay
Au g/t
As ppm
1.07
1.54
3.63
0.86
1.84
2.98
0.41
0.81
4.62
0.73
13.10
1.12
130
15
980
440
605
2,985
40
45
825
170
1,310
DESCRIPTION
<1g/t North South Fault Zone
1-2.5 g/t Au - north South fault zone
>2.5 g/t Au north south fault Zone
<1g/t main tonalite
1-2.5g/t Au main tonalite
>2.5g/t Main Tonalite
<1 g/t Au sediment hosted
1-2.5 g/t Au Sediment hosted
>2.5 g/t Sediment hosted
<1 g/t Au Oxide zone
>1 g/t Au Oxide zone
Metallurgical Test Work Programme
Each individual sample was crushed to minus 4mm, homogenised, and split with one split stored for
future use and the other half used for its respective composite of 15 to 30kg each. The composites
were prepared for head assays analysing for Au, Ag, S and SiO2 along with other analytes such as
As.
11 composites were prepared to investigate grind times to reach particle size distributions of 80
percent passing 850, 250, 150 and 75 micron (“P80 = 850, 250, 150 and 75µm).
Following this a bulk portion of 15kg was ground to P80 = 850µm and processed through a laboratory
size Knelson gravity separator. The Knelson concentrate was then intensively leached while the
Knelson tailings were dried and split into 1kg samples for conventional cyanide leaching. All gravity
and leach products were analysed for Au and Ag.
3
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
A 12th composite was also generated, composed of all fresh medium and low-grade composites.
This composite was called “LOM composite” and was used as the initial “scout” tests to better
determine the leach parameters.
Following initial LOM sample tests, it was decided to test the composite samples at a leach grind
size of P80 = 200µm. Following review of the results from this test work, the program was re-run at a
lower grind size of P80 = 150µm.
Gravity Recoverable Gold (GRG) Testwork
Large scale gravity separation tests were conducted to eliminate individual 1kg gravity test
variations.
Three of the LOM composite sample tests were conducted at a Knelson Concentrator feed grind
size of P80 = 850µm, with the remainder conducted at P80 = 200µm.
Gravity Recovered Au Results are shown below,
COMP_ID
NSF_FR_LG
NSF_FR_MG
NSF_FR_HG
EZT_FR_LG
EZT_FR_MG
EZT_FR_HG
SED_FR_LG
SED_FR_MG
SED_FR_HG
OX_LG
OX_HG
LOM Composite*
-200µ Grind
-150µ Grind
48.6
51.6
54.8
48.5
51.7
49.1
42.3
49.5
47.8
28.1
60.1
41.7
48.2
52.9
57.7
48.0
52.2
49.9
35.6
50.0
48.3
n/a
n/a
n/a
Gravity recovery is relatively consistent at around 49% to 50%, disregarding the three anomalous
oxide results. For study purposes the design gravity will be set at 45%.
Leaching Test Work
All leach tests conducted in the Phase 2 programme were undertaken using sea water.
As with the Phase 1 test work, the Phase 2 leach test work demonstrated rapid leach times with the
majority of tests achieving total gold extraction in excess of 90% within 8 hours.
The total extraction curves for the P80 = 150µm leach test work are shown below,
4
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
RATE OF GOLD EXTRACTION
100
90
80
EXTRACTION (%)
70
60
50
40
30
20
10
0
0
2
4
6
8
10
12
14
16
18
20
22
24
TIME (Hours)
SED-FR-MG Composite
NSF-FR-MG Composite
EZT-FR-MG Composite
SED-FR-LG Composite
NSF-FR-LG Composite
EZT-FR-LG Composite
SED-FR-HG Composite
NSF-FR-HG Composite
EZT-FR-HG Composite
Gravity, leach and overall recoveries for each of the Phase 2 test along with respective reagent
consumptions are shown below.
