Ternera drilling delivers high-grade gold intercepts
Released
Released
Announcement PDF
31 Cliff Street, Fremantle WA 6160 | +61 8 6383 7883 | info@tesorogold.com.au | tesorogold.com.au
ASX ANNOUNCEMENT
30 APRIL 2026
ASX: TSO OTCQB: TSORF FSE: 5D7
TERNERA DRILLING CONTINUES TO DELIVER,
HIGH-GRADE GOLD INTERCEPTS
Tesoro Gold Limited (Tesoro or the Company) (ASX: TSO, OTCQB: TSORF, FSE: 5D7) is pleased
to report assay results from drilling completed at the Ternera Gold Deposit (Ternera), part of
the El Zorro Gold Project in Chile (El Zorro, or the Project).
Results from an additional ten holes completed as part of the ongoing >20,000m infill drilling
programme continue to demonstrate the scale, continuity and grade distribution of
mineralisation within the Ternera orebody.
Six diamond drill rigs remain in continuous operation, focused on delivering the data and
samples required to support an updated Mineral Resource Estimate (MRE) and Definitive
Feasibility Study (DFS) workstreams.
The programme is nearing completion, and three rigs will shortly be allocated to the 12,000m
new-discovery focused drilling programme, targeting new areas of gold mineralisation at
multiple, high-priority prospects across the district (see Figure 3).
HIGHLIGHTS
• Multiple thick, high-grade intercepts returned, including:
• 62.28m @ 1.35g/t Au from 374.00m (ZDDH0430) including:
• 10.00m @ 2.68g/t Au from 374.00m and
• 7.00m @ 4.97g/t Au from 403.00m
• 93.00m @ 1.21g/t Au from 572.00m (ZDDH0440) including:
• 18.00m @ 2.96g/t Au from 495.00m and
• 4.00m @ 6.73g/t Au from 511.00m
• 18.00m @ 1.28g/t Au from 226.00m (ZDDH0441) including;
• 2.40m @ 7.53g/t Au from 240.00m
• 12.50m @ 1.21g/t Au from 293.00m (ZDDH0447A) including:
• 1.00m @ 8.58g/t Au from 293.00m
• Results from holes ZDDH0430 and ZDDH0440 are expected to widen mineralised
zones within the existing Ternera MRE block model (Figure 2).
• All metallurgical testwork holes are complete, with final physical ore characterisation
testing on selected samples set to commence.
Tesoro Gold 2
ASX ANNOUNCEMENT
30 APRIL 2026
• Assays remain outstanding for 19 diamond drillholes, with a further ten holes
remaining to complete all infill drilling.
Tesoro Managing Director, Zeff Reeves, commented:
“Drilling at Ternera continues to progress around the clock, with only ten holes remaining to
wrap up this portion of the programme.
Results from this latest round of drilling are expected to widen existing mineralised zones
within the Ternera block model, further enhancing gold distribution within the orebody.
Metallurgical and open pit geotechnical drilling campaigns are well advanced, with
metallurgical samples being prepared for final testwork to refine our understanding of the
deposit’s physical characteristics. These results will feed into an updated MRE to support
final design and engineering parameters as part of ongoing DFS workstreams.
With this programme nearing completion, we are looking forward to transitioning rigs to our
exciting district targets, to deliver additional new discoveries along the largely unexplored
El Zorro Gold trend.”
TERNERA INFILL DRILLING
Tesoro is progressing a 38,000m fully-funded, diamond drilling programmes across the
El Zorro Gold Project. Six diamond drill rigs are currently active at Ternera, completing the
final stages of the infill and geotechnical drilling campaigns. This component of drilling is
primarily designed to upgrade the Mineral Resource classification within areas of the
Ternera Deposit.
Assay results from a batch of ten holes completed as part of this >20,000m infill drilling
programme have returned multiple thick, high-grade intercepts, notably:
• 62.28m @ 1.35g/t Au from 374.00m (ZDDH0430) including:
• 10.00m @ 2.68g/t Au from 374.00m and
• 7.00m @ 4.97g/t Au from 403.00m
• 93.00m @ 1.21g/t Au from 572.00m (ZDDH0440) including:
• 18.00m @ 2.96g/t Au from 495.00m and
• 4.00m @ 6.73g/t Au from 511.00m
These wide, high-grade intercepts are distributed across multiple locations within Ternera.
