Investor Presentation
Released
Released
Announcement PDF
El Zorro Gold Project
Ongoing Growth Drilling and
Development Readiness Rapidly
Advancing
November 2026
ASX: TSO | OTCQX: TSORF | FSE: 5DF
1
Disclaimer and Cautionary Statements
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have been prepared by Tesoro Gold Limited (Tesoro or the Company) and approved by the Board of the Company. The information contained in the Presentation (Information) is summary only and should be
read in conjunction with any other documents provided to you by the Company. The Information is current as at 9 November 2026 and the Company does not undertake to provide any additional or update information, whether as a result of new information, future events or results or otherwise. By receiving the
Presentation, you acknowledge and represent to the Company that you have read, understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro, or
related bodies corporate, shareholders or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make any representations or warranties, express or implied, as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the
information, opinions and conclusions contained in this Presentation. Tesoro does not represent or warrant that this Presentation is complete or that it contains all material information about Tesoro or which a prospective investor or purchaser may require in evaluating a possible investment in Tesoro or acquisition of
shares. To the maximum extent permitted by law, Tesoro and its Agents expressly disclaim any and all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other important
factors, many of which are outside the control of Tesoro and which are subject to change without notice and could cause the actual results, performance or achievements of Tesoro to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is
not necessarily a guide to future performance and recipients of this Presentation are cautioned not to place undue reliance on such forward-looking statements.
Production target: The production target referred to in this announcement is based on a combination of Indicated and Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of
Indicated Mineral Resources or that the production target itself will be realised. The Scoping Study is based on lower-level technical and economic assessments and is insufficient to support estimation of Ore Reserves or to provide assurance of economic development.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to be used as the basis for making an investment decision. In providing this Presentation, Tesoro has not considered the
objectives, financial position or needs of any particular recipients. Before making an investment decision prospective investors should consider the appropriateness of the information in this Presentation having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice
appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments Commission or any other foreign regulator) and is not, and does not constitute, an invitation or offer of securities for
subscription, purchase or sale in any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the United States or any other jurisdiction in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will
not be, registered under the U.S. Securities Act of 1933 as amended or the securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States. The information in this Presentation is strictly confidential. It may not be disclosed, reproduced,
disseminated, quoted or referred to, in whole or in part, without the express consent of Tesoro.
Competent Person’s Statements
The information in this report that relates to Exploration Results and Metallurgical Results is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of Geoscientists and a Director and shareholder of the Company. Mr
Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves. Mr Reeves is a Director, employee and Shareholder of the Company. He consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.
The information in this announcement that relates to Mineral Resources has been extracted from the Company’s ASX announcement on 27 August 2026 titled “Upgrade to Ternera 1.8MOZ Mineral Resource” (available at the Company’s website ASX Announcement). Tesoro confirms that it is not aware of any new
information or data that materially affects the information included in the original market announcement above, and in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from the original market announcement.
The information in this report that relates to the Ore Reserve and Production Target for the Ternera Gold Deposit was previously reported by the Company in its ASX announcement dated 18 September 2026 titled “Maiden 1.28Moz Ore Reserve at Ternera”. The Company confirms that it is not aware of any new
information or data that materially affects the information included in that announcement and that all material assumptions and technical parameters underpinning the Ore Reserve estimate continue to apply and have not materially changed. The Company further confirms that all material assumptions underpinning the
Production Target continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
The Company has released all material information that relates to Exploration Results for the El Zorro Gold Project, on a continuous basis to the ASX and in compliance with JORC 2012. The Company confirms that it is not aware of any new information that materially affects the content of this ASX release.
2
TESORO GOLD | INVESTOR PRESENTATION
The El Zorro Gold Development Project
N
2.5 5 10 km
0
El Zorro Concession Areas
Ternera August 2026 MRE Shell
Surface Expression of Host Tonalites
Mineralised Corridor
EXISTING TERNERA
GOLD DEPOSIT
1.82Moz GOLD MRE
1.28Moz GOLD ORE RESERVE
El Zorro Gold
Development
Project
A Highly-Attractive Gold Development Project on all Measures
1 Aggressive Resource
Growth and Discovery
2 Project De-Risking and
Development Readiness
ONE OF THE MOST PROSPECTIVE, YET UNDEREXPLORED, UNDEVELOPED GOLD PROJECTS IN CHILE 3
We Know there is Gold in this System!
