Investor Presentation for MST Access Conference
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
15 JUNE 2021
ASX: TSO | ACN 106 854 175
Tesoro Presenting at MST Access Australia Micro & Small Caps
Conference, 16 June 2021
Tesoro Resources Limited (Tesoro or the Company) (ASX:TSO) advises that the Company is
presenting at the MST Access Australia Micro & Small Caps Conference on Wednesday 16 June
2021 at 2:00pm AEST.
Please find attached the presentation to be given by Tesoro’s Managing Director, Mr Zeff Reeves.
To join, please click the webinar link below:
https://mstfinancial-au.zoom.us/j/84899630666
Tesoro’s presentation can be downloaded from:
www.tesororesources.com.au/announcement-category/presentations/
This ASX Announcement has been approved for release by Zeff Reeves, Managing Director.
For more information, please contact:
Zeff Reeves
Managing Director
zeff.reeves@tesororesources.com.au
Peter Taylor
Investor Relations
Peter@nwrcommunications.com.au
0412 036 231
About Tesoro Resources
Tesoro Resources Limited was established with a strategy of acquiring, exploring, and developing mining
projects in the Coastal Cordillera region of Chile. The Coastal Cordillera region is host to multiple world class
copper and gold mines, has well established infrastructure, service providers and an experienced mining
workforce. Large areas of the Coastal Cordillera remain unexplored due to the unconsolidated nature of
mining concession ownership, but Tesoro, via its in-country network and experience has been able secure
rights to a district scale gold project in-line with the Company’s strategy. Tesoro’s 95% owned Chilean
Subsidiary owns 85% of the El Zorro Gold Project.
1
+61 8 9322 1587 | info@tesororesources.com.au | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au
Aerial View of the Ternera Prospect Looking North
El Zorro Gold Project Presentation June 2021
ASX:TSO
Tesoro Resources Limited ACN 106 854 175
DISCLAIMER
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have been prepared by Tesoro Resources Limited (Tesoro or the Company) and approved by the Board of the Company. The information contained in
the Presentation (Information) is summary only and should be read in conjunction with any other documents provided to you by the Company. The Information is current as at 14 June 2021 and the Company does not undertake to provide any additional or update
information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the Company that you have read, understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or fairness of the information, opinions and
conclusions contained in this Presentation. Tesoro, or related bodies corporate, shareholders or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make any representations or warranties, express or
implied, as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro does not represent or warrant that this Presentation is complete or that it contains all
material information about Tesoro or which a prospective investor or purchaser may require in evaluating a possible investment in Tesoro or acquisition of shares. To the maximum extent permitted by law, Tesoro and its Agents expressly disclaim any and all liability,
including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and unknown risks,
uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of Tesoro and which are subject to change without notice and could cause the actual results, performance or achievements of Tesoro to be materially
different from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of this Presentation are cautioned not to place undue reliance on such
forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to be used as the basis for making an investment decision. In
providing this Presentation, Tesoro has not considered the objectives, financial position or needs of any particular recipients. Before making an investment decision prospective investors should consider the appropriateness of the information in this Presentation having
regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments Commission or any other foreign regulator) and is not, and does
not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction in
which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or the securities laws of any state or other jurisdiction of the United States and may not be
offered or sold, directly or indirectly in the United States.
The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated, quoted or referred to, in whole or in part, without the express consent of Tesoro.
Competent Person’s Statements
The information in this Presentation that relates to Exploration Results is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of Geoscientists and Managing Director
and shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in this Presentation of the matters based on this information in the form and context in which it appears.
The information in this report that relates to Geophysical Results is based on information compiled by Dr Jayson Meyers who is a Fellow of the Australian Institute of Geoscientists. Dr Meyers is a consultant to Tesoro Resources Limited and has sufficient experience which
is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.
The Company has released all material information that relates to Exploration Results for the El Zorro Gold Project, on a continuous basis to the ASX and in compliance with JORC 2012. The Company confirms that it is not aware of any new information that materially
affects the content of this ASX release. A list of all Material ASX releases referred to in this announcement are listed at Appendix 4 of this release.
