Wide High-Grade Gold Intercepts at El Zorro
Released
Released
Announcement PDF
Sign up HERE to our Investor Hub
ASX ANNOUNCEMENT
16 JANUARY 2025
ASX: TSO OTCQB: TSORF FSE: T5D7
WIDE HIGH GRADE GOLD INTERCEPTS AT EL ZORRO
INCLUDING 153.90M @ 1.61G/T AU AND 132.18M @ 1.28G/T AU
Tesoro Gold Limited (Tesoro or the Company) (ASX:TSO, OTCQB:TSORF, FST:5D7) is pleased
to announce significant assay results from its ongoing infill and extensional drilling program
at the El Zorro Gold Project in Chile (El Zorro). Exploration drilling has revealed a new wide,
high-grade gold zone to the south and below the existing 1.3 Moz Mineral Resource Estimate
(MRE) at the Ternera Gold Deposit (Ternera). The new zone, located approximately 50m
below the current MRE boundary, returned 132.18m @ 1.28g/t Au from 363m, including
32.20m @ 3.28g/t Au from 371.30m (ZDDH0356).
HIGHLIGHTS
•
Assay results from eight diamond holes drilled as part of the ongoing infill and
extensional drilling program have returned multiple significant mineralised zones.
•
New zones of wide, high-grade gold mineralisation have been intercepted outside of
the current MRE boundary, highlighting the significant growth potential of Ternera.
•
Drill hole ZDDH0356 intersected the boundary of the existing MRE, continuing beyond its
currently defined limits into previously untested zones.
•
New zone intercepted to the south and below the existing MRE boundary:
•
•
•
32.20m @ 3.28g/t Au from 371.30m and;
•
3.25m @ 12.639g/t Au from 371.30m.
Key intercepts from within the existing boundary include:
•
•
•
132.18m @ 1.28g/t Au from 363m (ZDDH0356), including;
153.90m @ 1.61g/t from 83.10m (ZDDH0356), including;
•
25.82m @ 3.96g/t Au from 93.00m; and
•
44.25m @ 1.99g/t Au from 161.00m.
58.70m @ 2.10g/t Au from 264.30m (ZDDH0351), including;
•
7.50m @ 12.42g/t Au from 286.50m; and
•
2.00m @ 29.45g/t Au from 279.00m.
Drilling is ongoing, with a focus on MRE expansion at the shallow northern and southern
ends of the Ternera Deposit.
Tesoro Managing Director, Zeff Reeves, commented:
Level 39, 152-158 St Georges Terrace, Perth
+61 8 6383 7883
info@tesorogold.com.au
ASX ANNOUNCEMENT 16 JANUARY 2025
“The results from hole ZDDH0356 continue to highlight the huge latent growth potential of
the Ternera Gold Deposit. The discovery of this significant new gold zone, located outside
the existing MRE, open to the south and at depth, reinforces our confidence in both our
geological model and the development potential of the broader project.
Additional drilling is planned as part of the current program to further define and expand
this exciting new zone. These results, coupled with recent intercepts from the north,
demonstrate that Ternera remains open in all directions, offering an exceptional opportunity
to significantly expand the resource base.”
Figure 1: El Zorro Gold Project – Ternera Area. Drill locations in the current program, with new results highlighted
in gold. Previously announced results shown in white (refer ASX Announcements 23 March 2021, 25 June 2021, 3
November 2021, 8 November 2022, 18 September 2023, 13 June 2024, 2 July 2024 and 28 October 2024). Section
location for Figure 2 shown at A-A’ - Datum PSAD56 19S.
TESOROGOLD.COM.AU
2
ASX ANNOUNCEMENT 16 JANUARY 2025
TERNERA CONTINUES TO DELIVER
Tesoro’s current round of diamond drilling is focused on infill and expansion of the 1.3 Moz
Ternera Gold Deposit, targeting high-priority zones within a 1.5 km radius of the existing
1.3 Moz Resource. Results have been received from eight holes, all returning significant gold
intercepts.
Key highlights include hole ZDDH0356, which uncovered:
•
An upper zone that widens and upgrades a shallow portion of the MRE.
•
A lower, previously undiscovered zone of mineralisation outside the current MRE,
highlighting the potential for future growth at Ternera (refer Figure 2).
Figure 2 illustrates the continuity of gold mineralisation at Ternera, now extended to over
800m down-plunge with hole ZDDH0356 contributing an additional 100m of continuity.
