Quarterly Activities Report
Released
Released
Announcement PDF
Sign up HERE to our Investor Hub
ASX ANNOUNCEMENT
23 JANUARY 2024
ASX: TSO OTCQB: TSORF
QUARTERLY ACTIVITIES AND CASHFLOW REPORT
FOR THE PERIOD ENDED 31 DECEMBER 2023
Tesoro Gold Limited (ASX: TSO, OTCQB: TSORF) (Tesoro or the Company) is pleased to report
on its activities for the quarter ended 31 December 2023 (the Quarter).
HIGHLIGHTS
•
New large outcropping gold anomaly identified at Drone Hill, located west of the
Ternera Gold Deposit (Ternera), with wide channel sample intercepts including:
•
47m @ 1.40g/t Au (EZTR004255) including;
─ 9m @ 4.66g/t Au
•
15m @ 0.53g/t Au (EZTR004132)
•
3m @ 1.88g/t Au (EZTR004110) 1
•
Assay results for initial eight (8) scout holes at Kitsune identified prospective lithology
and alteration with a similar geological setting to Ternera.
•
Results validate the prospectivity of Kitsune as a regional target with additional drilling
warranted to test high-priority zones.
•
Appointment of experienced finance executive Mr Graeme Morissey as Chief Financial
Officer (CFO).
•
Two-Tranche equity placement of A$3.0 million funding secured to advance El Zorro
drilling, project studies and new regional target generation.
•
Cash balance of A$1.2 million and zero debt at 31 December 2023.
•
Receipt of additional $A2.5 million of funding subsequent to Quarter end, comprising
of approximately A$1.25 million for partial payment of historical VAT credit and
$A1.25m for Tranche 2 of equity placement.
Tesoro Gold Managing Director, Zeff Reeves commented:
“We conclude CY2023 with very promising results from our drilling and surface sampling
activities around Ternera.
1
Refer ASX Announcement 19 October 2023
ASX ANNOUNCEMENT 23 JANUARY 2024
At Kitsune, gold intercepts further highlight the possibility of additional mineralisation similar
to that discovered previously at Ternera.
Similarly, robust results delineated from the outcropping anomaly at Drone Hill indicate the
potential for continuity of the Ternera mineralisation for large-scale resource growth. Post
quarter end additional $A2.5m of funding was received which places the Company in a
sound financial position to execute its plans to delineate additional gold resources during
2024.”
EL ZORRO GOLD PROJECT, CHILE
New large gold anomaly defined at Drone Hill
Detailed, systematic mapping and sampling work conducted at Drone Hill identified a
broad, continuous zone of outcropping gold mineralisation associated with a northwest
trending fault system within sedimentary rocks.
Positive results were returned from the surface sampling conducted west of Ternera. The
results delineated a new large outcropping gold anomaly which has never been drilled at
Drone Hill, with wide surface sample intersections of up to 47m returned, including:
•
47m @ 1.40g/t Au (EZTR004255) including;
─ 9m @ 4.66g/t Au
•
15m @ 0.53g/t Au (EZTR004132)
•
3m @ 1.88g/t Au (EZTR004110)
•
2m @ 5.21g/t Au (EZTR4108)
•
3m @ 2.11g/t Au (EZTR004282) 2.
A number of El Zorro Tonalite (EZT) intrusive dykes outcrop to the west of the northwest
trending fault system and the intersection of faults with the EZT presenting high-priority drill
targets for the next stage of work at Drone Hill (refer Figure 2 below).
Surface mineralisation is now confirmed to extend at least 750m west and 380m south of
the Ternera Gold Deposit (refer ASX announcement 18 September 2023).
Drilling is set to commence at this highly prospective target in the coming weeks.
Kitsune Drill Results
Results received for the initial eight (8) scout drill holes from the Kitsune Targets confirm the
prospectivity of the area to host additional gold mineralisation within a similar geological
setting to Ternera.
2
Refer ASX Announcement 19 October 2023
TESOROGOLD.COM.AU
2
ASX ANNOUNCEMENT 23 JANUARY 2024
All initial holes intersected the target EZT lithology adjacent to the Dorado fault, which are
the main gold host rocks at the Ternera Gold Deposit. Due to rugged access and
operational issues with the drilling contractor, the highest priority holes at Kitsune are yet to
be drilled. Kitsune warrants additional drilling to fully test the extensive surface gold
anomaly defined by mapping and sampling.