Tesoro Resources Corporate Presentation June 2021
2
18 MONTHS ON THE ASX
MANAGEMENT FOCUSED ON RAPIDLY ADVANCING THE EL ZORRO GOLD PROJECT
▪ A$31.6M Raised Since March 2020 ASX Listing
▪ >87% of Capital invested into the Ground
▪ >52 km of Diamond Drilling completed
▪ Currently 6 Rigs Drilling 24/7
▪ Ternera Mineralised Footprint Grown by >300%
▪ Regionally Dominant ~555 km2 Ground Position
▪ 5 New Gold Targets Identified
▪ Multiple Untested Ternera Analogues
▪ Funded & Poised for Growth in 2021
▪ Clear Development Pathway
Tesoro Resources Corporate Presentation June 2021
3
TESORO RESOURCES – AN EXPERIENCED TEAM
BOARD & MANAGMENT
John Toll - Chairman
John is a Partner at Azure Capital Limited & has >15 years of experience in corporate advisory, focusing mainly on equity financing transactions across a range of
industries including mining, technology, general industrials, biotech & infrastructure.
Zeffron Reeves - Managing Director
Geologist with >20 years of experience in the resources sector on resource projects from greenfields exploration, discovery, definition & feasibility, construction,
production to closure. Zeff previously Managing Director of ASX listed Metallum Ltd which had a number of development & operational projects in Chile. He has also
held senior management positions with companies developing projects in Brazil. He has had previous exploration success identifying & delineating new gold districts in
Brazil and Chile.
Geoff McNamara - Non-Executive Director
>25 years of international resource sector experience as a Geologist, Project Manager & Fund Manager. Previously worked in Private Equity (FUM USD800 million) & as a
Director of Societe General’s Mining Finance Team in New York. Operational roles include Project Manager, Senior Mine Geologist & Mine Geologist for Ivanhoe Mines,
Lion Ore International & Western Mining Corporation.
Sergio Uribe - Country Manager, Chile
Administrative, management & development professional with experience in Chile. He has worked on numerous resource projects from greenfields exploration,
discovery, production, closure, retreatment & tailings reclamation. Part of the development team with Fortescue Metals Group during development of its Pilbara mining
operations, he has 10 years of resource sector experience. Sergio has represented numerous foreign companies investing into resource projects in Chile & was
Commercial Manager of Metallum Chile Ltd. where he was involved in the acquisition & development of their operation in Chile. Prior to this he was General Manager
of Acorn Mining Chile Ltd & Country Manager for Cleveland Mining Chile Ltd. Sergio has a Business Management degree from Universidad del Desarrollo & is a member
of the civil police & a military reserve officer.
Shannon Coates - Company Secretary
Qualified lawyer with >20 years’ experience in corporate law & compliance. She is currently Non-Executive Director of ASX listed companies Vmoto Limited, Bellevue
Gold Limited & Company Secretary to a number of public unlisted & listed companies.
