QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 30 SEPTEMBER 2025
Tesoro Gold Limited (ASX: TSO, OTCQB: TSORF, FSE: 5D7) (Tesoro or the Company) is pleased
to report on its activities for the quarter ended 30 September 2025 (the Quarter).
HIGHLIGHTS FROM THE QUARTER
• Updated Ternera Scoping Study demonstrated an economically attractive, technically
straightforward open pit gold mining and processing operation.
• US$2,750/oz (Base Case) gold price forecast delivers:
• NPV7.5% of US$917M and 60% IRR (pre-tax).
• NPV7.5% of US$663M and 51% IRR (post-tax).
• US$3,300/oz (Spot Case) gold price forecast delivers:
• NPV7.5% of US$1,331M and 79% IRR (pre-tax).
• NPV7.5% of US$966M and 68% IRR (post-tax).
• Single open pit schedule of 41Mt at 1.02g/t Au for 1.3Moz of contained gold.
• Average 111koz p.a. gold production for the first 9 years of full production.
• Initial operating mine life of 13.5 years at 3.0Mtpa throughput.
• Forecast average All-In-Sustaining-Cost (AISC) of US$1,216/oz.
• Attractive metallurgy supports a conventional Carbon-in-Pulp (CIP) process plant,
estimated to deliver average gold recovery of more than 94%.
• Low pre-production capital cost of US$248M (includes US$41M for pre-strip).
• Updated Ternera Mineral Resource of 51.2Mt at 1.10g/t Au for 1.82Moz at a 0.30g/t Au
cut-off grade, constrained within a US$3,000/oz open pit shell.
• 530koz increase in contained gold, representing 42% growth versus the 2023 MRE1.
• 62% of the Mineral Resource, for 1.12 Moz, is now classified as Indicated.
• Unconstrained MRE increases to 2Moz at 1.07g/t Au (Indicated and Inferred).
• Robust continuity of higher-grade zones, including 17Mt at 2.10g/t Au for 1.14Moz
at a 1.0g/t cut-off.
• Deposit remains open in all directions with further extensional and near-resource
growth identified across multiple mineralised horizons.
1 Refer to ASX Announcement dated 9 March 2023 – Ternera Mineral Resource Update and Initial Exploration Target
Tesoro Gold 2
ASX ANNOUNCEMENT
28 OCTOBER 2025
• High-priority drill targets near Ternera scheduled for testing in coming months.
• Advanced metallurgical test work results indicated Ternera ore is highly amenable to
conventional Carbon in Pulp processing.
• 95% average gold recovery from Ternera composite samples (125 µm grind size).
• Gravity recoverable gold consistent across all grade ranges averaging 41%.
• Very low with reagent consumption, with cyanide at <0.2 kg/t and lime at 8kg/t.
• Comminution test work returned an average Bond Work index of 20.9 kWh/t.
• Results will directly support process plant design and inputs for a Pre-Feasibility Study
(PFS) currently scheduled for delivery in Q2 2026.
• Channel sampling at La Brea has identified four major northwest mineralised trends up
to 200m wide and 4km long, highlighting the vast scale and potential of this target.
• Individual fault zones, and associated alteration mapped up to 4km long, returned
high-grade gold including:
• 1.00m at 9.32g/t Au (EZTR004867);
• 1.00m at 22.10g/t Au (EZTR005000);
• 1.00m at 11.80g/t Au (EZTR005065);
• 1.00m at 9.38g/t Au (EZTR005186);
• 1.00m at 10.45g/t Au (EZTR005253); and
• 4.00m at 4.85g/t Au (EZTR005259).
• Drilling at La Brea has commenced.
CORPORATE
• Secured binding commitments for A$34 million via an equity placement to accelerate
the development of El Zorro through to positive Final Investment Decision (FID).
• Appointment of Ms Emma Curnow as Chief Financial Officer.
• Enhanced cash balance of A$3.75 million and zero debt at 30 September 2025.
Tesoro Managing Director, Zeff Reeves, commented:
“This quarter, we were very pleased to announce that the substantial body of exploration,
metallurgical, and engineering work completed over the recent periods culminated in the
delivery of a highly positive updated Scoping Study for the El Zorro Gold Project.