Results from holes ZDDH0430 and ZDDH0440 have the strong potential to further enhance
gold zones within the current MRE (Figure 2).
To date, 69 infill holes have been completed out of a total planned 79 holes. An additional
six infill-focused holes have been added to the programme to ensure sufficient drill density
Tesoro Gold 3
ASX ANNOUNCEMENT
30 APRIL 2026
to support the upgrade of a majority of the MRE to Indicated classification under the JORC
Code.
All significant intercepts from this batch are presented in Appendix 1, with full details
provided in Appendix 2.
Figure 1: El Zorro Gold Project – Ternera Gold Deposit. Drill locations and results received in this announcement.
Section shown at figure 2 located at A-A’. Datum PSAD56 19S.
Tesoro Gold 4
ASX ANNOUNCEMENT
30 APRIL 2026
Figure 2: El Zorro Gold Project –Drilling section A-A’. Showing holes ZDDH0429, ZDDH0440 and ZDDH0430 drilled
to improve inferred resource classification of the existing MRE block model. Holes ZDDH0430 and ZDDH0440
demonstrating potential to widen existing ore zones. Looking northwest. Datum PSAD56 19S. Refer ASX
announcement 31 March 2026 for results from ZDDH0429.
Tesoro Gold 5
ASX ANNOUNCEMENT
30 APRIL 2026
Figure 3: El Zorro Gold Project showing priority targets over a greater than 30km corridor.
Tesoro Gold 6
ASX ANNOUNCEMENT
30 APRIL 2026
Authorised by the Board of Tesoro Gold Ltd.
For more information:
Company
Zeff Reeves
Managing Director
info@tesorogold.com.au
Investor Relations & Media Enquiries
Grace Lauder
Fivemark Partners
Grace.lauder@fivemark.com.au
Follow Us
• Website
• LinkedIn
• X
Table 2: Ternera Mineral Estimates for selected cut-off grades. Highlighted open pit Mineral Resource has been
constrained by an optimised pit shell using a gold price of US$3000/oz and process recovery of 94.5%. The
estimates in this table are rounded to reflect their precision; rounding errors are apparent.
Tenera Updated MRE Indicated Inferred Total
Au g/t cut-off Mt Au g/t Koz Mt Au g/t Koz Mt Au g/t Koz
Optimised Open Pit at 0.30 31.8 1.10 1,123 19.5 1.11 692 51.2 1.1 1,816
2.00 3.5 3.55 394 2.5 3.54 280 5.9 3.54 673
1.00 10.5 2.08 705 7.9 2.04 520 18.5 2.06 1,225
0.70 17.5 1.58 891 13 1.57 657 30.5 1.58 1,547
0.30 31.8 1.10 1,128 26.1 1.03 863 58.1 1.07 1,992
0.20 33.8 1.05 1,144 28.7 0.96 885 62.5 1.01 2,028
Refer ASX announcement dated 4 August 2025.
Tesoro Gold 7
ASX ANNOUNCEMENT
30 APRIL 2026
About Tesoro
Tesoro Gold Limited has discovered and defined the
first Intrusive Related Gold System in Chile. The 1.82M
oz Ternera discovery is in the Coastal Cordillera region
of Chile. The Coastal Cordillera region is host to
multiple world-class copper and gold mines, has well
established infrastructure, service providers and an
experienced mining workforce. Large areas of the
Coastal Cordillera remain unexplored due to the
unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and
experience has been able secure rights to the district-
scale El Zorro gold project in-line with the Company’s
strategy. Tesoro’s 95% owned Chilean subsidiary owns
95.4% of the El Zorro Gold Project (see ASX
announcement released 12 August 2025).
