Investor Presentation
Released
Released
Announcement PDF
INVESTOR PRESENTATION
EL ZORRO GOLD PROJECT, CHILE
NOVEMBER 2023
ASX:TSO | OTCQB:TSORF
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
DISCLAIMER
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have been prepared by Tesoro Gold Limited (Tesoro or the Company) and approved by the Board of the Company. The information
contained in the Presentation (Information) is summary only and should be read in conjunction with any other documents provided to you by the Company. The Information is current as at 13 November 2023 and the Company does not
undertake to provide any additional or update information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the Company that you have read,
understood and accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or fairness of the
information, opinions and conclusions contained in this Presentation. Tesoro, or related bodies corporate, shareholders or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or
make any representations or warranties, express or implied, as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro does not
represent or warrant that this Presentation is complete or that it contains all material information about Tesoro or which, a prospective investor or purchaser may require in evaluating a possible investment in Tesoro or acquisition of shares. To
the maximum extent permitted by law, Tesoro and its Agents expressly disclaim any and all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this
Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of Tesoro and which are subject to change without notice and could cause the actual results, performance or
achievements of Tesoro to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of this
Presentation are cautioned not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to be used as the basis for making an
investment decision. In providing this Presentation, Tesoro has not considered the objectives, financial position or needs of any particular recipients. Before making an investment decision prospective investors should consider the
appropriateness of the information in this Presentation having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments Commission or any other foreign
regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase
or sale in the United States or any other jurisdiction in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or the
securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States. The information in this Presentation is strictly confidential. It may not be disclosed, reproduced,
disseminated, quoted or referred to, in whole or in part, without the express consent of Tesoro.
Competent Person’s Statements
The information in this report that relates to Exploration Results and Exploration Target is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in this report of the matters based on this information in
the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled by Mr Lynn Widenbar, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Widenbar is acting as an
independent consultant to Tesoro Gold Limited. Mr Widenbar has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person
as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Company confirms that Mr Widenbar consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears and that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original announcement on 9 March 2023.
The information in this report that relates to the Production Target, assumptions on Modifying Factors and evaluation of other relevant factors are based on and fairly represents information and supporting documentation that has been
compiled for this announcement and have been compiled under the supervision of Mr Linton Putland BEng (Mining), MSc (Mineral Economics) & Member AusIMM. Mr Putland is a Director of the Company. Mr Putland has reviewed and approved
the technical content of this announcement. Mr Putland is a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012). Mr Putland
consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
The Company has released all material information that relates to Exploration Results for the El Zorro Gold Project, on a continuous basis to the ASX and in compliance with JORC 2012. The Company confirms that it is not aware of any new
information that materially affects the content of this ASX release.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 2
UNLOCKING EL ZORRO’S FULL POTENTIAL
DUAL TRACK ADVANCEMENT STRATEGY
DEVELOPING
TERNERA
DISTRICT
DISCOVERIES
REFINE THE DEVELOPMENT
PATHWAY
CONFIRM CONTINUITY OUTSIDE
TERNERA
CONTINUE GROWING THE
RESOURCE BASE
TEST TERNERA STYLE
TARGETS
Phase 2 metallurgical testwork,
planning and permitting
Define ounces outside of the
existing Ternera Deposit
Infill drilling and
resource growth
Aggressive drill testing of look-alike
targets
DISCOVER AND DEFINE
NEW TARGETS
CONTINUED TARGET
GENERATION
New and extensional
mineralisation discoveries
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Ongoing mapping and
sampling programs
INVESTOR PRESENTATION | 3
CORPORATE SNAPSHOT
TESORO GOLD (ASX: TSO, OTCQB: TSORF)
Capital structure (pro-forma)1
Gold Fields Strategic Investment
Share price2
A$0.019
1,220.3 M
Shares on issue3
Performance rights3
73.41 M
Listed options (ASX: TSOO and ASX: TSOOA)3
174.76 M
Market capitalisation (undiluted)
A$23.19 M
Cash4
A$4.00 M
Debt4
Nil
Register detail5 (or pro-forma)
9.4%
14.9%
56.2%
BOARD AND MANAGEMENT
GOLD FIELDS
INSTITUTIONAL INVESTORS
19.5%
•
Continued support from one of the world’s largest gold mining
companies
•
Globally diverse South African gold producer with nine operating mines
in Australia, Peru, South Africa and Ghana (including the Asanko JV) and
two projects in Canada and Chile
•
Annual gold production of approximately 2.2 Moz6
•
Owns the Salares Norte high-grade open pit gold-silver project in
Northern Chile, 190 km north-east from the El Zorro Gold Project,
scheduled for first gold shortly
•
Processing capacity of 2.8 Moz per year of metal doré for
approximately 9.9 t of gold annually7
•
Tesoro strategic investment facilitates acceleration of regional and
district scale exploration at the El Zorro Gold Project
•
Subject to shareholder approval of Tranche 2, Gold Fields will have a
19.05% shareholding in Tesoro Gold
OTHER INVESTORS
1.
