Major gold intersections at El Zorro
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
27 September 2022
ASX: TSO | ACN 106 854 175
Major gold intersections at El Zorro
129.60m @ 1.08g/t Au including
22.60m @ 2.51g/t Au and 7.50m 4.16g/t Au
Highlights
▪
Results received for three holes of the current infill and extensional drill program at the 1.1
Moz Ternera Gold Deposit (Ternera) at the El Zorro Gold Project (El Zorro).
▪
Further wide high grade gold results returned, highlights include:
•
ZDDH0300:
221.00m @ 0.85g/t Au from 153.00m, including:
▪ 129.60m @ 1.08g/t Au from 193.40m;
▪ 22.60m @ 2.51g/t Au from 193.40m;
▪ 7.50m @ 4.16g/t Au from 206.00m; and
▪ 22.50m @ 1.48g/t Au from 292.50m.
▪
•
ZDDH0301:
▪ 22.08m @ 1.98g/t Au from 346.00m, including:
▪ 17.86 @ 2.35g/t Au from 346.00m; and
▪ 4.36m @ 4.67g/t Au from 349.14m.
▪
Results provide significant infill intercepts within existing resource, further upgrading the
Ternera Gold Deposit Mineral Resource Estimate (MRE).
▪
▪
Eleven holes completed for 4,301m with assays outstanding for 6 holes.
▪
First hole at the Calderillas Target underway, with results expected in 4-6 weeks.
Hole ZDDH0300 is the 26th hole that has returned >100 gram metre gold intercept at the
Ternera Gold Deposit.
Tesoro Gold Limited (Tesoro or the Company) (ASX:TSO, OTCQB:TSORF) is pleased to announce
assay results from three holes from the current drilling program at the El Zorro Gold Project (El Zorro),
Chile.
All holes have returned positive gold results with holes ZDDH0300 and ZDDH0301 adding further wide
zones of mineralisation within the Ternera Gold Deposit (Ternera).
Tesoro Managing Director, Zeff Reeves commented:
“We are progressing well with drilling, which aims to improve the resource classification within the
Ternera gold deposit as well as add additional ounces within the existing optimised pit shell. What
we are seeing is low grade, or “no grade” areas being significantly upgraded with results from this
program which we believe will have a positive impact on the Ternera MRE and distribution of
indicated and inferred resources.”
1
+61 8 9322 1587 | info@tesorogold.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesorogold.com.au
ASX Announcement 27 September 2022
Figure 1 – Ternera Gold Deposit Drilling Plan on geology. Dashed blue lines show approximate section locations for
sections presented below. Datum PSAD56 19S
Drilling Discussion
Drilling at Ternera is targeting an improvement of resource classification, particularly the distribution
of Indicated classification in the upper parts of the deposit, as well as testing and extending the
down plunge high grade zones within the deposit.
2
+61 8 9322 1587 | info@tesorogold.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesorogold.com.au
ASX Announcement 27 September 2022
Holes ZDDH0300 was drilled to reduce drill spacing between existing drill holes and confirming
geological continuity of mineralisation.
Hole ZDDH0300 intercepted significant high-grade gold zones which have the potential to improve
the gold grade within areas of the MRE (Figure 1), as well as improvements to continuity of gold
grade >1.00g/t.
Hole ZDDH0301 returned a wide zone of gold mineralisation in the south of the deposit where
previous drill coverage is sparse. A new gold zone has been identified with this hole outside of the
existing MRE and highlights the potential for further expansion of the Ternera Gold Deposit to the
south, where the deposit remains open.
Hole ZDDH0299 was drilled to test for extensions of mineralisation to the north of Ternera. Multiple
fault related mineralised zones were encountered with the deposit remaining open to the north.
Additional drilling is required in this area to further define extensions of the orebody.
Figure 2 –Drill Section A-A’ looking west with MRE block model. Block model coloured to gold grade. Hole ZDDH0298 and
ZDDH0300 has infilled and upgraded gold grade within the existing MRE block model. Window +/-25m, datum PSAD56
19S.