“Outcomes from the study clearly demonstrate a technically robust, high-value open pit
gold operation underpinned by the growing 1.82 million ounce Ternera Resource. The
Tesoro Gold 3
ASX ANNOUNCEMENT
28 OCTOBER 2025
combination of an initial single open-pit and a simple and conventional processing
pathway, shines a spotlight on El Zorro’s strong future development potential.
“With this base in place, Tesoro is now firmly focused on advancing feasibility and permitting
activities in parallel with an expanded exploration programme across the broader El Zorro
Gold District. The coming quarter will see an increase in drilling activity aimed at delivering
new discoveries and Resource growth, which in combination with current gold price tail
winds, sets the stage for an exciting period ahead for Tesoro and its shareholders.”
Tesoro Gold 4
ASX ANNOUNCEMENT
28 OCTOBER 2025
Figure 1 – El Zorro Gold Project district map showing highly prospective gold corridor and high priority targets
along an approximately 20km north-south trending zone. Datum PSAD56 19S.
Tesoro Gold 5
ASX ANNOUNCEMENT
28 OCTOBER 2025
EL ZORRO GOLD PROJECT, CHILE
Ternera Mineral Resource Estimate grows to 1.82Moz gold
On 4 August 2025, Tesoro announced an updated Mineral Resource Estimate (MRE) for
Ternera consisting of 51.2Mt at 1.10g/t Au for 1.82Moz. The updated MRE provides a basis
for future exploration and Ternera as a compelling and strategically significant emerging
gold development project.
The updated MRE is based on 126,761 metres of diamond drilling from 399 holes and utilises
a 0.30g/t Au cut-off and is constrained within a US$3,000/oz open pit shell. The
unconstrained global MRE now stands at 2.0Moz at 1.07g/t Au, providing further
confirmation of the Deposit’s scale and continuity.
The updated MRE confirms a substantial increase in contained gold, with a 42% uplift
(530koz) to 1.82Moz. In addition, Tesoro has achieved a material upgrade in Mineral
Resource classification with 62% of the MRE now of an Indicated classification. The increase
in the quantity of Indicated mineralisation in the Resource to 1.12Moz will support higher
levels of technical and economic assessment for the Project and provide the confidence
required to advance project financing and development discussions.
Table 1 – Ternera Mineral Estimates for selected cut-off grades. Highlighted open pit Mineral Resource has been
constrained by an optimised pit shell using a metal price of US$3,000/oz Au and process recovery of 94.5%. The
estimates in this table are rounded to reflect their precision; rounding errors are apparent.
Ternera Updated MRE Indicated Inferred Total
Cut off (g/t Au) Mt Au g/t Koz Mt Au g/t Koz Mt Au g/t Koz
Optimised Open Pit 31.8 1.10 1,123 19.5 1.11 692 51.2 1.1 1,816
2.00 3.5 3.55 394 2.5 3.54 280 5.9 3.54 673
1.00 10.5 2.08 705 7.9 2.04 520 18.5 2.06 1,225
0.70 17.5 1.58 891 13 1.57 657 30.5 1.58 1,547
0.30 31.8 1.10 1,128 26.1 1.03 863 58.1 1.07 1,992
0.20 33.8 1.05 1,144 28.7 0.96 885 62.5 1.01 2,028
Tesoro Gold 6
ASX ANNOUNCEMENT
28 OCTOBER 2025
Figure 2 – Updated MRE displaying optimised open pits at various gold prices (Updated MRE shown in blue, 2023
MRE in grey).
Expanded and upgraded open-pit Scoping Study for Ternera
On 11 September 2025, Tesoro released an updated Scoping Study for the El Zorro Gold
Project centred on an updated assessment of the development potential of an open pit
gold mining and processing operation from the Ternera Gold Deposit (the Deposit).
The Study demonstrates an economically attractive, technically straightforward open pit
gold mining and processing operation. It is based on a single open pit utilising the August
2025 Ternera MRE and a 3.0Mtpa processing plant, delivering total production of 1.26Moz
gold (Indicated and Inferred) over an initial 15-year project life.
The Study assesses the Project on a 100% basis (Tesoro 90.6%) and to an economic accuracy
of ± 35%. The Study assumes a 27% corporate tax rate and is based on a conservative base-
case gold price of US$2,750/oz.