Post A$3 million 2 tranche share placement at $0.018 refer ASX announcement 13 November 2023
2. As at 10 November 2023
3. As at 7 March 2023: TSOO expiring 7 July 2025 and TSOOA expiring 13 December 2025
4. As at 30 September 2023 plus $3m placement
5. At 13 November 2023
6. Source: www.goldfields.com
7. Source: https://www.bnamericas.com/en/features/5-chilean-gold-projects-set-to-help-boost-national-output
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 4
RAPID RESOURCE DELINEATION
EXPLORATION SUCCESS CONFIRMED EL ZORRO AS A NEW GOLD DISTRICT
APRIL 20232
TERNERA GOLD DEPOSIT
MAR 2021
JUL 2021
JAN 2022
MAY 2022
NOV 2022
Increased
Maiden Mineral
Gold discovered at
Ternera MRE
Gold Fields Ltd makes
SCOPING STUDY
ownership of
Resource Estimate
Drone Hill target, 2km
increases to 1.1Moz
strategic investment
El Zorro to 85%
(MRE) at Ternera,
north and west of
@ 1.12g/t Au
to accelerate
TECHNICALLY AND
661 koz Au
Ternera
exploration
SEP 2023
PHASE 1 OPEN PIT
FINANCIALLY ROBUST
Surface sampling highlight
Ternera expansion
potential, with grades up to
STARTER PIT
20.80 g/t Au returned
GOLD MINING AND
FEB 2020
PROCESSING OPERATION
Listed on the ASX
TSO
2021
2022
2023
MARCH 20231
TERNERA MINERAL
1.
2.
RESOURCE INCREASED
APR 2021
SEP 2021
MAR 2022
AUG 2022
Gold discovered at
Metallurgical test
Spectacular hit at
Significant intersection at
Ternera East and
work confirmed
Ternera, ZDDH0288
Ternera ZDDH0297
(63% INDICATED)
100,000m drill
+94% recoveries
returned 64m @
returned: 435m @ 1.22g/t
INITIAL EXPLORATION
program completed
7.61g/t Au incl 7m @
Au incl 90m @ 3.07g/t Au
TARGET OF 48.5 – 101.0 Mt
at Ternera
66.10g/t Au
incl 21m @ 9.19g/t Au
AT 0.91 – 1.45g/t
TO 1.3 Moz AT 1.18g/t
Refer Tesoro ASX release dated 9 March 2023 Mineral Resource Update and Exploration Target, and Appendix A.
For full Scoping Study details, refer Tesoro ASX release dated 4 April 2023, Ternera Gold Deposit Phase 1 Open Pit Scoping Study Outcomes. Tesoro
Gold confirms that it is not aware of any new information or data that materially affects the information included in that release. All material
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
JUN 2023
OCT 2023
Results from step-out
New large gold anomaly
drilling confirm
defined at Drone Hill.
continuity of shallow
Intersections returned,
sediment-hosted gold included: 47m @ 1.40 g/t
mineralisation up to
Au, including 9m @
420m south of Ternera
4.66g/t Au
INVESTOR PRESENTATION | 5
TESORO GOLD LIMITED
RAPID GROWTH AND ADVANCEMENT OF THE EL ZORRO GOLD PROJECT
Au
$
Au
Cu/Fe
Cu
Cu/Au
A. LOCATION
B. RESOURCE
C. GROWTH
Large surface
gold footprint on
570km2 of
tenure
Increased and
upgraded
1.3 Moz1 Ternera
Gold Deposit
Further
unlocking a
district scale
gold system
Coastal location and
supporting
infrastructure in a
Tier 1 mining
jurisdiction
Scoping study
evidences robust
starter pit gold mining
and processing
operation
Numerous exciting,
untested targets and
district level potential
provides multi-million
ounce potential
Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023 and Appendix A, Tesoro Gold Limited confirms that it is
not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical
parameters underpinning that release continue to apply and have not materially changed.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
CHILE
1.