3
+61 8 9322 1587 | info@tesorogold.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesorogold.com.au
ASX Announcement 27 September 2022
Table 1 – ZDDH0299 to ZDDH0301 Significant intercepts. Results are uncut, no top cut has been applied. Refer Appendix
1 - JORC Tables for data aggregation criteria. Significant intercept is any intercept with grade x width >0.50.
Hole_ID
ZDDH0299
ZDDH0299
ZDDH0299
ZDDH0299
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0300
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
ZDDH0301
From (m)
139.50
139.50
245.00
246.00
31.00
31.00
44.00
153.00
193.40
193.40
170.00
193.40
206.00
292.50
388.00
507.00
560.00
565.00
40.00
55.10
57.00
83.10
206.30
231.00
231.00
247.93
264.00
321.13
329.00
346.00
346.00
349.14
359.60
381.00
To (m)
146.00
142.23
248.50
246.86
34.00
34.00
46.00
374.00
323.00
263.00
183.00
216.00
213.50
315.00
393.00
512.30
561.00
565.38
44.00
61.00
61.00
90.00
207.00
268.00
233.00
252.00
268.00
330.65
330.00
368.08
363.86
353.50
361.93
382.00
Interval
6.50
2.73
3.50
0.86
3.00
3.00
2.00
221.00
129.60
69.60
13.00
22.60
7.50
22.50
5.00
5.30
1.00
0.38
4.00
5.90
4.00
6.90
0.70
37.00
2.00
4.07
4.00
9.52
1.00
22.08
17.86
4.36
2.33
1.00
Au (g/t)
0.85
1.83
0.63
0.86
1.37
3.04
1.61
0.85
1.08
1.23
1.35
2.51
4.16
1.48
1.36
1.02
1.54
1.67
1.11
1.79
2.46
0.88
5.10
0.58
1.65
2.04
2.19
0.82
4.05
1.98
2.35
4.67
7.23
0.96
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Next Steps
Eleven holes have been completed at Ternera with assays outstanding for six holes. It is envisaged
that once all assays are received that a review of the Ternera MRE will be undertaken to update
the resource inventory and classifications.
Drilling has commenced at the recently discovered and exciting Calderillas target, approximately
5km north of Ternera. An initial four holes are planned to be drilled at Calderillas where recent
surface sampling results have identified wide zones of high grade, outcropping gold mineralisation
(ASX Announcements 4 Jully 2022 and 12 September 2022).
4
+61 8 9322 1587 | info@tesorogold.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesorogold.com.au
ASX Announcement 27 September 2022
Table 4 – El Zorro Drill Hole location details
Hole ID
ZDDH00297
ZDDH00298
ZDDH00299
ZDDH00300
ZDDH00301
ZDDH00302
ZDDH00303
ZDDH00304
ZDDH00305
ZDDH00306
ZDDH00307
Hole Location
Hole Orientation
Northing Easting Elevation
Dip
Azimuth
341810
7036243 599
-50
175
341767
7036394 648
-50
172
342072
7036640 710
-60
240
341760
7036448 623
-50
172
341820
7035960 616
-60
240
341680
7035706 545
-60
350
341873
7035862 610
-60
350
341611
7035923 560
-60
240
341583
7035947 574
-60
240
342074
7036609 696
-60
240
341623
7035902 561
-60
240
Drill Depth (m)
544.30
634.40
296.00
597.00
450.00
349.20
404.50
240.00
246.00
300.00
240.05
Figure 3 - Drill Section B-B’ looking north west with MRE block model. Block model coloured to gold grade. Hole
ZDDH0301 has defined a new gold zone outside of the existing MRE. Window +/-25m, datum PSAD56 19S
This ASX Announcement has been approved for release by the Board of Tesoro Gold Ltd.