Future Performance
This announcement may contain certain forward-looking
statements and opinions. Forward-looking statements,
including projections, forecasts and estimates, are provided as
a general guide only and should not be relied on as an
indication or guarantee of future performance and involve
known and unknown risks, uncertainties, assumptions,
contingencies and other important factors, many of which are
outside the control of the Company and which are subject to
change without notice and could cause the actual results,
performance or achievements of the Company to be
materially different from the future results, performance or
achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance,
and no representation or warranty is made as to the likelihood
of achievement or reasonableness of any forward-looking
statements or other forecast. Nothing contained in this
announcement, nor any information made available to you is,
or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future
performance of Tesoro Gold.
Competent Persons Statements
The information in this report that relates to Mineral
Resources is based on information compiled by Mr Lynn
Widenbar (B.Sc. (Hons) Geology, M.Sc. FAusIMM,
MAIG), a Competent Person who is a Fellow of The
Australasian Institute of Mining and Metallurgy. Mr
Widenbar is acting as an independent consultant to
Tesoro Gold Limited. Mr Widenbar has sufficient
experience that is relevant to the style of mineralisation
and type of deposit under consideration, and to the
activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. The Company confirms
that it is not aware of any new information or data that
materially affects the information contained the form
and context in which the Competent Person’s findings
are presented have not been materially modified from
in the original announcement on 4 August 2025, and all
material assumptions and technical parameters
underpinning the estimates in that announcement
continue to apply and have not materially changed.
The information in this report that relates to Exploration
Results is based on information compiled by Mr Zeffron
Reeves (B App Sc (Hons) Applied Geology) MBA,
MAIG). Mr Reeves is a member of the Australian Institute
of Geoscientists and a Director and shareholder of the
Company. Mr Reeves has sufficient experience that is
relevant to the style of mineralisation and type of
deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Reeves consents to the inclusion in this
report of the matters based on this information in the
form and context in which it appears.
Tesoro Gold 8
ASX ANNOUNCEMENT
30 APRIL 2026
APPENDIX 1: SIGNIFCANT INTERCEPT TABLE
Significant intercepts table for results reported in this announcement. Results are uncut, no top cut has been
applied. Refer Appendix 3 - JORC Tables for data aggregation criteria. A significant intercept is defined as any
intercept with a down hole grade x width >0.25. NSI denotes No Significant Intercept.
Tesoro Gold 9
ASX ANNOUNCEMENT
30 APRIL 2026
APPENDIX 2: DRILLING DETAILS
Drillhole details for holes drilled from the Ternera Infill Drilling Programme
Northing Easting Elevation Dip Azimuth Northing Easting Elevation
Di
p
Azimuth
ZDDH00406 341572 7036394 579 -60 240 207.70 ZDDH00439 341706 7036228 597 -60 240 230.00
ZDDH00407 341561 7036218 557 -60 240 56.50 ZDDH00440 342059 7036251 690 -60 240 607.20
ZDDH00407A 341567 7036220 566 -60 240 130.10 ZDDH00441 341670 7035900 556 -60 240 250.23
ZDDH00408 341505 7036285 563 -60 240 109.00 ZDDH00442 341688 7036321 597 -60 240 205.70
ZDDH00409 342280 7035724 549 -60 240 964.50 ZDDH00443 341870 7035976 617 -60 240 418.10
ZDDH00410 341600 7036067 600 -60 240 192.30 ZDDH00444 341591 7036130 574 -60 240 175.20