Figure 2: El Zorro Gold Project – Block Model Section (looking west): Hole ZDDH0356 shows new mineralised zone
well outside of existing MRE. Block model shows indicated and inferred material >0.60g/t Au and is colour coded
to Au g/t. Holes ZDDH0351 and ZDDH0351A projected onto section were drilled approximately 50m to the east.
NEXT STEPS
Drilling at El Zorro is set to continue over the coming months with two diamond drill rigs
currently operational. Assays remain outstanding for thirteen holes, and additional drilling is
planned to expand the Resource further.
TESOROGOLD.COM.AU
3
ASX ANNOUNCEMENT 16 JANUARY 2025
Table 1: Significant intercepts table for results reported in this announcement. Results are uncut, no top cut has
been applied. Refer Appendix 1 - JORC Tables for data aggregation criteria. Significant intercept is defined as
any intercept with a downhole grade x width >0.25. NSI denotes No Significant Intercept.
Hole_ID
From (m) To (m) Interval Au (g/t) Comments
ZDDH0350 153.00
154.00 1.00
2.51
ZDDH0350 184.90
186.10 1.20
4.99
ZDDH0350 195.00
196.70 1.70
1.12
ZDDH0350 318.00
319.00 1.00
2.24
ZDDH0351 76.00
76.80 0.80
1.40
ZDDH0351 92.00
94.00 2.00
1.36
ZDDH0351 158.48
159.87 1.39
0.91
ZDDH0351 212.44
213.00 0.56
1.96
ZDDH0351 264.30
323.00 58.70
2.10
ZDDH0351 264.30
296.00 31.70
3.67
including
ZDDH0351 277.00
296.00 19.00
5.85
including
ZDDH0351 279.00
286.50 7.50
12.42
including
ZDDH0351 279.00
281.00 2.00
29.45
including
ZDDH0351 358.00
359.50 1.50
1.36
ZDDH0351A 94.87
99.00 4.13
1.03
ZDDH0351A 130.20
138.00 7.80
0.74
ZDDH0351A 130.20
134.00 3.80
1.20
including
ZDDH0351A 140.56
141.30 0.74
0.92
ZDDH0351A 154.90
158.00 3.10
0.47
ZDDH0351A 166.70
168.03 1.33
5.56
ZDDH0351A 194.00
201.37 7.37
0.95
ZDDH0351A 280.00
282.05 2.05
1.58
ZDDH0351A 299.30
307.00 7.70
0.52
ZDDH0352 93.80
110.66 16.86
0.54
ZDDH0352 93.80
97.50 3.70
1.36
including
ZDDH0352 182.78
193.50 10.72
1.58
ZDDH0352 183.35
185.35 2.00
5.80
including
ZDDH0352 238.55
316.00 77.45
0.55
ZDDH0352 243.00
244.00 1.00
1.41
including
ZDDH0352 264.00
269.31 5.31
1.03
including
ZDDH0352 282.00
286.40 4.40
1.31
including
ZDDH0352 300.60
304.00 3.40
3.55
including
ZDDH0352 344.00
345.00 1.00
1.15
ZDDH0353A 75.90
76.20 0.30
8.18
ZDDH0353A 113.45
119.00 5.55
1.44
ZDDH0353A 147.68
150.55 2.87
0.95
TESOROGOLD.COM.AU
Hole_ID
From (m) To (m) Interval Au (g/t) Comments
ZDDH0353A 176.77
177.36 0.59
2.51
ZDDH0353A 221.30
234.05 12.75
1.18
ZDDH0353A 246.00
247.00 1.00
1.66
ZDDH0353A 254.00
256.00 2.00
8.67
ZDDH0353A 375.00
376.00 1.00
1.31
ZDDH0353A 490.40
491.30 0.90
2.25
ZDDH0353A 493.75
494.50 0.75
1.36
ZDDH0353A 516.40
517.20 0.80
1.24
ZDDH0354 297.00
305.84 8.84
0.83
ZDDH0354 324.70
325.30 0.60
1.39
ZDDH0355 63.52
66.34 2.82
2.15
ZDDH0355 71.62
72.00 0.38
1.38
ZDDH0355 148.54
158.30 9.76
1.11
ZDDH0355 148.54
152.00 3.46
2.53
including
ZDDH0356 16.90
17.80 0.90
1.60
ZDDH0356 83.10