CORPORATE
Resignation of Director
On 5 October 2023, Tesoro announced the resignation of Ms Kristie Young as NonExecutive Director. Ms Young stepped down from the Tesoro board to focus on other
commitments.
As part of an ongoing Board re-composition, the Company intends to make new
appointments in due course.
Appointment of Chief Financial Officer
On 20 November 2023, Tesoro appointed Mr Graeme Morissey as CFO to the Company,
succeeding Ms Pennee Osmond.
Mr Morissey has held Director-level roles in the audit divisions of global accounting firms EY,
KPMG and Grant Thornton. He has over 15 years’ direct experience in servicing clients within
the mining exploration and development sector. This includes specific expertise extending
across compliance with the Australian Securities Exchange (ASX), the Australian Accounting
Standards Board, the Corporations Act 2001 (Cth) and Department of Mines regulation.
Mr Morissey has also consulted directly to CFOs within the Australian mining sector, which
has included services to assist management to optimise internal reporting processes, cash
management and cashflow forecasting. His clients have included gold production
companies Westgold and Ora Banda.
Mr Morissey is a Chartered Accountant (CA), a Fellow of the Governance Institute of
Australia (FGIA) and a member of the Australian Institute of Company Directors (MAICD).
He holds a Bachelor of Commerce from McMaster University in Canada.
Capital Raising to Advance Gold Exploration
On 13 November 2023, Tesoro announced an equity placement to raise approximately
A$3.0 million (before costs). Funds raised from the placement are to be deployed towards
drilling at Drone Hill, Ternera and district targets, to advance project studies, metallurgical
testing and for new target generation.
TESOROGOLD.COM.AU
3
ASX ANNOUNCEMENT 23 JANUARY 2024
The Placement comprised the issue of approximately 166.7 million new fully paid ordinary
shares in the Company to professional and sophisticated investors at an issue price of
$0.018 per share comprising:
•
Tranche 1: ~$1,752,800 via the issue of approximately 97,377,778 Placement Shares
within the Company’s placement capacity under ASX Listing Rule 7.1 and 7.1A
(4,016,521 shares under Listing Rule 7.1 and 93,361,257 under Listing Rule 7.1A); and
•
Tranche 2: ~$1,247,200 via the issue of approximately 69,288,889 Placement Shares to
Corporate International Holdings BV, a wholly owned subsidiary of Gold Fields Limited,
which were subject to obtaining shareholder approval at an Extraordinary General
Meeting (EGM) held on 15 January 2024.
Strong support was received from institutional and sophisticated investors including the
$1,247,200 commitment from strategic partner Gold Fields Limited. The investment via
Gold Fields’ nominee took their shareholding in the Company to approximately 18.91%.
Initial Tax Refund Received
Post Quarter end, Tesoro announced on 10 January 2024 that it had received an initial
payment of the historical Value Added Tax (VAT) credit from the Chilean tax authority of
CLP745,796,841 (approximately A$1.25 million) through its subsidiary, El Zorro S.C.M.
Tesoro’s 95%-owned Chilean subsidiary, Tesoro Mining Chile SpA (TMC), owns 93.8% of El
Zorro S.C.M. the joint venture company that holds the El Zorro Gold Project concessions.
As previously announced (refer ASX announcement 18 September 2023), El Zorro S.C.M.
was approved for exporter status allowing the recovery of historical VAT made on project
expenditure since 2017.
An outstanding VAT tax credit balance of CLP1,485,063,149 (approximately A$2.50 million)
remains outstanding following receipt of the initial CLP745,796,841. Tesoro anticipates that
an additional payment or payments will be made by the Chilean tax authority in the
coming months.
Expenditure and Payments to Related Parties
During the Quarter, the Company spent approximately A$0.90 million on exploration
activities, which comprised primarily of costs associated with its drill programs at Kitsune and
surface mapping and sampling programs at Drone Hill.
As outlined in the Appendix 5B for the quarter ending 31 December 2023 (sections 6.1 and
6.2), approximately A$253,522 in payments were made to related parties and/or their
associates as remuneration (inc. superannuation) for the Managing Director, Non-Executive
Director fees and Consulting fees.