ZDDH00411 342213 7035800 574 -60 240 700.00 ZDDH00445 342063 7036220 680 -60 240 265.82
ZDDH00412 341874 7036012 632 -60 240 450.00 ZDDH00445A 342065 7036222 680 -60 240 404.00
ZDDH00413 341848 7036478 638 -60 240 200.10 ZDDH00446 341674 7036347 594 -60 240 150.00
ZDDH00414 341573 7036155 556 -60 240 172.10 ZDDH00447 342119 7036422 677 -60 240 352.40
ZDDH00415 341897 7036505 637 -60 240 290.65 ZDDH00447A 342119 7036422 677 -60 240 440.00
ZDDH00416 341618 7036248 565 -60 240 174.50 ZDDH00440A 342059 7036251 690 -60 240 573.40
ZDDH00417 342207 7036402 639 -60 240 205.80 ZDDH00448 341562 7036080 575 -60 240 121.10
ZDDH00418 341828 7036501 641 -60 240 268.00 ZDDH00449 341930 7036078 657 -60 240 480.20
ZDDH00417A 342207 7036402 639 -60 240 481.00 ZDDH00450 341914 7036583 646 -60 240 254.10
ZDDH00420 341643 7036262 572 -60 240 175.00 ZDDH00451 341720 7035893 574 -60 240 301.00
ZDDH00419 341871 7036457 633 -60 240 209.50 ZDDH00452 341850 7035965 614 -60 240 421.10
ZDDH00421 342237 7035698 543 -60 240 680.10 ZDDH00453 341952 7036056 665 -60 240 520.15
ZDDH00422 341748 7036080 574 -60 240 287.50 ZDDH00454 341820 7036017 620 -60 240 375.00
ZDDH00423 341652 7036335 581 -60 240 150.00 ZDDH00455 341980 7036070 671 -60 240 520.00
ZDDH00424 342156 7036374 649 -60 240 493.60 ZDDH00456 342161 7036308 640 -60 240 520.00
ZDDH00425 341971 7036580 668 -60 240 191.00 ZDDH00457 341790 7035932 601 -60 240 359.70
ZDDH00426 341656 7036167 585 -60 240 267.60 ZDDH00458 341718 7036132 590 -60 240 375.90
ZDDH00427 341724 7036204 611 -60 240 281.10 ZDDH00459 342114 7036350 656 -60 240 400.00
ZDDH00428 341879 7036564 628 -60 240 223.40 ZDDH00460 342159 7036341 641 -60 -240 518.00
ZDDH00429 341703 7036089 574 -60 240 250.95 ZDDH00461 341776 7036027 596 -60 -240 343.10
ZDDH00430 342135 7036294 656 -60 240 435.00 ZDDH00462 342112 7036555 706 -60 240 309.30
ZDDH00431 341740 7036178 604 -60 240 391.74 ZDDH00463 341565 7036116 570 -60 240 150.00
ZDDH00432 342136 7036568 717 -60 240 310.00 ZDDH00464 342000 7036118 673 -60 240 514.10
ZDDH00433 341588 7036094 588 -60 240 110.55 ZDDH00465 342147 7036438 665 -60 240 400.00
ZDDH00434 341947 7036567 659 -60 240 176.20 ZDDH00466 341919 7036243 627 -60 240 440.50
ZDDH00435 341563 7035977 572 -60 240 150.00 ZDDH00467 34211 7036250 665 -60 240 473.40
ZDDH00436 342156 7036271 640 -60 240 460.30 ZDDH00468 342129 7036395 664 -60 240 430.10
ZDDH00437 341583 7035920 566 -60 240 146.60 ZDDH00469 341910 7036066 650 -60 240 86.00
ZDDH00438 341655 7036097 598 -60 240 220.60
Hole
Orientation Drill
Depth (m)
Hole Location
Hole
Orientation Drill
Depth (m)
Hole ID Hole ID
Hole Location
Tesoro Gold 10
ASX ANNOUNCEMENT
30 APRIL 2026
APPENDIX 3: JORC TABLES
Section 1: Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
Tesoro has completed 485 diamond drill holes at the El
Zorro Gold Project for 153,324m.
Diamond drill holes were drilled with HQ. Sampling was
half core at geologically defined and significant
mineralisation boundaries.
The CP considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Tesoro Diamond drill holes were drilled with HQ.
Sampling was half core at geological and significant
mineralisation boundaries. The CP consider this
appropriate for the style of mineralisation.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done; this
would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’).
In other cases, more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
Diamond drilling was used to obtain ½ core samples of
various lengths (minimum 0.25m), from which 1kg of
material was pulverised passing 200 mesh to produce
a 50g charge for fire assay fusion with a gravimetric
finish. Multielement assays were completed by 4-acid
digest with a 2.5g charge. The CP consider these
appropriate assay techniques.