5
+61 8 9322 1587 | info@tesorogold.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesorogold.com.au
ASX Announcement 27 September 2022
For more information, please contact:
Company:
Investor Relations:
Zeff Reeves, Managing Director,
Tesoro Gold Limited
info@tesorogold.com.au
Evan Smith
Advisir
Evan.smith@advisir.com.au
Engage with the Company directly via our new Investor Hub at the below link. Take a look and
make sure to leave us a question!
announcements.tesorogold.com.au
About Tesoro Gold
Tesoro Gold Limited was established with a strategy of acquiring, exploring, and
developing mining projects in the Coastal Cordillera region of Chile. The Coastal
Cordillera region is host to multiple world class copper and gold mines, has well
established infrastructure, service providers and an experienced mining workforce.
Large areas of the Coastal Cordillera remain unexplored due to the unconsolidated
nature of mining concession ownership, but Tesoro, via its in-country network and
experience has been able secure rights to a district scale gold project in-line with the
Company’s strategy. Tesoro’s 95% owned Chilean subsidiary owns 85% of the El Zorro
Gold Project.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Zeffron Reeves
(B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of Geoscientists and
a Director and shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Reeves consents to the inclusion in this report of the matters based on this information in
the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled by Mr Lynn Widenbar, a
Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Widenbar is acting as an
independent consultant to Tesoro Gold Limited. Mr Widenbar has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. The Company confirms that the form and context in which the Competent Person’s findings are presented
have not been materially modified from the original announcement on 23 May 2022.
Future Performance
This announcement may contain certain forward-looking statements and opinion. Forward-looking statements, including
projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication
or guarantee of future performance and involve known and unknown risks, uncertainties, assumptions, contingencies
and other important factors, many of which are outside the control of the Company and which are subject to change
without notice and could cause the actual results, performance or achievements of the Company to be materially
different from the future results, performance or achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance and no representation or warranty is made as to the
likelihood of achievement or reasonableness of any forward-looking statements or other forecast. Nothing contained in
this announcement, nor any information made available to you is, or and shall be relied upon as, a promise,
representation, warranty or guarantee as to the past, present or the future performance of Tesoro.
6
+61 8 9322 1587 | info@tesorogold.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesorogold.com.au
ASX Announcement 27 September 2022
APPENDIX 1 – JORC TABLES
JORC Table 1
Section 1: Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as downhole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Tesoro has completed 312 diamond drill holes for 104,536m
in 2017, 2018, 2020, 2021 and 2022 (ZDDH0001 to
ZDDH00307). Diamond drill holes were drilled with HQ.
Sampling was half core at geologically defined and significant
mineralisation boundaries.
Tesoro considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Tesoro Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Tesoro consider this appropriate for the style of
mineralisation.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done,
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Diamond drilling was used to obtain ½ core samples of various
lengths (minimum 0.25m), from which 1kg of material was
pulverised passing 200 mesh to produce a 50g charge for fire
assay fusion with a gravimetric finish. Multielement assays
were completed by 4-acid digest with a 2.5g charge. Tesoro
consider these appropriate assay techniques.
Drilling techniques • Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Drill sample
recovery
Logging
Tesoro has completed 312 diamond drill holes for 104,536m
Diamond drill holes were drilled with HQ. Sampling was half
core at geological and significant mineralisation boundaries.
Standard tube was used.
• Method of recording and assessing core and
chip sample recoveries and results assessed.
Core recovery was estimated using the drillers recorded depth
marks against the length of the core recovered. Reviewing the
core photos, there are occasional shears/faults where core is
broken. There is however no significant core loss.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
A single tube system was employed and in general core
recovery good.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
There appears to be no potential sample bias as there was no
regular loss of core.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour, lithology,
weathering, grain size, mineralisation, alteration, geotechnical
characteristics etc. Diamond core is stored at the Company’s
warehouse.
Tesoro consider the data to be of an appropriate level of detail
to support a future resource estimation.
• Whether logging is qualitative or quantitative in Logging of diamond core was qualitative and diamond core was
photographed.
nature. Core (or costean, channel, etc.)
photography.