INVESTOR PRESENTATION | 6
A. LOCATION | STRATEGICALLY POSITIONED TENURE
PROXIMATE TO ESTABLISHED INFRASTRUCTURE AND EXISTING MINES
•
El Zorro Gold Project 93.8% owned by 95% owned
subsidiary Tesoro Mining Chile SpA
•
One of the largest and most prospective gold projects in
Chile, covering 570km2 of tenure
•
First mover advantage and first to identify an Intrusive
Related Gold System (IRGS) in Chile
•
Surface gold confirmed over 50km of strike
•
Coastal location, surrounded by operating mines
•
15km from Pan American Highway and Pacific Ocean
•
Less than 20km from the proposed port at Santo Domingo
•
Atacama airport a 1 hour drive from site
•
Ready access to power and water
•
Close to the cities of Caldera, Chanaral and Copiapo with
accommodation and skilled labour
Cu/Fe
El Zorro
Gold Project
Cu
Cu/Au
Caldera
Fe
Cities
Ternera Gold Deposit
Other Mines
Santo Domingo Proposed
Port
Tesoro License (570 km2)
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Au
Chanaral
Copiapo
Cu/Au
Au
Airport & Power
Pan American Highway
INVESTOR PRESENTATION | 7
A. LOCATION | TIER 1 MINING JURISDICTION
MINING REIGNS SUPREME IN THE CHILEAN NORTH
•
Mining is a key contributor to the Chilean economy
representing over half of the country’s total exports
•
The Fraser Institute’s 2020 annual survey ranked Chile as the
best country in South America for mining exploration
investment based on public policy factors such as tax rates
and regulation
•
Low sovereign risk and extremely low corruption
•
Chile is the top copper producer in the world and second
largest producer of lithium
•
Many of the world’s largest, most successful mining
companies operate in Chile
Source: www.trade.gov and World Bank, https://www.fraserinstitute.org/sites/default/files/annual-survey-of-mining-companies-2020.pdf
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
CHILE
INVESTOR PRESENTATION | 8
B. RESOURCE | DEVELOPING TERNERA
CONTINUOUS HIGH-GRADE MINERALISATION FROM SURFACE
Currently 802koz (63%) of total MRE within
Indicated classification1
•
Orebody starting at surface to over 500m depth
with 77.5% of Indicated Resource in upper 200m
•
Additional well-defined, high-grade zones
identified beneath existing pit shell
•
Recently returned, surface sampling results
suggest significant southern extension (380m
from MRE limit) to Ternera with grades of up to
30.80g/t Au returned, including2:
•
•
•
•
1.50-2.50
2.50-5.00
>5.00
350m
•
4.00m @ 13.31g/t Au (EZTR004143);
13.00m @ 9.67g/t Au (EZTR004207) including;
•
•
6.00m @ 20.02g/t Au; and
3.00m @ 30.80g/t Au.
1100m
Ternera Gold Deposit Block Model Long Section looking northwest highlighting continuous high-grade
mineralisation from surface above 1.50g/t Au. US$1,800/oz pit shell shown as red outline
9.00m @ 4.60g/t Au (EZTR004208) including;
•
3.00m @ 12.60g/t Au.
3.00m @ 4.70 g/t Au (EZTR004209)
1.
Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023 and Appendix A
2. Refer to ASX Announcement, 18 September 2023 Surface sampling highlight Ternera expansion potential
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 9
B. RESOURCE | CHILE’S NEWEST GOLD DISCOVERY
MAJOR OUTCROPPING GOLD EXTENSIONS NORTH AND SOUTH
•
Surface sampling has delineated a vast >10km continuous mineralised
system extending from south of Ternera at Buzzard, north to Kitsune and
continuing to Calderillas North
•
Individual intrusive dykes at Kitsune identified continuous gold
anomalism along 930m, significant results include 1:
•
•
•
•
18m @ 1.59g/t Au (EZTR003853) including;
•
6m @ 4.14g/t Au
66m @ 0.32g/t Au (EZTR003842) including;
•
9m @ 1.22g/t Au
3m @ 6.25g/t Au (EZTR003850)
Channel sampling at Calderillas returned very high-grade gold grades
including:
•
•
2m @ 15.90g/t Au (EZTR003752)
•
21.00m @ 0.55 g/t Au incl 7.20m @ 1.43 g/t Au (ZDDH0310)
2m @ 3.01g/t Au (EZTR003753).