Tesoro Resources Corporate Presentation June 2021
4
EL ZORRO GOLD PROJECT LOCATION
▪ Tesoro owns 85% of El Zorro
▪ Fully diluting JV
▪ ~555 km2 Project Area
▪ El Zorro Identified as an Intrusive Related Gold System (IRGS)
▪ Mineralisation Identified to date has a Strike Length >5km
▪ Open in All Directions
▪ World Class Mining Region
▪ Candelaria (Lundin Mining), Inca de Oro (Codelco),
Mantoverde (Mitsubishi) & Maricunga (Kinross) 90km radius
Tesoro Resources Corporate Presentation June 2021
5
EL ZORRO GOLD PROJECT – LEVERAGING EXISTING INFRASTRUCTURE
▪ Regionally Dominant Concession Holding
▪ Region III (Atacama Desert), Chile
▪ Low Altitude 600m to 1,600m ASL
▪ Pan American Highway 10km
▪ Pacific Ocean (processing H2O) 10km
▪ Caldera Port 57km
▪ Atacama Airport 76km
▪ Copiapo City 130km
▪ Multiple Power, H2O & Transport Options within 60km
El Zorro Gold Project Concession area
555 km2 of an emerging IRGS Region
Yellow diamond – Ternera Deposit
Tesoro Resources Corporate Presentation June 2021
6
TERNERA – DEFINING A MAJOR GOLD SYSTEM
▪ Tesoro has Drilled >52,000m at Ternera
▪ Gold Mineralisation Associated with Multiple, Parallel, Elongate Tonalite Intrusions
▪ To Date Mineralisation Identified over a Large Area
▪ >1,000m North-South
▪ >550m East-West
▪ Outcropping at Surface to >400m depth
▪ Mineralisation Open in all Directions, Large Extensions to North East, results include:
▪ ZDDH00017 86.54m @ 2.29g/t Au from 167.55m including;
A’
B’
C’
55.50m @ 3.63g/t Au from 182.70m
▪ ZDDH00025 121.55m @ 1.32g/t Au from 49.00m including;
12.27m @ 4.98g/t Au from 148.00m
D’
▪ ZDDH00049 111.50m @ 1.17g/t Au from 124.00m including;
A
B
27.50m @ 3.57g/t Au from 154.00m
▪ ZDDH00057 22.00m @ 1.03g/t Au from 22.00m and;
77.00m @ 1.13g/t Au from 274.00m
▪ ZDDH00069 267.00m @ 1.12g/t Au from 147.00m including;
C
45.00m @ 4.02g/t Au from 292.00m
D
▪ ZDDH00075 220.00m @ 0.86g/t Au from 76.00m including;
39.00m @ 2.73g/t Au from 270.00m
▪ ZDDH000124 71.00m @ 1.63g/t Au (116g/m) from 152.00m including:
19.00m @ 5.07g/t Au from 152.00m;
▪ To date 14 holes have returned >100 gm drill intercepts*
Ternera Prospect
>1000m strike drilled
Drilled to >400m depth
>750m strike surface mineralisation
Multiple high grade fault zones
Section Lines in Blue
Tesoro Resources Corporate Presentation June 2021
7
*Full table of significant intercepts presented at Appendix 1
TERNERA – DEFINING A MAJOR GOLD SYSTEM
▪ Drilling constantly expanding Ternera
▪ Parallel Ore Zones Linked by NW & E trending Faults
▪ Majority of Mineralisation Tonalite Hosted
▪ Faults Mineralise Tonalites & Sedimentary Country Rocks
▪ North South faults define multiple high grade zones
B
B’
C
Ternera Prospect Schematic Sections Looking North West
Sections of modelled tonalite, faults and gold grade shells at 0.20g/t and 0.50 g/t Au cut-offs
Tesoro Resources Corporate Presentation June 2021
8
C’
TERNERA – MULTIPLE HIGH GRADE GOLD ZONES
AA
A’A’
▪ Ternera over 1km long