Reagent Consumption
P80 = 200µm
P80 = 150µm
NaCN
Lime
NaCN
Lime
kg/t
kg/t
kg/t
kg/t
COMP_ID
NSF_FR_LG
NSF_FR_MG
NSF_FR_HG
EZT_FR_LG
EZT_FR_MG
EZT_FR_HG
SED_FR_LG
SED_FR_MG
SED_FR_HG
AVERAGE
MEDIAN
OX_HG
OX_LG
0.47
0.54
0.54
0.54
0.54
0.54
0.61
0.57
0.57
0.55
0.54
0.47
0.54
2.08
1.78
2.17
2.74
3.18
1.71
2.80
2.66
2.88
2.44
2.66
3.22
2.61
0.50
0.46
0.47
0.57
0.47
0.48
0.43
0.43
0.41
0.47
0.47
3.12
3.55
3.73
3.67
4.32
3.63
4.36
4.49
4.25
3.90
3.73
Recoveries
P80 = 200µm
P80 = 150µm
Gravity
Leach Overall
Gravity
Leach
Overall
%
%
%
%
%
%
48.6
51.6
54.8
48.5
51.8
49.1
42.3
49.5
47.6
49.3
49.1
60.1
28.1
42.2
40.6
37.0
47.3
39.9
42.3
49.6
42.3
43.0
42.7
42.3
37.6
67.0
90.8
92.2
92.4
95.8
91.6
91.5
92.0
91.8
90.5
92.1
91.8
97.6
95.1
48.2
52.9
57.7
48.0
52.1
49.9
35.9
52.2
48.3
49.5
49.9
44.5
42.7
39.8
47.9
42.5
42.5
50.3
42.5
45.5
44.2
42.7
92.7
95.5
97.5
95.9
94.6
93.4
88.9
94.6
93.9
94.1
94.6
INTERPRETATION OF RESULTS
The Phase 2 metallurgical results confirm high gravity and cyanide leach gold recoveries from
Ternera material using conventional gravity and CIL processes at a coarse grind size. Information
was also produced to provide guidance on expected reagent usage to achieve these recoveries
at a level appropriate for use in a Scoping Study level of assessment for the project.
These results provide the basis for a very simple, generic, preliminary processing flowsheet for the
project as shown below.
5
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
Authorised by the Managing Director of Tesoro Resources Limited.
For more information:
Company:
Zeff Reeves Managing Director
Tesoro Resources Limited
+61 8 9322 1587
6
Investors:
Peter Taylor
NWR Communications
+61 (0) 412 036 231
peter@nwrcommunications.com.au
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
About Tesoro
Tesoro Resources Limited was established with a strategy of acquiring,
exploring and developing mining projects in the Coastal Cordillera region of
Chile. The Coastal Cordillera region is host to multiple world class copper and
gold mines, has well established infrastructure, service providers and an
experienced mining workforce. Large areas of the Coastal Cordillera remain
unexplored due to the unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and experience has been
able secure rights to a district scale gold project in-line with the Company’s
strategy. Tesoro has rights to acquire up to 80% of the El Zorro Gold Project.
Future Performance
This announcement may contain certain forward-looking statements and opinion. Forward-looking
statements, including projections, forecasts and estimates, are provided as a general guide only and should
not be relied on as an indication or guarantee of future performance and involve known and unknown risks,
uncertainties, assumptions, contingencies and other important factors, many of which are outside the control
of the Company and which are subject to change without notice and could cause the actual results,
performance or achievements of the Company to be materially different from the future results, performance
or achievements expressed or implied by such statements. Past performance is not necessarily a guide to
future performance and no representation or warranty is made as to the likelihood of achievement or
reasonableness of any forward looking statements or other forecast. Nothing contained in this announcement
nor any information made available to you is, or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future performance of Tesoro.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and shareholder of the Company. Mr Reeves has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in
this report of the matters based on this information in the form and context in which it appears.
The information in this report that relates to Metallurgical Test Work Results is based on information compiled
by Mr Linton Putland (B Eng – Mining, MSc – Mineral Economics, MAUSIMM, MAICD). Mr Putland is a member
of the Australasian Institute of Mining and Metallurgy and a Director and employee of the Company. Mr
Putland has sufficient experience that is relevant to the results under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Metallurgical Results. Mr Putland consents to the inclusion in this report of the matters based
on this information in the form and context in which it appears.
