Quarterly Activities Report
Released
Released
Announcement PDF
Sign up HERE to our Investor Hub
ASX ANNOUNCEMENT
26 APRIL 2024
ASX: TSO OTCQB: TSORF
QUARTERLY ACTIVITIES AND CASHFLOW REPORT
FOR THE PERIOD ENDED 31 MARCH 2024
Tesoro Gold Limited (ASX: TSO, OTCQB: TSORF) (Tesoro or the Company) is pleased to report
on its activities for the quarter ended 31 March 2024 (the Quarter).
HIGHLIGHTS
•
Surface sampling results confirmed two new outcropping gold anomalies, La Brea and
Sierra del Portrero prospects along the Dorado Fault Zone (DFZ) approximately 15km
north of Ternera within the known 20km long north-south gold corridor.
•
Key results included1:
─ 3m @ 22.70g/t Au (EZTR004827) (La Brea)
─ 27m @ 0.64g/t Au (EZTR004828) (La Brea) including;
o
9m @ 3.98g/t Au (EZTR004828) (La Brea) including;
o
3m @ 10.65g/t Au; and
o
3m @ 4.65g/t Au.
─ 2m @ 12.00g/t Au (EZTR004533) (La Brea)
─ 2m @ 4.14g/t Au (EZTR004558) (La Brea)
─ 3m @ 3.07g/t Au (EZTR004525) (La Brea)
─ 1m @ 43.20g/t Au (EZTR004503) (Sierra del Portrero)
─ 1m @ 4.33g/t Au (EZTR004507) (Sierra del Portrero)
1
•
Further positive results from systematic infill and extensional surface sampling at Drone
Hill expand the large outcropping gold anomaly to over 750m long by 250m wide.
•
An Initial six-hole diamond drilling programme commenced at Drone Hill, with assay
results expected in Q2 2024.
•
Receipt of initial tax refund for approximately A$1.25 million for partial payment of
historical Value Added Tax (VAT) credit.
•
Appointment of Ms Sue Wong as Company Secretary.
•
Cash balance of A$2.07 million and zero debt at 31 March 2024.
Refer ASX Announcements 29 January 2024 and 15 April 2024
ASX ANNOUNCEMENT 26 APRIL 2024
Tesoro Gold Managing Director, Zeff Reeves commented:
“We are pleased with the results received from surface sampling and target generation
activities completed during the 2023 exploration program. Two new, large, outcropping
high grade gold anomalies have been identified at La Brea and Sierra del Portrero, further
adding to known mineralisation within the 20km long north-south gold corridor at El Zorro.
Follow-up surface sampling confirmed further prospectivity with a continuous, wide,
outcropping gold anomaly up to 200m wide. Further assessment and exploration of La
Brea will commence to build on these highly positive first-pass results.
The outcropping Drone Hill anomaly has also been extended further, now measuring
approximately 750m by 250m. This is an extremely positive result given that Drone Hill
demonstrates similar geological characteristics and proximity to the Ternera Gold Deposit.
A recently commenced six-hole diamond drill programme will continue to test a large
surface gold anomaly defined by previous systematic sampling.
Our primary exploration focus remains on targeting these high priority targets outlying
Ternera, producing further exploration successes which has the potential to culminate in
an update to our Mineral Resource endowment.”
EL ZORRO GOLD PROJECT, CHILE
New Gold Targets Identified at El Zorro
First pass mapping and channel sampling was previously conducted along trend of the
Ternera Gold Deposit. On 29 January 2024, Tesoro announced that assay results identified
two prospective zones of outcropping gold anomalism, La Brea and Sierra del Portrero.
These two prospects occur within the ~20km north-south trending corridor (Figure 1)
associated with the DFZ. This corridor is defined by the occurrence of intrusive rocks of
tonalitic composition which have interacted with favourable fault systems and
characterised by widespread outcropping anomalous gold and multiple undrilled targets
extending north of Ternera.
In particular, the La Brea target is characterised by the occurrence of the approximately
1.5km by 1km outcropping intrusive La Isla Stock (Figure 2). The La Isla Stock is of similar
composition and type to the larger intrusive granite adjacent to the Ternera Gold Deposit,
which is interpreted to be related to gold mineralisation throughout the district.