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
Tesoro has completed 485 diamond drill holes at the El
Zorro Gold Project for 153,324m..
Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
Core recovery was estimated using the drillers
recorded depth marks against the length of the core
recovered. Reviewing the core photos, there are
occasional shears/faults where core is broken. There is
however no significant core loss.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
A single tube system was employed and in general
core recovery good.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have occurred
due to preferential loss/gain of
fine/coarse material.
There appears to be no potential sample bias as there
was no regular loss of core.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour,
lithology, weathering, grain size, mineralisation,
alteration, geotechnical characteristics etc. Diamond
core is stored at the Company’s warehouse.
Tesoro consider the data to be of an appropriate level
of detail to support a future resource estimation.
Tesoro Gold 11
ASX ANNOUNCEMENT
30 APRIL 2026
Criteria JORC Code explanation Commentary
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
Logging of diamond core was qualitative, and
diamond core was photographed.
• The total length and percentage of the
relevant intersections logged.
All drilled intervals are logged and recorded.
Subsampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
Drill core was cut, and half core was collected for
analysis
• If non-core, whether riffled, tube
sampled, rotary split, etc. and whether
sampled wet or dry.
Tesoro has not completed any percussion drilling.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
The sample preparation of crushing half core at the
lab to mm size prior to splitting off a 50g charge (either
by cone/quarter or riffle) for pulverisation provides an
appropriate and representative sample for analysis.
• Quality control procedures adopted for
all subsampling stages to maximise
representivity of samples.
Half core was collected for the entirety of the Tesoro
drilling, as such there was consistency throughout the
drilling. Core was logged by a qualified geoscientist.
Each subsample is considered to be representative of
the interval.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Sampling of half core is representative of the in-situ
material. There are field duplicate samples collected
from the diamond core with irregular results. Field drill
core duplicates are irregular by nature, and it has
been recommended by Tesoro’s consultants to use
coarse reject material to monitor the sample
preparation.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Sample sizes collected were considered appropriate
to reasonably represent the material being tested.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Assays reported in this report were undertaken at the
accredited laboratory of ALS Santiago, which is fully
certified. Core samples of various lengths were
assayed (minimum 0.25m) from which 1kg of material
was pulverized passing 200 mesh to produce a 50 g
charge for fire assay fusion with gravimetric finish.
Multielement assays were completed by 4-acid digest
with a 2.5 g charge.
All techniques are appropriate for the element being
determined.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Standard chemical analyses were used for grade
determination. There was no reliance on determination
of analysis by geophysical tools.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.
QAQC procedures included the insertion of Certified
Reference Materials (CRMs) (5%) and blank material
(2%), Check samples (5%) and check assaying (5%)
The laboratories used have generally demonstrated
analytical accuracy at an acceptable level within 95%
confidence limits.
Verification of
sampling and
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
All intercepts have been verified by multiple
appropriately qualified Company personnel.
• The use of twinned holes. No twinned holes have been completed
• Documentation of primary data, data
entry procedures, data verification, data
Tesoro drilling is digitally entered and stored following
documented core handling protocols.
The protocols are considered adequate.
Tesoro Gold 12
ASX ANNOUNCEMENT
30 APRIL 2026
Criteria JORC Code explanation Commentary
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data. No adjustments were made to Tesoro Drilling
Location of data
points
• Accuracy and quality of surveys used to
locate drillholes (collar and downhole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Tesoro drill hole collars have been surveyed accurately
using differential GPS for all holes.
• Specification of the grid system used. The grid system used PSAD56 19S
• Quality and adequacy of topographic
control.
The topography generated from an accurate
topographic survey data completed by a registered
surveyor and has been used for the current control.
Data spacing
and distribution
• Data spacing for reporting of Exploration
Results.
Drill hole spacing is variable between 25m and 200m
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
The current data spacing and distribution is not
considered suitable for Mineral Resource and Ore
reserve estimation at this early exploration stage.
• Whether sample compositing has been
applied.