A’A’
▪ Multiple continuous mineralised
zones
▪ Multiple Drill Results >100m @
>1.00g/t Au
▪ Three North Trending High Grade
Zones 30m to 70m thick @ 2.00g/t
to >4.00g/t Au
▪ Mineralised zones up to 200m wide
from surface to over 400m deep
▪ Modelling has Defined Multiple
Extensions
▪ Open in all Directions
AA
▪ High Grade Core Emerging
>2.50g/t Au
Ternera Modelled Geology and Grade Shells at 520m RL
520m RL Plan slice through the Ternera modelled tonalite,
faults and gold grade shells at 0.20g/t and 0.50 g/t Au cut-offs
Tesoro Resources Corporate Presentation June 2021
Long Section through the MF350 Fault looking west showing gold endowment (gram metres)
Drill pierce points located at midpoint of drill hole intervals. Gram Metres are calculated from
downhole width x Au g/t
9
EL ZORRO GOLD PROJECT
SYSTEMATIC EXPLORATION DEFINING A MAJOR GOLD SYSTEM
▪
▪
▪
Surface Mapping & Sampling has Defined New Targets
Tesoro has only Scratched the Surface
Outcropping Mineralisation at Drone Hill, Toro Blanco, Ternera North, Toro Gordo, Ternera East & Buzzard
▪
Drone Hill –
First Drill hole returned 11.50m @ 1.13g/t Au
including 1.57m @ 7.37g/t Au
▪
Toro Gordo –
First Drilling returned high grade results including;
1.00m @ 69.70g/t Au
4.00m @ 8.04g/t Au
2.00m @ 3.30g/t Au
▪
Surface Channel Sampling includes:
▪
Ternera East –
3.00m @ 8.33g/t Au,
12.00m @ 0.95g/t Au
3.00m @ 2.31g/t Au
▪
Ternera North –
16.60m @ 1.33g/t Au
▪
Toro Gordo –
17.00m @ 1.48g/t Au, including 1.00m @ 22.30g/t Au
23.00m @ 2.16g/t Au, including 1.00m @ 42.70g/t Au
40.00m @ 1.23g/t Au, including 8.00m @ 3.14g/t Au
18.00m @ 1.23g/t Au, including 4.00m @ 3.97g/t Au
Buzzard –
26.00m @ 1.62g/t Au including 8.00m @ 3.08g/t Au
El Zorro Project
District map showing gold
targets with proven
mineralisation
Tesoro Resources Corporate Presentation June 2021
10
EL ZORRO GOLD PROJECT –
GEOPHYSICS HIGHLIGHTS TARGETS & DEMONSTRATES SCALE
▪ IP Anomalies Correlate well to Drilling Results*
▪ Multiple Untested IP Targets Identified
▪ Ternera East Identified from GAIP
▪ GAIP highlights gold bearing North-South Faults are
continuous over 2km north of Ternera
▪ Surface Sampling, Drilling & Geophysics Define System
▪ Untested Regional Potential
▪ Rapidly Growing Large Scale Gold Project
El Zorro Targets
Gradient Array IP Chargeability Image and Drilling
Tesoro Resources Corporate Presentation June 2021
11
* Refer ASX Announcement 1 December 2020
EL ZORRO GOLD PROJECT STUDIES & DEVELOPMENT
El Zorro is Ideally Located to Leverage off Existing Infrastructure & Support Services
▪
Order of Magnitude Conceptual Studies & Long Lead Activities Commenced:
▪
Metallurgy, Environment, Surface Easement Corridors, Infrastructure Access & Options;
▪
Initial Metallurgical Studies from Ternera:
▪
▪
▪
▪
Free Milling Material;
Gold Recoveries up to 99%;
Amenable to Gravity Concentration up to 75% Gravity Recovery; &
Initial Testwork Indicates Conventional Gravity Concentration with CIL.
