Upgrade to Ternera 1.8Moz Mineral Resource
Released
Released
Announcement PDF
31 Cliff Street, Fremantle WA 6163 | +61 8 6383 7883 | info@tesorogold.com.au | tesorogold.com.au
ASX ANNOUNCEMENT
27 AUGUST 2026
ASX: TSO OTCQX: TSORF OTCQB FSE: 5D7
UPGRADE TO TERNERA 1.8MOZ MINERAL RESOURCE
1.47MOZ CLASSIFIED AS MEASURED AND INDICATED
Tesoro Gold Limited (Tesoro or the Company) (ASX: TSO, OTCQB: TSORF, FSE: 5D7) is pleased
to announce an updated Mineral Resource Estimate (MRE) for the Ternera Gold Deposit at
its El Zorro Gold Project in Chile (El Zorro).
The updated MRE comprises 51.6Mt at 1.10g/t Au for 1.82Moz of gold, reported at a
0.30g/t Au cut-off grade and constrained within a US$3,500/oz optimised open pit shell.
This update delivers an increase in the confidence of the Ternera MRE, with 1.47Moz,
representing 78% of total contained gold, now classified as Measured and Indicated.
Measured and Indicated Resources have increased by 348koz compared to the August
2025 MRE, with a Measured Mineral Resource component defined for the first time.
The significant increase in higher-confidence Mineral Resources follows the recent
completion of the 27,000m infill drilling programme and provides the necessary support for
the calculation of a maiden Ore Reserve for a single open pit at Ternera.
HIGHLIGHTS
• Updated Ternera Mineral Resource of 51.6Mt at 1.10g/t Au for 1.82Moz at a 0.30g/t Au
cut-off grade, constrained within a US$3,500/oz open pit shell.
• 1.47Moz, or 78% of the total contained gold, is now classified as Measured and
Indicated, materially increasing confidence in the Ternera Mineral Resource.
• Measured and Indicated Resources increased by approximately 348koz compared
with the August 2025 MRE1.
• Unconstrained Mineral Resource now 1.93Moz at 1.07g/t Au.
• The substantial increase in higher-confidence Mineral Resources provides the
foundation for Ternera's maiden Ore Reserve, expected in September 2026.
• Ternera remains open in multiple directions, with drilling continuing at extensional
Mineral Resource growth targets.
• Assay results for four recently completed near-deposit holes are expected in the
coming weeks.
• Tesoro is also progressing its new-discovery drilling programme across high-priority
targets within the El Zorro Gold District.
Tesoro Gold 2
ASX ANNOUNCEMENT
27 AUGUST 2026
Tesoro Managing Director, Zeff Reeves, commented:
“This updated MRE is a significant upgrade for the Ternera Gold Deposit supported by the
27,000m of drilling completed this year. Ternera now contains 1.47Moz of gold in the higher-
confidence Measured and Indicated categories, representing 78% of the total Mineral
Resource.
“Since discovery, more than 160km of diamond drilling has systematically defined a
substantial, high-confidence gold resource. This work provides the foundation for Ternera’s
maiden Ore Reserve, which is well advanced, and supports the broader technical studies
required for project development.
“El Zorro is now progressing into its next development phase. Drilling will continue to test
extensions to Ternera and advance high-priority discovery targets across the El Zorro Gold
District."
Figure 1: El Zorro Gold Project – Regional Location Map. Red outline showing El Zorro Concessions. Ternera Gold
Deposit located at blue circle.
Tesoro Gold 3
ASX ANNOUNCEMENT
27 AUGUST 2026
Table 1: Ternera Mineral Estimates for selected cut-off grades. Highlighted open pit Mineral Resource has been
constrained by an optimised pit shell using a gold price of US$3500/oz and process recovery of 94.5%. The
estimates in this table are rounded to reflect their precision; rounding errors are apparent.