The Study was prepared by Tesoro with input from a team of expert independent
consultants, which include Lynn Widenbar and Associates, Peter O’Bryan and Associates,
GRES and ALS Perth.
The outcomes of this study demonstrate the ability of the Deposit to support the estimated
capital required for the development of the Project at a scale that would result in an
average steady-state gold production of approximately 111koz per annum over the first
nine years of full production.
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
1,800 1,800 2,300 2,500 3,000
Gold price (US$)
Contained Au
within the MRE (koz)
Gold price used to optimise pit shell (US$)
Indicated Inferred Au Price
Tesoro Gold 7
ASX ANNOUNCEMENT
28 OCTOBER 2025
Key outcomes from the Study are summarised in Table 2 below.
Table 2 – Study Outcomes and Assumptions
Physicals and Costs (± 35%)
Ore tonnage Mt 40.7
Gold grade g/t 1.02
Contained ounces Moz 1.33
Plant throughput Mtpa 3.0
Evaluation period (excluding pre-strip) years 13.5
Strip ratio waste:ore 8.0:1
Process gold recovery (life of mine average) % 94.5
Process production (total evaluation period) Moz 1.26
Process production (average annual steady state) koz pa 111
Upfront capital (plant and process infrastructure) US$M 180.1
Upfront capital (open pit mining) US$M 26.4
Upfront capital (pre strip) US$M 41.4
Operating costs (mining) US$/oz Au 640
Operating costs (processing) US$/oz Au 444
Operating costs (general and administration) US$/oz Au 101
Financials and Key Assumptions (± 35%) Base Case Spot Case
Gold price US$/oz 2,750 3,300
Discount rate (real) % 7.5 7.5
AISC (life of mine average) US$/oz 1,216 1,216
NPV7.5% (pre-tax) US$M 917 1,331
IRR (pre-tax) % 60 79
NPV7.5% (post-tax) US$M 663 966
IRR (post-tax) % 51 68
Net cash flow (undiscounted, pre-tax) US$M 1,684 2,377
Payback period (post-tax) Months 20 16
On the strength of these outcomes, the Tesoro Board has approved commencement of a
Pre-Feasibility Study (PFS), currently scheduled for completion in Q2 2026.
Tesoro Gold 8
ASX ANNOUNCEMENT
28 OCTOBER 2025
Metallurgical test work confirmed simple, low-cost processing option
On 29 August 2025, Tesoro announced advanced metallurgical testwork results for Ternera.
These testwork results confirm and enhance previous metallurgy, delivering gold recoveries
of greater than 95% across all grade ranges, with low cyanide consumption, and favourable
comminution characteristics. These outcomes indicate that Ternera ore is highly amenable
to conventional Cyanide In Pulp processing.
Figure 3 – Ternera Gold Deposit. Isometric pit design showing location of drill holes selected for composite
metallurgical samples. Datum PSAD56 19S
All testwork was conducted using brine wastewater from the Aguascap desalination plant,
located approximately 25km from EL Zorro. Tesoro has entered into a Memorandum of
Understanding with Aguascap to supply brine water to El Zorro for use as processing water
(see ASX announcement released 9 May 2025).
Comminution
Physical property and comminution parameter testing was completed, which included
SMC testwork and the calculation of Bond Impact Crushing Work Index (CWi), Bond
Abrasion Index (Ai), Bond Rod Work Index (RWi) and Bond Ball Mill Work Index (BWi).
Comminution data for the Ternera Deposit is summarised in Table 3.
Tesoro Gold 9
ASX ANNOUNCEMENT
28 OCTOBER 2025
Table 3 – Ternera Gold Deposit. Comminution Testwork Summary results
Grind Size and Gold Recovery
A range of grind sizes were tested to determine the optimum for gold recovery. Recoveries
ranged from 92.4% at 150µm for (Composite 4) up to 97.4% at 75µm (Composite 2).
A grind size of 125µm was selected as optimal and was applied in the subsequent
gravity/leach testwork on the master composite.
Leach kinetics were rapid, with most leaching occurring in the first 8 – 12 hours. Full results
are shown in Table 4.
Tesoro Gold 10
ASX ANNOUNCEMENT
28 OCTOBER 2025
Table 4 – Ternera Gold Deposit. Composite sample gravity/leach results at various grind sizes.