Tesoro Focused & Well Positioned to Progress El Zorro through Development
El Zorro access road looking west to Pacific Ocean & Pan American Hwy
Tesoro Resources Corporate Presentation June 2021
12
TESORO – DEFINED WORKPLAN
Ternera
▪
Initial Drill Testing of
Ternera East
▪
Regional Targeting to find
Ternera Analogues
▪
Further Drill testing at
Drone Hill
▪
Additional Zones of
Mineralisation Discovered
▪
4 Targets Remain
Undrilled
Identify causative Intrusions
from Mapping &
Geochemistry
▪
Additional Zones of
Mineralisation being
Delineated
▪
Mapping, Sampling &
Geophysics to Define
additional Targets
Tesoro has First Mover
Advantage
▪
IRGS System Potential for
Multiple Deposits
▪
Resource Definition Drilling
▪
Maiden Resource Estimate
▪
Continue to expand Ternera
▪
▪
Tesoro Resources Corporate Presentation June 2021
Studies and Development
Regional Exploration
El Zorro District
13
▪
Detailed Metallurgical
Testwork to Optimise
Metallurgy
▪
Environmental Studies
▪
Infrastructure Studies to
Optimise Power & H2O
Options
▪
Mining & Processing
Studies for Scoping to PreFeasibility
CONTACT DETAILS
Zeffron Reeves, Managing Director
Email: info@tesororesources.com.au
Phone: +61 8 9322 1587
Web: www.tesororesources.com.au
Address: Suite 5 | 62 Ord Street | West Perth | WA 6005
Tesoro Resources Corporate Presentation June 2021
14
APPENDIX 1
EL ZORRO GOLD PROJECT SIGNIFICANT INTERCEPTS TABLE
Hole_ID
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0001
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0002
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0003
ZDDH0004
ZDDH0004
ZDDH0004
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0005
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0006
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0007
ZDDH0008
ZDDH0008
From (m)
5.00
5.00
5.00
12.00
14.30
33.64
44.30
64.00
75.50
75.50
107.00
117.00
5.70
8.80
8.80
51.70
58.00
21.00
21.00
21.00
37.20
47.30
64.00
90.00
5.00
56.00
57.00
4.00
4.00
9.80
9.80
51.60
65.00
72.00
72.00
72.00
100.60
130.00
135.80
0.00
2.40
22.60
24.00
46.70
61.10
108.30
133.50
148.00
180.10
180.10
184.00
207.00
226.00
236.00
1.00
39.00
39.00
104.85
117.40
35.00
58.00
To (m)
119.00
15.00
51.30
13.00
15.00
39.00
51.30
65.00
79.00
76.00
112.00
119.00
68.00
24.30
14.00
68.00
61.00
77.30
27.00
22.83
43.00
48.00
77.30
91.00
66.00
66.00
61.00
42.65
32.00
28.00
10.15
52.00
67.00
85.90
75.00
73.00
102.00
132.60
136.80
88.00
3.00
25.95
25.00
50.30
64.02
116.00
135.60
151.80
244.00
181.10
186.00
212.00
227.00
244.00
4.00
66.20
58.00
110.00
118.00
41.10
59.00
Interval
114.00
10.00
46.30
1.00
0.70
5.36
7.00
1.00
3.50
0.50
5.00
2.00
62.30
15.50
5.20
16.30
3.00
56.30
6.00
1.83
5.80
0.70
13.30
1.00
61.00
10.00
4.00
38.65
28.00
18.20
0.35
0.40
2.00
13.90
3.00
1.00