TESOROGOLD.COM.AU
4
ASX ANNOUNCEMENT 23 JANUARY 2024
Cash
Tesoro’s cash balance at 31 December 2023 was A$1.20 million and the Company had zero
debt (excluding typical trade creditors).
Post quarter end Tesoro received ~$1,247,200 being Tranche 2 of the placement and
payment of the historical Value Added Tax (VAT) credit from the Chilean tax authority of
CLP745,796,841 (approximately A$1.25 million) through its subsidiary, El Zorro S.C.M. Current
cash is approximately $3.8 million.
Authorised by the Board of Tesoro Gold Ltd.
For more information:
Company:
Zeff Reeves, Managing Director
Tesoro Gold Limited
info@tesorogold.com.au
TESOROGOLD.COM.AU
5
ASX ANNOUNCEMENT 23 JANUARY 2024
Figure 1 – Geology map and surface sample locations at Drone Hill showing proximity to the Ternera Gold
Deposit. Hole ZDDH0095 (ASX Announcement 23 March 2021) is approximately 350m southwest of this new
undrilled anomaly.
TESOROGOLD.COM.AU
6
ASX ANNOUNCEMENT 23 JANUARY 2024
Figure 2 – Drone Hill schematic geology section looking northeast showing prospective gold zone associated
with faulting and EZT intrusive units (ASX Announcement 19 October 2023).
TESOROGOLD.COM.AU
7
ASX ANNOUNCEMENT 23 JANUARY 2024
Figure 3 – El Zorro Gold Project surface sampling results for the Ternera to Calderillas mineralised trend. Diamond
TESOROGOLD.COM.AU
8
ASX ANNOUNCEMENT 23 JANUARY 2024
symbols show results locations for this report. Circle symbols denote previously announced results. (Refer ASX
Announcement 24 May 2023 and 9 March 2023).
Table 1: Toro Blanco and Kitsune drillhole locations.
Hole Location
Hole Orientation
Drill Depth (m)
TARGET
Northing Easting Elevation
Dip
Azimuth
ZDDH00327 342290
7037884 890
-60
240
31.90
Toro Blanco (Abandoned)
ZDDH00327A 342290
7037883 890
-60
240
146.50
Toro Blanco
ZDDH00328 341359
7038855 690
-60
240
233.50
Kitsune
ZDDH00329 341724
7038695 699
-60
240
200.00
Kitsune
ZDDH00330 341788
7038750 745
-60
240
200.00
Kitsune
ZDDH00331 341828
7038480 830
-60
240
146.60
Kitsune
ZDDH00332 341426
7038921 642
-60
240
100.00
Kitsune
ZDDH00333 340938
7039755 791
-60
240
130.00
Kitsune
ZDDH00334 341249
7039400 684
-60
240
51.50
Kitsune (Abandoned)
ZDDH00335 340938
7039755 791
-60
0
140.10
Kitsune
Hole ID
TESOROGOLD.COM.AU
9
ASX ANNOUNCEMENT 23 JANUARY 2024
About Tesoro
Future Performance
Tesoro Gold Limited was established with a strategy o
acquiring, exploring, and developing mining project
in the Coastal Cordillera region of Chile. The Coasta
Cordillera region is host to multiple world class coppe
and gold mines, has well established infrastructure
service providers and an experienced minin
workforce. Large areas of the Coastal Cordiller
remain unexplored due to the unconsolidated natur
of mining concession ownership, but Tesoro, via its in
country network and experience has been abl
secure rights to a district scale gold project in-line wit
the Company’s strategy. Tesoro’s 95% owned Chilea
subsidiary owns 85% of the El Zorro Gold Project.
This announcement may contain certain forwardlooking statements and opinion. Forward-looking
statements, including projections, forecasts and
estimates, are provided as a general guide only
and should not be relied on as an indication or
guarantee of future performance and involve
known
and
unknown
risks,
uncertainties,
assumptions, contingencies and other important
factors, many of which are outside the control of
the Company and which are subject to change
without notice and could cause the actual results,
performance or achievements of the Company to
be materially different from the future results,
performance or achievements expressed or implied
by such statements. Past performance is not
necessarily a guide to future performance and no
representation or warranty is made as to the
likelihood of achievement or reasonableness of any
forward-looking statements or other forecast.