Master Composite Gravity/Leach and Direct Leaching Testwork
The 32kg master composite sample was subjected to bulk gravity separation followed by
cyanide leach. A 48-hour bulk direct gravity/leach test was conducted at 125μm to
generate leached slurry for downstream dry-stacking tailings assessment. As with all other
testing, brine wastewater from the Aguascap desalination plant was used.
A summary of results is presented in Table 5.
Table 5 – Ternera Gold Deposit. Master Composite bulk gravity/leach summary results
Tesoro Gold 11
ASX ANNOUNCEMENT
28 OCTOBER 2025
Reagent Consumption
Very low quantities of reagents were consumed in gold extraction:
• Cyanide: Consistently low, with less than 0.2 kg/t NaCN consumed from 0.6 kg/t added
reagent.
• Lime: Averaged approximately 8 kg/t due to the buffering effect of the bitterns water,
a level expected to be replicated in the full-scale plant operating at pH 10.
Conclusions
• Ternera ores tested showed highly consistent performance across both composite and
master samples
• Gravity recoverable gold response is positive, with overall recoveries of greater than
95% achieved with cyanide leaching.
• No deleterious elements or preg-robbing tendencies identified.
• Ore is siliceous, brittle and fracture easily during crushing, however high BWi values
indicate it is not amendable to autogenous or semi-autogenous grinding.
• Variability in results across composites is low, providing confidence to support
advanced levels of technical studies.
Large, mineralised target emerging at La Brea, 15km north of Ternera
On 10 July 2025, Tesoro released significant surface sampling assay results from the La Brea
target, located approximately 15km north of Ternera and within the northern extent of the
well-defined El Zorro Gold corridor (refer Figure 1).
Recent mapping and systematic outcrop channel sampling have delineated a large new
gold target at La Brea.
Work during the quarter at La Brea included detailed geological mapping and systematic
channel sampling across favourable geology. A total of 317 samples were collected.
Results returned widespread outcropping gold mineralisation along favourable northwest
trending fault zones and adjacent alteration, both within, and surrounding, the La Isla
intrusion. Four major northwest mineralised trends have been identified, up to 200m wide
and 4km long (Figure 4), highlighting the vast scale and potential of the La Brea target.
Assayed gold grades of up to 22.10g/t Au were returned and 128 samples (~40%) returned
results above 0.10g/t Au highlighting the widespread nature of gold mineralisation at La
Brea.
For full details, tables and results, refer to ASX release dated 10 July 2025.
Tesoro Gold 12
ASX ANNOUNCEMENT
28 OCTOBER 2025
Figure 4 – El Zorro Gold Project – La Brea Target showing mapped structural and alteration zones with gold in
red. For previous results refer to ASX announcement 15 April 2024. Datum PSAD56 19S
Additional mapping work was also completed to refine drill targets, with drilling at La Brea
having commenced post end of the quarter.
Tesoro Gold 13
ASX ANNOUNCEMENT
28 OCTOBER 2025
Figure 5 – El Zorro Gold Project – Ternera Area. Drill locations in the current program, with results received during
the quarter highlighted in gold. Mineralised intercepts in new large southern gold zone, outside of existing MRE
shown by red drill trace. Previously announced results shown in white4 . Datum PSAD56 19S.
Tesoro Gold 14
ASX ANNOUNCEMENT
28 OCTOBER 2025
NEXT STEPS AND ADDITIONAL PROJECT UPSIDE POTENTIAL
Readily available additional project upside will be assessed in advanced technical studies.
This will include the incorporation of additional in-pit resource ounces, an assessment of
expanded pit and underground mining options, drill-out of near-mine growth targets, and
the evaluation of potential new discoveries across the broader El Zorro tenure. Project
optimisation and advancement workstreams now underway include:
• Mine scheduling refinements to further prioritise shallow, high-grade zones.
• Evaluation of underground potential below the current pit shell.
• Further environmental baseline studies and permitting processes.
• Detailed PFS workstreams.
Ongoing Mineral Resource growth activities include:
• Targeting shallow extensions to the Ternera deposit.
• Drilling of hanging-wall mineralisation at Ternera East.
• Broader exploration across the district-scale landholding.