1.40
2.60
1.00
88.00
0.60
3.35
1.00
3.60
2.92
7.70
2.10
3.80
63.90
1.00
2.00
5.00
1.00
8.00
3.00
27.20
19.00
5.15
0.60
6.10
1.00
Au (g/t)
0.35
0.55
0.45
1.64
2.35
0.97
0.67
2.50
0.89
4.82
1.11
2.05
0.54
1.15
1.96
0.78
3.62
0.50
1.96
5.24
1.27
2.00
0.41
1.53
0.97
4.53
9.60
0.65
0.84
1.17
20.10
2.03
1.03
0.52
1.90
4.32
2.07
0.66
12.20
0.15
0.75
2.14
6.10
0.32
0.42
0.30
1.30
0.59
0.23
0.55
1.06
0.77
0.55
0.66
4.75
0.70
0.80
0.34
2.75
0.28
1.43
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
From (m) To (m)
ZDDH0009 4.00
6.00
ZDDH0009 12.55
38.00
ZDDH0009 21.00
26.00
ZDDH0009 48.00
48.50
ZDDH0009 78.00
83.00
ZDDH0010 31.00
33.00
ZDDH0010 60.00
61.00
ZDDH0010 66.00
67.00
ZDDH0010 75.00
159.30
ZDDH0010 75.00
104.00
ZDDH0010 82.50
86.45
ZDDH0010 91.00
102.00
ZDDH0010 93.00
97.00
ZDDH0010 120.00
126.00
ZDDH0010 149.00
159.00
ZDDH0011 176.00
274.30
ZDDH0011 181.70
212.00
ZDDH0011 196.40
212.00
ZDDH0011 203.00
203.70
ZDDH0011 203.00
212.00
ZDDH0011 217.00
222.00
ZDDH0011 246.60
256.40
ZDDH0012 0.00
58.80
ZDDH0012 1.70
22.00
ZDDH0012 1.70
8.40
ZDDH0012 2.30
4.70
ZDDH0012 17.60
22.00
ZDDH0012 17.60
20.00
ZDDH0012 53.20
58.80
ZDDH0012 53.20
56.00
ZDDH0012 151.80
152.20
ZDDH0013 0.00
3.00
ZDDH0013 9.00
14.30
ZDDH0013 25.00
29.80
ZDDH0013 28.55
29.80
ZDDH0013 46.30
70.00
ZDDH0013 46.30
51.50
ZDDH0013 51.25
65.35
ZDDH0013 58.00
65.35
ZDDH0013 102.00
104.00
ZDDH0013 136.00
137.30
ZDDH0013 165.00
173.60
ZDDH0013 170.40
173.00
ZDDH0014 15.30
70.60
ZDDH0014 15.30
34.00
ZDDH0014 15.30
26.30
ZDDH0014 23.00
26.30
ZDDH0014 64.60
70.60
ZDDH0014 64.60
67.35
ZDDH0014 112.00
122.50
ZDDH0014 115.00
117.00
ZDDH0014 177.20
179.00
ZDDH0015 37.90
39.70
ZDDH0015 91.90
132.70
ZDDH0015 91.90
94.60
ZDDH0015 112.00
116.00
ZDDH0015 240.60
242.00
ZDDH0015 265.90
269.00
ZDDH0016 125.00
131.72
ZDDH0016 152.00
204.60
ZDDH0016 188.10
194.00
ZDDH0016 188.58
188.90
ZDDH0016 203.60
204.60
ZDDH0016 281.00
290.00
ZDDH0016 287.50
290.00
Tesoro Resources Corporate Presentation June 2021
Interval
2.00
25.45
5.00
0.50
5.00
2.00
1.00
1.00
84.30
29.00
3.95
11.00
4.00
6.00
10.00
98.30
30.30
15.60
0.70
9.00
5.00
9.80
58.80
20.30
6.70
2.40
4.40
2.40
5.60
2.80
0.40
3.00
5.30
4.80
1.25
23.70
5.20
14.10
7.35
2.00
1.30
8.60
2.60
55.30
18.70
11.00
3.30
6.00
2.75
10.50
2.00
1.80
1.80
40.80
2.70
4.00
1.40
3.10
6.72
52.60
5.90
0.32
1.00
9.00
2.50
Au (g/t) Comments
1.39
0.51
1.09
including
2.19
0.59
2.47
1.16
1.04
1.30
2.95
including
4.97
including
4.70
including
8.50
including
1.11
including
1.07
including
1.58
3.03
including
3.87
including
21.70
including
5.07
including
4.13
including
2.28
including
1.70
4.50
including
12.21
including
33.35
including
2.00
including
2.82
including
0.95
1.42
including
2.29
0.83
0.41
0.72
2.14
including
0.85
1.24
including
1.08
including
1.65
including