7
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
APPENDIX 1 – DRILLHOLE COLLAR LOCATION MAP
Ternera Gold Deposit drillhole collar location map for holes used for metallurgical samples. Collar locations = red diamonds, Maiden Mineral
Resource Estimate area in dashed blue line. PSAD56 19S Datum. For full drill hole details refer to ASX Announcement 6 December 2021
8
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
APPENDIX 2 – JORC TABLES
JORC Table 1
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as downhole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Tesoro has completed 265 diamond drill holes for 85,830m in
2017, 2018, 2020 and 2021 (ZDDH0001 to ZDDH00260).
Diamond drill holes were drilled with HQ. Sampling was half
core at geologically defined and significant mineralisation
boundaries.
Tesoro considers the sampling methodologies to be
appropriate for this style of mineralisation.
Metallurgical sampling methodology is described in the body of
this report.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Tesoro Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Tesoro consider this appropriate for the style of
mineralisation.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done,
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Diamond drilling was used to obtain ½ core samples of various
lengths (minimum 0.25m), from which 1kg of material was
pulverised passing 200 mesh to produce a 50g charge for fire
assay fusion with a gravimetric finish. Multielement assays
were completed by 4-acid digest with a 2.5g charge. Tesoro
consider these appropriate assay techniques.
Drilling techniques • Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Tesoro has completed 265 diamond drill holes for 85,830m .
Diamond drill holes were drilled with HQ. Sampling was half
core at geological and significant mineralisation boundaries.
Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
Core recovery was estimated using the drillers recorded depth
marks against the length of the core recovered. Reviewing the
core photos, there are occasional shears/faults where core is
broken. There is however no significant core loss.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
A single tube system was employed and in general core
recovery good.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
There appears to be no potential sample bias as there was no
regular loss of core.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour, lithology,
weathering, grain size, mineralisation, alteration, geotechnical
characteristics etc. Diamond core is stored at the Company’s
warehouse.
Tesoro consider the data to be of an appropriate level of detail
to support a future resource estimation.
Logging
• Whether logging is qualitative or quantitative in Logging of diamond core was qualitative and diamond core was
photographed.
nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the relevant All drilled intervals are logged and recorded.
intersections logged.
Subsampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
Drill core was cut, and half core was collected for analysis
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.
Tesoro has not completed any percussion drilling.
9
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
Criteria
JORC Code explanation
Commentary
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
The sample preparation of crushing half core at the lab to mm
size prior to splitting off a 50g charge (either by cone/quarter
or riffle) for pulverisation provides an appropriate and
representative sample for analysis.
Details of sample prpartion for metllurgical samples is
described in the body of this report.
Half core was collected for the entirety of the Tesoro drilling, as
• Quality control procedures adopted for all
subsampling stages to maximise representivity such there was consistency throughout the drilling. Core was
logged by a qualified geoscientist. Each subsample is
of samples.
considered to be representative of the interval.
Quality of assay
data and
laboratory tests
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Sampling of half core is representative of the in-situ material.
There are field duplicate samples collected from the diamond
core with irregular results. Field drill core duplicates are
irregular by nature and it has been recommended by Tesoro’s
consultants to use coarse reject material to monitor the
sample preparation.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
sample sizes collected were considered appropriate to
reasonably represent the material being tested.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Assays reported in this report were undertaken at the
accredited laboratory of ALS Metllurgical Laboratory Perth
Australia, which is fully certified. Composite core samples of
various lengths were assayed (minimum 0.25m) from which
1kg of material was pulverized passing 200 mesh to produce a
50 g charge for fire assay fusion with gravimetric finish.
Multielement assays were completed by 4-acid digest with a
2.5 g charge.
All techniques are appropriate for the element being
determined.
• For geophysical tools, spectrometers, handheld Standard chemical analyses were used for grade
XRF instruments, etc., the parameters used in determination. There was no reliance on determination of
determining the analysis including instrument analysis by geophysical tools.
make and model, reading times, calibrations
factors applied and their derivation, etc.
QAQC procedures included the insertion of Certified Reference
• Nature of quality control procedures adopted
Materials (CRMs) (5%) and blank material (2%), Check samples
(e.g. standards, blanks, duplicates, external
(5%) and check assaying 5%
laboratory checks) and whether acceptable
Cube Consulting Pty Ltd manage the database for Tesoro.
levels of accuracy (i.e. lack of bias) and
precision have been established.