CORPORATE
Capital Raising Activities
On 30 September 2025, Tesoro announced an equity placement to raise A$34 million
(before costs) at A$0.053 per share (Placement). Proceeds from the Placement are
expected to fully fund the advancement El Zorro through to a positive FID. Funds will be
initially applied to PFS workstreams and permitting, in parallel with an ongoing aggressive
district exploration programme to unlock the potential of the broader El Zorro Gold District.
Placement details
The Placement comprises the issuance of approximately 641.5 million new fully paid ordinary
shares (Shares) to professional and sophisticated investors at a price of A$0.053 per Share
(Placement Shares). The Placement is being undertaken via two tranches; with Tranche 1
receipted by the Company post quarter end and Tranche 2 subject to shareholder
approval at an Extraordinary General Meeting (EGM) expected to be held in November
2025.
• Tranche 1: Approximately A$26.7 million via the issue of 503,671,027 Placement Shares
under the Company’s existing placement capacity, comprising 302,202,631 shares
under Listing Rule 7.1 and 201,468,396 under Listing Rule 7.1A.
• Tranche 2: Approximately A$7.3 million via the issue of approximately 137,838,383
Placement Shares subject to shareholder approval at an EGM expected to be held in
November 2025.
Tesoro Gold 15
ASX ANNOUNCEMENT
28 OCTOBER 2025
Expiry of Listed Options
On 7 July 2025, 60,256,162 quoted Options, exercisable at $0.11 (trading under ASX Code
TSOO) (Options) expired.
Tesoro previously advised of the expiry of the Options in the June Quarter, noting that as
the Options were substantially “out of the money”, the Company had elected not to
dispatch personalised notices to option holders in accordance with Item 5.3 of Appendix
6A to the Listing Rules.
Vesting of Performance Rights
Tesoro advises that a total of 5,700,000 Performance Rights vested during the Quarter, as set
out below.
Security Description Number of Securities Expiry Date
Class I Performance Rights 750,000 31 July 2028
Class J Performance Rights 750,000 31 July 2028
Class K Performance Rights 750,000 31 July 2028
Class L Performance Rights 2,100,000 31 July 2028
Class M Performance Rights 1,350,000 31 July 2028
Tesoro further advises that 21,750,000 Class F Performance Rights vested subsequent to the
end of the Quarter. These Performance Rights, which were issued to Directors, may now be
exercised in accordance with the terms of the Option and Performance Rights Plan at any
time prior to their expiry. Details of the Performance Rights, including the relevant
performance milestones, are set out in the Notice of Annual General Meeting released to
ASX on 29 October 2024.
El Zorro S.C.M. Capital Increase and dismissal of legal proceedings with Wanaco SPA
Tesoro advised on 12 August 2025 that the First Instance Court in Chile had dismissed the
initial legal proceedings brought by El Zorro Joint Venture partner, Wanaco SpA (Wanaco),
reinforcing Tesoro’s position and affirming the rigour of its governance processes.
The proceedings, filed in 2021 against Tesoro’s Chilean subsidiary, Tesoro Mining Chile SpA
(TMC) and its officers, related to the valuation and the procedure followed for a capital
increase approved at the Shareholders Meeting of El Zorro SCM held on 11 February 2021.
Wanaco alleged breaches of the Mining Code, Corporations Law, and Civil Code.
The 7th Civil Court de Santiago de Chile has now confirmed that these claims and
associated damages were without merit, awarding costs to TMC in relation to the dismissed
proceedings. Other ancillary proceedings filed by Wanaco on similar allegations remain
before the courts.
Tesoro Gold 16
ASX ANNOUNCEMENT
28 OCTOBER 2025
Tesoro maintains that it has acted lawfully throughout and will continue to defend its position
as required. During the quarter, Wanaco exercised its right to appeal against the judgement
under the Chilean Procedural Code. It is expected that the appeal will be resolved within
an estimated two-year timeframe.
Separately, Tesoro Mining Chile SpA (95% owned by Tesoro Gold Ltd) has increased its
ownership of the El Zorro Gold Project to 95.4% through a capital contribution of
approximately CLP5.2 billion (approximately US$5.4 million) to El Zorro SCM, covering
capitalised expenditure at the project. As a result, Tesoro Gold Ltd’s effective ownership of
El Zorro has risen to approximately 90.6%.
Appointment of Chief Financial Officer
On 22 July 2025, Tesoro announced the appointment of Ms Emma Curnow as Chief Financial
Officer. Ms Curnow replaced outgoing CFO Mr Graeme Morissey, who stepped down from
the role due to other professional commitments.