Host rocks have been mapped at surface and modelled at depth at the
Ternera Deposit. Surface sampling confirms gold across the corridor
True Multi-Deposit Potential
Material upside exists beyond Ternera, with over 40km of
mineralised strike, the scale of the opportunity is immense
Develop and Grow
Tesoro’s dual track strategy combines the rapid development of Ternera
over the next 18-24 months while aggressively drill-testing the district
+40km MINERALISED CORRIDOR
TONALITES HOST GOLD AT EL ZORRO
Tesoro Corporate Snapshot
Mark Connelly Independent Non-Executive Chair
Zeff Reeves Managing Director
Linton Putland Executive Director – Mining and Development
Emma Curnow Chief Financial Officer
Tim Williams Chief Development Officer
Sergio Uribe Country Manager Chile
Geoff McNamara Non-Executive Director
Alan Gibson Non-Executive Director
Sarah Wilson Company Secretary
Share price (5 November 2026) A$0.76
Shares on issue 246.2M
Performance rights 12.8M
Share rights 0.1M
Options 1.0M
Market Capitalisation (undiluted)1 A$187.0M
Net cash (at 30 September 2026 plus gross Placement proceeds) A$49.2M
Implied Enterprise Value (undiluted)1 A$138.0M
8.4%
9.4%
52.6%
29.6%
BOARD AND MANAGEMENT
GOLD FIELDS
INSTITUTIONAL INVESTORS
OTHER INVESTORS
Register Detail Broker Coverage
Capital Structure Board and Management
Shares, Performance Rights, Share Rights and Options as at 4 November 2026
Strong position to deliver on the dual-track advancement strategy
4
A$40M PLACEMENT ENABLES CONTINUED EXPLORATION AND ONGOING PROJECT ADVANCEMENT
1. Post Tranche 2 share issue and issue of acquisition shares for Tesoro Mining Chile – Refer ASX announcement 29 October 2026
1 –
Location, Location, Location
El Zorro Project Area Possesses all the Ingredients Required to Support a New Gold Mining and Processing Operation
El Salvador
Diego de
Almagro
Chanaral
Salina
Copiapo
(130km)
0 50km
N
Manto
Verde
Volcan
Candelaria
80km
20km
57km
76km
Santo
Domingo
EL ZORRO
GOLD
PROJECT
Cerro Negro
Caldera
Nueva
Esperanza
Maricunga
Fenix
Inca de Oro
La Colpa
La Pepe
El Zorro Gold
Development Project
5
Proximity to Port and Market
13km from the Pacific Ocean, 57km
by road from the port of Caldera
Easy Access
Low-altitude coastal setting with
sealed road access
Available Power
Grid power concept via the Totoralillo
substation, 21.6km away
Unlimited Water
Process water from desalination brine,
tested and confirmed in metallurgy
Tenure Secured
All mining tenure required for the
project obtained
TESORO GOLD | INVESTOR PRESENTATION
Salares Norte
Ternera MRE and Ore Reserve
El Zorro’s Foundational Gold Deposit
Total Ternera In-Pit Mineral Resource (August 2026)
Refer to ASX Announcements dated 4 August 2025 and 18 September 2026 .Tesoro Gold Limited confirms that it is not aware of any new information or data
that materially affects the information included in that release. All material assumptions and technical parameters underpinning that release continue to apply
and have not materially changed.