• The total length and percentage of the relevant All drilled intervals are logged and recorded.
intersections logged.
Subsampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
Drill core was cut, and half core was collected for analysis
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.
Tesoro has not completed any percussion drilling.
7
+61 8 9322 1587 | info@tesorogold.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesorogold.com.au
ASX Announcement 27 September 2022
Criteria
JORC Code explanation
Commentary
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
The sample preparation of crushing half core at the lab to mm
size prior to splitting off a 50g charge (either by cone/quarter
or riffle) for pulverisation provides an appropriate and
representative sample for analysis.
Half core was collected for the entirety of the Tesoro drilling, as
• Quality control procedures adopted for all
subsampling stages to maximise representivity such there was consistency throughout the drilling. Core was
logged by a qualified geoscientist. Each subsample is
of samples.
considered to be representative of the interval.
Quality of assay
data and
laboratory tests
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Sampling of half core is representative of the in-situ material.
There are field duplicate samples collected from the diamond
core with irregular results. Field drill core duplicates are
irregular by nature and it has been recommended by Tesoro’s
consultants to use coarse reject material to monitor the
sample preparation.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
sample sizes collected were considered appropriate to
reasonably represent the material being tested.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Assays reported in this report were undertaken at the
accredited laboratory of ALS Santiago, which is fully certified.
Core samples of various lengths were assayed (minimum
0.25m) from which 1kg of material was pulverized passing 200
mesh to produce a 50 g charge for fire assay fusion with
gravimetric finish. Multielement assays were completed by 4acid digest with a 2.5 g charge.
All techniques are appropriate for the element being
determined.
• For geophysical tools, spectrometers, handheld Standard chemical analyses were used for grade
XRF instruments, etc., the parameters used in determination. There was no reliance on determination of
determining the analysis including instrument analysis by geophysical tools.
make and model, reading times, calibrations
factors applied and their derivation, etc.
QAQC procedures included the insertion of Certified Reference
• Nature of quality control procedures adopted
Materials (CRMs) (5%) and blank material (2%), Check samples
(e.g. standards, blanks, duplicates, external
(5%) and check assaying 5%
laboratory checks) and whether acceptable
Cube Consulting Pty Ltd manage the database for Tesoro.
levels of accuracy (i.e. lack of bias) and
precision have been established.
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
A number of independent consulting geoscientists (Cube
Consulting, Oliver, and Cooley) external to Tesoro have verified
the intersections for holes ZDDH0001 to ZDDH00296. Holes
ZDDH0297 onwards have been verified by multiple
appropriately qualified Company personnel.
• The use of twinned holes.
no twinned holes have been completed
Tesoro drilling is digitally entered and stored following
documented core handling protocols.
The protocols are considered adequate.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Location of data
points
Data spacing and
distribution
8
The laboratories used have generally demonstrated analytical
accuracy at an acceptable level within 95% confidence limits.
• Discuss any adjustment to assay data.
No adjustments were made to Tesoro Drilling
• Accuracy and quality of surveys used to locate
drillholes (collar and downhole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Tesoro drill hole collars have been surveyed accurately using
differential GPS for holes ZDDH0001 to ZDDH000296. Holes
ZDDH0297 onwards have been surveyed using handheld GPS
and will be surveyed using differential GPS once the drill
program has concluded.
• Specification of the grid system used.
The grid system used PSAD56 19S
• Quality and adequacy of topographic control.
The topography generated from an accurate topographic
survey data completed by a registered surveyor and has been
used for the current control.
Drill hole spacing is variable between 25m and 200m
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
The spacing of drill holes is variable and satisfactory for
reconnaissance level drilling. The holes are not intended to be
used for resource estimates at this stage of exploration.
• Whether sample compositing has been
applied.
Sample composites was not employed.
+61 8 9322 1587 | info@tesorogold.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesorogold.com.au
ASX Announcement 27 September 2022
Criteria
JORC Code explanation
Orientation of data • Whether the orientation of sampling achieves
in relation to
unbiased sampling of possible structures and
geological
the extent to which this is known, considering
structure
the deposit type.