Nothing contained in this announcement, nor any
information made available to you is, or and shall
be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the
future performance of Tesoro.
Competent Persons Statements
The information in this report that relates to
Exploration Results is based on information
compiled by Mr Zeffron Reeves (B App Sc (Hons)
Applied Geology) MBA, MAIG). Mr Reeves is a
member of the Australian Institute of Geoscientists
and a Director and shareholder of the Company.
Mr Reeves has sufficient experience that is relevant
to the style of mineralisation and type of deposit
under consideration and to the activity which he is
undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Reeves consents to
the inclusion in this report of the matters based on
this information in the form and context in which it
appears.
The information in this report that relates to Mineral
Resources is based on information compiled by Mr
Lynn Widenbar, a Competent Person who is a
Member of The Australasian Institute of Mining and
Metallurgy. Mr Widenbar is acting as an
independent consultant to Tesoro Gold Limited. Mr
Widenbar has sufficient experience that is relevant
to the style of mineralisation and type of deposit
under consideration, and to the activity being
undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’.
The Company
confirms that the form and context in which the
Competent Person’s findings are presented have
not been materially modified from the original
announcement on 9 March 2023.
TESOROGOLD.COM.AU
10
ASX ANNOUNCEMENT 23 JANUARY 2024
APPENDIX 1: CONCESSION SCHEDULE AS AT 31 DECEMBER 2023
EL ZORRO GOLD PROJECT EXPLORATION CONCESSIONS (85%* Tesoro Mining Chile SpA)
10-august-2026
Size
(ha)
200
Concession
type
Exploration
ZORRO 2B
10-august-2026
200
Exploration
ZORRO 3B
10-august-2026
200
Exploration
ZORRO 4B
10-august-2026
100
Exploration
ZORRO 5B
10-august-2026
200
Exploration
ZORRO 6B
10-august-2026
200
Exploration
PUNTA DE DIAMENTE 1A
17-august-2025
200
Exploration
PUNTA DE DIAMENTE 2A
06-august-2025
300
Exploration
PUNTA DE DIAMENTE 3A
28-september-2025
300
Exploration
LA NEGRA COJA 1A
10-august-2025
200
Exploration
LA NEGRA COJA 2A
06-august-2025
300
Exploration
LA NEGRA COJA 3A
10-august-2025
300
Exploration
LA NEGRA COJA 4A
06-august-2025
200
Exploration
LA NEGRA COJA 5A
09-august-2025
300
Exploration
LA NEGRA COJA 6A
11-august-2025
200
Exploration
LA NEGRA COJA 7A
09-august-2025
300
Exploration
LA NEGRA COJA 8A
11-august-2025
300
Exploration
LA NEGRA COJA 9A
09-august-2025
200
Exploration
LA NEGRA COJA 10A
11-august-2025
300
Exploration
LA NEGRA COJA 11A
10-august-2025
300
Exploration
LA NEGRA COJA 12A
11-august-2025
200
Exploration
LA NEGRA COJA 13A
10-august-2025
300
Exploration
LA NEGRA COJA 14A
11-august-2025
300
Exploration
LA NEGRA COJA 15A
10-august-2025
300
Exploration
LA NEGRA COJA 16A
18-august-2025
200
Exploration
LA NEGRA COJA 17A
17-august-2025
300
Exploration
LA NEGRA COJA 18A
18-august-2025
300
Exploration
LA NEGRA COJA 19A
11-august-2025
200
Exploration
NICE BARREL 1
05-august-2025
200
Exploration
NICE BARREL 2
05-august-2025
300
Exploration
NICE BARREL 3
06-august-2025
200
Exploration
NICE BARREL 4
05-august-2025
200
Exploration
NICE BARREL 5
06-august-2025
200
Exploration