Initial assay results identified a number of gold bearing fault zones within sedimentary rocks
returning gold grades of up to 43.20g/t Au.
TESOROGOLD.COM.AU
2
ASX ANNOUNCEMENT 26 APRIL 2024
Further high-grade results from La Brea
Subsequent to Quarter end, Tesoro announced further high-grade results from La Brea
(ASX Announcement 15th April 2024)
These follow-up assay results identified further gold bearing fault zones within sedimentary
rocks, with samples returning grades of up to 22.70g/t Au. Importantly, broad zones (up to
200m in width) of alteration and gold anomalism (>0.10g/t Au), have been identified, with
results suggesting the presence of a large-scale mineralised system (Figure 2).
Outcropping gold mineralisation is strongly controlled by multiple sub-parallel northwest
trending faults and associated quartz veins and alteration.
Further detailed, systematic channel sampling work is underway to define drill targets in
anticipation of near-term drilling at La Brea.
TESOROGOLD.COM.AU
3
ASX ANNOUNCEMENT 26 APRIL 2024
Figure 1 – El Zorro Gold Project district map showing highly prospective gold corridor and high priority targets
along an approximately 20km north-south trending zone. Blue outlines show approximate position of Figures 2
and 3. Datum PSAD56 19S.
TESOROGOLD.COM.AU
4
ASX ANNOUNCEMENT 26 APRIL 2024
Figure 2 – The La Brea Prospect and channel sampling locations adjacent to the La Isla Stock intrusive. New
results in gold highlights (refer to ASX Announcement 15 April 2024). New concession boundary shown in yellow
covering the La Isla Stock intrusive and large gold anomaly to the southwest. For previous channel sampling
results refer to ASX Announcements 29 January 2024 Datum PSAD56 19S.
TESOROGOLD.COM.AU
5
ASX ANNOUNCEMENT 26 APRIL 2024
Expansion of Drone Hill Gold Anomaly
On 12 February 2024, Tesoro reported further positive results from systematic infill and
extensional surface sampling at the Drone Hill target previously conducted in Q4 CY2023.
This detailed systematic mapping and sampling work followed up the previously
announced channel sampling program undertaken in the area (ASX Announcement 19
October 2023).
The results of this programme successfully expanded the footprint of the Drone Hill gold
anomaly, now characterised by a 750m x 250m area of anomalous outcropping gold
results.
Higher grades (typically >1g/t Au) are interpreted to be associated with the northwest
trending fault system which intersects both the Drone Hill target and the Ternera Gold
Deposit.
Subsequent to Quarter end, a first pass diamond drilling program commenced to drill test
a large surface gold anomaly defined by systematic sampling across the target area.
Previous work has delineated a new large outcropping gold anomaly at Drone Hill with
significant results including:
•
47m @ 1.40g/t Au (EZTR004255) including;
─ 9m @ 4.66g/t Au.
•
42m @ 0.42g/t Au (EZTR004674) including;
─ 3m @ 4.37g/t Au.
•
15m @ 0.53g/t Au (EZTR004132);
•
9m @ 0.99g/t Au (EZTR004714);
•
6m @ 1.18g/t Au (EZTR004668);
•
3m @ 9.67g/t Au (EZTR004673);
•
3m @ 6.70g/t Au (EZTR004662);
•
3m @ 4.94g/t Au (EZTR004669);
•
3m @ 2.11g/t Au (EZTR004282);
•
3m @ 1.88g/t Au (EZTR004110); and
•
2m @ 5.21g/t Au (EZTR4108).
This initial six-hole drilling program remains underway, with the first hole completed
reaching a depth of 344.80m (ZDDH0336). Core samples have been submitted to ALS
Laboratory in Santiago for analysis, with results expected to be returned within the June
Quarter.