Sample compositing was not employed at the
sampling stage.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
Drill holes were drilled across the interpreted strike of
the mineralisation.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Tesoro diamond drilling at various orientations does not
reveal any bias regarding the orientation of the
mineralised horizons.
Sample security • The measures taken to ensure sample
security.
Chain of Custody of digital data is managed by the
Company. Physical material was stored on site and,
when necessary, delivered to the assay laboratory.
Thereafter laboratory samples were controlled by the
nominated laboratory which to date has been Bureau
Veritas and ALS Santiago. All sample collection was
controlled by digital sample control file(s) and
hardcopy ticket books.
Audits or reviews • The results of any audits or reviews of
sampling techniques and data.
No audits have been undertaken.
Section 2: Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
Information regarding tenure is included in the
Company’s March 2026 quarterly report released to the
ASX on 23 April 2026.
Tesoro Resources Ltd, 95% owned Chilean subsidiary,
Tesoro Mining Chile SpA, owns 95.4% of the El Zorro Gold
Project Concessions.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The Concessions are believed to be in good standing with
the governing authority and there is no known
impediment to operating in the area.
Exploration
done by
other parties
• Acknowledgment and appraisal of
exploration by other parties.
Little historical exploration has been undertaken in either
project area. Coeur d’Alene’s Chilean exploration division
undertook activities on the Ternera prospect, under an
Tesoro Gold 13
ASX ANNOUNCEMENT
30 APRIL 2026
Criteria JORC Code explanation Commentary
option agreement with the previous owners between April
1990 and January 1993.
Geology • Deposit type, geological setting and
style of mineralisation.
The mineralisation model is considered to be an intrusive
related gold deposit. The key characteristics that are
consistent with this style deposit include:
• Low sulphide content, (typically <5%); reduced ore
mineral assemblage that typically comprises pyrite and
lacks primary magnetite or hematite
• Mineralisation occurs as sheeted vein deposits or
stockwork assemblages and often combine gold with
variably elevated Bi, W, As, Mo, Te, and/or Sb but low
concentrations of base metals as seen in the initial four
holes by Tesoro at El Zorro
• Restricted and commonly weak proximal hydrothermal
alteration
• Intrusions of intermediate to felsic composition.
Drillhole
information
• A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material
drillholes:
o easting and northing of the drillhole
collar
o elevation or RL (Reduced Level –
elevation above sea level in m) of
the drillhole collar
o dip and azimuth of the hole
o downhole length and interception
depth
o hole length.
• If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of
the report, the Competent Person
should clearly explain why this is the
case.
Relevant information is presented in this report.
Data
aggregation
methods
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Significant intercepts have been calculated as downhole
width weighted averages. No top cut has been used.
• Where aggregate intercepts
incorporate short lengths of high-grade
results and longer lengths of low-grade
results, the procedure used for such
aggregation should be stated and
some typical examples of such
aggregations should be shown in detail.
Relevant information is presented in this report.
• The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation
with respect to the drillhole angle is
known, its nature should be reported.
The mineralisation forms sub-vertical sheeted veins and
individual veins and may form plunging zones within the
Tesoro Gold 14
ASX ANNOUNCEMENT
30 APRIL 2026
Criteria JORC Code explanation Commentary
mineralised structures. Drilling by Tesoro has been
undertaken to test these orientations.
• If it is not known and only the downhole
lengths are reported, there should be a
clear statement to this effect (e.g.
‘downhole length, true width not
known’).
Diagrams • Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include but not be limited to a plan
view of drillhole collar locations and
appropriate sectional views.
Relevant maps and diagrams are included in the body of
the report.
Balanced
reporting
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low
and high grades and/or widths should
be practiced to avoid misleading
reporting of Exploration Results.
Relevant information is presented in this report.
Other
substantive
exploration
data
• Other exploration data, if meaningful
and material, should be reported
including (but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk
samples – size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical
and rock characteristics; potential
deleterious or contaminating
substances.
All material exploration data is reported in the body of the
report.
Further work • T
Share your feedback
Discover