Phase 1 Scoping Study Presentation
Released
Released
Announcement PDF
PHASE 1 OPEN PIT
SCOPING STUDY
PRESENTATION
EL ZORRO GOLD PROJECT, CHILE
APRIL 2023
ASX:TSO | OTCQB:TSORF
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
DISCLAIMER
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have been prepared by Tesoro Gold Limited (Tesoro or the Company) and approved by the Board of the Company. The information
contained in the Presentation (Information) is summary only and should be read in conjunction with any other documents provided to you by the Company. The Information is current as at 3 April 2023 and the Company does not undertake to
provide any additional or update information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the Company that you have read, understood and
accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or fairness of the
information, opinions and conclusions contained in this Presentation. Tesoro, or related bodies corporate, shareholders or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or
make any representations or warranties, express or implied, as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Tesoro does not
represent or warrant that this Presentation is complete or that it contains all material information about Tesoro or which a prospective investor or purchaser may require in evaluating a possible investment in Tesoro or acquisition of shares. To
the maximum extent permitted by law, Tesoro and its Agents expressly disclaim any and all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this
Presentation, or otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of Tesoro and which are subject to change without notice and could cause the actual results, performance or
achievements of Tesoro to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of this
Presentation are cautioned not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to be used as the basis for making an
investment decision. In providing this Presentation, Tesoro has not considered the objectives, financial position or needs of any particular recipients. Before making an investment decision prospective investors should consider the
appropriateness of the information in this Presentation having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments Commission or any other foreign
regulator) and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase
or sale in the United States or any other jurisdiction in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or the
securities laws of any state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States. The information in this Presentation is strictly confidential. It may not be disclosed, reproduced,
disseminated, quoted or referred to, in whole or in part, without the express consent of Tesoro.
Competent Person’s Statements
The information in this report that relates to Exploration Results and Exploration Target is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of
Geoscientists and a Director and shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in this report of the matters based on this information in
the form and context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled by Mr Lynn Widenbar, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Widenbar is acting as an
independent consultant to Tesoro Gold Limited. Mr Widenbar has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person
as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Company confirms that Mr Widenbar consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears and that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original announcement on 9 March 2023.
The information in this report that relates to the Production Target, assumptions on Modifying Factors and evaluation of other relevant factors are based on and fairly represents information and supporting documentation that has been
compiled for this announcement and have been compiled under the supervision of Mr Linton Putland BEng (Mining), MSc (Mineral Economics) & Member AusIMM. Mr Putland is a Director of the Company. Mr Putland has reviewed and approved
the technical content of this announcement. Mr Putland is a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012). Mr Putland
consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
The Company has released all material information that relates to Exploration Results for the El Zorro Gold Project, on a continuous basis to the ASX and in compliance with JORC 2012. The Company confirms that it is not aware of any new
information that materially affects the content of this ASX release.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 2
TESORO GOLD LIMITED
RAPID GROWTH AND ADVANCEMENT OF THE EL ZORRO GOLD PROJECT
Au
$$
Au
Cu/Fe
Cu
Cu/Au
LOCATION
RESOURCE
GROWTH
Large surface
gold footprint on
570km2 of
tenure
Increased and
upgraded
1.3 Moz1 Ternera
Gold Deposit
Further
unlocking a
district scale
gold system
Coastal location and
supporting
infrastructure in a
Tier 1 mining
jurisdiction
Scoping study
evidences robust
starter pit gold mining
and processing
operation
Numerous exciting,
untested targets and
district level potential
provides multi-million
ounce potential
Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023 and the Appendix, Tesoro Gold Limited confirms that it
is not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical
parameters underpinning that release continue to apply and have not materially changed.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
CHILE
1.