TESOROGOLD.COM.AU
6
ASX ANNOUNCEMENT 26 APRIL 2024
Figure 3 – Geology map of the Tenera Gold Deposit and near deposit targets with planned drilling at Drone
Hill shown. (Refer to ASX Announcements 12 February 2024, 19 October 2023, 18 September 2023, 23 March
2021, 8 November 2022, 3 November 2021 and 25 June 2021 and Table 1). Datum PSAD56 19S.
CORPORATE
Initial Tax Refund Received
On 10 January 2024, the Company announced the receipt of an initial payment of the
historical VAT credit from the Chilean tax authority of CLP745,796,841 (approximately
A$1.25 million) through its subsidiary, El Zorro S.C.M.
Tesoro’s 95%-owned Chilean subsidiary, Tesoro Mining Chile SpA (TMC), owns 93.8% of El
Zorro S.C.M. the joint venture company that holds the El Zorro Gold Project concessions.
As previously announced (refer ASX announcement 18 September 2023), El Zorro S.C.M.
was approved for exporter status allowing the recovery of historical VAT made on project
expenditure since 2017.
TESOROGOLD.COM.AU
7
ASX ANNOUNCEMENT 26 APRIL 2024
An outstanding VAT tax credit balance of CLP1,485,063,149 (approximately A$2.50 million)
remains outstanding following receipt of the initial CLP745,796,841. Tesoro anticipates that
an additional payment or payments will be made by the Chilean tax authority in the
coming months.
El Zorro S.C.M. Capital Increase and Joint Venture with Wanaco SpA
As announced on 3 July 2023, Tesoro’s 95%-owned Chilean subsidiary, Tesoro Mining Chile
SpA (TMC) had increased its ownership of the Joint Venture company that holds the El
Zorro concessions, El Zorro S.C.M. to approximately 93.80% (from 85%). At a Shareholder
Meeting of El Zorro S.C.M. held on 7June 2023, it was resolved to increase the capital base
via contribution on a pro-rated basis. TMC subscribed its pro-rata shares for an amount
equal to CLP12,120,334,847 (approximately A$22.4 million), which reflects its funding of
exploration and development activities at El Zorro since March 2021. The minority
shareholder in El Zorro S.C.M., being Wanaco SpA (Wanaco), declined to participate in
the capital increase, resulting in TMC increasing its ownership in El Zorro S.C.M. to
approximately 93.80%. Tesoro’s underlying ownership interest in El Zorro is now
approximately 89.1%.
As announced on 26 August 2021, Wanaco is disputing the valuation and procedure
followed for the capital increase approved in the Shareholders Meeting of El Zorro S.C.M.
held on 11 February 2021. The initial proceedings brought by Wanaco were dismissed by
the Court as they were deemed to have been incorrectly brought, requiring correction.
On 13 October 2021, the proceedings were brought in the correct manner. During
February and March 2023, several procedural hearings were conducted whereby all
parties were provided the opportunity to present evidence and expert witnesses for
consideration by the Court. These hearings were to assess if the proceedings brought by
Wanaco warranted progression to a trial.
Tesoro maintains its position that all capital increases were properly valued and duly
approved under Chilean Corporate Regulations and that Wanaco’s claim is spurious.
On 21 February 2024, TMC received a notification that Wanaco has filed additional claims
with the court relating to an alleged “abandonment” of works under the option and joint
venture agreement between TMC and Wanaco. Wanaco is seeking orders that TMC:
•
stop drilling;
•
deliver the land (not the concessions) where the concessions are located to
Wanaco in the best possible condition;
•
deliver all the information to Wanaco regarding any management or matter that
may have been carried out by TMC prior to the abandonment; and
•
restitution of the mining concessions to Wanaco.
TESOROGOLD.COM.AU
8
ASX ANNOUNCEMENT 26 APRIL 2024
Tesoro considers that the new claims are a part of the ongoing legal proceedings brought
by Wanaco, and Tesoro maintains its position that it has acted at all times in accordance
with the terms of the option, joint venture agreement and Chilean corporate regulations,
and Wanaco’s claims are spurious and without merit.
Tesoro will continue to vigorously defend all claims brought by Wanaco and, as at the
date of this report, no further updates from the Chilean court system have been received
relating to any of the proceedings. The Company will provide further updates in due
course.