Measured Indicated Inferred Total
Cut-off Tonnes Au Gold Tonnes Au Gold Tonnes Au Gold Tonnes Au Gold
Au g/t Mt g/t K Oz Mt g/t K Oz Mt g/t K Oz Mt g/t K Oz
0.30 2.4 1.24 95 37.9 1.13 1,371 11.3 0.98 356 51.6 1.10 1,822
3.00 0.1 4.44 20 1.9 4.64 278 0.4 4.27 48 2.4 4.57 345
2.50 0.2 3.87 26 2.8 4.01 359 0.6 3.70 66 3.6 3.95 451
2.00 0.3 3.26 34 4.3 3.37 469 0.9 3.13 92 5.6 3.33 595
1.50 0.6 2.62 47 7.3 2.71 631 1.9 2.40 145 9.7 2.64 824
1.00 1.1 1.95 67 14.1 1.98 898 4.4 1.71 244 19.6 1.92 1,209
0.90 1.2 1.81 72 16.5 1.83 972 5.4 1.57 275 23.2 1.77 1,319
0.80 1.5 1.67 78 19.5 1.68 1,053 6.6 1.45 306 27.6 1.62 1,438
0.70 1.7 1.56 83 22.9 1.54 1,134 7.8 1.33 336 32.4 1.49 1,553
0.60 1.8 1.47 87 26.3 1.43 1,206 9.4 1.22 368 37.5 1.38 1,661
0.50 2.0 1.38 90 30.2 1.31 1,275 11.3 1.11 402 43.5 1.26 1,767
0.40 2.2 1.30 93 34.2 1.21 1,333 13.4 1.01 432 49.9 1.16 1,858
0.30 2.4 1.24 95 38.1 1.12 1,377 15.4 0.92 455 55.9 1.07 1,927
0.20 2.4 1.22 95 41.8 1.05 1,406 17.4 0.84 470 61.6 1.00 1,972
Figure 2: El Zorro Gold Project – Ternera Gold Deposit. Resource growth and classification over time.
Tesoro Gold 4
ASX ANNOUNCEMENT
27 AUGUST 2026
Figure 3: Plan view of the Ternera Gold Deposit. Showing drill collars (black triangles) and infill drill programme
drill collars (blue stars) over the block model (>1g/t blocks only) and US$3500/oz pit shell. Dashed blue line shows
location for long section line for Figure 4. Green dashed line shows cross sections presented at Figure 5. Datum
PSAD56 19S.
Tesoro Gold 5
ASX ANNOUNCEMENT
27 AUGUST 2026
Figure 4: Ternera Gold Deposit long section looking north-west. Top showing block model coloured to gold
>0.30g/t Au, bottom coloured to Resource classification. US$3500/oz Au optimised pit shell in blue. Section
locations shown in Figure 3. Demonstrating over 720m down plunge extent and ore zones over 80m wide. Scale
bar 80m.
Tesoro Gold 6
ASX ANNOUNCEMENT
27 AUGUST 2026
Figure 5: Ternera Gold Deposit cross section looking north-east. Top showing block model coloured to gold
>0.30g/t Au, bottom coloured to Resource classification. US$3500/oz Au optimised pit shell in blue. Section
locations shown in Figure 3. Demonstrating continuous mineralisation over 520m down dip up to 60m wide. Scale
bar 80m.
Tesoro Gold 7
ASX ANNOUNCEMENT
27 AUGUST 2026
TERNERA GOLD DEPOSIT
The Ternera Gold Deposit is situated within the El Zorro Gold Project, located 900km north of
Santigo in Chile’s mining-friendly Atacama Region. The Project is ideally positioned in a low-
altitude, coastal setting with excellent infrastructure, including sealed road access, grid
power and water.
Chile is recognised as one of the world’s premier mining jurisdictions, with a well-established
regulatory framework and strong Government and investment support for responsible mine
development.
The updated MRE has added 252Koz’s (44%) to the Indicated classification, and for the first
time, 95koz’s of measured resource. This takes the total of Measured and Indicated
Resource to 1.47Moz’s @ 1.14g/t Au.
Overall, the constrained open pit resource of all classifications Measured, Indicated, and
Inferred remains stable at 1.82Moz’s @ 1.10 g/t Au. A comparison of this updated MRE to the
August 2025 MRE is presented in Figure 2. The material increase in Resource classification
across the Deposit provides a solid foundation for the calculation of a Maiden Ore Reserve
for the Ternera Gold Deposit, further de-risking the Project as it advances towards
development.
The updated MRE is based on 153,180 metres of diamond drilling from 474 holes and utilises
a 0.30g/t Au cut-off and is constrained within a US$3,500/oz open pit shell. The
unconstrained global MRE is 1.93Moz @ 1.07g/t Au, providing further confirmation of the
Deposit’s scale and continuity, with potential for further resource growth with more drilling.