Ms Curnow brings extensive experience in senior financial and governance roles across the
mining exploration and development sector, having served as CFO and Company
Secretary for Australian Stock Exchange (ASX) and AIM (London Stock Exchange sub-
market) listed companies. Her expertise spans financial reporting, regulatory compliance,
and corporate governance across multiple jurisdictions, including the Australian
Investments and Security Commission (ASIC), the Australian Accounting Standards Board,
and under the Corporations Act 2001 (Cth).
Expenditure and Payments to Related Parties
During the Quarter, the Company spent approximately A$3.21million on exploration
activities, which comprised primarily of diamond drilling programs, surface mapping and
sampling programs and project development work and studies.
As outlined in the Appendix 5B for the quarter ending 30 September 2025 (sections 6.1 and
6.2), approximately A$250,000 in payments were made to related parties and/or their
associates as remuneration (inc. superannuation) for the Managing Director, Non-Executive
Director fees and Consulting fees.
Cash balance
Tesoro’s cash balance at 30 September 2025 was A$3.75 million and the Company had zero
debt (excluding typical trade creditors).
Tesoro Gold 17
ASX ANNOUNCEMENT
28 OCTOBER 2025
Authorised by the Board of Tesoro Gold Ltd.
For more information:
Company:
Zeff Reeves, Managing Director
Tesoro Gold Limited
info@tesorogold.com.au
Tesoro Gold 18
ASX ANNOUNCEMENT
28 OCTOBER 2025
About Tesoro
Tesoro Gold Limited has discovered and defined the
first Intrusive Related Gold System in Chile. The 2M oz
Ternera discovery is in the Coastal Cordillera region of
Chile. The Coastal Cordillera region is host to multiple
world-class copper and gold mines, has well
established infrastructure, service providers and an
experienced mining workforce. Large areas of the
Coastal Cordillera remain unexplored due to the
unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and
experience has been able secure rights to the district-
scale El Zorro gold project in-line with the Company’s
strategy. Tesoro’s 95% owned Chilean subsidiary owns
95.4% of the El Zorro Gold Project (see ASX
announcement released 12 August 2025).
Future Performance
This announcement may contain certain forward-
looking statements and opinions. Forward-looking
statements, including projections, forecasts and
estimates, are provided as a general guide only and
should not be relied on as an indication or guarantee
of future performance and involve known and
unknown risks, uncertainties, assumptions,
contingencies and other important factors, many of
which are outside the control of the Company and
which are subject to change without notice and could
cause the actual results, performance or
achievements of the Company to be materially
different from the future results, performance or
achievements expressed or implied by such
statements. Past performance is not necessarily a
guide to future performance and no representation or
warranty is made as to the likelihood of achievement
or reasonableness of any forward-looking statements
or other forecast. Nothing contained in this
announcement, nor any information made available
to you is, or and shall be relied upon as, a promise,
representation, warranty or guarantee as to the past,
present or the future performance of Tesoro Gold.
Competent Persons Statements
The information in this report that relates to Mineral
Resources is based on information compiled by Mr Lynn
Widenbar (B.Sc(Hons) Geology, M.Sc. FAusIMM, MAIG), a
Competent Person who is a Fellow of The Australasian
Institute of Mining and Metallurgy. Mr Widenbar is acting as
an independent consultant to Tesoro Gold Limited. Mr
Widenbar has sufficient experience that is relevant to the
style of mineralisation and type of deposit under
consideration, and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
The Company confirms that it is not aware of any new
information or data that materially affects the information
contained the form and context in which the Competent
Person’s findings are presented have not been materially
modified from in the original announcement on 4 August
2025, and all material assumptions and technical
parameters underpinning the estimates in that
announcement continue to apply and have not materially
changed.
The information in this report that relates to Exploration and
Metallurgical Results is based on information compiled by
Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA,
MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and shareholder of the
Company. Mr Reeves has sufficient experience that is
relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined
in the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr
Reeves consents to the inclusion in this report of the matters
based on this information in the form and context in which
it appears.