Appointment of Company Secretary
On 16 February 2024, Tesoro appointed Ms Sue Wong as Company Secretary. Ms Wong is
an employee of Source Governance and is a Fellow of the Governance Institute of
Australia (FGIA). She has over 20 years of experience in legal and corporate roles,
including over 10 years in corporate governance. She holds a Bachelor of Commerce and
a Bachelor of Laws from the University of Western Australia.
Expenditure and Payments to Related Parties
During the Quarter, the Company spent approximately A$1.120 million on exploration
activities, which comprised primarily of drilling programs and surface mapping and
sampling programs, as well as assay charges connected with those programs. The
Company also paid its annual concession fees, totalling A$0.323 million.
As outlined in the Appendix 5B for the quarter ending 31 March 2024 (sections 6.1 and 6.2),
approximately A$142,252 in payments were made to related parties and/or their associates
as remuneration (inc. superannuation) for the Managing Director, Non-Executive Directors,
and Executive Director fees.
Cash
Tesoro’s cash balance at 31 March 2024 was A$2.07 million and the Company had zero
debt (excluding typical trade creditors).
TESOROGOLD.COM.AU
9
ASX ANNOUNCEMENT 26 APRIL 2024
Table 1 - The updated MRE has been constrained to a US$1,800/oz optimised pit shell, with the underground
resource reported at a 1.50 g/t Au cut-off. The underground resource is reported at a cut-off where gold
mineralisation is consistently well-developed below the optimised pit shell.
For full details of the Ternera Deposit Mineral Resource Estimate (802 koz Indicated, 479 koz Inferred), refer to
ASX Announcement dated 9 March 2023. .
Authorised by the Board of Tesoro Gold Ltd.
For more information:
Company:
Zeff Reeves, Managing Director
Tesoro Gold Limited
TESOROGOLD.COM.AU
10
ASX ANNOUNCEMENT 26 APRIL 2024
About Tesoro
Future Performance
Tesoro Gold Limited was established with a strategy of
acquiring, exploring, and developing mining projects
in the Coastal Cordillera region of Chile. The Coastal
Cordillera region is host to multiple world class copper
and gold mines, has well established infrastructure,
service providers and an experienced mining
workforce. Large areas of the Coastal Cordillera
remain unexplored due to the unconsolidated nature
of mining concession ownership, but Tesoro, via its incountry network and experience has been able
secure rights to a district scale gold project in-line with
the Company’s strategy. Tesoro’s 95% owned Chilean
subsidiary owns 85% of the El Zorro Gold Project.
This announcement may contain certain forwardlooking statements and opinion. Forward-looking
statements, including projections, forecasts and
estimates, are provided as a general guide only
and should not be relied on as an indication or
guarantee of future performance and involve
known
and
unknown
risks,
uncertainties,
assumptions, contingencies and other important
factors, many of which are outside the control of
the Company and which are subject to change
without notice and could cause the actual results,
performance or achievements of the Company to
be materially different from the future results,
performance or achievements expressed or implied
by such statements. Past performance is not
necessarily a guide to future performance and no
representation or warranty is made as to the
likelihood of achievement or reasonableness of any
forward-looking statements or other forecast.
Nothing contained in this announcement, nor any
information made available to you is, or and shall
be relied upon as, a promise, representation,
warranty or guarantee as to the past, present or the
future performance of Tesoro.
Competent Persons Statements
The information in this report that relates to
Exploration Results is based on information
compiled by Mr Zeffron Reeves (B App Sc (Hons)
Applied Geology) MBA, MAIG). Mr Reeves is a
member of the Australian Institute of Geoscientists
and a Director and shareholder of the Company.
Mr Reeves has sufficient experience that is relevant
to the style of mineralisation and type of deposit
under consideration and to the activity which he is
undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Reeves consents to
the inclusion in this report of the matters based on
this information in the form and context in which it
appears.
The information in this report that relates to Mineral
Resources is based on information compiled by Mr
Lynn Widenbar, a Competent Person who is a
Member of The Australasian Institute of Mining and
Metallurgy. Mr Widenbar is acting as an
independent consultant to Tesoro Gold Limited. Mr
Widenbar has sufficient experience that is relevant
to the style of mineralisation and type of deposit
under consideration, and to the activity being
undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’.