NICE BARREL 6
05-august-2025
200
Exploration
NICE BARREL 7
10-august-2025
200
Exploration
NICE BARREL 13
28-september-2025
300
Exploration
NICE BARREL 12
28-september-2025
200
Exploration
NICE BARREL 11
28-september-2025
300
Exploration
NICE BARREL 10
28-september-2025
200
Exploration
NICE BARREL 9
28-september-2025
300
Exploration
NICE BARREL 8
28-september-2025
200
Exploration
SIERRA PATACONES 1
Replaced by SIERRA PATACONES 1A in process
300
Exploration
Concession Name
Date of Expiration
ZORRO 1B
TESOROGOLD.COM.AU
11
ASX ANNOUNCEMENT 23 JANUARY 2024
Concession Name
Date of Expiration
Size
(ha)
Concession
type
SIERRA PATACONES 2
Replaced by SIERRA PATACONES 2A in process
300
Exploration
SIERRA PATACONES 3
Replaced by SIERRA PATACONES 3A in process
300
Exploration
SIERRA PATACONES 4
Replaced by SIERRA PATACONES 4A in process
300
Exploration
SIERRA PATACONES 5
Replaced by SIERRA PATACONES 5A in process
300
Exploration
SIERRA PATACONES 6
Replaced by SIERRA PATACONES 6A in process
300
Exploration
SIERRA PATACONES 7
Replaced by SIERRA PATACONES 7A in process
300
Exploration
SIERRA PATACONES 8
Replaced by SIERRA PATACONES 8A in process
300
Exploration
SIERRA PATACONES 9
Replaced by SIERRA PATACONES 9A in process
300
Exploration
SIERRA PATACONES 10
Replaced by SIERRA PATACONES 10A in process
300
Exploration
SIERRA PATACONES 11
Replaced by SIERRA PATACONES 11A in process
300
Exploration
SIERRA PATACONES 12
Replaced by SIERRA PATACONES 12A in process
300
Exploration
SIERRA PATACONES 13
Replaced by SIERRA PATACONES 13A in process
300
Exploration
SIERRA PATACONES 14
Replaced by SIERRA PATACONES 14A in process
300
Exploration
SIERRA PATACONES 15
Replaced by SIERRA PATACONES 15A in process
300
Exploration
SIERRA PATACONES 20
Replaced by SIERRA PATACONES 20A in process
300
Exploration
SIERRA PATACONES 19
Replaced by SIERRA PATACONES 19A in process
300
Exploration
SIERRA PATACONES 18
Replaced by SIERRA PATACONES 18A in process
300
Exploration
SIERRA PATACONES 17
Replaced by SIERRA PATACONES 17A in process
300
Exploration
SIERRA PATACONES 16
Replaced by SIERRA PATACONES 16A in process
300
Exploration
SIERRA PATACONES 21
Replaced by SIERRA PATACONES 21A in process
300
Exploration
SIERRA PATACONES 22
Replaced by SIERRA PATACONES 22A in process
300
Exploration
SIERRA PATACONES 23
Replaced by SIERRA PATACONES 23A in process
300
Exploration
SIERRA PATACONES 24
Replaced by SIERRA PATACONES 24A in process
300
Exploration
SIERRA PATACONES 25
Replaced by SIERRA PATACONES 25A in process
300
Exploration
SIERRA PATACONES 26
Replaced by SIERRA PATACONES 26A in process
300
Exploration
SIERRA PATACONES 27
Replaced by SIERRA PATACONES 27A in process
300
Exploration
SIERRA PATACONES 28
Replaced by SIERRA PATACONES 28A in process
300
Exploration
SIERRA PATACONES 29
Replaced by SIERRA PATACONES 29A in process
300
Exploration
SIERRA PATACONES 30
Replaced by SIERRA PATACONES 30A in process
300
Exploration
SIERRA PATACONES 31
Replaced by SIERRA PATACONES 31A in process
300
Exploration
SIERRA PATACONES 32
Replaced by SIERRA PATACONES 32A in process
300
Exploration
SIERRA PATACONES 33
Replaced by SIERRA PATACONES 33A in process
300
Exploration
SIERRA PATACONES 34
Replaced by SIERRA PATACONES 34A in process
300
Exploration
SIERRA PATACONES 35