A total of 78% of the Mineral Resource, is now Measured and Indicated classification.
Measure material is confined to areas where Resource definition drilling is typically <12.5m
spacing. Indicated material is confined to areas where Resource definition diamond drilling
is typically <25m spacing. Inferred material is confined to areas where diamond drill spacing
is generally <50m. Areas of wider spacing are unclassified and not reported as part of the
Mineral Resource.
Tesoro Gold 8
ASX ANNOUNCEMENT
27 AUGUST 2026
Figure 6: Isometric view of the Ternera Gold Deposit block model looking north-west. Showing Measured
(yellow), Indicated (red) and Inferred (green) classified resources and US$3500/oz pit shell. Datum PSAD56 19S.
ORE RESERVE AND DEFINITIVE FEASIBILTY STUDY - DEVELOPMENT PATHWAY
The updated MRE provides the resource basis for calculation of maiden Ore Reserve for the
Ternera Gold Deposit. Ore Reserve work is well advanced and incorporates the relevant
modifying factors developed through the technical, engineering and economic studies
completed and underway as part of the Project’s development programme.
The maiden Ore Reserve is expected to be released in September 2026 and will be
incorporated into DFS-level mine planning ahead of delivery of the DFS by the end of
CY2026.
Tesoro Gold 9
ASX ANNOUNCEMENT
27 AUGUST 2026
STRONG PIPELINE OF NEAR-TERM CATALYSTS ACROSS EXPLORATION AND
DEVELOPMENT
Over the coming months, Tesoro expects to deliver a number of important project
development and exploration milestones as Ternera advances towards development, while
drilling high priority targets for further Mineral Resource growth and new discoveries across
the broader El Zorro Gold Project.
Key upcoming activities and expected news flow include:
• Maiden Ore Reserve for Ternera, converting the increased geological confidence
within this newly upgraded Mineral Resource into a mineable reserve to underpin DFS-
level mine planning.
• El Zorro development-readiness and DFS update, covering progress across key
engineering, mining, processing, infrastructure, permitting, financing and project
execution workstreams.
• Assay results from near-deposit drilling, including extensional drilling at Ternera and
targets close to the current Mineral Resource and proposed development footprint.
• Refined regional exploration and drilling plan, incorporating the latest geological,
geophysical and geochemical information to prioritise the next phase of district-scale
drilling across the more than 40km mineralised corridor.
This activity schedule provides Tesoro with multiple potential sources of near-term news flow.
While the DFS workstreams are focused on progressively refining the development pathway
for Ternera, drilling is increasingly directed towards testing opportunities to expand the
existing mineralised system and assess the broader discovery potential of El Zorro.
INFORMATION REQUIRED UNDER LISTING RULE 5.8.1
Mineral Tenement and Land Tenure Status
The Ternera Gold Deposit occurs within Tesoro’s El Zorro Gold Project which covers a total
concession holding area of approximately 570km2, located approximately 130km north of
Copiapó City, in Region III (Atacama) in northern Chile. The Ternera Deposit is 13km inland
from the Pacific Ocean, 57km by road from the port town of Caldera and is well-supported
by existing road, power, and water infrastructure.
Tesoro’s 95% owned Chilean subsidiary, Tesoro Mining Chile SpA, currently owns 94.5% of the
El Zorro Gold Project within a fully diluting joint venture structure.
Geology and geological interpretation
The Project is located within the Coastal Cordillera of Chile. At Ternera, gold mineralisation
is predominately hosted within numerous intermediate intrusions and associated quartz and
sulphide veins, veinlets, and alteration, within faulted and strongly altered tonalitic intrusions
(El Zorro Tonalite or EZT). The EZT intrusions have intruded Permian-aged basement
Tesoro Gold 10
ASX ANNOUNCEMENT
27 AUGUST 2026
sedimentary sequences. Gold mineralisation at Ternera has been classified as an Intrusive
Related Gold System (IRGS) and Tesoro has discovered additional gold targets in the El Zorro
District which exhibit similar styles of gold mineralisation.
Gold mineralisation is interpreted to be related to regional-scale, north-south striking fault
zones and associated local north-west striking strike slip faults. Mineralisation is interpreted to
occur as discontinuous shoots, controlled by a combination of the intersection of the
structures with the preferred host rock tonalite, and locally developed intersections of
fracture populations that developed during strike-slip deformation.