INVESTOR PRESENTATION | 3
UNLOCKING EL ZORRO’S FULL POTENTIAL
DUAL TRACK ADVANCEMENT STRATEGY
DEVELOPING
TERNERA
DISTRICT
DISCOVERIES
REFINE THE DEVELOPMENT
PATHWAY
CONFIRM CONTINUITY OUTSIDE
TERNERA
CONTINUE GROWING THE
RESOURCE BASE
TEST TERNERA STYLE
TARGETS
Economic assessment,
planning and permitting
Define ounces outside of the existing
Ternera deposit
Infill drilling and
resource growth
Aggressive drill testing of look-alike
targets
DISCOVER AND DEFINE
NEW TARGETS
CONTINUED TARGET
GENERATION
New and extensional
mineralisation discoveries
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Ongoing mapping and
sampling programs
INVESTOR PRESENTATION | 4
CORPORATE SNAPSHOT
TESORO GOLD (ASX: TSO, OTCQB:TSORF)
Capital structure
Board and management
Share price1
A$0.027
Zeffron Reeves
Managing Director
1,053.5 M
Linton Putland
Executive Director
Performance rights2
73.41 M
Geoff McNamara
Non-Executive Director
Listed options (ASX: TSOO and ASX: TSOOA)2
174.76 M
Kristie Young
Non-Executive Director
Market capitalisation (undiluted)
A$28.44 M
Sarah Wilson
Company Secretary
Cash3
A$7.21 M
Sergio Uribe
Country Manager – Chile
Debt3
Nil
Ruben Cahuana
Exploration Manager – Chile
Tatania Garcia
Manager – Permitting, Community
Relations and Sustainability
Francisco Varela
Legal Counsel - Chile
Shares on issue2
Register detail4
9.4%
14.9%
56.2%
19.5%
BOARD AND MANAGEMENT
GOLD FIELDS
INSTITUTIONAL INVESTORS
OTHER INVESTORS
1.
As at 3 April 2023
2. As at 7 March 2023: TSOO expiring 7 July 2025 and TSOOA expiring 13 December 2025
3. As at 31 December 2023
4. At 16 February 2023
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 5
TESORO GOLD LIMITED
EL ZORRO GOLD PROJECT, CHILE
SCOPING STUDY
Ternera Gold Deposit
Phase 1 Open Pit
Scoping Study
Outcomes
A simple, robust gold project
with conventional mining and
metallurgy, located close to
key infrastructure in a wellestablished, supportive mining
jurisdiction
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 6
PHASE 1 OPEN PIT SCOPING STUDY HIGHLIGHTS
TECHNICALLY AND FINANCIALLY ROBUST GOLD MINING AND PROCESSING1
MINE SCHEDULE
MINING PHYSICALS
STANDARD CIP PLANT
17.1 Mt at 1.25 g/t gold
2.4 Mtpa throughput
94.5% gold recovery
Initial open pit mine
For initial 8-year operating life
Simple non-refractory metallurgy
PHASE 1 GOLD OUTPUT
AISC
UPFRONT CAPITAL COST
651 koz
US$1,068/oz
US$132M
Average production 93 koz p.a.
Including US$8.6M of sustaining capital
Including US$10.4M in pre-strip
NPV5%
IRR
PAYBACK
US$201M
27.5%
3.4 years
Pre-tax at US$1,750/oz gold
1.
Pre-tax at US$1,750/oz gold
Pre-tax from first production
For full Scoping Study details, refer Tesoro ASX release dated 4 April 2023, Ternera Gold Deposit Phase 1 Open Pit Scoping Study Outcomes. Tesoro Gold confirms that it is not aware of any new information or data that
materially affects the information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 7
PHASE 1 OPEN PIT SCOPING STUDY HIGHLIGHTS
DETAILED STUDY OUTCOMES
Key parameter (± 35%)
Unit
Ore throughput
Mt
17.1
Gold grade
g/t
1.25
Production ounces
koz
651
Plant throughput
Mtpa
2.4
Average annual steady state production
koz pa
93
Production life (excluding pre-strip)
years
7.4
Forecast average All‐In‐Sustaining‐Cost (AISC)
US$/oz
1,068
Total pre‐production capital cost (including pre-strip)
US$M
132
Economic outcomes (± 35%)
Unit
Base
Spot1
Gold price
US$/oz
1,750
1,950
NPV5% (pre-tax, ungeared)
US$M
201
300
%
27.5
37.1
Net cashflow (pre-tax, undiscounted, ungeared)
US$M
312.3
442.5
Payback from first production
years
3.4
2.8
IRR (pre-tax, ungeared)
1.