Replaced by SIERRA PATACONES 35A in process
300
Exploration
SIERRA PATACONES 42
Replaced by SIERRA PATACONES 42A in process
300
Exploration
SIERRA PATACONES 41
Replaced by SIERRA PATACONES 41A in process
300
Exploration
SIERRA PATACONES 40
Replaced by SIERRA PATACONES 40A in process
300
Exploration
SIERRA PATACONES 39
Replaced by SIERRA PATACONES 39A in process
300
Exploration
SIERRA PATACONES 38
Replaced by SIERRA PATACONES 38A in process
300
Exploration
SIERRA PATACONES 37
Replaced by SIERRA PATACONES 37A in process
300
Exploration
TESOROGOLD.COM.AU
12
ASX ANNOUNCEMENT 23 JANUARY 2024
Concession Name
Date of Expiration
Size
(ha)
Concession
type
SIERRA PATACONES 36
Replaced by SIERRA PATACONES 36A in process
300
Exploration
SIERRA PATACONES 43
Replaced by SIERRA PATACONES 43A in process
300
Exploration
SIERRA PATACONES 44
Replaced by SIERRA PATACONES 44A in process
300
Exploration
SIERRA PATACONES 45
Replaced by SIERRA PATACONES 45A in process
300
Exploration
SIERRA PATACONES 46
Replaced by SIERRA PATACONES 46A in process
300
Exploration
SIERRA PATACONES 47
Replaced by SIERRA PATACONES 47A in process
300
Exploration
SIERRA PATACONES 48
Replaced by SIERRA PATACONES 48A in process
300
Exploration
SIERRA PATACONES 49
Replaced by SIERRA PATACONES 49A in process
300
Exploration
SIERRA PATACONES 50
Replaced by SIERRA PATACONES 50A in process
300
Exploration
SIERRA PATACONES 51
Replaced by SIERRA PATACONES 51A in process
300
Exploration
SIERRA PATACONES 53
Replaced by SIERRA PATACONES 53A in process
300
Exploration
SIERRA PATACONES 54
Replaced by SIERRA PATACONES 54A in process
300
Exploration
SIERRA PATACONES 55
Replaced by SIERRA PATACONES 55A in process
300
Exploration
SIERRA PATACONES 56
Replaced by SIERRA PATACONES 56A in process
300
Exploration
SIERRA PATACONES 57
Replaced by SIERRA PATACONES 57A in process
300
Exploration
SIERRA PATACONES 62
Replaced by SIERRA PATACONES 62A in process
300
Exploration
SIERRA PATACONES 61
Replaced by SIERRA PATACONES 61A in process
300
Exploration
SIERRA PATACONES 60
Replaced by SIERRA PATACONES 60A in process
300
Exploration
SIERRA PATACONES 59
Replaced by SIERRA PATACONES 59A in process
300
Exploration
SIERRA PATACONES 58
Replaced by SIERRA PATACONES 58A in process
300
Exploration
SIERRA PATACONES 63
Replaced by SIERRA PATACONES 63A in process
300
Exploration
SIERRA PATACONES 64
Replaced by SIERRA PATACONES 64A in process
300
Exploration
SIERRA PATACONES 65
Replaced by SIERRA PATACONES 65A in process
300
Exploration
SIERRA PATACONES 66
Replaced by SIERRA PATACONES 66A in process
300
Exploration
SIERRA PATACONES 67
Replaced by SIERRA PATACONES 67A in process
300
Exploration
SIERRA PATACONES 68
Replaced by SIERRA PATACONES 68A in process
300
Exploration
SIERRA PATACONES 69
Replaced by SIERRA PATACONES 69A in process
300
Exploration
SIERRA PATACONES 70
Replaced by SIERRA PATACONES 70A in process
300
Exploration
SIERRA PATACONES 71
Replaced by SIERRA PATACONES 71A in process
300
Exploration
SIERRA PATACONES 72
Replaced by SIERRA PATACONES 72A in process
300
Exploration
SIERRA PATACONES 73
Replaced by SIERRA PATACONES 73A in process
300
Exploration
SIERRA PATACONES 74
Replaced by SIERRA PATACONES 74A in process
300
Exploration
SIERRA PATACONES 75
Replaced by SIERRA PATACONES 75A in process
300
Exploration