237.00 153.90 1.61
ZDDH0356 83.10
125.90 42.80
2.64
including
ZDDH0356 93.00
118.82 25.82
3.96
including
ZDDH0356 95.50
104.40 8.90
9.67
including
ZDDH0356 141.40
148.00 6.60
2.95
including
ZDDH0356 161.00
205.25 44.25
1.99
including
ZDDH0356 261.70
262.15 0.45
6.38
ZDDH0356 299.44
299.90 0.46
5.64
ZDDH0356 309.00
309.50 0.50
2.43
ZDDH0356 363.00
495.18 132.18 1.28
ZDDH0356 371.30
403.50 32.20
3.28
including
ZDDH0356 371.30
393.00 21.70
4.26
including
ZDDH0356 371.30
374.55 3.25
12.63
including
ZDDH0356 424.37
435.00 10.63
1.69
including
ZDDH0356 452.25
454.00 1.75
9.01
including
ZDDH0356 464.00
464.80 0.80
1.54
including
ZDDH0356 469.60
470.10 0.50
1.38
including
ZDDH0356 475.50
478.00 2.50
1.22
including
ZDDH0356 491.47
495.18 3.71
1.45
including
ZDDH0356 513.75
514.37 0.62
1.41
ZDDH0356 522.88
523.30 0.42
3.58
ZDDH0356 529.60
533.40 3.80
0.99
4
ASX ANNOUNCEMENT 16 JANUARY 2025
Authorised by the Board of Tesoro Gold Ltd.
For more information:
Company:
Zeff Reeves, Managing Director
Tesoro Gold Limited
info@tesorogold.com.au
Table 2 - Constrained Ternera MRE
Au g/t
Area
Open Pit
Resource
Underground
Resource
Total Resources
cut off
Indicated
Inferred
Total
Mt
Au g/t
Koz
Mt
Au g/t
Koz
Mt
Au g/t
Koz
0.30
22.5
1.10
795
10.0
1.18
379
32.5
1.13
1,175
1.50
0.1
2.64
7
1.2
2.64
100
1.3
2.64
107
22.6
1.11
802
11.2
1.34
479
33.7
1.18
1,282
The updated MRE has been constrained to a US$1,800/oz optimised pit shell, with the underground Resource
reported at a 1.50g/t Au cut-off. The underground resource is reported at a cut-off where gold mineralisation is
consistently well-developed below the optimised pit shell.
Indicated
Inferred
Total
Au g/t cut off
2.00
Mt
2.6
Au g/t
3.75
Koz
317
Mt
2.0
Au g/t
3.71
Koz
241
Mt
4.7
Au g/t
3.73
Koz
558
1.00
7.2
2.25
523
5.6
2.24
400
12.8
2.24
923
0.50
16.3
1.39
727
12.8
1.37
561
29.1
1.38
1,288
0.30
23.2
1.09
815
19.4
1.03
645
42.6
1.07
1,459
Unconstrained Ternera MRE reported at various cut offs to the 200mRL.
For full details of the Ternera Deposit Mineral Resource Estimate (802 koz Indicated, 479 koz Inferred), refer to
ASX Announcement dated 9 March 2023.
TESOROGOLD.COM.AU
5
ASX ANNOUNCEMENT 16 JANUARY 2025
About Tesoro
Future Performance
Tesoro Gold Limited has discovered and defined the
first Intrusive Related Gold System in Chile. The 1.3M oz
Ternera discovery is in the Coastal Cordillera region
of Chile. The Coastal Cordillera region is host to
multiple world-class copper and gold mines, has well
established infrastructure, service providers and an
experienced mining workforce. Large areas of the
Coastal Cordillera remain unexplored due to the
unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and
experience has been able secure rights to the districtscale El Zorro gold project in-line with the Company’s
strategy. Tesoro’s 95% owned Chilean subsidiary owns
93.8% of the El Zorro Gold Project.