Drilling Techniques
Drilling was completed at the El Zorro Project and results used to support the MRE included
474 diamond HQ drill holes for 153,180 metres (Figure 7). All diamond holes are drilled from
surface with most holes drilled towards the south-west with a dip of 60 degrees. Drilling used
a HQ (~63.5 mm diameter) drill size. Drill core was collected from a core barrel and placed
in appropriately marked core trays. Down hole core run depths were measured and marked
with core blocks, and orientation marks were routinely placed onto the core. The samples
were also measured for core loss and were photographed before geological and
geotechnical logging was completed.
Figure 7: Ternera Gold Deposit - Drill Hole Collar Location Plan. Pre-2026 MRE Holes – black. New holes in red.
Tesoro Gold 11
ASX ANNOUNCEMENT
27 AUGUST 2026
Sampling
Half core was sampled at significant mineralisation and geological boundaries. Core
recovery was estimated using the drillers recorded depth marks against the length of the
core recovered. Occasional shears and faults where core is broken are noted from the core
photographs, but there is no significant core loss.
Sample Preparation and Assaying
Sample preparation was conducted at the ALS laboratory in Copiapó, Chile. Diamond drill
core was split using an electric diamond saw. Typically, half core is sampled at 1m intervals
with adjustments made to reflect geological and mineralisation boundaries, with a minimum
sample length of 0.25m applied. Whole samples are split to generate a 1kg sample and
pulverised with 85% passing 75 microns.
Sample pulps were dispatched to ALS Santiago where 50g was used for a charge for fire
assay fusion with gravimetric finish. Multi-element assays were completed by 4-acid digest
with a 2.5 g charge.
Analysis results are returned via digital certificate for import into the drill hole database.
Estimation Methodology
Three-dimensional (3D) modelling of the geology was carried out to generate domains for
further analysis and Resource estimation.
Statistical analysis was based on these 3D tonalite and fault domains, to determine the
capping (top cuts) to be applied to the gold assay data prior to Resource estimation. The
top cuts varied by domain from 10 to 30g/t Au. Analysis of density data was carried out to
determine parameters for density estimation. Variography was also carried out on both gold
and density to generate the parameters required for estimation.
Gold grade and density were estimated using the Ordinary Kriging (OK) method. The initial
estimation was used to generate mineralised and unmineralised envelopes. A second
kriging pass then used these sub-domains within the major tonalite and fault domains to
produce final estimates of gold grade and density. A third pass estimate was conducted
within tonalite domains using a search with a strike of 345⁰ and a vertical dip.
A dynamic search technique was used in the estimation of the tonalites, which allows the
search strategy to follow the local variations in dip and strike of the mineralisation. In the
fault domains between the tonalite intrusions a vertical, search was used with a strike of
345⁰. A three-pass search strategy was used, with search radii of 20m, 35m and 50m
respectively.
Tesoro Gold 12
ASX ANNOUNCEMENT
27 AUGUST 2026
Resource Classification and Hole Spacing
Resource classification is based on a range of criteria including:
• Geological continuity;
• Data quality;
• Drill hole spacing;
• Modelling technique; and
• Estimation properties including search strategy, number of informing data and
average distance of data from blocks
Drill hole location plots have been used to ensure that local drill spacing conforms to the
minimum expected for the Resource classification. Measure material is confined to areas
where Resource definition drilling is typically <12.5m spacing. Indicated material is confined
to areas where Resource definition drilling is typically <25m spacing. Inferred material is
confined to areas where drill spacing is generally <50m. Areas of wider spacing are
unclassified and not reported as part of the Mineral Resource.
Blocks with more widely spaced drill spacing are estimated but are not classified as part of
the Mineral Resource.
Mining and Metallurgy
Development of this Mineral Resource adopts mining standard equipment and methods
using a conventional truck and hydraulic excavator and open pit mining at an appropriate
bench height.
Mineral Resource Statement
Mineralised material interpreted to have “reasonable prospects of eventual economic
extraction” by open pit mining methods was defined as mineralised material with a cut-off
above 0.30g/t within an optimised pit shell. The assumptions used in to model the optimised
open pit shell are presented in Table 2.