SIERRA PATACONES 76
Replaced by SIERRA PATACONES 76A in process
300
Exploration
SIERRA PATACONES 77
Replaced by SIERRA PATACONES 77A in process
300
Exploration
SIERRA PATACONES 84
Replaced by SIERRA PATACONES 84A in process
300
Exploration
SIERRA PATACONES 83
Replaced by SIERRA PATACONES 83A in process
300
Exploration
SIERRA PATACONES 82
Replaced by SIERRA PATACONES 82A in process
300
Exploration
SIERRA PATACONES 81
Replaced by SIERRA PATACONES 81A in process
300
Exploration
SIERRA PATACONES 80
Replaced by SIERRA PATACONES 80A in process
300
Exploration
TESOROGOLD.COM.AU
13
ASX ANNOUNCEMENT 23 JANUARY 2024
Concession Name
Date of Expiration
Size
(ha)
Concession
type
SIERRA PATACONES 79
Replaced by SIERRA PATACONES 79A in process
300
Exploration
SIERRA PATACONES 78
Replaced by SIERRA PATACONES 78A in process
300
Exploration
SIERRA PATACONES 52
Replaced by SIERRA PATACONES 52A in process
300
Exploration
GOLD STORE 72
Replaced by GOLD STORE 72A in process
300
Exploration
GOLD STORE 71
Replaced by GOLD STORE 71A in process
300
Exploration
GOLD STORE 70
Replaced by GOLD STORE 70A in process
300
Exploration
GOLD STORE 69
Replaced by GOLD STORE 69A in process
300
Exploration
GOLD STORE 68
Replaced by GOLD STORE 68A in process
300
Exploration
GOLD STORE 67
Replaced by GOLD STORE 67A in process
300
Exploration
GOLD STORE 66
Replaced by GOLD STORE 66A in process
300
Exploration
GOLD STORE 1
Replaced by GOLD STORE 1A in process
300
Exploration
GOLD STORE 2
Replaced by GOLD STORE 2A in process
300
Exploration
GOLD STORE 3
Replaced by GOLD STORE 3A in process
300
Exploration
GOLD STORE 4
Replaced by GOLD STORE 4A in process
300
Exploration
GOLD STORE 5
Replaced by GOLD STORE 5A in process
300
Exploration
GOLD STORE 6
Replaced by GOLD STORE 6A in process
300
Exploration
GOLD STORE 7
Replaced by GOLD STORE 7A in process
300
Exploration
GOLD STORE 8
Replaced by GOLD STORE 8A in process
300
Exploration
GOLD STORE 9
Replaced by GOLD STORE 9A in process
300
Exploration
GOLD STORE 10
Replaced by GOLD STORE 10A in process
300
Exploration
GOLD STORE 11
Replaced by GOLD STORE 11A in process
300
Exploration
GOLD STORE 12
Replaced by GOLD STORE 12A in process
300
Exploration
GOLD STORE 13
Replaced by GOLD STORE 13A in process
300
Exploration
GOLD STORE 14
Replaced by GOLD STORE 14A in process
300
Exploration
GOLD STORE 15
Replaced by GOLD STORE 15A in process
300
Exploration
GOLD STORE 16
Replaced by GOLD STORE 16A in process
300
Exploration
GOLD STORE 17
Replaced by GOLD STORE 17A in process
300
Exploration
GOLD STORE 18
Replaced by GOLD STORE 18A in process
300
Exploration
GOLD STORE 19
Replaced by GOLD STORE 19A in process
300
Exploration
GOLD STORE 20
Replaced by GOLD STORE 20A in process
300
Exploration
GOLD STORE 21
Replaced by GOLD STORE 21A in process
300
Exploration
GOLD STORE 22
Replaced by GOLD STORE 22A in process
300
Exploration
GOLD STORE 23
Replaced by GOLD STORE 23A in process
300
Exploration
GOLD STORE 24
Replaced by GOLD STORE 24A in process
300
Exploration
GOLD STORE 25
Replaced by GOLD STORE 25A in process
300
Exploration
GOLD STORE 26
Replaced by GOLD STORE 26A in process
300
Exploration
GOLD STORE 27
Replaced by GOLD STORE 27A in process
300
Exploration
GOLD STORE 28
Replaced by GOLD STORE 28A in process
300
Exploration