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
A number of independent consulting geoscientists (Cube
Consulting, Oliver, and Cooley) external to Tesoro have verified
the intersections for holes ZDDH0001 to ZDDH0080. Holes
ZDDH0081 onwards have been verified by multiple
appropriately qualified Company personnel.
• The use of twinned holes.
no twinned holes have been completed
Tesoro drilling is digitally entered and stored following
documented core handling protocols.
The protocols are considered adequate.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Location of data
points
Data spacing and
distribution
• Discuss any adjustment to assay data.
No adjustments were made to Tesoro Drilling
• Accuracy and quality of surveys used to locate
drillholes (collar and downhole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Tesoro drill hole collars have been surveyed accurately using
differential GPS for holes ZDDH0001 to ZDDH00080. Holes
ZDDH0081 onwards have been surveyed using handheld GPS
and will be surveyed using differential GPS once the drill
program has concluded.
• Specification of the grid system used.
The grid system used PSAD56 19S
• Quality and adequacy of topographic control.
The topography generated from an accurate topographic
survey data completed by a registered surveyor and has been
used for the current control.
Drill hole spacing is variable between 25m and 200m.
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
10
The laboratories used have generally demonstrated analytical
accuracy at an acceptable level within 95% confidence limits.
The spacing of drill holes is variable and satisfactory for
reconnaissance level drilling. The metallurgical holes and
intervals were selected based upon their gold grades, ore type
and location within the Ternera Gold Deposit.
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
Criteria
JORC Code explanation
Commentary
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
Orientation of data • Whether the orientation of sampling achieves
in relation to
unbiased sampling of possible structures and
geological
the extent to which this is known, considering
structure
the deposit type.
The composite samples described in this report relate to
exisiting diamond drill holes drilled at the Ternera Gold Deposit.
Drill holes were drilled across the interpreted strike of the
mineralization
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Tesoro diamond drilling at various orientations does not reveal
any bias regarding the orientation of the mineralised horizons.
Sample security
• The measures taken to ensure sample
security.
Chain of Custody of digital data is managed by the Company.
Physical material was stored on site and, when necessary,
delivered to the assay laboratory. Thereafter laboratory
samples were controlled by the nominated laboratory which to
date has been Bureau Veritas and ALS Santiago. All sample
collection was controlled by digital sample control file(s) and
hardcopy ticket books.
Audits or reviews
• The results of any audits or reviews of
sampling techniques and data.
No audits have been undertaken.
ALS Metallurgy Perth and the Companies consulting
metallurgist have reviewed the data.
(Criteria in this section apply to all succeeding sections)
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
Information regarding tenure is included in the company’s
December 2020 half yearly report released to the ASX on 12
March 2021
Tesoro Resources Ltd, 95% owned Chilean subsidiary, Tesoro
Mining Chile SpA, owns 85% of the El Zorro Gold Project
Concessions.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
The Concession is believed to be in good standing with the
governing authority and there is no known impediment to
operating in the area.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration
by other parties.
Little historical exploration has been undertaken in either project
area. Coeur d’Alene’s Chilean exploration division undertook
activities on the Ternera prospect, under an option agreement
with the previous owners between April 1990 and January 1993.
Geology
• Deposit type, geological setting and style of
mineralisation.
The mineralisation model is to likely to be intrusive related gold
deposit. The key characteristics that are consistent with this
style deposit include:
• Low sulphide content, (typically <5%); reduced ore mineral
assemblage that typically comprises pyrite and lacks primary
magnetite or hematite
• Mineralisation occurs as sheeted vein deposits or stockwork
assemblages and often combine gold with variably elevated
Bi, W, As, Mo, Te, and/or Sb but low concentrations of base
metals as seen in the initial four holes by Tesoro at El Zorro
• Restricted and commonly weak proximal hydrothermal
alteration
• Intrusions of intermediate to felsic composition.
Drillhole
information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drillholes:
Information relating to current drill program presented in this
report.
o easting and northing of the drillhole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drillhole
collar
o dip and azimuth of the hole
o downhole length and interception depth
11
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
ASX Announcement 10 December 2021
Criteria
JORC Code explanation
Commentary
o hole length.
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding o
Share your feedback