• Scout hole at Calderillas 4.7km north of Ternera returned:
1.
ASX announcement 24 May 2023.
2. ASX announcement 1 December 2022
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Ternera District Gold Prospects and Prospective Gold Corridor
associated with the Dorado Fault
INVESTOR PRESENTATION | 10
B. RESOURCE | CHILE’S NEWEST GOLD DISCOVERY
MAJOR NEW OUTCROPPING GOLD ANOMALY AT DRONE HILL
•
Surface sampling has delineated a new large outcropping gold anomaly
which has never been drilled at Drone Hill, with wide outcropping
intersections of up to 47m wide, including:
•
•
•
•
•
•
47m @ 1.40g/t Au (EZTR004255) including;
•
9m @ 4.66g/t Au
15m @ 0.53g/t Au (EZTR004132)
3m @ 1.88g/t Au (EZTR004110)
2m @ 5.21g/t Au (EZTR4108)
3m @ 2.11g/t Au (EZTR004282).
Surface mineralisation now confirmed to extend at least 750m west and
380m south of the Ternera Gold Deposit2 (refer ASX announcement 18
September 2023).
•
Ternera is open in all direction sand multiple targets in immediate vicinity
demonstrating wide zones of gold mineralisation
•
Initial drilling to test Drone Hill planned to commence early 2024
1.
Refer Tesoro ASX release dated 19 October 2023 New Large Gold Anomaly Defined at Drone Hill
2. Refer Tesoro ASX release dated 18 September 2023 Surface sampling highlight Ternera expansion potential
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Ternera Gold Deposit – near deposit targets highlighting significant drill
intercepts and sampling results from high priority areas
INVESTOR PRESENTATION | 11
B. RESOURCE | DEVELOPING TERNERA
TECHNICALLY AND FINANCIALLY ROBUST SCOPING STUDY OUTCOMES1
MINE SCHEDULE
MINING PHYSICALS
STANDARD CIP PLANT
17.1 Mt at 1.25 g/t gold
2.4 Mtpa throughput
94.5% gold recovery
Initial open pit mine
For initial 8-year operating life
Simple non-refractory metallurgy
PHASE 1 GOLD OUTPUT
AISC
UPFRONT CAPITAL COST
651 koz
US$1,068/oz
US$132M
Average production 93 koz p.a.
Including US$8.6M of sustaining capital
Including US$10.4M in pre-strip
NPV5%
IRR
PAYBACK
US$201M
27.5%
3.4 years
Pre-tax at US$1,750/oz gold
1.
Pre-tax at US$1,750/oz gold
Pre-tax from first production
For full Scoping Study details, refer Tesoro ASX release dated 4 April 2023, Ternera Gold Deposit Phase 1 Open Pit Scoping Study Outcomes. Tesoro Gold confirms that it is not aware of any new information or data that
materially affects the information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 12
B. RESOURCE | DEVELOPING TERNERA
DETAILED PHASE 1 OPEN PIT SCOPING STUDY OUTCOMES
Key parameter (± 35%)
Unit
Ore throughput
Mt
17.1
Gold grade
g/t
1.25
Production ounces
koz
651
Plant throughput
Mtpa
2.4
Average annual steady state production
koz pa
93
Production life (excluding pre-strip)
years
7.4
Forecast average All‐In‐Sustaining‐Cost (AISC)
US$/oz
1,068
Total pre‐production capital cost (including pre-strip)
US$M
132
Economic outcomes (± 35%)
Unit
Base
Spot1
Gold price
US$/oz
1,750
1,950
NPV5% (pre-tax, ungeared)
US$M
201
302
%
27.5
37.4
Net cashflow (pre-tax, undiscounted, ungeared)
US$M
312.3
444.6
Payback from first production
years
3.4
2.8
IRR (pre-tax, ungeared)
1.