WASTE DUMP
TERNERA FINAL PIT OUTLINE
MAGAZINE
DRY STACKED TAILS
PROPOSED ACCESS ROAD AND WATER PIPELINE
ACCOMMODATION VILLAGE
PROPOSED HIGH-VOLTAGE POWER
MINE WORKSHOP
LOW-GRADE STOCKPILE
PROCESSING PLANT
N
Ternera Ore Reserve (September 2026)
CATEGORY PROVED PROBABLE TOTAL
Cut-off (g/t Au) Mt Au g/t Koz Mt Au g/t Koz Mt Au g/t Koz
0.30 2.8 1.05 93 40.1 0.92 1,190 42.8 0.93 1,283
TESORO GOLD | INVESTOR PRESENTATION
Ternera Gold Project Planned Site Layout
6
Single Open Pit Mine
A Future Long-Life Gold Processing Operation
Refer to ASX Announcements dated 27 August 2026 and 18 September 2026. Mineral Resources reported at a 0.3g/t cut-off grade and constrained within a
US$3,500/oz optimised open pit shell. Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the information
included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
FAVOURABLE GEOLOGY FOR BULK OPEN PIT MINING
CLASSIFICATION TONNES AU GRADE CONTAINED GOLD
Measured 2.4Mt 1.24g/t 95koz
Indicated 37.9Mt 1.13g/t 1,371koz
Inferred 11.3Mt 0.98g/t 356koz
Total 51.6Mt 1.10g/t 1,822koz
Ternera Block Model N
• A single open-pit gold mine with
+1.2Moz in Reserve now rarely seen
in greenfield development
• Ternera boasts highly-favourable
geology for a bulk open pit gold
mining operation
Ternera Development Project
An Attractive Gold Project on all Measures
42.8 Mt at 0.93 g/t GOLD
Initial single open pit mine
1.19 Moz GOLD
+110koz p.a. steady state
AISC US�1,538/oz
Life-of-mine average
UPFRONT CAPITAL
US�276M
including US$41M pre-strip
TESORO GOLD | MAIDEN ORE RESERVE 7
PFS-Level Economics
95% Au RECOVERY
Standard CIP plant
3 Mtpa THROUGHPUT
Initial 13-year operating life
Refer to ASX announcement dated 11 September 2025. Tesoro Gold Limited confirms that it is not aware of any new
information or data that materially affects the information included in that release. All material assumptions and technical
parameters underpinning that release continue to apply and have not materially changed.
September 2026 Ore Reserve Declaration
US$3,500/oz gold
SINGLE OPEN PIT MINING OPERATION WITH 3MTPA PROCESSING PLANT, CAPABLE OF DELIVERING
OVER 110KOZ PER ANNUM OF GOLD, WITH ADDITIONAL UPSIDE STILL TO COME
7
Refer to ASX Announcements dated 4 August 2025, 27 August 2026 and 18 September 2026. Tesoro Gold Limited confirms that it
is not aware of any new information or data that materially affects the information included in that release. All material assumptions
and technical parameters underpinning that release continue to apply and have not materially changed.
NPV5% US�994M
Post-tax at US$3,500/oz gold
IRR 57%
Post-tax at US$3,500/oz gold
FREE CASH FLOW US�1,510M
Post-tax at US$3,500/oz gold
HEAD GRADE 1.16g/t Au
For the first 9 years of production
Key Metrics
Tesoro has Consolidated and Locked Down the Entire Belt
Immense Exploration Upside
The First Intrusive Related Gold System Discovered in Chile
Current Ternera MRE
Is very well defined by 474 diamond drill holes
for a total of 153,180m
TERNERA AUGUST 2026 MRE SHELL
N
2.5 5 10 km
0
El Zorro Gold
Development
Project
Concessions
Ternera Gold Deposit
Host Tonalites
HOST TONALITES MAPPED AT SURFACE ACROSS ENTIRE BELT 8
TESORO GOLD | INVESTOR PRESENTATION
Beyond the MRE Boundary
Drilling returned broad zones of mineralisation
in multiple areas outside the current MRE
Limited Drilling Outside of Ternera
Just 10,000m of drilling completed to date outside
of Ternera (approx. 6% of total drilling)
The First of Many?