Approximate gold spot price as at 28 March 2023
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Study estimate
STARTER PIT
VALUE UPSIDE
Base case
assessment of
development
potential
Significant
leverage to
future resource
growth
Initial project derived
from the shallowest
portion of the Ternera
Deposit MRE
Project economics
highly attractive at
current, rising
gold prices
INVESTOR PRESENTATION | 8
SUBSTANTIAL POTENTIAL UPSIDE DRIVERS
IMMEDIATE POTENTIAL FOR PRODUCTION EXPANSION
1. Further 170 koz Au available within optimised pit shell:
Additional ounces residing between base of the Scoping Study pit
design and optimal pit shell at US$1,750/oz – provides potential
open pit expansion to 822 koz Au
2. Underground development: Through incorporation of further
Ternera MRE ounces into the mine schedule via potential
underground mining – to be interrogated during Phase 2 study work
3. Ternera Exploration Target area: Potential resource additions to be
unlocked through exploration within the initial constrained Ternera
Exploration Target area
4. Ternera extensional targets: Drill-out and potential conversion of
key growth targets at Toro Blanco and Kitsune - situated within 3km
of the Ternera Deposit
5. El Zorro district targets: High impact targets remain to be
unlocked, including the prospective geology defined at the Animas
Viejas Target – just 35km north of Ternera
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 9
DEVELOPMENT SCHEDULE
BASELINE STUDIES, EIA AND PROJECT APPROVALS UNDERWAY
2023
2024
2025
2026
2027
2028
EARLY STUDIES / FEASIBILITY ENGINEERING
EIA APPLICATION AND CONSULTATION
DETAILED STUDIES / ADVANCED ENGINEERING
PAS – PA APPLICATION PROCESS
CONSTRUCTION
PRODUCTION
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 10
UNLOCKING EL ZORRO’S FULL POTENTIAL
MILESTONES ON THE VALUE REALISATION PATHWAY
DISTRICT
DISCOVERIES
DEVELOPING
TERNERA
•
MRE increased and upgraded with initial
Exploration Target defined Q1 2023
•
Kitsune maiden drilling program to commence
Q2 2023
•
Ternera expansion drilling program ongoing
with completion targeted by end H1 2023
•
Calderillas Target follow up drilling planned to
commence Q2 2023
•
Ternera Gold Deposit Phase 2 Scoping Study
targeted for Q4 2023
•
Ongoing mapping and sampling work to
further define drill targets at Calderillas north,
Drone Hill and Buzzard during 2023
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 11
1
2
3
4
5
6
LARGE, HIGHLY PROSPECTIVE GOLD PROJECT
Strategically positioned, and located in a Tier 1 mining jurisdiction
EXISTING 1.3 Moz MINERAL RESOURCE ESTIMATE
Delivered at a low A$21/oz discovery cost and 99% success rate
EXCEPTIONAL METALLURGY FOR SIMPLE PROCESS FLOW
Single stage crushing, gravity and CIP expected
ATTRACTIVE PHASE 1 OPEN PIT SCOPING STUDY OUTCOMES
Technically and financially robust initial base case project
RESOURCE AND DISTRICT LEVEL GROWTH POTENTIAL
Numerous discoveries for multi-million ounce potential
HIGHLY EXPERIENCED BOARD AND MANAGEMENT TEAM
Local presence and deep Chilean expertise
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
APPENDIX
PHASE 1 OPEN PIT
SCOPING STUDY DETAIL
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
TERNERA DEPOSIT
MINERAL RESOURCE ESTIMATE (MRE)
Constrained 1.28 Moz Au MRE: US$1,800/oz optimised pit shell, underground reported at 1.5 g/t Au cut off1
Area
Cut off
Open Pit Resource
Underground Resource
Total Resources
Indicated
Total
Inferred
Au g/t
Mt
Au g/t
Koz
Mt
Au g/t
Koz
Mt
Au g/t
Koz
0.30
1.50
22.5
0.1
22.6
1.10
2.64
1.11
795
7
802
10.0
1.2
11.2
1.18
2.64
1.34
379
100
479
32.5
1.3
33.7
1.13
2.64
1.18
1,175
107
1,282
Unconstrained 1.46 Moz Au MRE: reported at various cut offs to the 200mRL1
Cut off
Au g/t
0.3
0.5
1.00
2.00
Indicated
Mt
23.2
16.3
7.2
2.6
Au g/t
1.09
1.39
2.25
3.75
Total
Inferred
Koz
815
727
523
317
Mt
19.4
12.8
5.6
2.0
Au g/t
1.03
1.37
2.24
3.71
Koz
645
561
400
241
Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023. Tesoro Gold Limited confirms that it is not aware of any
new information or data that materially affects the information included in that release. All material assumptions and technical parameters
underpinning that release continue to apply and have not materially changed.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Mt
42.6
29.1
12.8
4.7
Au g/t
1.07
1.38
2.24
3.37
Koz
1,459
1,288
923
558
1.