This announcement may contain certain forwardlooking statements and opinions. Forward-looking
statements, including projections, forecasts and
estimates, are provided as a general guide only and
should not be relied on as an indication or guarantee
of future performance and involve known and
unknown
risks,
uncertainties,
assumptions,
contingencies and other important factors, many of
which are outside the control of the Company and
which are subject to change without notice and could
cause the actual results, performance or achievements
of the Company to be materially different from the
future results, performance or achievements expressed
or implied by such statements. Past performance is not
necessarily a guide to future performance and no
representation or warranty is made as to the likelihood
of achievement or reasonableness of any forwardlooking statements or other forecast. Nothing
contained in this announcement, nor any information
made available to you is, or and shall be relied upon as,
a promise, representation, warranty or guarantee as to
the past, present or the future performance of Tesoro
Gold.
Competent Persons Statements
The information in this report that relates to Exploration
Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA,
MAIG). Mr Reeves is a member of the Australian Institute
of Geoscientists and a Director and shareholder of the
Company. Mr Reeves has sufficient experience that is
relevant to the style of mineralisation and type of
deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Reeves consents to the inclusion in this
report of the matters based on this information in the
form and context in which it appears.
The information in this report that relates to Mineral
Resources is based on information compiled by Mr Lynn
Widenbar, a Competent Person who is a Member of The
Australasian Institute of Mining and Metallurgy. Mr
Widenbar is acting as an independent consultant to
Tesoro Gold Limited. Mr Widenbar has sufficient
experience that is relevant to the style of mineralisation
and type of deposit under consideration, and to the
activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. The Company confirms
that the form and context in which the Competent
Person’s findings are presented have not been
materially modified from the original announcement on
9 March 2023.
TESOROGOLD.COM.AU
6
ASX ANNOUNCEMENT 16 JANUARY 2025
APPENDIX 1: DRILLING DETAILS – CURRENT PROGRAM
Hole
Orientation
Hole Location
Hole ID
Northing
Easting
Elevatio
Dip Azimuth
n
Drill Depth (m)
ZDDH00336
341247
7036902
658
-60 20
342.55
ZDDH00337
341259
7036856
623
-60 20
24.95
ZDDH00337A 341259
7036857
625
-60 20
280.00
ZDDH00338
341448
7036627
632
-60 330
298.40
ZDDH00339
342386
7034313
620
-60 0
68.70
ZDDH00339A 342394
7034308
618
-60 0
197.40
ZDDH00340
342258
7036280
648
-60 0
230.00
ZDDH00341
342276
7036185
598
-60 0
400.15
ZDDH00342
341283
7036941
677
-60 240
281.40
ZDDH00343
341682
7036408
596
-60 240
180.50
ZDDH00344
342306
7036207
630
-60 0
281.50
ZDDH00345
342239
7036207
640
-60 0
420.00
ZDDH00346
342110
7036836
820
-60 0
224.50
ZDDH00347
342283
7036134
599
-60 0
472.30
ZDDH00348
342122
7035963
607
-60 0
327.65
ZDDH00349A 341968
7036455
660
-60 10
412.70
ZDDH00350
341908
7035998
642
-65 0
478.70
ZDDH00351
341838
7036097
619
-55 0
360.10
ZDDH00352
341779
7036073
584
-65 0
506.00
ZDDH00353A 341801
7036100
594
-55 177
566.50
ZDDH00354
342004
7036079
684
-65 0
473.55
ZDDH00351A 341838
7036094
615
-55 0
347.70
ZDDH00355
341979
7035633
557
-60 0
247.70
ZDDH00357
341930
7035766
572
-60 0
190.70
ZDDH00358
342045
7036611
692
-60 240
230.50
ZDDH00359
341974
7036506
672
-60 40
200.30
ZDDH00356
341810
7036187
586
-50 177
572.10
ZDDH00360
342044
7036573
672
-60 240
173.90
ZDDH00360A 342041
7036576
677
-60 240
202.30
ZDDH00361
341825
7035664
541
-60 240
150.00
ZDDH00362
341841
7035707
538
-60 240
140.50
ZDDH00363
341814
7035740
539
-60 240
119.50
ZDDH00364
342028
7036575
693
-60 240
193.90
ZDDH00365
341874
7035704
532
-60 240
125.40
ZDDH00366
341860
7036510
648
-60 240
242.50
ZDDH00367
341842
7035690
541
-60 240
113.00
ZDDH00368
341908
7036527
642
-45 75
240.30
TESOROGOLD.COM.AU
7
ASX ANNOUNCEMENT 16 JANUARY 2025
APPENDIX 2: JORC TABLES
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
Tesoro has completed 381 diamond drill holes for
121,039m in 2017, 2018, 2020, 2021, 2022, 2023 and 2024
(ZDDH0001 to ZDDH00368) at the El Zorro Gold Project.