Approximate gold spot price as 9 November 2023
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Study estimate
STARTER PIT
VALUE UPSIDE
Base case
assessment of
development
potential
Significant
leverage to
future resource
growth
Initial project derived
from the shallowest
portion of the Ternera
Deposit MRE
Project economics
highly attractive at
current gold prices
INVESTOR PRESENTATION | 13
C. GROWTH | CURRENT MRE IS JUST THE BEGINNING
EXISTING DRILLING INFORMS SIGNIFICANT GROWTH POTENTIAL
•
•
•
Exploration Target of 48.5 Mt to 101.0 Mt at
0.91g/t Au to 1.45g/t Au1
Drilled metres
120,000
Ternera Deposit remains open in all directions
•
Multiple continuous high-grade zones
2,000
60,000
1,096
40,000
20,000
661
586
0
Ternera Exploration Target1
75
July 2021 MRE
Lower
Upper
Lower
Upper
Lower
Upper
48.5
101.0
0.91
1.45
1.6
3.0
1,281
479
1,460
1,600
645
593
503
May 2022 MRE
Drilled metres
Contained Au (Moz)
3,000
2,500
80,000
Wide-spaced drill intercepts outside of Resource
Au Grade (g/t)
3,500
100,000
Exploration Target constrained to the extent of
the current drill footprint
Tonnage (Mt)
Ternera constrained MRE
3,000
Indicates Ternera could potentially contain
between 1.6 Moz and 3.0 Moz gold1
•
•
Resource (kOz Au)
802
March 2023 MRE
815
March 2023
Tenera Gold Deposit
unconstrained MRE Exploration Target
Indicated Resource
Inferred Resource
1,500
1,000
500
0
Ternera MRE growth updates and initial Exploration Target highlighting improved classification and
consistent resource growth with efficient drilling. The Exploration Target has been prepared and
reported in accordance with the 2012 edition of the JORC Code. The potential quantity and grade
are conceptual in nature and there has been insufficient exploration to estimate a Mineral
Resource. It is uncertain if further exploration will result in the estimation of a JORC-compliant
Mineral Resource.
1.
Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023 and Appendix A
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 14
C. GROWTH | ADDITIONAL DISTRICT DISCOVERIES
IS TERNERA THE FIRST OF MANY?
•
Surface gold confirmed over 50km of strike - major gold belt potential
•
More than 570km2 of unexplored tenure
•
Multiple El Zorro Tonalite dyke swarms (EZT, gold host rock) – strong
potential for Ternera repeats
•
Channel sampling results from the Toro Blanco and Kitsune targets
defined a large 3.2km by 1.5km anomalous gold zone – highlights the
potential for Ternera to extend 3km to the north1
• Positive results returned from channel sampling on widespread
outcropping mineralisation at Animas Viejas Target (35km north of
Ternera) defined prospective geology over an area of approximately
7km x 2km
• Ongoing district-wide target generation
1.
Refer Tesoro ASX release dated, 17 January 2023
2. Refer Tesoro ASX release dated , 1 December 2022
3. Refer Tesoro ASX release dated , 31 October 2022
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
El Zorro Gold Project concession map. Yellow indicates mapped
intrusions (EZT) prospective for gold mineralisation
INVESTOR PRESENTATION | 15
HIGHLY EXPERIENCED BOARD
WITH A TRACK RECORD OF EXPLORATION AND DEVELOPMENT SUCCESS
Linton Putland
Zeffron Reeves
Executive Director
Managing Director
•
•
•
Geologist with more than 20 years
of resource experience, spanning
greenfield exploration, mineral
discovery, definition and feasibility,
construction, production and
closure.
Previously Managing Director of ASX
listed Metallum Ltd, a company with
development projects and
operations in Chile.
Track record of exploration success
identifying and delineating new gold
districts in Brazil and Chile.
•
•
•
More than 30 years of experience in
mining in Australia, Africa and the
Americas covering a wide range of
commodities.
Current Principal of private mining
consultancy company, LJ Putland &
Associates.
Previously held senior management
roles in IAMGOLD, Aurion Gold,
Delta Gold and Pancontinental
Mining.
Member of AusIMM and a Graduate
Member of Australian Institute of
Company Directors.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Non-Executive Director
Non-Executive Director
Mining and Development
•
Alan Gibson
Geoff McNamara
•
•
•
•
•
More than 30 years of international
resource sector experience.
Previously Director of Mining
Finance at Societe General, NYC
Private Equity Manager for PRCM
(FUM US$800M).
Previous operational roles include
Project Manager, Senior Mine
Geologist and Mine Geologist for
Ivanhoe Mines, Lion Ore
International and Western Mining
Corporation.