Underexplored mineralised corridor spanning
+40km, with outcropping gold mineralisation
0.9 km
1.1 km
Immediate Growth Target Areas at Ternera
To Rapidly Add Ounces to the Already Impressive Resource Base
1
3
4
Ternera North-East Extension
Ternera South Extension
TESORO GOLD | INVESTOR PRESENTATION 9
1
6.29m at 1.15g/t Au (ZDDH0231)
Hole drilled: Assay results pending
Hole drilled: Assay results pending
Ternera East Extension
2
2
16.00m at 1.06g/t Au (ZDDH0478)
9.00m at 1.19g/t Au (ZDDH0228)
5.00m at 2.92g/t Au (ZDDH0481)
3
Drone Hill
4
12.92 at 1.03 g/t Au and
9.00m at 1.96 g/t Au (ZDDH0421)
8.84m at 3.54g/t Au (ZDDH0411)
1.80m at 77.15g/t Au (ZDDH0338)
TERNERA AUGUST 2026 MRE SHELL
OPEN
OPEN
OPEN
OPEN
OPEN
Refer to ASX announcement dated 13 June 2024 “Drone Hill Drilling Results” (ZDDH0338), 6 December 2021 (Drilling extends Ternera by 400m, more gold at Ternera East (ZDDH0231 and ZDDH0228), 22 October 2026 “Growth Drilling Intersects Gold 300m Beyond Ternera Resource” (ZDDH0481 and ZDDH0478), 9
February 2026 “27.70g/t Au and 9.89g/t Au Intercepted 400m Down Plunge of Existing Open Pit Resource” (ZDDH0411) and 31 March 2026 “Ternera Gold Deposit Drilling Update” (ZDDH0421).
Material Upside Beyond Ternera
More Than 40km of Greenfield Prospectivity Yet to be Fully Explored
Priority 1 Targets
Drone Hill, Ternera East and Toro Blanco are considered top priority
targets and are all within 1 km of Ternera
Priority 2 Targets
La Brea, Pena Blanca, Kitsune and Calderillas represent high-
potential opportunities the require drill testing
Priority 3 Targets
Blue sky-potential, with geological and geochemical work
demonstrating additional new discovery optionality
The Scale of the Exploration Opportunity is Immense El Zorro
Gold
Project
SIERRA DEL PORTRERO
3
KITSUNE
2
BUZZARD
3
LA FALDA
3
LA BREA
2
DRONE HILL
1
TERNERA EAST
1
CALDERILLAS NORTH
3
CALDERILLAS
2
TORO BLANCO
1
PENA BLANCA
2
N
2.5 5 10 km
0
GOLD MINERALISATION DEFINED ACROSS MULTIPLE DRILL-READY NEW DISCOVERY TARGETS 10
2
Resource Growth and New Discovery Drilling
Advancing and Growing the El Zorro Gold Development Project
CY26 CY27 CY28 CY29
Near-deposit growth
North-east extensional drilling
North-west extensional drilling
District-scale, new-discovery focused
Drone Hill, Ternera East and Toro Blanco
Additional belt scale targets
Multiple Critical Milestones Already Delivered
Mineral Resource Update and Maiden Ore Reserve
Delivered September 2026
Environmental Baseline Study Completion
Delivered August 2026
Definitive Feasibility Study Completion
On track for delivery by 2026 calendar year end
1
CY26 CY27 CY28 CY29
Decision Taken to Proceed to DFS
DFS
Approvals to Work and FID
EIA and RCA Approval
Construction and Commissioning
Target First Gold
DFS OUTCOMES EXPECTED TO PROVIDE NECESSARY CONFIDENCE TO TAKE KEY EARLY DEVELOPMENT DECISIONS 11
Project Development and Permitting
Project Financing Activities Commenced
Strong indicative support for traditional funding mix
Tesoro Gold Investment Highlights
SET TO BE CHILE’S
NEXT MAJOR ENTIRELY NEW
GOLD DEVELOPMENT
A leading new Chilean gold development,
advancing through DFS-level workstreams
towards a Final Investment Decision.
RARE STANDALONE
GREENFIELD GOLD MINE AND
PROCESSING OPPORTUNITY
In a market dominated by major-owned
projects, satellite deposits and brownfield
expansions.