The Company
confirms that the form and context in which the
Competent Person’s findings are presented have
not been materially modified from the original
announcement on 23 May 2022.
TESOROGOLD.COM.AU
11
ASX ANNOUNCEMENT 26 APRIL 2024
APPENDIX 1: CONCESSION SCHEDULE
EL ZORRO GOLD PROJECT EXPLORATION CONCESSIONS (85%* Tesoro Mining Chile SpA)
10-august-2026
Size
(ha)
200
Concession
type
Exploration
ZORRO 2B
10-august-2026
200
Exploration
ZORRO 3B
10-august-2026
200
Exploration
ZORRO 4B
10-august-2026
100
Exploration
ZORRO 5B
10-august-2026
200
Exploration
ZORRO 6B
10-august-2026
200
Exploration
PUNTA DE DIAMENTE 1A
17-august-2025
200
Exploration
PUNTA DE DIAMENTE 2A
06-august-2025
300
Exploration
PUNTA DE DIAMENTE 3A
28-september-2025
300
Exploration
LA NEGRA COJA 1A
10-august-2025
200
Exploration
LA NEGRA COJA 2A
06-august-2025
300
Exploration
LA NEGRA COJA 3A
10-august-2025
300
Exploration
LA NEGRA COJA 4A
06-august-2025
200
Exploration
LA NEGRA COJA 5A
09-august-2025
300
Exploration
LA NEGRA COJA 6A
11-august-2025
200
Exploration
LA NEGRA COJA 7A
09-august-2025
300
Exploration
LA NEGRA COJA 8A
11-august-2025
300
Exploration
LA NEGRA COJA 9A
09-august-2025
200
Exploration
LA NEGRA COJA 10A
11-august-2025
300
Exploration
LA NEGRA COJA 11A
10-august-2025
300
Exploration
LA NEGRA COJA 12A
11-august-2025
200
Exploration
LA NEGRA COJA 13A
10-august-2025
300
Exploration
LA NEGRA COJA 14A
11-august-2025
300
Exploration
LA NEGRA COJA 15A
10-august-2025
300
Exploration
LA NEGRA COJA 16A
18-august-2025
200
Exploration
LA NEGRA COJA 17A
17-august-2025
300
Exploration
LA NEGRA COJA 18A
18-august-2025
300
Exploration
LA NEGRA COJA 19A
11-august-2025
200
Exploration
NICE BARREL 1
05-august-2025
200
Exploration
NICE BARREL 2
05-august-2025
300
Exploration
NICE BARREL 3
06-august-2025
200
Exploration
NICE BARREL 4
05-august-2025
200
Exploration
NICE BARREL 5
06-august-2025
200
Exploration
NICE BARREL 6
05-august-2025
200
Exploration
NICE BARREL 7
10-august-2025
200
Exploration
NICE BARREL 13
28-september-2025
300
Exploration
NICE BARREL 12
28-september-2025
200
Exploration
NICE BARREL 11
28-september-2025
300
Exploration
NICE BARREL 10
28-september-2025
200
Exploration
NICE BARREL 9
28-september-2025
300
Exploration
NICE BARREL 8
28-september-2025
200
Exploration
Concession Name
Date of Expiration
ZORRO 1B
TESOROGOLD.COM.AU
12
ASX ANNOUNCEMENT 26 APRIL 2024
Concession Name
Date of Expiration
Size
(ha)
Concession
type
SIERRA PATACONES 1
Replaced by SIERRA PATACONES 1A in process
300
Exploration
SIERRA PATACONES 2
Replaced by SIERRA PATACONES 2A in process
300
Exploration
SIERRA PATACONES 3
Replaced by SIERRA PATACONES 3A in process
300
Exploration
SIERRA PATACONES 4
Replaced by SIERRA PATACONES 4A in process
300
Exploration
SIERRA PATACONES 5
Replaced by SIERRA PATACONES 5A in process
300
Exploration
SIERRA PATACONES 6
Replaced by SIERRA PATACONES 6A in process
300
Exploration
SIERRA PATACONES 7
Replaced by SIERRA PATACONES 7A in process
300
Exploration
SIERRA PATACONES 8
Replaced by SIERRA PATACONES 8A in process
300
Exploration