Fellow of AusIMM and a Graduate
Member of Australian Institute of
Company Directors.
•
•
•
Currently Vice President Corporate
Development and Head of Legal for
Gold Fields Ltd with more than 20
years’ experience in Corporate,
Energy and Resources Law.
Carried out a number of key growth
transactions, acquisitions and joint
ventures globally.
Holds a Bachelor of Laws and
Bachelor of Economics from
Murdoch University (WA).
INVESTOR PRESENTATION | 16
DEEP CHILEAN EXPERTISE
DEDICATED IN COUNTRY TEAM OF LOCAL SPECIALISTS
Ruben Cahuana
Sergio Uribe
Exploration Manager
Country Manager
•
•
Administrative, management and
development professional with
significant Chilean experience.
Background in greenfield
exploration, discovery, production,
closure, retreatment and tailings
reclamation.
Previously Commercial Manager of
Metallum Chile, General Manager of
Acorn Mining Chile and Country
Manager for Cleveland Mining Chile.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Legal Counsel
Chile
Chile
•
Francisco Varela Echaurren
•
•
•
Geologist and Geotechnical
engineer with more than 15 years of
mining and exploration experience
in Chile, Peru, and the Dominican
Republic.
Deep personnel and project
management expertise including
strategic planning with a focus on
safety and ESG.
Extensive background in geological
mapping, geochemical sampling,
drilling, modelling, QA/QC and
geotechnical assessment.
Chile
•
•
•
Lawyer and Master of Tax Law with
14 years experience in Chilean law.
Specialist in the development of
Mining and Energy sector
investment projects.
Advises national and foreign clients
in matters related to project
development, M&A, public
procurement, financing structures
and venture capital.
INVESTOR PRESENTATION | 17
1
2
3
4
5
6
LARGE, HIGHLY PROSPECTIVE GOLD PROJECT
Strategically positioned, and located in a Tier 1 mining jurisdiction
EXISTING 1.3 Moz MINERAL RESOURCE ESTIMATE
Delivered at a low US$14/oz discovery cost and 99% success rate
EXCEPTIONAL METALLURGY FOR SIMPLE PROCESS FLOW
Single stage crushing, gravity and CIL expected
RESOURCE AND DISTRICT LEVEL GROWTH POTENTIAL
Numerous discoveries for multi-million ounce potential
HIGHLY EXPERIENCED BOARD AND MANAGEMENT TEAM
Local presence and deep Chilean expertise
MULTIPLE CATALYSTS FOR VALUE RECOGNITION
Significant upside to Scoping Study Starter Pit economics
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
TESORO GOLD LIMITED
Level 48
152-158 St Georges Terrace
Perth, WA 600
+61 8 6311 9160
info@tesorogold.com.au
www.tesorogold.com.au
ASX:TSO | OTCQB:TSORF
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
APPENDIX A
TERNERA MINERAL RESOURCE ESTIMATE (MRE)
Constrained 1.28 Moz Au MRE: US$1,800/oz optimised pit shell, underground reported at 1.5 g/t Au cut off1
Area
Cut off
Open Pit Resource
Underground Resource
Total Resources
Indicated
Total
Inferred
Au g/t
Mt
Au g/t
Koz
Mt
Au g/t
Koz
Mt
Au g/t
Koz
0.30
1.50
22.5
0.1
22.6
1.10
2.64
1.11
795
7
802
10.0
1.2
11.2
1.18
2.64
1.34
379
100
479
32.5
1.3
33.7
1.13
2.64
1.18
1,175
107
1,282
Unconstrained 1.46 Moz Au MRE: reported at various cut offs to the 200mRL1
Cut off
Au g/t
0.3
0.5
1.00
2.00
Indicated
Mt
23.2
16.3
7.2
2.6
Au g/t
1.09
1.39
2.25
3.75
Total
Inferred
Koz
815
727
523
317
Mt
19.4
12.8
5.6
2.0
Au g/t
1.03
1.37
2.24
3.71
Koz
645
561
400
241
Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023 and Appendix A. Tesoro Gold Limited confirms that it is
not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical
parameters underpinning that release continue to apply and have not materially changed.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Mt
42.6
29.1
12.8
4.7
Au g/t
1.07
1.38
2.24
3.37
Koz
1,459
1,288
923
558
1.
INVESTOR PRESENTATION | 20