IMMENSE MATERIAL UPSIDE
BEYOND THE CURRENT
DEVELOPMENT CASE
Near-mine growth and district-scale
discoveries across the broader >40km
gold corridor.
12
TESORO GOLD | INVESTOR PRESENTATION
TESORO GOLD | INVESTOR PRESENTATION
Why Chile is an Attractive Place to Build a New Gold Mine
It Has All The Hallmarks of a Premier Mining Jurisdiction
Mining Powerhouse
Established Existing Mining Infrastructure
Ports, power, services, and
local engineering expertise
Deep mining services
ecosystem in-country
Home to all the major
international mining companies
Strong institutional support
for responsible mining
TESORO GOLD | INVESTOR PRESENTATION 13
World-class Geology
Pro-investment, Key Economic Enabler
#1 copper
producer
Proven mineral endowment
in the Coastal Cordillera
US�56B
in active foreign mining
investment (2024)
27%
corporate tax, no mining-
specific royalties
13
#2 lithium producer,
growing gold sector
Predictable Permitting and a Structured Process
~12 months
Historical average
approval process
30–70%
Cut from 2025
reforms timelines
Exploitation concessions
awarded for indefinite duration
ALL DFS AND DEVELOPMENT READINESS WORKSTREAMS UNDERWAY OR MATERIALLY ADVANCED
Project Execution Capability
Strengthened
A high-calibre team of subject-matter
experts assembled to advance and
ultimately deliver El Zorro
Mining Execution Partner
Secured
STRACON Chile SpA. engaged
under an alliance-style framework to
deliver the project with Tesoro as a
single, integrated team
Permitting Advancing on
Schedule
Environmental baseline studies
successfully completed in
August 2026
People and Presence
Strengthened
Chilean management and project
capability enhanced with experienced
mining, engineering and project
development professionals
14
Refer to ASX announcement dated 1 July 2026 for additional detail on Tesoro DFS and development readiness activities.
Development Readiness Workstreams Accelerating
Declaration of the Maiden Ore Reserve a Material Step Towards Completion of All Key DFS Project Workstreams
Project Financing Activities Underway
To secure development funding as soon as permits are granted
El Zorro Gold
Project Detail
DFS and Development Readiness
Workstreams Underway or Materially Advanced
15
Annual Mill Head Grade and Gold Production Ounces
16
Current Ore Reserve Supports a Project Production Life of More than 13 Years
Mill Production (koz Au) and Head Grade (g/t Au)
TESORO GOLD | MAIDEN ORE RESERVE
-
30
111
107
112
104 106
111
102 101 100
41 41 41 41 41
1.13 1.22 1.18 1.23 1.14 1.16 1.22
1.12 1.11 1.10
0.45 0.45 0.45 0.45 0.45
-
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
0.0
20.0
40.0
60.0
80.0
100.0
120.0
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16
Production Ounces (koz Au) - 30 111 107 112 104 106 111 102 101 100 41 41 41 41 41
Head Grade (g/t Au) 1.13 1.22 1.18 1.23 1.14 1.16 1.22 1.12 1.11 1.10 0.45 0.45 0.45 0.45 0.45
Production Ounces (koz Au) Head Grade (g/t Au)
AVERAGE 1.16
G/T GOLD FOR
FIRST 10 YEARS
IN THE CURRENT
PRODUCTION
PROFILE
Refer to ASX Announcement 18 September 2026 .Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
19
25
28 29
39
45
39
27
10
7
0
2
6
5 4
3
5
5
5
4
4
0
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12
Ore (Mt) 2 6 5 4 3 5 5 5 4 4 0
Waste (Mt) 19 25 28 29 39 45 39 27 10 7 0
Strip Ratio 11.4 4.5 5.9 7.5 12.2 8.7 8.0 5.1 2.4 1.6 0.1
Waste (Mt) Ore (Mt) Strip Ratio
Production Metrics
17
PFS-level Technical Assumptions
Cost Estimates
TESORO GOLD | MAIDEN ORE RESERVE
Refer to ASX Announcement 18 September 2026 .Tesoro Gold Limited confirms that it is not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