Cut-off Grade
The 0.30g/t Au reporting cut-off was selected having regard to the open pit mining,
processing and metallurgical assumptions used to establish reasonable prospects for
eventual economic extraction, including the US$3,500/oz gold price, 94.5% metallurgical
recovery and the mining and processing cost assumptions summarised in Table 2 below.
Other Modifying Factors
The Mineral Resource has been constrained within an optimised open pit shell to
demonstrate reasonable prospects for eventual economic extraction. The optimisation
incorporates assumptions relating to mining method and costs, mining dilution and
recovery, metallurgical recovery, processing and site operating costs, gold price and pit
Tesoro Gold 13
ASX ANNOUNCEMENT
27 AUGUST 2026
slope angles. These assumptions are considered appropriate for the current level of study
and are summarised in Table 2 below.
Table 2: Optimised open pit shell modelling assumptions.
Item Units Value Justification
Average mining cost US$/t mined 2.80 Based on mining cycle time modelling. Includes closure cost provisions
Mining dilution % 10.00 Industry standard assumption for open pit mining
Mining recovery % 95.00 Industry standard assumption for open pit mining
Gold price US$/oz 3,500 Discount to current spot gold price
Metallurgical recovery % Au 94.50 Based on Phase 2 metallurgical test work results announced 10 Dec 2021
Processing cost US$/t milled 11.50 Based on cost modelling from metallurgical tests and database costs
General and admin US$/t milled 2.50 Based on cost estimate database
Owners mine
management
US$/t milled 0.90 Based on cost estimate database
Tailings disposal US$/t milled 0.10 Based on cost estimate database
Overall pit slope angles Degrees 42 Based on Scoping Study geotechnical assessment
Authorised by the Board of Tesoro Gold Ltd.
For more information:
Company
Zeff Reeves
Managing Director
info@tesorogold.com.au
Investor Relations & Media
Enquiries
Grace Lauder
Fivemark Partners
Grace.lauder@fivemark.com.au
Follow Us
• Website
• LinkedIn
• X
References:
1. ASX Announcement 4 August 2026 - TERNERA RESOURCE GROWS TO 1.82 MOZ GOLD
2. ASX Announcement 9 March 2023- TERNERA MINERAL RESOURCE UPDATE AND INITIAL EXPLORATION
TARGET
3. ASX Announcement 23 May 2022 - Ternera Mineral Resource increased by +66% to1.1Moz @ 1.12g/t
Au
4. ASX Announcement 28 July 2021 - Maiden Mineral Resource Estimate of 660 koz gold sets foundation
at El Zorro
Tesoro Gold 14
ASX ANNOUNCEMENT
27 AUGUST 2026
About Tesoro
Tesoro Gold Limited has discovered and defined the
first Intrusive Related Gold System in Chile. The 1.8M oz
Ternera discovery is in the Coastal Cordillera region of
Chile. The Coastal Cordillera region is host to multiple
world-class copper and gold mines, has well
established infrastructure, service providers and an
experienced mining workforce. Large areas of the
Coastal Cordillera remain unexplored due to the
unconsolidated nature of mining concession
ownership, but Tesoro, via its in-country network and
experience has been able secure rights to the district-
scale El Zorro gold project in-line with the Company’s
strategy. Tesoro’s 95% owned Chilean subsidiary owns
94.5% of the El Zorro Gold Project.
Future Performance
This announcement may contain certain forward-looking
statements and opinions. Forward-looking statements,
including projections, forecasts and estimates, are provided as
a general guide only and should not be relied on as an
indication or guarantee of future performance and involve
known and unknown risks, uncertainties, assumptions,
contingencies and other important factors, many of which are
outside the control of the Company and which are subject to
change without notice and could cause the actual results,
performance or achievements of the Company to be
materially different from the future results, performance or
achievements expressed or implied by such statements. Past
performance is not necessarily a guide to future performance
and no representation or warranty is made as to the likelihood
of achievement or reasonableness of any forward-looking
statements or other forecast. Nothing contained in this
announcement, nor any information made available to you is,
or and shall be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the future
performance of Tesoro Gold.
Competent Persons Statements
The information in this report that relates to Mineral
Resources is based on information compiled by Mr Lynn
Widenbar (B.Sc(Hons) Geology, M.Sc. FAusIMM, MAIG),
a Competent Person who is a Fellow of The Australasian
Institute of Mining and Metallurgy. Mr Widenbar is acting
as an independent consultant to Tesoro Gold Limited.