SIERRA PATACONES 9
Replaced by SIERRA PATACONES 9A in process
300
Exploration
SIERRA PATACONES 10
Replaced by SIERRA PATACONES 10A in process
300
Exploration
SIERRA PATACONES 11
Replaced by SIERRA PATACONES 11A in process
300
Exploration
SIERRA PATACONES 12
Replaced by SIERRA PATACONES 12A in process
300
Exploration
SIERRA PATACONES 13
Replaced by SIERRA PATACONES 13A in process
300
Exploration
SIERRA PATACONES 14
Replaced by SIERRA PATACONES 14A in process
300
Exploration
SIERRA PATACONES 15
Replaced by SIERRA PATACONES 15A in process
300
Exploration
SIERRA PATACONES 20
Replaced by SIERRA PATACONES 20A in process
300
Exploration
SIERRA PATACONES 19
Replaced by SIERRA PATACONES 19A in process
300
Exploration
SIERRA PATACONES 18
Replaced by SIERRA PATACONES 18A in process
300
Exploration
SIERRA PATACONES 17
Replaced by SIERRA PATACONES 17A in process
300
Exploration
SIERRA PATACONES 16
Replaced by SIERRA PATACONES 16A in process
300
Exploration
SIERRA PATACONES 21
Replaced by SIERRA PATACONES 21A in process
300
Exploration
SIERRA PATACONES 22
Replaced by SIERRA PATACONES 22A in process
300
Exploration
SIERRA PATACONES 23
Replaced by SIERRA PATACONES 23A in process
300
Exploration
SIERRA PATACONES 24
Replaced by SIERRA PATACONES 24A in process
300
Exploration
SIERRA PATACONES 25
Replaced by SIERRA PATACONES 25A in process
300
Exploration
SIERRA PATACONES 26
Replaced by SIERRA PATACONES 26A in process
300
Exploration
SIERRA PATACONES 27
Replaced by SIERRA PATACONES 27A in process
300
Exploration
SIERRA PATACONES 28
Replaced by SIERRA PATACONES 28A in process
300
Exploration
SIERRA PATACONES 29
Replaced by SIERRA PATACONES 29A in process
300
Exploration
SIERRA PATACONES 30
Replaced by SIERRA PATACONES 30A in process
300
Exploration
SIERRA PATACONES 31
Replaced by SIERRA PATACONES 31A in process
300
Exploration
SIERRA PATACONES 32
Replaced by SIERRA PATACONES 32A in process
300
Exploration
SIERRA PATACONES 33
Replaced by SIERRA PATACONES 33A in process
300
Exploration
SIERRA PATACONES 34
Replaced by SIERRA PATACONES 34A in process
300
Exploration
SIERRA PATACONES 35
Replaced by SIERRA PATACONES 35A in process
300
Exploration
SIERRA PATACONES 42
Replaced by SIERRA PATACONES 42A in process
300
Exploration
SIERRA PATACONES 41
Replaced by SIERRA PATACONES 41A in process
300
Exploration
SIERRA PATACONES 40
Replaced by SIERRA PATACONES 40A in process
300
Exploration
SIERRA PATACONES 39
Replaced by SIERRA PATACONES 39A in process
300
Exploration
TESOROGOLD.COM.AU
13
ASX ANNOUNCEMENT 26 APRIL 2024
Concession Name
Date of Expiration
Size
(ha)
Concession
type
SIERRA PATACONES 38
Replaced by SIERRA PATACONES 38A in process
300
Exploration
SIERRA PATACONES 37
Replaced by SIERRA PATACONES 37A in process
300
Exploration
SIERRA PATACONES 36
Replaced by SIERRA PATACONES 36A in process
300
Exploration
SIERRA PATACONES 43
Replaced by SIERRA PATACONES 43A in process
300
Exploration
SIERRA PATACONES 44
Replaced by SIERRA PATACONES 44A in process
300
Exploration
SIERRA PATACONES 45
Replaced by SIERRA PATACONES 45A in process
300
Exploration