Diamond drill holes were drilled with HQ. Sampling was
half core at geologically defined and significant
mineralisation boundaries.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Tesoro Diamond drill holes were drilled with HQ.
Sampling was half core at geological and significant
mineralisation boundaries. The CP consider this
appropriate for the style of mineralisation.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done; this
would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’).
In other cases, more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
Diamond drilling was used to obtain ½ core samples of
various lengths (minimum 0.25m), from which 1kg of
material was pulverised passing 200 mesh to produce
a 50g charge for fire assay fusion with a gravimetric
finish. Multielement assays were completed by 4-acid
digest with a 2.5g charge. The CP consider these
appropriate assay techniques.
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
Tesoro has completed 381 diamond drill holes for
121,039m at the El Zorro Gold Project. Diamond drill
holes were drilled with HQ. Sampling was half core at
geological and significant mineralisation boundaries.
Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
Core recovery was estimated using the drillers
recorded depth marks against the length of the core
recovered. Reviewing the core photos, there are
occasional shears/faults where core is broken. There is
however no significant core loss.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
A single tube system was employed and in general
core recovery good.
The CP considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Whether a relationship exists between
There appears to be no potential sample bias as there
sample recovery and grade and
was no regular loss of core.
whether sample bias may have occurred
due to preferential loss/gain of
fine/coarse material.
Logging
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour,
lithology, weathering, grain size, mineralisation,
alteration, geotechnical characteristics etc. Diamond
core is stored at the Company’s warehouse.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
Logging of diamond core was qualitative, and
diamond core was photographed.
• The total length and percentage of the
relevant intersections logged.
All drilled intervals are logged and recorded.
TESOROGOLD.COM.AU
Tesoro consider the data to be of an appropriate level
of detail to support a future resource estimation.
8
ASX ANNOUNCEMENT 16 JANUARY 2025
Criteria
JORC Code explanation
Commentary
Subsampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
Drill core was cut, and half core was collected for
analysis
• If non-core, whether riffled, tube
sampled, rotary split, etc. and whether
sampled wet or dry.
Tesoro has not completed any percussion drilling.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
• Quality control procedures adopted for
all subsampling stages to maximise
representivity of samples.
Half core was collected for the entirety of the Tesoro
drilling, as such there was consistency throughout the
drilling. Core was logged by a qualified geoscientist.
Each subsample is considered to be representative of
the interval.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Sampling of half core is representative of the in-situ
material. There are field duplicate samples collected
from the diamond core with irregular results. Field drill
core duplicates are irregular by nature, and it has
been recommended by Tesoro’s consultants to use
coarse reject material to monitor the sample
preparation.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Sample sizes collected were considered appropriate
to reasonably represent the material being tested.
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Assays reported in this report were undertaken at the
accredited laboratory of ALS Santiago, which is fully
certified. Core samples of various lengths were
assayed (minimum 0.25m) from which 1kg of material
was pulverized passing 200 mesh to produce a 50 g
charge for fire assay fusion with gravimetric finish.
Multielement assays were completed by 4-acid digest
with a 2.5 g charge.
Quality of assay
data and
laboratory tests
The sample preparation of crushing half core at the
lab to mm size prior to splitting off a 50g charge (either
by cone/quarter or riffle) for pulverisation provides an
appropriate and representative sample for analysis.
All techniques are appropriate for the element being
determined.
Verification of
sampling and
assaying
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Standard chemical analyses were used for grade
determination. There was no reliance on determination
of analysis by geophysical tools.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
QAQC procedures included the insertion of Certified
Reference Materials (CRMs) (5%) and blank material
(2%), Check samples (5%) and check assaying (5%)
Cube Consulting Pty Ltd manage the database for
Tesoro.
The laboratories used have generally demonstrated
analytical accuracy at an acceptable level within 95%
confidence limits.
• The verification of significant intersections A number of independent consulting geoscientists
by either independent or alternative
(Cube Consulting, Oliver, and Cooley) external to
Tesoro have verified the intersections for holes
company personnel.
ZDDH0001 to ZDDH0080. Holes ZDDH0081 onwards
have been verified by multiple appropriately qualified
Company personnel.
• The use of twinned holes.
No twinned holes have been completed
Tesoro drilling is digitally entered and stored following
• Documentation of primary data, data
entry procedures, data verification, data documented core handling protocols.