INVESTOR PRESENTATION | 14
PRODUCTION PROJECTIONS
PHASE 1 OUTPUT OF 651 koz
• Average production 93 koz p.a.
• Mining rates provide 2.4 Mt p.a. mill feed
• Mining dilution factor of 10% @ 0g/t Au
Annual recovered gold and head grade
applied to all mill feed tonnes
• Mining loss of 5% used for all optimisation runs
and production schedules
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 15
SENSITIVITY ANALYSIS
STRONG GOLD PRICE LEVERAGE
• Commodity price/revenue and operating
NPV5% (pre-tax) sensitivity analysis (US$M)
cost parameters represent the largest
economic sensitivity to Project NPV
• Significant NPV5% (pre-tax) uplift to US$300M
at current gold spot price levels of
US$1,950/oz
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 16
PROJECT CONFIGURATION
INITIAL 8-YEAR OPERATING LIFE
• Open pit operation with activities performed
by a mining contractor
• Mining costs estimate based on the use of a
Optimised pit production target (US$1,750/oz at 0.46 g/t Au)
Indicated
Inferred
Total
Pit
Mt
Au g/t
koz
%
Mt
Au g/t
koz
%
Mt
Au g/t
koz
Phase 1
14.8
1.22
582
84
2.3
1.45
107
16
17.1
1.25
689
230-tonne diesel hydraulic excavator and
120-tonne truck fleet
• Modelling based on preliminary pit, run of
mine and waste dump designs
• Open pit mining schedules developed
based on a single stage pit, targeting a mill
feed rate of 2.4 Mt p.a. at the highest grade
possible
• Over an initial 8-year operating life, the
Phase 1 pit provides approximately 17.1 Mt of
mill feed at an average grade of 1.25g/t Au
and a strip ratio of 8.3:1
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 17
PROCESS PLANT FLOWSHEET
SIMPLE SINGLE STAGE CRUSHING, GRAVITY AND CIP
Mill throughput by resource category
45%
gold recovered
by gravity
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
94.5%
total recovery at 150
micron grind size
INVESTOR PRESENTATION | 18
CAPITAL COST ESTIMATE
LOW UP FRONT CAPITAL BURDEN
• Total pre-production capital cost estimate of
US$132M
• Estimated in consultation with independent
specialists, a leading South American mining
contractor and GR Engineering Services
• Pre-strip mining costs of US$10M for the
period preceding commercial production
included in the total cost
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Pre-production capital cost estimate (plant and infrastructure)
Area
Cost estimate (US$M)
Processing plant
62.5
Project infrastructure
39.0
Other costs
6.6
Mining capital
13.5
Pre–strip mining activities
10.4
Total pre-production capital cost
132.0
INVESTOR PRESENTATION | 19
OPERATING COST ESTIMATE
HIGHLY COMPETITIVE ALL IN SUSTAINING COST (AISC) ESTIMATE
• Forecast average AISC US$1,068/oz
• Includes US$13/oz sustaining capital
• Operating cost estimates constructed in
consultation with independent specialists, a
mining contractor and GR Engineering
Services and derived across mining,
processing and administration
Operating cost estimate (rounded)
Area
US$/t Au processed
US$/oz Au processed
Processing plant
22.2
585
Project infrastructure
14.0
368
Other costs
3.9
102
C1 cost
40.1
1,055
Sustaining capital
0.5
13
All‐In‐Sustaining‐Cost
40.6
1,068
• Mining contractor operating strategy to be
adopted
• Estimate assumes all material in pit will
require drill and blast
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 20
LICENCE TO OPERATE
ENVIRONMENTAL AND SOCIAL STRATEGY
ALIGNED TO THE UNITED NATIONS (UN) SUSTAINABLE DEVELOPMENT GOALS (SDG) WITH A COMMITMENT TO
ENSURING EXPLORATION AND OPERATIONAL ACTIVITIES GENERATE POSITIVE SUSTAINABILITY OUTCOMES
Health and safety
Occupational Health and Safety are fundamental responsibilities Tesoro has towards its workforce. Our
strategies and practices are based on providing a safe workplace for all employees, suppliers and
contractors.