SIERRA PATACONES 46
Replaced by SIERRA PATACONES 46A in process
300
Exploration
SIERRA PATACONES 47
Replaced by SIERRA PATACONES 47A in process
300
Exploration
SIERRA PATACONES 48
Replaced by SIERRA PATACONES 48A in process
300
Exploration
SIERRA PATACONES 49
Replaced by SIERRA PATACONES 49A in process
300
Exploration
SIERRA PATACONES 50
Replaced by SIERRA PATACONES 50A in process
300
Exploration
SIERRA PATACONES 51
Replaced by SIERRA PATACONES 51A in process
300
Exploration
SIERRA PATACONES 53
Replaced by SIERRA PATACONES 53A in process
300
Exploration
SIERRA PATACONES 54
Replaced by SIERRA PATACONES 54A in process
300
Exploration
SIERRA PATACONES 55
Replaced by SIERRA PATACONES 55A in process
300
Exploration
SIERRA PATACONES 56
Replaced by SIERRA PATACONES 56A in process
300
Exploration
SIERRA PATACONES 57
Replaced by SIERRA PATACONES 57A in process
300
Exploration
SIERRA PATACONES 62
Replaced by SIERRA PATACONES 62A in process
300
Exploration
SIERRA PATACONES 61
Replaced by SIERRA PATACONES 61A in process
300
Exploration
SIERRA PATACONES 60
Replaced by SIERRA PATACONES 60A in process
300
Exploration
SIERRA PATACONES 59
Replaced by SIERRA PATACONES 59A in process
300
Exploration
SIERRA PATACONES 58
Replaced by SIERRA PATACONES 58A in process
300
Exploration
SIERRA PATACONES 63
Replaced by SIERRA PATACONES 63A in process
300
Exploration
SIERRA PATACONES 64
Replaced by SIERRA PATACONES 64A in process
300
Exploration
SIERRA PATACONES 65
Replaced by SIERRA PATACONES 65A in process
300
Exploration
SIERRA PATACONES 66
Replaced by SIERRA PATACONES 66A in process
300
Exploration
SIERRA PATACONES 67
Replaced by SIERRA PATACONES 67A in process
300
Exploration
SIERRA PATACONES 68
Replaced by SIERRA PATACONES 68A in process
300
Exploration
SIERRA PATACONES 69
Replaced by SIERRA PATACONES 69A in process
300
Exploration
SIERRA PATACONES 70
Replaced by SIERRA PATACONES 70A in process
300
Exploration
SIERRA PATACONES 71
Replaced by SIERRA PATACONES 71A in process
300
Exploration
SIERRA PATACONES 72
Replaced by SIERRA PATACONES 72A in process
300
Exploration
SIERRA PATACONES 73
Replaced by SIERRA PATACONES 73A in process
300
Exploration
SIERRA PATACONES 74
Replaced by SIERRA PATACONES 74A in process
300
Exploration
SIERRA PATACONES 75
Replaced by SIERRA PATACONES 75A in process
300
Exploration
SIERRA PATACONES 76
Replaced by SIERRA PATACONES 76A in process
300
Exploration
SIERRA PATACONES 77
Replaced by SIERRA PATACONES 77A in process
300
Exploration
SIERRA PATACONES 84
Replaced by SIERRA PATACONES 84A in process
300
Exploration
SIERRA PATACONES 83
Replaced by SIERRA PATACONES 83A in process
300
Exploration
TESOROGOLD.COM.AU
14
ASX ANNOUNCEMENT 26 APRIL 2024
Concession Name
Date of Expiration
Size
(ha)
Concession
type
SIERRA PATACONES 82
Replaced by SIERRA PATACONES 82A in process
300
Exploration
SIERRA PATACONES 81
Replaced by SIERRA PATACONES 81A in process
300
Exploration
SIERRA PATACONES 80
Replaced by SIERRA PATACONES 80A in process
300
Exploration
SIERRA PATACONES 79
Replaced by SIERRA PATACONES 79A in process
300
Exploration