The protocols are considered adequate.
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
TESOROGOLD.COM.AU
No adjustments were made to Tesoro Drilling
9
ASX ANNOUNCEMENT 16 JANUARY 2025
Criteria
JORC Code explanation
Location of data • Accuracy and quality of surveys used to
points
locate drillholes (collar and downhole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Data spacing
and distribution
Orientation of
data in relation
to geological
structure
Sample security
Commentary
Tesoro drill hole collars have been surveyed accurately
using differential GPS for all holes.
• Specification of the grid system used.
The grid system used PSAD56 19S
• Quality and adequacy of topographic
control.
The topography generated from an accurate
topographic survey data completed by a registered
surveyor and has been used for the current control.
Drill hole spacing is variable between 25m and 200m
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Areas with up to 50m drill spacing are considered to be
suitable for Mineral Resource Estimation. Areas of
sparser drilling and at the fringes and depth extents of
the deposit have been excluded from the MRE.
• Whether sample compositing has been
applied.
Sample compositing was not employed at the
sampling stage.
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
Drill holes were drilled across the interpreted strike of
the mineralisation.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Tesoro diamond drilling at various orientations does not
reveal any bias regarding the orientation of the
mineralised horizons.
• The measures taken to ensure sample
security.
Chain of Custody of digital data is managed by the
Company. Physical material was stored on site and,
when necessary, delivered to the assay laboratory.
Thereafter laboratory samples were controlled by the
nominated laboratory which to date has been Bureau
Veritas and ALS Santiago. All sample collection was
controlled by digital sample control file(s) and
hardcopy ticket books.
Audits or reviews • The results of any audits or reviews of
sampling techniques and data.
Where drill spacing is beyond 50m mineralisation has
been interpreted to continue and have been used in
the estimation of the Exploration Target. Drill spacing
up to 200m has been used in the Exploration Target
Estimation
No audits have been undertaken.
Section 2: Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
Information regarding tenure is included in the company’s
June 2024 quarterly report released to the ASX on 29 July
2024.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The Concessions are believed to be in good standing with
the governing authority and there is no known
impediment to operating in the area.
• Acknowledgment and appraisal of
exploration by other parties.
Little historical exploration has been undertaken in either
project area. Coeur d’Alene’s Chilean exploration division
undertook activities on the Ternera prospect, under an
option agreement with the previous owners between April
1990 and January 1993.
Exploration
done by
other parties
TESOROGOLD.COM.AU
Tesoro Resources Ltd, 95% owned Chilean subsidiary,
Tesoro Mining Chile SpA, owns 94.42% of the El Zorro Gold
Project Concessions.
10
ASX ANNOUNCEMENT 16 JANUARY 2025
Criteria
JORC Code explanation
Commentary
Geology
• Deposit type, geological setting and
style of mineralisation.
The mineralisation model is considered to be an intrusive
related gold deposit. The key characteristics that are
consistent with this style deposit include:
• Low sulphide content, (typically <5%); reduced ore
mineral assemblage that typically comprises pyrite and
lacks primary magnetite or hematite
• Mineralisation occurs as sheeted vein deposits or
stockwork assemblages and often combine gold with
variably elevated Bi, W, As, Mo, Te, and/or Sb but low
concentrations of base metals as seen in the initial four
holes by Tesoro at El Zorro
• Restricted and commonly weak proximal hydrothermal
alteration
• Intrusions of intermediate to felsic composition.
Drillhole
information
• A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material
drillholes:
Relevant information is presented in this report.
o easting and northing of the drillhole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drillhole collar
o dip and azimuth of the hole
o downhole length and interception
depth
o hole length.
• If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of
the report, the Competent Person
should clearly explain why this is the
case.
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Significant intercepts have been calculated as downhole
width weighted averages. No top cut has been used.
• Where aggregate intercepts
incorporate short lengths of high-grade
results and longer lengths of low-grade
results, the procedure used for such
aggregation should be stated and
some typical examples of such
aggregations should be shown in detail.
Relevant information is presented in this report.
• The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
No metal equivalents are reported.
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation
with respect to the drillhole angle is
known, its nature should be reported.
The mineralisation forms sub-vertical sheeted veins and
individual veins and may form plunging zones within the
mineralised structures. Drilling by Teso
Share your feedback
Discover