Climate change
Total GHG emissions on a $ per value basis for newly mined gold is significantly lower than that for other
major metals and mined products. Tesoro is committed to put in place a framework to ensure future
mine developments are built and operated to support global greenhouse mitigation targets.
Environment
Tesoro applies leading exploration techniques, technology and practices to promote drilling efficiency
and minimise environmental impacts. Furthermore, Tesoro is committed to continual improvement of its
environmental performance through a robust environmental management program.
People and culture
Attracting, developing and retaining a diverse, inclusive and competent workforce is important to Tesoro
and a key foundation to the company's policies and practices.
Community partnerships
Tesoro partners with the local and host communities of the Coastal Cordillera region of Chile to share
value through the creation of local jobs and business opportunities.
Economic sustainability
Generating economic growth and value for all our investors, employees and stakeholders through
successful exploration and investment in the Coastal Cordillera region of Chile.
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 21
CURRENT MRE IS JUST THE BEGINNING
EXISTING DRILLING INFORMS SIGNIFICANT GROWTH POTENTIAL
•
•
•
Exploration Target of 48.5 Mt to 101.0 Mt at 0.91
g/t Au to 1.45 g/t Au1
120,000
Resource (kOz Au)
Ternera constrained MRE
3,500
3,000
Indicates Ternera could potentially contain
between 1.6 Moz and 3.0 Moz gold1
100,000
Exploration Target constrained to the extent of
the current drill footprint
•
Ternera Deposit remains open in all directions
•
Multiple continuous high-grade zones
•
Drilled metres
Ternera Exploration Target1
2,500
80,000
2,000
60,000
1,096
40,000
20,000
Wide-spaced drill intercepts outside of Resource
3,000
661
586
0
75
July 2021 MRE
1,281
479
1,460
1,600
645
593
503
May 2022 MRE
Drilled metres
802
March 2023 MRE
815
March 2023
Tenera Gold Deposit
unconstrained MRE Exploration Target
Indicated Resource
Inferred Resource
1,500
1,000
500
0
Lower
Upper
Lower
Upper
Lower
Upper
48.5
101.0
0.91
1.45
1.6
3.0
Ternera MRE growth updates and initial Exploration Target highlighting improved classification and
consistent resource growth with efficient drilling. Refer to Mineral Resource Update and
Exploration Target, ASX Announcement 9 March 2023, Tesoro Gold Limited confirms that it is not
aware of any new information or data that materially affects the information included in that
release. All material assumptions and technical parameters underpinning that release continue to
apply and have not materially changed.
1.
Refer to Mineral Resource Update and Exploration Target, ASX Announcement 9 March 2023
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 22
Tonnage (Mt)
Au Grade (g/t)
Contained Au (Moz)
GOLD FIELDS STRATEGIC INVESTMENT
HIGH QUALITY SUPPORTIVE PARTNERSHIP
•
Partnering with one of the world’s largest gold mining firms
•
Globally diverse South African gold producer with eight
mining operations and projects through Australia, Chile,
Ghana, Peru and South Africa
•
Annual gold production of approximately 2.2 Moz1
•
Constructing the Salares Norte high-grade open pit gold-silver
project in Northern Chile, 190 km north-east from the El Zorro
Gold Project
•
Processing capacity of 2.8Moz per year of metal doré for
approximately 9.9 t of gold annually2
•
Tesoro strategic investment facilitates acceleration of regional
and district scale exploration at the El Zorro Gold Project
•
Gold Fields now hold a 14.86% investment in Tesoro Gold
“
Gold
Fields’
strategic
investment
demonstrates tremendous confidence in the
Tesoro team and recognises the current
opportunity and significant upside potential
of the El Zorro Gold Project. This investment
allows us to accelerate our regional and
district scale exploration efforts, while we
continue to grow the existing Mineral
Resource base.
”
- Zeff Reeves, Tesoro Managing Director
1.
Source: www.goldfields.com
2. Source: https://www.bnamericas.com/en/features/5-chilean-gold-projects-set-to-help-boost-national-output
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
INVESTOR PRESENTATION | 23
TESORO GOLD LIMITED
Level 48
152-158 St Georges Terrace
Perth, WA 600
+61 8 6311 9160
info@tesorogold.com.au
www.tesorogold.com.au
ASX:TSO | OTCQB:TSORF
Tesoro Gold (ASX:TSO | OTCQB:TSORF) | CORPORATE PRESENTATION
Share your feedback
Discover