GOLD STORE 29
Replaced by GOLD STORE 29A in process
300
Exploration
GOLD STORE 30
Replaced by GOLD STORE 30A in process
300
Exploration
GOLD STORE 36
Replaced by GOLD STORE 36A in process
300
Exploration
GOLD STORE 35
Replaced by GOLD STORE 35A in process
300
Exploration
GOLD STORE 34
Replaced by GOLD STORE 34A in process
300
Exploration
GOLD STORE 33
Replaced by GOLD STORE 33A in process
300
Exploration
GOLD STORE 37
Replaced by GOLD STORE 37A in process
300
Exploration
GOLD STORE 38
TESOROGOLD.COM.AU
Replaced by GOLD STORE 38A in process
300
Exploration
14
ASX ANNOUNCEMENT 23 JANUARY 2024
Replaced by GOLD STORE 39A in process
Size
(ha)
300
Concession
type
Exploration
GOLD STORE 40
Replaced by GOLD STORE 40A in process
300
Exploration
GOLD STORE 41
Replaced by GOLD STORE 41A in process
300
Exploration
GOLD STORE 42
Replaced by GOLD STORE 42A in process
300
Exploration
GOLD STORE 43
Replaced by GOLD STORE 43A in process
300
Exploration
GOLD STORE 44
Replaced by GOLD STORE 44A in process
300
Exploration
GOLD STORE 45
Replaced by GOLD STORE 45A in process
300
Exploration
GOLD STORE 46
Replaced by GOLD STORE 46A in process
300
Exploration
GOLD STORE 47
Replaced by GOLD STORE 47A in process
300
Exploration
GOLD STORE 48
Replaced by GOLD STORE 48A in process
300
Exploration
GOLD STORE 49
Replaced by GOLD STORE 49A in process
300
Exploration
GOLD STORE 50
Replaced by GOLD STORE 50A in process
300
Exploration
GOLD STORE 51
Replaced by GOLD STORE 51A in process
300
Exploration
GOLD STORE 52
Replaced by GOLD STORE 52A in process
300
Exploration
GOLD STORE 53
Replaced by GOLD STORE 53A in process
300
Exploration
GOLD STORE 54
Replaced by GOLD STORE 54A in process
300
Exploration
GOLD STORE 55
Replaced by GOLD STORE 55A in process
300
Exploration
GOLD STORE 56
Replaced by GOLD STORE 56A in process
200
Exploration
GOLD STORE 57
Replaced by GOLD STORE 57A in process
300
Exploration
GOLD STORE 58
Replaced by GOLD STORE 58A in process
300
Exploration
GOLD STORE 59
Replaced by GOLD STORE 59A in process
300
Exploration
GOLD STORE 60
Replaced by GOLD STORE 60A in process
300
Exploration
GOLD STORE 61
Replaced by GOLD STORE 61A in process
300
Exploration
GOLD STORE 62
Replaced by GOLD STORE 62A in process
300
Exploration
GOLD STORE 63
Replaced by GOLD STORE 63A in process
300
Exploration
GOLD STORE 64
Replaced by GOLD STORE 64A in process
300
Exploration
GOLD STORE 65
Replaced by GOLD STORE 65A in process
300
Exploration
VACAS FLACAS 1
26-October-2026
300
Exploration
VACAS FLACAS 2
26-October-2026
300
Exploration
VACAS FLACAS 5
26-October-2026
300
Exploration
VACAS FLACAS 6
26-October-2026
300
Exploration
VACAS FLACAS 7
26-October-2026
300
Exploration
VACAS FLACAS 8
26-October-2026
300
Exploration
VACAS FLACAS 9
26-October-2026
300
Exploration
VACAS FLACAS 10
26-October-2026
300
Exploration
VACAS FLACAS 11
26-October-2026
300
Exploration
VACAS FLACAS 12
26-October-2026
300
Exploration
VACAS FLACAS 13
26-October-2026
300
Exploration
VACAS FLACAS 14
26-October-2026
300
Exploration
VACAS FLACAS 15
26-October-2026
300
Exploration
VACAS FLACAS 16
26-October-2026
300
Exploration
VACAS FLACAS 17
26-October-2026
300
Exploration
VACAS FLACAS 18
26-October-2026
300
Exploration
VACAS FLACAS 19
26-October-2026
300
Exploration
V
Share your feedback
Discover