0.79
4.97
1.60
2.80
including
1.01
2.19
including
3.40
including
6.18
including
2.03
including
5.00
including
0.52
1.75
including
2.37
1.11
0.37
1.64
including
1.13
including
8.46
0.64
1.47
0.62
3.30
including
31.30
including
3.00
including
0.36
0.77
including
Hole_ID
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0017
ZDDH0018
ZDDH0018
ZDDH0018
ZDDH0018
ZDDH0019
ZDDH0019
ZDDH0019
ZDDH0020
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0021
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0022
ZDDH0023
ZDDH0023
ZDDH0023
ZDDH0023
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0024
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0025
ZDDH0026
ZDDH0026
ZDDH0026
ZDDH0026
ZDDH0027
ZDDH0027
ZDDH0027
ZDDH0027
From (m)
44.00
44.00
44.00
70.00
103.46
167.55
182.70
183.22
190.00
197.00
200.00
187.27
187.27
197.00
189.00
21.00
36.00
74.00
87.30
100.92
107.50
100.92
189.25
189.25
189.25
193.90
30.00
78.00
94.40
105.00
105.00
146.70
146.70
273.00
276.00
6.00
41.00
41.00
44.10
54.50
56.50
66.00
155.00
162.20
161.80
49.00
73.10
75.00
104.00
110.00
148.00
148.00
155.20
92.00
105.40
233.00
240.00
176.00
176.00
176.00
176.00
To (m)
74.00
60.10
47.00
74.00
105.60
254.00
233.20
206.22
205.00
202.30
202.30
222.00
211.00
199.70
204.00
89.52
45.00
79.00
87.60
116.50
112.00
101.70
208.50
201.30
195.40
195.40
31.00
119.17
95.45
119.17
110.32
151.00
149.00
277.00
277.00
9.00
78.00
45.50
45.50
57.00
69.50
69.50
169.00
163.50
167.00
170.55
84.00
82.00
118.00
113.60
160.27
170.55
159.90
110.00
110.00
242.00
242.00
206.50
202.00
188.00
182.00
15
Interval
30.00
16.10
3.00
4.00
2.14
86.45
50.50
23.00
15.00
5.30
2.30
34.73
23.73
2.70
15.00
68.52
9.00
5.00
0.30
15.58
4.50
0.78
19.25
12.05
6.15
1.50
1.00
41.17
1.05
14.17
5.32
4.30
2.30
4.00
1.00
3.00
37.00
4.50
1.40
2.50
13.00
3.50
14.00
1.30
5.20
121.55
10.90
7.00
14.00
3.60
12.27
22.55
4.70
18.00
4.60
9.00
2.00
30.50
26.00
12.00
6.00
Au (g/t)
0.94
1.05
4.27
4.26
1.76
2.29
3.63
7.20
10.82
25.31
46.41
2.94
4.09
22.21
5.99
0.47
1.34
1.23
3.33
0.95
1.24
8.44
2.86
4.25
7.37
20.82
3.16
1.38
2.98
3.25
6.54
7.25
13.30
1.06
3.32
1.63
0.86
2.12
5.93
1.87
1.12
2.53
3.06
19.72
6.97
1.32
4.57
6.14
1.63
4.97
4.98
2.98
10.69
1.36
4.99
1.85
7.31
0.40
0.44
0.64
1.21
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
open downhole
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0028
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0029
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0030
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0031
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0032
ZDDH0033
ZDDH0033
ZDDH0033
ZDDH0033
ZDDH0033
ZDDH0033
From (m)
14.00
21.00
25.00
42.00
43.90
29.50
29.50
29.50
43.00
56.64
72.00
91.00
121.00
121.00
166.30
180.00
5.20
50.00
66.00