SIERRA PATACONES 78
Replaced by SIERRA PATACONES 78A in process
300
Exploration
SIERRA PATACONES 52
Replaced by SIERRA PATACONES 52A in process
300
Exploration
GOLD STORE 72
Replaced by GOLD STORE 72A in process
300
Exploration
GOLD STORE 71
Replaced by GOLD STORE 71A in process
300
Exploration
GOLD STORE 70
Replaced by GOLD STORE 70A in process
300
Exploration
GOLD STORE 69
Replaced by GOLD STORE 69A in process
300
Exploration
GOLD STORE 68
Replaced by GOLD STORE 68A in process
300
Exploration
GOLD STORE 67
Replaced by GOLD STORE 67A in process
300
Exploration
GOLD STORE 66
Replaced by GOLD STORE 66A in process
300
Exploration
GOLD STORE 1
Replaced by GOLD STORE 1A in process
300
Exploration
GOLD STORE 2
Replaced by GOLD STORE 2A in process
300
Exploration
GOLD STORE 3
Replaced by GOLD STORE 3A in process
300
Exploration
GOLD STORE 4
Replaced by GOLD STORE 4A in process
300
Exploration
GOLD STORE 5
Replaced by GOLD STORE 5A in process
300
Exploration
GOLD STORE 6
Replaced by GOLD STORE 6A in process
300
Exploration
GOLD STORE 7
Replaced by GOLD STORE 7A in process
300
Exploration
GOLD STORE 8
Replaced by GOLD STORE 8A in process
300
Exploration
GOLD STORE 9
Replaced by GOLD STORE 9A in process
300
Exploration
GOLD STORE 10
Replaced by GOLD STORE 10A in process
300
Exploration
GOLD STORE 11
Replaced by GOLD STORE 11A in process
300
Exploration
GOLD STORE 12
Replaced by GOLD STORE 12A in process
300
Exploration
GOLD STORE 13
Replaced by GOLD STORE 13A in process
300
Exploration
GOLD STORE 14
Replaced by GOLD STORE 14A in process
300
Exploration
GOLD STORE 15
Replaced by GOLD STORE 15A in process
300
Exploration
GOLD STORE 16
Replaced by GOLD STORE 16A in process
300
Exploration
GOLD STORE 17
Replaced by GOLD STORE 17A in process
300
Exploration
GOLD STORE 18
Replaced by GOLD STORE 18A in process
300
Exploration
GOLD STORE 19
Replaced by GOLD STORE 19A in process
300
Exploration
GOLD STORE 20
Replaced by GOLD STORE 20A in process
300
Exploration
GOLD STORE 21
Replaced by GOLD STORE 21A in process
300
Exploration
GOLD STORE 22
Replaced by GOLD STORE 22A in process
300
Exploration
GOLD STORE 23
Replaced by GOLD STORE 23A in process
300
Exploration
GOLD STORE 24
Replaced by GOLD STORE 24A in process
300
Exploration
GOLD STORE 25
Replaced by GOLD STORE 25A in process
300
Exploration
GOLD STORE 26
Replaced by GOLD STORE 26A in process
300
Exploration
GOLD STORE 27
Replaced by GOLD STORE 27A in process
300
Exploration
GOLD STORE 28
Replaced by GOLD STORE 28A in process
300
Exploration
GOLD STORE 29
Replaced by GOLD STORE 29A in process
300
Exploration
GOLD STORE 30
Replaced by GOLD STORE 30A in process
300
Exploration
GOLD STORE 36
Replaced by GOLD STORE 36A in process
300
Exploration
TESOROGOLD.COM.AU
15
ASX ANNOUNCEMENT 26 APRIL 2024
Replaced by GOLD STORE 35A in process
Size
(ha)
300
Concession
type
Exploration
GOLD STORE 34
Replaced by GOLD STORE 34A in process
300
Exploration
GOLD STORE 33
Replaced by GOLD STORE 33A in process
300
Exploration
GOLD STORE 37
Replaced by GOLD STORE 37A in process
Share your feedback