The information in this report that relates to the Production
Target, assumptions on Modifying Factors and evaluation of
other relevant factors are based on and fairly represents
information and supporting documentation that has been
compiled for this announcement and have been compiled
under the supervision of Mr Linton Putland BEng (Mining),
MSc (Mineral Economics) & Member AusIMM. Mr Putland is
a Director of the Company. Mr Putland has reviewed and
approved the technical content of this announcement. Mr
Putland is a Competent Person as defined in the 2012
Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (JORC Code
2012). Mr Putland consents to the inclusion in this
announcement of the matters based on his information in
the form and context in which it appears. The Company
confirms that it is not aware of any new information or data
that materially affects the information and all the material
assumptions and technical parameters underpinning the
production target and forecast financial information
derived from the production target in the original report
continue to apply and have not materially changed.
Tesoro Gold 19
ASX ANNOUNCEMENT
28 OCTOBER 2025
APPENDIX 1: CONCESSION SCHEDULE
EL ZORRO GOLD PROJECT EXPLORATION CONCESSIONS (95.4%* Tesoro Mining Chile SpA)
Number
Concession Name
Date of
Expiration
Size
(ha)
Concession
type
1 ZORRO 1B 10/Aug/2026 200 Exploration
2 ZORRO 2B 10/Aug/2026 200 Exploration
3 ZORRO 3B 10/Aug/2026 200 Exploration
4 ZORRO 4B 10/Aug/2026 100 Exploration
5 ZORRO 5B 10/Aug/2026 200 Exploration
6 ZORRO 6B 10/Aug/2026 200 Exploration
7 GOLD STORE 72A 21/Sep/2026 300 Exploration
8 GOLD STORE 71A 21/Sep/2026 300 Exploration
9 GOLD STORE 70A 21/Sep/2026 300 Exploration
10 GOLD STORE 69A 21/Sep/2026 300 Exploration
11 GOLD STORE 68A 21/Sep/2026 300 Exploration
12 GOLD STORE 67A 21/Sep/2026 300 Exploration
13 GOLD STORE 66A 27/Sep/2026 300 Exploration
14 BLOODY GOOD SHOT 13B 27/Sep/2026 200 Exploration
15 BLOODY GOOD SHOT 12B 27/Sep/2026 200 Exploration
16 BLOODY GOOD SHOT 11B 27/Sep/2026 200 Exploration
17 BLOODY GOOD SHOT 10B 27/Sep/2026 300 Exploration
18 BLOODY GOOD SHOT 9B 28/Sep/2026 300 Exploration
19 BLOODY GOOD SHOT 8B 5/Oct/2026 200 Exploration
20 BLOODY GOOD SHOT 7B 28/Sep/2026 100 Exploration
21 BLOODY GOOD SHOT 6B 5/Oct/2026 200 Exploration
22 BLOODY GOOD SHOT 5B 29/Oct/2026 200 Exploration
23 BLOODY GOOD SHOT 4B 29/Oct/2026 300 Exploration
24 BLOODY GOOD SHOT 3B 3/Oct/2026 300 Exploration
25 BLOODY GOOD SHOT 2B 3/Oct/2026 300 Exploration
26 BLOODY GOOD SHOT 1B 3/Oct/2026 300 Exploration
27 SIERRA PATACONES 42A 24/Oct/2026 300 Exploration
28 SIERRA PATACONES 41A 24/Oct/2026 300 Exploration
29 SIERRA PATACONES 40A 25/Oct/2026 300 Exploration
30 SIERRA PATACONES 39A 25/Oct/2026 300 Exploration
31 SIERRA PATACONES 38A 25/Oct/2026 300 Exploration
32 SIERRA PATACONES 37A 25/Oct/2026 300 Exploration
33 SIERRA PATACONES 36A 25/Oct/2026 300 Exploration
34 SIERRA PATACONES 35A 25/Oct/2026 300 Exploration
35 SIERRA PATACONES 34A 25/Oct/2026 300 Exploration
36 SIERRA PATACONES 33A 25/Oct/2026 300 Exploration
37 SIERRA PATACONES 32A 25/Oct/2026 300 Exploration
38 SIERRA PATACONES 31A 25/Oct/2026 300 Exploration
39 SIERRA PATACONES 30A 25/Oct/2026 300 Exploration
40 SIERRA PATACONES 29A 25/Oct/2026 300 Exploration
41 SIERRA PATACONES 28A 25/Oct/2026
Share your feedback
Discover