66.00
66.00
70.00
101.00
117.00
117.00
165.00
195.40
202.95
72.00
72.00
72.00
100.00
100.00
118.30
146.40
171.60
193.30
193.30
193.30
204.34
204.34
228.00
248.00
291.00
3.20
17.30
43.50
75.00
128.00
128.00
132.63
157.00
171.00
178.30
178.30
191.00
40.00
57.00
59.00
100.00
134.70
143.00
To (m)
14.75
28.00
25.90
49.00
45.00
243.00
93.00
31.20
48.00
61.84
80.00
93.00
130.70
122.00
195.00
195.00
6.40
76.00
76.00
71.10
67.00
71.10
102.50
120.00
119.13
167.00
199.00
203.90
303.00
126.00
75.60
104.44
125.00
125.00
154.00
173.00
217.60
208.00
197.00
217.60
208.00
229.00
263.90
295.00
6.00
18.30
44.00
76.00
204.00
140.00
135.00
162.00
174.80
197.00
179.40
197.00
68.00
67.00
63.00
104.00
137.00
144.00
Interval
0.75
7.00
0.90
7.00
1.10
213.50
63.50
1.70
5.00
5.20
8.00
2.00
9.70
1.00
28.70
15.00
1.20
26.00
10.00
5.10
1.00
1.10
1.50
3.00
2.13
2.00
3.60
0.95
231.00
54.00
3.60
4.44
25.00
6.70
7.60
1.40
24.30
14.70
3.70
13.26
3.66
1.00
15.90
4.00
2.80
1.00
0.50
1.00
76.00
12.00
2.37
5.00
3.80
18.70
1.10
6.00
28.00
10.00
4.00
4.00
2.30
1.00
Au (g/t)
3.23
0.85
5.03
0.61
1.10
0.73
1.81
1.20
2.76
3.36
1.24
33.00
0.53
3.20
0.82
1.33
0.74
0.69
1.54
2.64
6.89
5.73
1.13
3.23
4.15
4.05
1.41
5.12
0.83
1.69
1.27
1.04
3.36
11.57
0.79
1.40
2.43
3.77
4.16
3.25
10.76
2.17
1.04
1.00
1.23
7.09
5.70
5.02
0.93
1.39
4.30
2.41
1.92
1.57
5.15
2.58
1.22
3.17
5.96
1.51
1.27
1.45
Comments
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
open downhole
open downhole
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
including
Hole_ID
ZDDH0034
ZDDH0034
ZDDH0034
ZDDH0034
ZDDH0034
ZDDH0034
ZDDH0034
ZDDH0034
ZDDH0034
ZDDH0034
ZDDH0034
ZDDH0034
ZDDH0035
ZDDH0035
ZDDH0035
ZDDH0035
ZDDH0035
ZDDH0035
ZDDH0035
ZDDH0035
ZDDH0035
ZDDH0035
ZDDH0035
ZDDH0035
ZDDH0036
ZDDH0036
ZDDH0036
ZDDH0036
ZDDH0036
ZDDH0036
ZDDH0036
ZDDH0037
ZDDH0037
ZDDH0037
ZDDH0037
ZDDH0037
ZDDH0037
ZDDH0037
ZDDH0037
ZDDH0037
ZDDH0038
ZDDH0038
ZDDH0038
ZDDH0038
ZDDH0038
ZDDH0038
ZDDH0038
ZDDH0038
ZDDH0038
ZDDH0038
ZDDH0039
ZDDH0039
ZDDH0039
ZDDH0039
ZDDH0039
ZDDH0039
ZDDH0039
ZDDH0039
ZDDH0040
ZDDH0040
ZDDH0040
ZDDH0040
ZDDH0040
ZDDH0040
ZDDH0040
ZDDH0040
ZDDH0040
ZDDH0041
ZDDH0041
ZDDH0041
ZDDH0041
ZDDH0041
From (m)
17.00
23.00
27.00
62.22
87.00
89.00
105.40
116.00
172.00
180.40
193.00
202.00
67.00
81.10
89.00
84.00
144.00
153.00
162.00
199.00
192.00
224.00
224.00
277.00
74.00
74.00
88.30
104.00
114.00
165.00
215.00
42.00
42.00
56.00
56.00
62.00
149.00
149.00
162.00
162.00
23.00
74.20
74.20
92.00
105.00
148.00
178.00
185.00
200.00
202.00
2.50
78.70
188.00
212.00
212.00
226.00
237.00
268.00
136.00
136.00
136.00
142.00
160.00
161.00
182.00
195.00
288.00
2.00
6.00
23.50
23.50
29.00
To (m)
28.00
24.00
28.00
63.34
92.84
91.00
106.00
117.00
173.00
181.50
194.00
203.00
68.00
11
Share your feedback
Discover