Material Movement (Mtpa) and Strip Ratio (waste:ore)
OPERATING COST
Mining Cost US$/oz 831
Processing Cost US$/oz 494
G & A Cost US$/oz 154
Capital Lease Items US$/oz 59
TOTAL OPERATING COST ESTIMATE US$/oz 1,538
CAPITAL COST
Processing Plant US$M 189.3
Project Infrastructure US$M 8.5
Other Costs US$M 11.8
Mining capital US$M 25.5
Pre-strip Mining Activities US$M 41.4
TOTAL PRE-PRODUCTION CAPITAL COST US$M 276.5
Sustaining Capital (Residual LOM) US$M 46.3
Significant Execution Capability
Stracon Chile SpA (STRACON)
Strategic Alliance to support Mining studies,
mining and operating costs
BurnVoir Corporate Finance (BurnVoir)
Optimal project financing mix and key debt
facilities
High-calibre Team of Partners Assembled to Deliver the El Zorro Development
GR Engineering Services (GRES)
Study compilation, metallurgical test work, process
engineering and design, operating and capital costs
Knight Piésold Pty Ltd (KP)
Tailings disposal and design
Fivemark
Investor relations and media
Lynn Widenbar and
Associates
Resource Estimation
Peter O’Bryan and Associates
Geotechnical
ALS Perth
Metallurgical Test Work
Aguas CAP, TECHNOCAP, Servicios de Ingeniería IMA S.A.
Infrastructure and capital costs
Parez & Alverez
Environmental, social and permitting
18
TESORO GOLD | INVESTOR PRESENTATION
WASTE DUMP
TERNERA FINAL PIT OUTLINE
MAGAZINE
DRY STACKED TAILS
PROPOSED ACCESS ROAD AND WATER PIPELINE
ACCOMMODATION VILLAGE
PROPOSED HIGH-VOLTAGE POWER
MINE WORKSHOP
LOW-GRADE STOCKPILE
PROCESSING PLANT
N
Fenix Gold Project, Rio2 Limited, STRACON
Configuration and Construction
Ternera Gold Deposit Site layout diagram
Clear, Optimised Development Pathway Defined
• Completed trade-off studies confirmed optimal project configuration.
• A simple, single open pit mining operation with 3Mtpa processing plant,
capable of delivering over 110koz per annum of gold.
Construction Partner Engaged Under
Alliance-Style Framework
• Alliance-style framework established between STRACON and Tesoro
to deliver the project as a single, integrated team.
• STRACON is a well-known, engineering-led mining infrastructure
services group operating across the Americas, providing end-to-end
solutions across the mining lifecycle.
• Arrangement structured to enable disciplined performance against
agreed targets, for the mutual benefit of both parties.
Project Configuration Set, with Advanced Design Underway
Refer to ASX announcement dated 1 July 2026 and ASX announcement dated 25 February 2026.
19
TESORO GOLD | INVESTOR PRESENTATION
Processing Plant Design Set, Advanced Cost Analysis
Crushing
Ore stock
pile
Process Water
Desalination Plant
Leaching
Tanks
Ball Milling
Grind Size =125µm
Gravity
Circuit
Interstage Screens
Carbon Advance
Pulp Advance
Transfer Pumps
Electrowinning Smelting Gold doré
Fresh carbon after
pre-attritioning
Carbon acid
wash
Cyanide
and other
reagents
Carbon elution
Carbon
regeneration
Carbon fines reused for
other applications
Regenerated carbon
Simple, Low-cost Carbon in Pulp Processing Route
Dry Stacked
Tailings
+
-
Screens
Screens
20
Refer to ASX announcement dated 29 August 2025
TESORO GOLD | INVESTOR PRESENTATION
TOP: El Zorro Gold Project proposed powerline and water pipeline routes
Refer to ASX announcements dated 3 May 2024 and dated 1 July 2026
The El Zorro Water Pathway is a Key Project Differentiator
Testwork Confirms Bittern Wastewater
Delivers Strong Recoveries
• Aguas CAP Totoralillo desalination plant just 25km from
Ternera, with an MoU agreed for the supply of water to El Zorro.