Mr Widenbar has sufficient experience that is relevant
to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore
Reserves’. Mr Windenbar consents to the inclusion in
the report of the matters based on his information in the
form and context in which it appears.
The information in this report that relates to Exploration
Results and Metallurgical Results is based on information
compiled by Mr Zeffron Reeves (B App Sc (Hons)
Applied Geology) MBA, MAIG). Mr Reeves is a member
of the Australian Institute of Geoscientists and a Director
and shareholder of the Company. Mr Reeves has
sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as
a Competent Person as defined in the 2012 Edition of
the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Reeves
consents to the inclusion in this report of the matters
based on this information in the form and context in
which it appears.
Tesoro Gold 15
ASX ANNOUNCEMENT
27 AUGUST 2026
APPENDIX 1: JORC TABLES
JORC Code, 2012 Edition - Table 1
Section 1: Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
Tesoro has completed 501 diamond drill holes at the El
Zorro Gold Project for 159,762m.
Diamond drill holes were drilled with HQ. Sampling was
half core at geologically defined and significant
mineralisation boundaries.
The CP considers the sampling methodologies to be
appropriate for this style of mineralisation.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Tesoro Diamond drill holes were drilled with HQ.
Sampling was half core at geological and significant
mineralisation boundaries. The CP consider this
appropriate for the style of mineralisation.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done; this
would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’).
In other cases, more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
Diamond drilling was used to obtain ½ core samples of
various lengths (minimum 0.25m), from which 1kg of
material was pulverised passing 200 mesh to produce
a 50g charge for fire assay fusion with a gravimetric
finish. Multielement assays were completed by 4-acid
digest with a 2.5g charge. The CP consider these
appropriate assay techniques.
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc.).
Tesoro has completed 501 diamond drill holes at the El
Zorro Gold Project for 159,762m.
Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Standard tube was used.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
Core recovery was estimated using the drillers
recorded depth marks against the length of the core
recovered. Reviewing the core photos, there are
occasional shears/faults where core is broken. There is
however no significant core loss.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
A single tube system was employed and in general
core recovery good.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have occurred
due to preferential loss/gain of
fine/coarse material.
There appears to be no potential sample bias as there
was no regular loss of core.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour,
lithology, weathering, grain size, mineralisation,
alteration, geotechnical characteristics etc. Diamond
core is stored at the Company’s warehouse.
Tesoro consider the data to be of an appropriate level
of detail to support a future resource estimation.
Tesoro Gold 16
ASX ANNOUNCEMENT
27 AUGUST 2026
Criteria JORC Code explanation Commentary
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.
Logging of diamond core was qualitative, and
diamond core was photographed.
• The total length and percentage of the
relevant intersections logged.
All drilled intervals are logged and recorded.
Subsampling
techniques and
sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
Drill core was cut, and half core was collected for
analysis
• If non-core, whether riffled, tube
sampled, rotary split, etc. and whether
sampled wet or dry.
Tesoro has not completed any percussion drilling.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.
The sample preparation of crushing half core at the
lab to mm size prior to splitting off a 50g charge (either
by cone/quarter or riffle) for pulverisation provides an
appropriate and representative sample for analysis.
• Quality control procedures adopted for
all subsampling stages to maximise
representivity of samples.
Half core was collected for the entirety of the Tesoro
drilling, as such there was consistency throughout the
drilling. Core was logged by a qualified geoscientist.
Each subsample is considered to be representative of
the interval.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
Sampling of half core is representative of the in-situ
material. There are field duplicate samples collected
from the diamond core with irregular results. Field drill
core duplicates are irregular by nature, and it has
been recommended by Tesoro’s consultants to use
coarse reject material to monitor the sample
preparation.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Sample sizes collected were considered appropriate
to reasonably represent the material being tested.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Assays reported in this report were undertaken at the
accredited laboratory of ALS Santiago, which is fully
certified. Core samples of various lengths were
assayed (minimum 0.25m) from which 1kg of material
was pulverized passing 200 mesh to produce a 50 g
charge for fire assay fusion with gravimetric finish.
Multielement assays were completed by 4-acid digest
with a 2.5 g charge.
All techniques are appropriate for the element being
determined.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Standard chemical analyses were used for grade
determination. There was no reliance on determination
of analysis by geophysical too
Share your feedback
Discover