Commentary
Drill holes have been drilled in multiple directions relative to
the orientation of multiple geological features, interpreted to
influence gold mineralisation.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Tesoro diamond drilling at various orientations does not reveal
any bias regarding the orientation of the mineralised horizons.
Sample security
• The measures taken to ensure sample
security.
Chain of Custody of digital data is managed by the Company.
Physical material was stored on site and, when necessary,
delivered to the assay laboratory. Thereafter laboratory
samples were controlled by the nominated laboratory which to
date has been Bureau Veritas and ALS Santiago. All sample
collection was controlled by digital sample control file(s) and
hardcopy ticket books.
Audits or reviews
• The results of any audits or reviews of
sampling techniques and data.
No audits have been undertaken.
(Criteria in this section apply to all succeeding sections)
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
Information regarding tenure is included in the company’s June
2022 quarterly half yearly report released to the ASX on 29 July
2022.
Tesoro Resources Ltd, 95% owned Chilean subsidiary, Tesoro
Mining Chile SpA, owns 85% of the El Zorro Gold Project
Concessions.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
The Concession is believed to be in good standing with the
governing authority and there is no known impediment to
operating in the area.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration
by other parties.
Little historical exploration has been undertaken in either project
area. Coeur d’Alene’s Chilean exploration division undertook
activities on the Ternera prospect, under an option agreement
with the previous owners between April 1990 and January 1993.
Geology
• Deposit type, geological setting and style of
mineralisation.
The mineralisation model is likely to be intrusive related gold
deposit. The key characteristics that are consistent with this
style deposit include:
• Low sulphide content, (typically <5%); reduced ore mineral
assemblage that typically comprises pyrite and lacks primary
magnetite or hematite
• Mineralisation occurs as sheeted vein deposits or stockwork
assemblages and often combine gold with variably elevated
Bi, W, As, Mo, Te, and/or Sb but low concentrations of base
metals as seen in the initial four holes by Tesoro at El Zorro
• Restricted and commonly weak proximal hydrothermal
alteration
• Intrusions of intermediate to felsic composition.
Drillhole
information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drillholes:
o easting and northing of the drillhole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drillhole
collar
o dip and azimuth of the hole
o downhole length and interception depth
Information relating to current drill program presented in this
report.
o hole length.
• If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
9
+61 8 9322 1587 | info@tesorogold.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesorogold.com.au
ASX Announcement 27 September 2022
Criteria
JORC Code explanation
Competent Person should clearly explain why
this is the case.
Commentary
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
No cutting of grades has been undertaken.
• Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
Down hole length weighted average results are calculated using
a 0.20g/t Au cut off and a maximum of 5m internal dilution
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths
Downhole intercepts are calculated using a length weighted
averaging method.
• These relationships are particularly important
in the reporting of Exploration Results.
• If the geometry of the mineralisation with
respect to the drillhole angle is known, its
nature should be reported.
The mineralisation forms sub-vertical sheeted veins and
individual veins and may form plunging zones within the
mineralised structures. Drilling by Tesoro has been undertaken
to test these orientations.
• If it is not known and only the downhole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘downhole
length, true width not known’).
Exploration results are reported as downhole widths as the true
width is not known with any certainty.
Diagrams
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drillhole collar
locations and appropriate sectional views.
Relevant maps and diagrams are included in the body of the
report.
Balanced
reporting
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
All assay results from drilling are reported. Reporting of visible
gold occurrences in drill core is by visual inspection only and
final gold content is not known until assay results have been
received.
Other
substantive
exploration
data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
All material exploration data is reported in the body of the report.
Further work
• The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Further work will be focused on drill testing the Ternera
mineralisation and additional prospects as defined in the work
program. Core will be used for metallurgical testwork and
resource modelling is planned.
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Diagrams have been included in the body of this report.
10
+61 8 9322 1587 | info@tesorogold.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesorogold.com.au
Share your feedback
Discover