• Advanced testwork using bittern wastewater delivered strong
gold recoveries and very low cyanide consumption.
• Alignment between process design and permitting requirements
reduces late-stage configuration and permitting risk.
PROPOSED ACCESS ROAD AND WATER PIPELINE
PROPOSED HIGH-VOLTAGE POWER
N
TOTORALILLO SUB-
STATION AND
DESALINATION PLANT
21
LEFT: Aguas CAP desalination plant
Process Water Pathway Validated
TESORO GOLD | INVESTOR PRESENTATION
Connection Authorisation Request Submitted
• A “Solicitud de Autorización de Conexión” submitted to Coordinator
Eléctrico Nacional for a 21MW power connection to El Zorro
Energy Delivery Via Tecnocap Infrastructure
• Non-binding MOU executed with Tecnocap
• Tecnocap’s 110KV high-capacity transmission line extends to
Totoralillo, about 25km west of Ternera
Chilean Grid Supplied Predominately by Renewables
• Hydro, solar and wind are the primary sources of grid power in Chile
• Provision of low cost (≈US12c/kwh) clean reliable power
175MVA
Transmission capacity of the
Tecnocap line
25km
Approximate distance
from Totoralillo to Ternera
84% renewable electricity
Peak hourly share of 84.4% in 2025
Chile is a Regional Clean Energy Leader
Clean Grid-Connected Power
Refer to ASX announcement dated 9 May 2025 and ASX announcement dated 1 July 2026
Energía Estratégica (2026), https://www.energiaestrategica.com/en/notes/gobierno-de-chile-
publica-su-hoja-de-ruta-para-alcanzar-un-peak-renovable-total-que-cambios-impulsa
22
TESORO GOLD | INVESTOR PRESENTATION
Tailings Design Adopts Leading-Practice Management Principles
Why Dry Stack Tailings?
• Reduced operational and geotechnical risk through elimination of
conventional slurry storage.
• Improved water stewardship, reducing process water demand and
supporting operations in water-constrained environments.
• Enhanced environmental performance, including reduced seepage
potential and improved closure outcomes.
• Reduces risk over the life of the facility in a high seismic zone.
• Alignment with stakeholder and regulatory expectations as
industry standards continue to evolve.
• Supports long-term project resilience through lower lifecycle risk
and greater operational flexibility.
Advancing Dry-stack Tailings Storage Facility Engineering and Design for Life-of-project Requirements
Refer to ASX announcement dated 1 July 2026.
ADOPTING A DRY STACK TAILINGS DESIGN IS A DELIBERATE AND PROACTIVE, RISK-BASED APPROACH
THAT STRENGTHENS PROJECT CREDENTIALS AND AIDS DEVELOPMENT READINESS
23
Expanding Our People and Presence
In Support of Our Chilean Execution Model
24
EIA kick-off meeting in Santiago, Chile.
New Tesoro office in Santiago Chile.
24
Tesoro Chilean Office Now Established
• Dedicated Chile operating presence established, with
project management and stakeholder engagement embedded
in-country.
• Executive development capability to drive the transition from
developer to development.
• Specialist consultants and in-country contractors engaged
• Cross-disciplinary execution model supports schedule
compression and early risk identification.
TESORO GOLD | INVESTOR PRESENTATION
Advancing Concurrently with Technical Workstreams
TESORO GOLD | INVESTOR PRESENTATION 25
Clearly Defined Permitting Process
• Following initial environmental desktop assessments, baseline
field studies commenced in August 2025
• These field study programmes were successfully completed
in August 2026
• Preparation and submission of EIA documentation to the
Chilean Environmental Impact Assessment System expected
to follow in late 2026 to early 2027
CHILE HAS ADOPTED A DISTINCTLY PRO-
MINING APPROACH TO PERMITTING AND
APPROVALS
Environmenta